Remove budget in Project System from prior fiscal years

Hello,
Budget control has been activated in PS.  In PS, it is on annual budget so there's budget and actuals in FY 2003, 2004, 2005, 2006, & 2007.  Is there a way to remove the annual budget in those Fiscal Years?  I've deactivated budget control using tcode CJBW.  Once budget control is deactivated, I tried removing the budget but it's giving an error "budget exceeded." 
Is there a way to remove budget in PS for prior fiscal years?
Thanks.

hi,
as per my knowledge, you had already de-activated the budget control.
so, my Q is why do u have to remove/delet the budget, when the system has no control of budget on project.
regards
parikshit

Similar Messages

  • Changing from a Fiscal year to a calendar year

    Hi Everyone,
    We need the supporting documentation, guidance to change from a Fiscal year to a calendar year. Also please share your experience, suggestions, thoughts on this?
    Currently, our year-end is SEP 30th, now there is a requirement to change the year end from SEP 30th to DEC 31st.
    N:> Keithley GL Superuser USA > Setup > Financials > Calendars > Accounting
    Calendar is already associated to the set of books and the budget year for 2011 is already opened in the Production instance
    We entered the budget through a spreadsheet upload using ADI. We can roll back the budget and reenter if required
    We have already gone through the metalink note IDs 102460.1, 134362.1, and also the below document from Oracle Support
    http://download.oracle.com/docs/cd/E15799_01/books/OnDemOLH/index.h...,
    Below are our open questions at this point
    1) Can you please let us know what would happen if the transition closes on the middle of the month
    Example: We will close the month end, year end at the end of the month but what would happen if we close at the middle of the month (say DEC 15th instead of DEC 31st)
    2) Will it be short? From 1st October 2010 - 31st December 2010.
    Or will it be long? From 1st October 2010 - 31st December 2011.
    Can you please let us know the pros and cons for each of these?
    3) According to the Metalink note Id 102460.1, the application will prevent you from making changes to calendar the unless you meet the following qualifications:
    a) All the periods to be changed have a status of Never Opened.
    This condition does not match to the current situation at the clients place as we don’t have the status "Never Opened" for any of the periods in the accounting calendar in
    subledgers
    b) A budget year that includes the periods to be changed is no t yet opened.
    Budget year is already opened for the year 2011 at the clients placec) An encumbrance year that includes the periods to be changed is not yet opened.
    “Encumbrance” is not applicable at the clients placed) The periods to be changed have not yet been copied from the GL Calendar to Project
    “Projects” is not applicable at the clients placeThanks
    Veena

    Pl post details of OS, database and EBS versions. Pl see if these MOS Docs can help
    How to change GL Calendar from a Fiscal to a Calendar year?          (Doc ID 102460.1)
    CHANGING SET OF BOOKS CALENDAR FROM CALENDAR YEAR TO FISCAL YEAR          (Doc ID 1060624.6)
    R12: Is It Still Possible To Change GL Calendar From Fiscal to Calendar Year In Release12?          (Doc ID 836263.1)
    General Ledger Calendar FAQ          (Doc ID 134362.1)
    HTH
    Srini

  • The fiscal year specified differs by more than a year from the fiscal year

    Dear All
    To rectify depreciation posted at development server I run OAGL which reset all depreciation posted (From FY 2008 to 2010), now when I am trying to post depreciation by AFAB for FY 2008 system showing error message
    No posting possible in fiscal year 2008
    Message no. AA688
    Diagnosis
    No posting is possible in the fiscal year 2008 specified. The fiscal year specified differs by more than a year from the fiscal year in which the last postings were performed.
    Procedure
    Correct your fiscal year specifications.
    please advice me what step to be follow
    Regards
    Sekhar

    Hi Sekhar,
    Error AA688 typically occurs in two situations:
    1) A company code did not have any depreciation posted in the previous year. See note 144441.
    2) If in a comany code no depreciation has been posted ever, then it is important to note that the periods of the last depreciation posting  in table TABA and the year and period of the last depreciation posting in table T093D (fields AFBLPE and AFBLGJ) are initial. You can set these fields to 000 / 0000 with the correction report attached in SAP note 26073.
    See if any of this information helps you further.
    Brigitte

  • Can we only year value from "0FISCPER" (Fiscal Year/Period) at BEx level

    Hi all,
    I have two time characteristics "0FISCYEAR" (Fiscal Year) and "0FISCPER" (Fiscal Year/Period). In DSO initially "0FISCPER" was there and later request came to add "0FISCYEAR". Now data in char. "0FISCPER" is since beginning (from 2000) and for char. "0FISCYEAR" is since 2010.
    User's requirement is to create a report which will display data Year wise.
    My issue is if i am using "0FISCYEAR" then user is not able to see year instead it shows #. I dont want to do data reloading as this is GL data and hold huge no. of records in it.
    So my concern is : Is there any way to use only year value from "0FISCPER" (Fiscal Year/Period) at BEx level? Is there any setting which I can apply and get the same value of Year as I can see from "0FISCYEAR". Please assist me on this.
    Thanks,
    Arvind

