Regarding  work center master creation In PP

Hi Iam Kiran working on routings and work centers creation.I want to know how the  formulaes are derived for caluculating capacities,shedulling,Costing.where can I find study material regarding formulae derivation.For the above mentioned.Please respond if your having any material with respect to this content.

Hi Kiran,
Please use the following transaction to create/check the parameters & formulas,
OP17 - Create formula parameter
OP19  - Maintain standard value key. (The parameters created are entered in this standard value key & this std value key is used in the work center (CR03) basic data tab page)
OP21 - Create Formulas
These formulas are assigned in the capacity, scheduling & costing tab page in the workcenter.
This workcenter is assigned to an operation in the routing (CA03).
Regards,
Senthilkumar

Similar Messages

  • Send Work Center Master data through IDOC

    Hello All
    Kindly provide me the standard IDOC type for work center master and the transaction to send work center master data using ALE and IDOC.
    Regards
    Avishek

    Hi,
    try IDocs LOIWCS01 or LOIWCS02 via PFAL or PWKC.
    Regards,
    Kai

  • WORK CENTER  master data n corresponding Bapi

    Hi........Gurus,
    Guys Please provide me hep for creating WORK CENTER master data using Bapi
    if u r providing exact Bapi name for creating  WORK CENTER master data or please provide step by step documentation or program logic
    that would be heplful to me
    Feel free to ask me if my Q is not clear
    Thanks in Advance
    Ravindra

    hi,
    Customized Work Center List
    The standard SAP Work Center List - CR05 includes the flag for
    deletion work center. This customized work center list allows
    you to include or exclude those work center that have been flag
    for deletion.  Those with a 'X' in the list are flag for deletion.
    REPORT ZPPWORKCENTER
           LINE-SIZE 120 NO STANDARD PAGE HEADING LINE-COUNT 058(001).
    TABLES: CRHD,  "Work Center Header
            CRTX,  "Text for the Work Center or Production Resource/Tool
            CRCO.  "Assignment of Work Center to Cost Center
    SELECT-OPTIONS: S_WERKS FOR CRHD-WERKS    DEFAULT 'XX',
                    S_LVORM FOR CRHD-LVORM.
    SELECT * FROM CRHD WHERE LVORM IN S_LVORM
                         AND WERKS IN S_WERKS.
       CLEAR CRCO.
       SELECT SINGLE * FROM CRCO WHERE OBJTY = 'A'
                                   AND OBJID = CRHD-OBJID
                                   AND ENDDA => SY-DATUM.
       CLEAR CRTX.
       SELECT SINGLE * FROM CRTX WHERE OBJTY = 'A'
                                   AND OBJID = CRHD-OBJID
                                   AND SPRAS = 'E'.
       WRITE: / CRHD-LVORM,
                CRHD-WERKS UNDER 'Plnt',
                CRHD-ARBPL UNDER 'Work Center',
                CRCO-KOSTL UNDER 'Cost Center',
                CRTX-KTEXT UNDER 'Description'.
    ENDSELECT.
    TOP-OF-PAGE.
        WRITE: / SY-DATUM, SY-UZEIT, SY-REPID, SY-UNAME,
                 SY-PAGNO.
        SKIP.
        WRITE:/3 'Plnt',
               8 'Work Center',
              20 'Cost Center',
              33 'Description'.
    *-- End of Program
    try these bapis...
    BAPI_BUSPROCESSND_CREATEMULTI
    BAPI_WORKCENTER_GETDETAIL
    BAPI_STANDARDMATERIAL_CREATE
    THANKS
    KARTHIK

  • Standard IDOC for WORK CENTER Master

    Hi,
    Please suggest the standard IDOC for work center master.
    I have tried PWKC.Got  DUMP when executed.
    Tried on SAP-Market place for help.Suggested not to use PWLC.
    Please suggest alternative.

    Will you please explain in a bit detail if LOIWCS01 or LOIWCS02 are transaction (as i tried to execute) or programs or please explain how to use these.(I executed from command prompt and SE38 but didnt helped)

  • Standard IDOC to transfer Work center master

    Hi all,
    Please tell me the tcode of Standard IDOC to transfer Work center master from one system to another.
    Thanks.

