Report to cancel released background jobs
Hi Folks,
Can anyone guide me whether there is any standard report/program where i can delete/cancel the background jobs already released/scheduled? We can cancel individual job using SM37, but i need to cancel "n" number of jobs at one slot.
Thanks in advance.
Regards,
Shiva
Siva,
can plz tell me how to change or reschedule the time on background job ?
Dilip
Similar Messages
-
Mass deletion or cancellation of background Jobs.
hi,
Can anybody tell me the program name or the Job name by which we can cancel or delete all the jobs i.e mass deletion or cancellation of background Jobs.Hi,
One clarification:
BTCTRNS1 report/program suspends all Released jobs (not Scheduled status) and make the status 'Released/Suspended' - so that they will not run during your activity.
When you will run report/program BTCTRNS2 (using se38/sa38) it will release them again.
Note: You can not freeze/suspend jobs which are event triggered. You have to set them using sm37 (released -->scheduled) - option is available in the menu.
Jobs in scheduled status never run.
Don't release/submit any job after BTCTRNS1, the new job will run (it will not be suspended). Please instruct other user also not to submit any job further.
Thanks,
Subrata -
I cannot cancel a background job
Hello,
I cannot cancel a background job which is running since the last Friday. I use the SM37 transacction but it doesn't stop.
Can anybody tell me how can I get to stop this job?
Thanks in advance.
Regards.Hello friend,
I think these links will help you to stop the job running in back ground,
How to stop Active Background Jobs
http://stackoverflow.com/questions/1439033/sap-background-job-hows-it-running
If your problem still exists revert back to me i will help you.
Thanks,
Sri Hari -
Job failure ( report RFFDKU00 scheduled for background job)
Hi Experts,
When iam scheduling the report RFFDKU00 for background job. Job is getting cancelled with status "ABAP/4 processor: DBIF_RSQL_SQL_ERROR" . when iam obesrving this job it is going to dump at this select query
" select ausbk belnr gjahr bzkey buzei
033370 from vbsegs into table t_vbsegsfields
033380 where bukrs in r_bukrs
033390 and not ( fdlev = space
033400 and fdgrp = space
033410 and fdtag = init_date
033420 and fdwbt = 0 )
033430 and not saknr in r_cm_sk "
Can anyone helpme to deal with this issues ,
thanks in advance,
Kranthinote 167301 might help.
-
How to cancel the background job processing in ABAP programming?
Hi,
I have a requirement where i need to cancel the job depending on some constraint. My code is something like this:
Select some data from the table.
if sy-subrc = 0.
Do nothing.
Else
Cancel the job
call function 'BP_JOB_ABORT'
exporting
jobcount = number
jobname = name
EXCEPTIONS
CHECKING_OF_JOB_HAS_FAILED = 1
JOB_ABORT_HAS_FAILED = 2
JOB_DOES_NOT_EXIST = 3
JOB_IS_NOT_ACTIVE = 4
NO_ABORT_PRIVILEGE_GIVEN = 5
OTHERS = 6
The above code is cancelling the job but it is throwing an exception called CX_SY_DYN_CALL_PARAM_MISSING because i dint pass job count. How can we find the job count of next job that is going to run? Or How to handle the exception which it is throwing. Even if i try to handle that exception something like this:
TRY
call function 'BP_JOB_ABORT'
exporting
jobcount = number
jobname = name
EXCEPTIONS
CHECKING_OF_JOB_HAS_FAILED = 1
JOB_ABORT_HAS_FAILED = 2
JOB_DOES_NOT_EXIST = 3
JOB_IS_NOT_ACTIVE = 4
NO_ABORT_PRIVILEGE_GIVEN = 5
OTHERS = 6
RAISE EXCEPTION TYPE CX_SY_DYN_CALL_PARAM_MISSING.
CATCH
CX_SY_DYN_CALL_PARAM_MISSING.
ENDTRY.
It avoids the exception but it doesnt cancel the job. I even tried with function modules like JOB_OPEN
JOB_SUBMIT,BP_JOB_SELECT,BP_JOB_ABORT and tried to build some logic using status overview table (TBTCO) and TBTCP (Jobstep overview table).
Can someone suggest me the right way to write this program ?
Thanks in advance.
RashmiHi,
Problem is solved.
Create an background job with 2 steps. The first step in the background job calls the program ZBACKJOB_STEP1. In the variant we have a wrong material number
If the material number is not found in Mara, the next step in the job should not get executed and the job should get cancelled..
In the above posts i had asked how do I get the job count of the job that is currently triggering the program at the runtimeu2026..If u see the below code uu2019ll get to know.. We have to use the standard structure TBTCM which captures the properties/characteristics of the job.
REPORT ZBACKJOB_STEP1.
TABLES: MARA,TBTCM.
PARAMETERS : MATNR TYPE MATNR.
START-OF-SELECTION.
SELECT SINGLE * FROM MARA WHERE MATNR = MATNR.