    Hi Arvind,
    Your requirement can be realised through virtual characteristics.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b04be008-86cc-2c10-4bad-e517ea3f4c80?QuickLink=index&…
    however, I would still suggest to reload the data. you will only need to reload years before 2010 and you can do this in phases.
    Hope this helps.
    -Swati.

  • Report from 2 fiscal years

    Hi,
    GL Balances : I want to take out the report from 2  fiscal years, 2009 (10 to 12 period) and 2010(1 to 9 period).
    Please let me know the report name.
    Thanks

    Hi...
    Can you use FS10N, FBL3N, S_ALR_87012332 - G/L Account Statements ,S_ALR_87012282 - G/L Line Items, List for Printing , to see the year wise like
    While entering the date range we have to  enter from 01.10.  2009 to 31.12.2009 or from 01.01.2010 to 31.09.2010
    But you can give both date range at a time
    I hope it will helps
    Regards
    vamsi

  • WBS Elements not getting created in ECC Project System from CRM 7.0

    Dear all,
    We are trying to integrate SAP CRM 7.0 with SAP ECC-PS module. The objective is to bring in the marketing plan and elements data from the CRM system, and to create the corresponding WBS in project system. We have done most of the configuration as recommended by SAP in both the systems, and we see that the BDOCS are getting generated and sent to the ECC system. The following steps have been successfully completed:
    1.       Set up the RFC connections between the two systems
    2.       Selected the connection type as Middleware in CRM system.
    3.       Installed the cProject Add on in CRM box.
    4.       Created a project scenario (with project and network profiles) in the PS system and assigned the same in the CRM system.
    5.       The Project Scenario in PS config has the same name as the Project Type in CRM config.
    6.       Created and released the campaign ids being created in the CRM system.
    As already mentioned, we can see that the BDOCS are coming to the ECC system and are getting stored in BDOC_TRACK table. However the issue is that the corresponding WBS elements are not getting generated in the ECC system. Is there anything that that we are missing in the ECC box which would trigger the WBS element creation?
    Request you all to share your inputs which would be immensely beneficial for us in achieving this integration.
    Thanks and Kind Regards,
    Aditya Shrivastava

    Hello Aditya,
    We too are facing this issue.. if you have resolved the issue could you please let us know the solution ?
    Some inputs related to our system,
    We have upgrade from CRM 4.0 to CRM 7.0 SP07 and R/3 backend system is on 4.7 SP27, earlier we have completed the upgrade on sandbox without any issues which was upgrade to CRM 7.0 SP04 but with SP07 we are facing the problem of WBS Element not getting created in R/3.
    Your help is highly appreciated.
    Thanks & Regards,
    Sumukh Kapoor.

  • Urgent - Business Object for Original Budget in Project Systems

    Hi,
      I am working on a workflow for original budget release in Project Systems.The transactions used are CJ30 (Original budget creation) CJ32( Budget release).
      I have to send a workitem fo release the original budget for a user. But I am not able to find out any business object relevant to Budget.
    Can any one helo me in this...????
    Thanx,
    Sivagami.R

    Hi,
    I have tried that option already. But I could not find any.
    Any update????
    Thanx,
    Sivagami.R

  • Budgeting in project system

    Dear All
    Can anyone explain me about the allocating a budget from planned cost to a project ,I am understanding if i am allocated the 100% planned cost to a project,I am not understanding what is distributed,distributable,remainder.
    Regards&Thanks
    P.Srinivasan

    Hi srinivasan,
    The concept of Distribution comes when you either directly Budget your project Or when you have converted the planned total to the Budget. Both the operations can be done in CJ30.
    When you copy the planned amount to the Budgeted amount in CJ30, the Column “Planned total” is updated.
    When you prepare a Budget, it’s generally “Total up” from the lower level WBS element. Distribution of the Budget is generally Top down.
    Firstly when you allocate the budget in the “Budget” Column, then the same will immediately appear in the “Current Budget” and “Distributable”. This means that the “Distributable” amount is ready to be distributed to lower level WBS elements. You can enter the required amount directly under the Column “Budget” of the corresponding lower level WBS element. Once you do this, the Column “Distributed” of the higher WBS element is updated, by the amount which is “Distributed”.
    The column “Assigned” is updated once you have assigned any cost to the project. (Commitment plus Actual)
    If you are working with Release Function of the Budget ( CJ32), then the Column “ Release” will be updated ( which can be seen in CJ30). In this case, you will be able to use only the released budget and not the Current budget.
    Hope this explanation helps.
    Warm regards,
    Srinivas Potluri