    Hello,
    There will be no standard Idoc like this we have an std idoc type.
    if so u want search goto tcode we02 .
    Thank u,
    Jay..............................

  • Regarding Work center

    Hi gurus,
    Presently I am working for a Engineering and Construction Project, I am new to Project systems. In this project client have one Fabrication unit and 20 Projects across the India. In project site also they are doing some production activities. How to create a work center in this aspect( There is no planned activities as of my knowledge)
    Thanks & Regards,
    Sudha

    hai,
    you are saying workcenter needed for Fabrication unit,
    As per my experiance in Fabrication unit it mainly consist of all types of welding(manuval, MIG, TIG etc) , and also bending and ctting of rods with (power saw, band saw etc).
    find out one suitable Activity unit for welding with time, Power consumption etc

  • Regarding Work Center Capacities

    Dear Exprts,
    How many Capacity Categories Can we maintain in Work center.
    Regards,
    MANOJ

    Dear Manoj,
    How many Capacity Categories Can we maintain in Work center.
    One can maintain any no of Capacity Categories in the work center, provided that you have actually defined/maintained
    that no of Capacity categories in customizing.
    So while creating work center you can have capacity categories like machine, person, processing unit, lab etc. as per requirements.
    Revert back in case of query,
    Thanks,
    Sudhakar

  • Regarding work center hierarchy

    Hi all,
    I have 2 work centers liked to a superior work center in a hirarchy.
    Is it possible to do capacity planning at the superior work center level.
    The scenario is like this - I will get planned order at a superior work center level. I will  convert the planned order into 2 production orders with child work centers in respective order.
    Now I want that, when I see the capacity overview for the superior work center, it should be full. That means I want to link the capacities of the child work centers to the parent work center. 
    Please let me know if it is possible ?
    Regards,
    Yogesh

    Hi,
    Work center hierarchies are used in capacity planning to cumulate available capacity and capacity requirements. You can cumulate available capacities from subordinate work centers to a superior work center level in order to determine the total available capacity for the superior work center.
    In your situation, I think you need to create two planned orders with the two work centers and after this you will be able to see the capacity requirements cumulated at the superior WC.
    Regards
    Datta

  • Regarding work center configuration.

    Hi PP Gurus,
    We need to take an account to Rated Line Speed (Bottles per minute)  (i.e. It should be the current capacity of the bottling line operating at the full rated speed, irrespective of the bottling format).
    We're using Discrete Manufacturing scenario and work center (CR01). How could it be taken into account.
    Is there any alternte way to put an additional fiueld in work center create (CR01)/work center change (CR02) transaction code?
    Thanks & Regards,
    Abu Arbab
    Edited by: abu arbaba on Jan 30, 2009 9:46 AM

    hi,
    What I mentioned is ,  create a reference operation set of one operation with that particular work center  and maintain operation times as the speed of that line  ( 100 bottles for minute should be entered as base qty as 100 and time as 1 min).   Call this reference operation set in any routings that uses this line.
    If you do this,  you don't need additional field in work center and so don't get confused  with it.
    cheers
    Rav

  • Changing operations work center during creation of  PM order

    Hi all,
    I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
    Does anyone know such possibility?
    Assaf

    Assaf,
    Have a look at BADI IWO1_TL_INTEGRATION2.
    Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
    Which system are you running?
    PeteA

  • Work center Change

    Hi All,
    How to change the work center once its get combined?
    Can I change my child order work center after creation of combined order?