IF SY-SUBRC IS INITIAL.
WRITE / : 'This is the material selected on the selection-screen' , MARA-MATNR.
ELSE.
CALL FUNCTION 'GET_JOB_RUNTIME_INFO'
IMPORTING
EVENTID = TBTCM-EVENTID
EVENTPARM = TBTCM-EVENTPARM
EXTERNAL_PROGRAM_ACTIVE = TBTCM-XPGACTIVE
JOBCOUNT = TBTCM-JOBCOUNT
JOBNAME = TBTCM-JOBNAME
STEPCOUNT = TBTCM-STEPCOUNT
EXCEPTIONS
NO_RUNTIME_INFO = 1
OTHERS = 2.
IF SY-SUBRC = 0.
CALL FUNCTION 'BP_JOB_ABORT'
EXPORTING
JOBCOUNT = TBTCM-JOBCOUNT
JOBNAME = TBTCM-JOBNAME
EXCEPTIONS
CHECKING_OF_JOB_HAS_FAILED = 1
JOB_ABORT_HAS_FAILED = 2
JOB_DOES_NOT_EXIST = 3
JOB_IS_NOT_ACTIVE = 4
NO_ABORT_PRIVILEGE_GIVEN = 5
OTHERS = 6.
IF SY-SUBRC <> 0.
ENDIF.
ENDIF.
ENDIF.
Regards,
Rashmi -
Report layout - ME2N - Automatic background job
HI all
We are using the above report for Pending PO-RElease ie., dynamic selection - release indicator "B" thru automatic background programme schedueld thru SM36 (after setting the variant) for the relevant/concerned users.
The issue is, the report layout be default standard sap layout is taking, actually i have saved layout as PO no & date, but always, whenever background job is run, default sap report is taken in HTML.
request kindly help how i can ensure my our report layout for backgrounds jobs thru ME2N or is there any other report which can give the pending PO-Release report for my requirement.
thanks in advance
regards
srihariI am doing same as suggested by you for all other reports, but i am not successful with ME2N, because after having your own default layout, but for background it is default taking sap report. even i have tried to delete the sap - std report format but not allowed.
if any one knows how to change the sap-default std report layout then also it's okay for us, as default report as 15 columns whereas we need only max 5 columns in report layout
thanx in advance
regards
srihari -
Spool report line width in background jobs
Hi All,
I wrote a report and specified the line size in the report header:
REPORT /sappssrm/option_handler
NO STANDARD PAGE HEADING
LINE-SIZE 185.
I want to run this report as background job and get a spool list with results of the report. I expected the width of the spool output to be well defined and it works in one system. However, in another systen, the line / page width is much smaller, and the system inserts line breaks in the output splitting my lines into two which causes very ugly results.
It seems that the LINE-SIZE specified in the report header doesn't affect the output width in every system.
Can anyone advice?
Regards
WolfgangHi Siggi,
thanks for your reply. Actually I changed that already yesterday...
But I found out what it was:
It seems, the background job keeps old versions of the program, even if you import a new program version. I created a new job with the same program and it worked.
Thanks again and best regards
Wolfgang -
Long Delay Release Background Job
Dear Expert
We now use BI Netweaver 2004
many times background jobs have release status in long time,
so the jobs can not be active
if I change priority to A, the jobs can be active
Why I must change priority the job for active ?
How to solve this problem ?
really appreciate your help
Regards
Jeiming1) See it in SM50 whether how many BGD processes are available (Status: Waiting) at the time of 'Release' job is waiting.
2) Suppose if you find more processes are in waiting status then check with your basis team to understand how many are available for priority A and remaining.
3) If you don't find many BGD processes then your job is waiting for availability of BGD process.
Thanks
Viswa -
How to cancel the background job?
Hi,
I have schedule the backgroud job.How to cancel the background the job.
When i select the job and click on stop button, iam getting message "job is not active - cancellation not possiable".How to schedule the background job.
Regards,
T.sureshgoto sm37
SM36 Define Background Job
SM37 Background Job Overview
SM39 Job Analysis
U can Moniter the background Jobs through T code SM37
In the Simple Job Selection window enter the name of the Job and User of that Job and u can check the status of that Job like JobName, Job CreatedBy, Status, Start date, Start time Duration(sec.) Delay (sec.). -
Emailing the report to external email - Background job
HI
We are creating background job for running the report in background...but i want the output(report) to send an email in Excel format after the job run successfully...
Here the email is External email not SAP inbox..
Do you have any idea how to achieve this? any user-exit or even handling will help this?
Please let me know
Thanks
GoviIam not using custom program to send the email...I know about the FM SO_DOCUMENT_SEND_API1...to send email.
My requirement is to send email to user the report in Excel after the background job runs.
we will define the job in SM36 with variant for the report with program name and variant.
after the job runs the spool request will be created and we can also setup the output of the report to be sent to SAP inbox.
my question is to how to send the output of this report in Excel format to external email i.e. Gmail, yahoo etc...