  • Set WBS status in Project System from CRM Status

    Hi Gurus
    I am figuring out a solution for how to influence WBS element status in Project Systems in ECC from the campaign/Marketing plan status in CRM. Has anyone done it before or is there any BADI for it.
    Your help is greatly appreciated.
    Regards
    -MP

    Your yourself answered your question.
    "Can we create our own list of system status"
    "Our own" status creation and maintenance feature within SAP in called "User Status".
    Please follow link below to have additional information regarding system status.
    link: [http://help.sap.com/saphelp_erp60/helpdata/en/a9/8a853488601e33e10000009b38f83b/frameset.htm]

  • How do I remove my credit card information from my 17 year old sons I tunes account

    How can I remove my credit card information from my sons iTunes account? He charged something once and now it is there for him to use over and over!

    On your computer's iTunes you should be able to edit the payment info on that account by going into the Store > View Account menu option and logging into the account, and on the account's details page there should be a payment link.  If you are doing it on an iOS device (iPad, iPhone or iPod Touch) then tap on the id in Settings > iTunes & App Store and select 'View Apple ID' on the popup - that should also give you a payments link on the account's page.
    Changing payment info : http://support.apple.com/kb/HT1918

  • Variable to display data from Current Fiscal Year to the MONTH entered

    Hi Friends,
    In the Quey Designer I require a CHARACTERISTIC VARIABLE for the 0CALMONTH which should have the following features:-
    1.Input Month(e.g JUN 2008)
    2.Mandatory
    3.Ready for Input
    The query should show the following OUTPUT:-
    The data should be displayed from the CURRENT FISCAL YEAR to the value of the Input MONTH entered.
         e.g For Input  =  DEC2008
               Output = from APRIL 2008 to DEC2008.
    Do we have a standard variable for this or we have to go for a Customer Exit??
    Thanks in Advance!!!
    Vivek

    Hi,
    Create a customer exit as follows.
    WHEN 'ZCMTD'.
    you variable name
    data: ZCMTD_LOW like sy-datum.
    ZCMTD_LOW = sy-datum.
    ZCMTD_LOW+4(2) = '04'.
    *replacing last two symbols (month) in the current month with '04'
    CLEAR L_S_RANGE.
    L_S_RANGE-LOW = ZCMTD_LOW.
    *initializing low interval limit
    L_S_RANGE-HIGH = SY-DATUM.
    *initializing high interval limit
    L_S_RANGE-SIGN = 'I'.
    *defining interval as inclusive
    L_S_RANGE-OPT = 'BT'.
    APPEND L_S_RANGE TO E_T_RANGE.
    ENDCASE.
    Thanks,
    Ashok

  • Budgets in projects system

    dear ps experts,
    wud like to know in any report of S_ALR*
    to know the budget updates in a project
    1. first cj30 & cj32
    2, later after some time cj36 & cj32
    wud like to know which report shows that cj30 & cj32  history
    and when cj36 & cj32 history.
    because every update at cj30,cj32,cj36,cj37,cj34 there is document created in sap, how to view these details as &when required
    thanx in advance
    regards
    srihari
    ps : s_alr_87013560 is of now use for my requirement

    Hi,
    When you go into CJ3B, it asks you for the document number. Then press F4, this will take you to another screen. Here you have a facility of entering the WBS element. Enter the Top Level WBSE of the project for which you want to see the detail. Then it will show the list of documents generated for that project.
    Hope this solves your issue.
    regards
    Pratap.V

  • KPIs for Project systems from standard SAP

    Dear Friends,
    can you please provide me the KPIs for PS module, available from standard SAP.
    Thanks,
    Nav

    Not able to understand your requirement.
    In my understanding there is no such things as KPI for SAP PS in standard SAP.
    KPI's are usually reporting requirements assessed during blueprint phase and are client specfic.