    Dear Hardik,
    There are two options:
    1. Change the workcentre in Routing and do Read PP master data which will pick up the current Workcentre (Provided no Goods Movements are carried out on order). The status of the order will be changed from REL to CRTD.
    2. Manually change the Workcentre in Order.
    Regards,
    Pradeep

  • PM Order - Change operations Work Center to Main Work Center

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi,
         The work Center entered by default comes in operation work center, u can do validations while saving the Order :-using user exit : IWO10009 PM Order: Customer Check for 'Save' Event.
    regards
    pushpa

  • Mandatory field in cost center master

    Hi,
    In a particular cost center master data(which was created earlier), business area is a mandatory field. It is critical to remove this mandatory option which has defaulted automatically. Entering a business area in the cost center master data is ruled out now. Also, deletion of the cost center is not possible as transaction data already exists.
    Please advise how to remove this mandatory indicator in the cost center master data as the system is not allowing to post any actual posting.
    Regards,
    Sakthy

    Hi,
    Check if the global parameters for your company has "Indicator: Business area financial statements required" on. This will affect also cost center master creation. Transaction Code: OBY6.
    Please discuss with financial members before you change it.
    Best regards, Takashi

  • LSMW for Work center text

    Hi Experts,
    Im developing LSMW to upload the Work center text(TCode CA10).
    I did tried on Direct input -> program /SAPDMC/SAP_LSMW_IMPORT_TEXTS in LSMW. The uploading process was done successfully but it <u>can not</u> be used in Master Recipe assignment(TCode C202). Reason due to the direct input program doesn't has <u>Work center short text</u>. FYI, the Work center short text is entered during the Work center text creation via CA10 first screen.
    And i did tried on CA10 manually, work center text only <u>can be used</u> in TCode C202 when it is created <u>with short text key in at CA10 first screen</u>. While for the Work center text that created <u>without</u> short text key in, system will prompt <u>error</u> when i try to assign the Work center text into C202.
    Thus, i may need you advice. In LSMW other that direct input,is there any BAPI or IDOC available for the Work center text upload?
    Please comment.
    Thanks in advance.

    Hi SKK,
    Thanks for you reply.
    I did tried on FM SUBMISSION_PROCESSING, and found:
    It is being trigger online, whereby i need to key in the text manually.
    Since my requirement is mass upload, hence that is impossible for me to execute the FM to key in the text manually.
    Do you know there is any other FM/BAPI/IDOC that can perform the <u>Work center Short and Long text</u> in background mode?
    Please comment.

  • Work center & Routings migration

    HI,
      i want to migrate the Work center master Data and Routing master data thru ALE,
      i didnt get any Process code and message type for those.
       which is the best process to migrate Work center and Routings Master Data...
    Reply me ASAP,
    Regards
    Satya

    hi
    u can go for LSMW for migrating WORKCENTRE and Rate routing
    for uploading  work centre  the details r given below.
    Object               0260   Work center
    Method               0000
    Program Name         RCRAPDX2
    Program Type         D   Direct Input
    for Rate routing:
    Object               0170   Routing
    Method               0001   Batch Input
    Program Name         RCPTRA01
    Program Type         B   Batch Input
    regadrds
    raghu..
    Edited by: Raghuveer Puram on Dec 18, 2008 9:23 AM

Maybe you are looking for

  • Connecting on ODBC to an old installation of 7.1 running on DEC Unix 4.0f

    We are attempting to connect on ODBC to an existing installation of Oracle 7.1.6.2 running on DEC Unix 4.0f, and are facing a problem. The TCP/IP adaptor is installed (using CD of Oracle 7.2) and the listener service is running. We are unable to conn

  • What is a good free app for presentations or notes in iPad?

    Hey I am looking for free app for presentations on iPad like to put and read my presentations or notes so which app do you advice me with? thanks

  • HT3546 Can't locate AirPlay on the Control Panel. It's not there as an option.

    I have an iphone 4S using IOS 7.0.4, I swiped up from the bottom of my screen to access my control panel.  When I do that the AirPlay option is not there. I'm trying to mirror my laptop PC with a program called Reflector.  Both iphone and laptop are

  • Creative video converter problem

    when i first got my creative zen (just the creative zen) i could easy use yt downloader and put the videos on my player not when i use the creative video converter it would keep saying its unscessful at 36%. i tried a video at .9mb and it work but wh

  • MM-SUS ASN status

    Hello, To implement a customer solution i need to know the ASN status. Does anyone know the table or function to obtain it??? I have found table CRM_JEST table but the status number doesn't mean anything for me Thanks in advance Nacho