I hope u r clear now...
Please let me know if you know the answer.
Thanks -
Cancellation of background job
HI ALL,
I have executed one program in backgroubd , it updates one of the database table . It now second day and still ACTIVE , i want to do some changes in the program and see
its effect now . How can i cancel this job , so that whatever chnages have been done to database they are not reflected in DB or it should appear as if no job was executed for this program?
Thanks in Advance .Hi,
You can do it in 2 ways.
From se37 , select the check box of job and goto menu Job->cancel active job.
2. Double click on the background job and click job details button . Note down the PID and application server name.
Goto transaction SM51 and select the PID and goto menu program ->cancel without core.
Sometimes the job gets cancelled at the Application server but still it shows active status in SM37, so checking the job from SE37 by going to menu JOB->check active job will show the correct status.
Hope this helps. -
How to cancel scheduled background job?
Hi,
I have used FM 'HR_START_BATCHJOB_IN_OTHER_SYS' to schedule background job.
Some mistake has happend and this FM calling has gone to infinite loop. So, now the system is keep on generating background job. I tried looking into SM36 to stop this background job but i failed.
Can anybody help me how to stop scheduled background job please.
Regards,
Mukund.Hi,
Check which background process your job is running from the Job details and inform your Basis consultant to Kill the process. If you have sm50 acess or sm66 access you can do the same.
Regards,
Vijay v -
Hello Gurus,
I have created a Z-program and scheduled it in background for every 15 mins.
In some cases I if the program doesn't fulfill the requirement I have to cancel the job which is running.
Is there anything specific thing needs to be done to cancel a job or just "Leave Program" will do the work.
Please let me know.
Regards
MacHi Mac,
After executing ur program the sessions will registered in SM37
with differrent status like NEW , PROCESSING , PROCESSED.
Go to Sm37, enter the job name and user name then select
the options scheduled,released and ready.
then cancel the jobs which are displayed.
Regards,
Ganesh. -
BAP Log/Error Report in case of Background Job
Hi Friends,
I have to develop one program where I am creating purchase orders using BAPI. This Program would be scheduled in background
hence the Error/log report can not be seen .I have been told to use SAP Application Log for getting the Error Report.
How this can be achieved using SAP Application log functionality. Any Help would be appreciated.
Thanks>
TANGO18 wrote:
> I have to develop one program where I am creating purchase orders using BAPI. This Program would be scheduled in
> background hence the Error/log report can not be seen .
Incorrect. How are you displaying your error / log report ?
Even if you use simple WRITE statements to display the log, the details would be there in the corresponding spool generated.
BR,
Suhas -
Notification upon Background Job Cancellation
Hi All,
We would like to send a notification to responsible person upon CANCELLATION of background job for various reasons.
What would be the best way to do it?
I tried to various events of business objects BPJOB/BPJOB_SMAN, with no sucess.
Will appreciate any guidance in this regard.
Thanks in Advance.
Regards,
Lakshmi NarayanaHI ,
You create one Z- Report and Write the following logic in it :-
1. Give a Job Name as selection selection parameter on the selection screen.
2. Select all those records from the Table TBTCO where JOBNAME = selection screen job name and SDLSTRTDT - sy-datum and STATUS = 'A'.
This will return you with all those jobs which were scheduled and canceled on current date. Status 'A' Means Canceled jobs.
3. Now you use FM 'EFG_GEN_SEND_EMAIL' to send a notification to the required user as per your requirement.
4. Now Enter all the JOb name which you want to monitor and save one varient for it
5. Now go to SM36 and Schedule this Z-Report with the created variant and the frequency you want.
This will Satisfy your requirement.
Please check and Revert.
Regards,
Nikhil Joshi
Maybe you are looking for
-
How do i create an imap account in my iphone 4s (iOs 7.1.1)?
crazy but to try and setup my PC contacts stored in windows live mail I deleted the comcast imap email acct in my iphone to recreate it as an outlook or exchange acct (as i was directed to do in another apple support string). Well, got an error messa
-
I just got my replacement phone from Warranty. The phone was on for just 2 hours and it crashed. I was told that motorola knows about this "possible" issue. I got a new sim, hard reset, If it can be done I did it. They are now sending me the same pho
-
Event for value change of an input field
Hello, I'm a newbie in WD4A. I've got a input field. Is there a event that's fired, if the value of an input field is changed? Regards Christian
-
Synchronous Storage Replication Process
Hi, I have a question regarding storage replication for synchronous mode. If I describe the process in detail having twin Data Centers called DC-A and DC-B we have: 1- The server in DC-A writes to the DC-A disk. 2- Before the server in DC-A receives
-
Just installed ios 7 on my 4s, and I have two issues: 1) control centre: the music controls do not work, only the volume adjust slider works; 2) in mail, where do you find the setting to control how many messages you want your inbox to retain?