  • Buget Exceed problem regarding material transfer in project system

    Hello Sir,
    I have a problem regarding budget in project system.
    when i do budget and release . and do any transaction
    with that budgeted wbs element in particular project.
    i get budget excced errors usally.
    however, budget remains more than exceeded buget.
    Let us touch with a example in brief, we have a buget for a L&T project 10 Lakh.
    Buget                                         Release                                          actual cost                                            total cost commitment
    10Lakh                                       10Lakh                                             8lakh                                                         1Lakh
    when i transfer a material from another project to this L&T project material worth is 50thousands.
    i get a errors for L&T project budget exceed with 40thousands.
    however in project budget remains 1Lakh remaining .
    why system shows errors for this material transfer worth rs 50thousands
    Please help me regarding this problem where is 1lakh budget
    with regards
    sanjay agrawal

    Hello sir,
    there is no any problem regarding budget supplement but if project sometimes
    remains 20lakh buget price remaining out of 50lakh.
    and need 1 lakh material price for transfer in project
    then why need to do budget supplement for 1 lakh if project
    remains 20lakh price rest.
    please guide me for above problems
    with regards
    sanjay agrawal

  • How to delete file systems from a Live Upgrade environment

    How to delete non-critical file systems from a Live Upgrade boot environment?
    Here is the situation.
    I have a Sol 10 upd 3 machine with 3 disks which I intend to upgrade to Sol 10 upd 6.
    Current layout
    Disk 0: 16 GB:
    /dev/dsk/c0t0d0s0 1.9G /
    /dev/dsk/c0t0d0s1 692M /usr/openwin
    /dev/dsk/c0t0d0s3 7.7G /var
    /dev/dsk/c0t0d0s4 3.9G swap
    /dev/dsk/c0t0d0s5 2.5G /tmp
    Disk 1: 16 GB:
    /dev/dsk/c0t1d0s0 7.7G /usr
    /dev/dsk/c0t1d0s1 1.8G /opt
    /dev/dsk/c0t1d0s3 3.2G /data1
    /dev/dsk/c0t1d0s4 3.9G /data2
    Disk 2: 33 GB:
    /dev/dsk/c0t2d0s0 33G /data3
    The data file systems are not in use right now, and I was thinking of
    partitioning the data3 into 2 or 3 file systems and then creating
    a new BE.
    However, the system already has a BE (named s10) and that BE lists
    all of the filesystems, incl the data ones.
    # lufslist -n 's10'
    boot environment name: s10
    This boot environment is currently active.
    This boot environment will be active on next system boot.
    Filesystem fstype device size Mounted on Mount Options
    /dev/dsk/c0t0d0s4 swap 4201703424 - -
    /dev/dsk/c0t0d0s0 ufs 2098059264 / -
    /dev/dsk/c0t1d0s0 ufs 8390375424 /usr -
    /dev/dsk/c0t0d0s3 ufs 8390375424 /var -
    /dev/dsk/c0t1d0s3 ufs 3505453056 /data1 -
    /dev/dsk/c0t1d0s1 ufs 1997531136 /opt -
    /dev/dsk/c0t1d0s4 ufs 4294785024 /data2 -
    /dev/dsk/c0t2d0s0 ufs 36507484160 /data3 -
    /dev/dsk/c0t0d0s5 ufs 2727290880 /tmp -
    /dev/dsk/c0t0d0s1 ufs 770715648 /usr/openwin -
    I browsed the Solaris 10 Installation Guide and the man pages
    for the lu commands, but can not find how to remove the data
    file systems from the BE.
    How do I do a live upgrade on this system?
    Thanks for your help.

    Thanks for the tips.
    I commented out the entries in /etc/vfstab, also had to remove the files /etc/lutab and /etc/lu/ICF.1
    and then could create the Boot Environment from scratch.
    I was also able to create another boot environment and copied into it,
    but now I'm facing a different problem, error when trying to upgrade.
    # lustatus
    Boot Environment           Is       Active Active    Can    Copy     
    Name                       Complete Now    On Reboot Delete Status   
    s10                        yes      yes    yes       no     -        
    s10u6                      yes      no     no        yes    -        Now, I have the Solaris 10 Update 6 DVD image on another machine
    which shares out the directory. I mounted it on this machine,
    did a lofiadm and mounted that at /cdrom.
    # ls -CF /cdrom /cdrom/boot /cdrom/platform
    /cdrom:
    Copyright                     boot/
    JDS-THIRDPARTYLICENSEREADME   installer*
    License/                      platform/
    Solaris_10/
    /cdrom/boot:
    hsfs.bootblock   sparc.miniroot
    /cdrom/platform:
    sun4u/   sun4us/  sun4v/Now I did luupgrade and I get this error:
    # luupgrade -u -n s10u6 -s /cdrom    
    ERROR: The media miniroot archive does not exist </cdrom/boot/x86.miniroot>.
    ERROR: Cannot unmount miniroot at </cdrom/Solaris_10/Tools/Boot>.I find it strange that this sparc machine is complaining about x86.miniroot.
    BTW, the machine on which the DVD image is happens to be x86 running Sol 10.
    I thought that wouldn't matter, as it is just NFS sharing a directory which has a DVD image.
    What am I doing wrong?
    Thanks.

Maybe you are looking for