Can we use normal routing,   in REM, if we can use normal routing y  we should use Rate routing
In rate routing production line is to be used,  there are no of work centres with different operations
then wt is this production line,,,,  what is the line hirarchy  pl let me know
i want a  scenario steps where production line  is used in rate routing 
thanks all

Dear Himakar,
A rate routing is a routing for repetitive manufacturing. It enables you to easily reproduce the lean
production process.In the rate routing, the production rate per operation is defined (production time
according to a base quantity). *Set-up time is not usually defined, since no changes to setup are
planned.*
So its not required to mention any value for set up time ,so that its not considered for costing and the
other processes.
http://help.sap.com/erp2005ehp_04/helpdata/EN/60/c6c50f146347e1933b4c15144ec31b/frameset.htm_
Check these links,
Re: Very Strange: SET UP  time is not calculated Automatically Even for sta
Re: Set up time not coming while confirming in MFBF
Regards
Mangalraj.S

Similar Messages

  • Rate routing in REM

    Hi all,
    I am working on REM and I am bit confused about scheduling and capacity data to be entered in workcenter (production line)
    Specially the formulas to be entered in both the tab for REM.
    1.I want to capture only Machine and labour time . suggest  the std actvity type , std value key and the formulas related to activity type for both scheduling and capacity defined for REM in the system
    2. my second doubt is unlike in std routing I cant define all the operation in Rate Routing I have to define one operation for one production line. but how to define the so many operations used in one production line.
    3. can I use any control key or is there any specfic control key is there for REM
    4. How user will withdraw the material from store for production . like in discrete we have GI.
    Regards
    Mona

    Dear Monalisa,
    1.First understand how a formula works during capacity and scheduling by checking the formula in the work center,for some
    base quantity,operation quantity and processing time and then choose the relevant one.
    2.normally PP01 is used for inhouse produced operations.
    3.In a REM scenario if required the materials(raw materials or the components) will be staged using T.Code -MF60(to
    accumulate the stock in the production storage location from which the components should get backflushed).Using this the
    system creates a stock transfer reservation for 311 movement for the missing parts.
    Input can be the planned orders or production orders or else directly for the BOM explosion with the required quantity of the
    header material.Once the stock transfer reservation is done,the same can transferred using MF65.
    Kindly check these threads,
    Re: Pull list - MF60
    Re: Question about mf60
    Re: Repetitive manufacturing
    Regards
    Mangalraj.S

  • Incorrect routing in REM Backflush

    Hi Experts,
    While doing REM Backflush, after clicking "Actual activities", system is showing previously deleted operations and not showing the added newly added operations, hence these activities are coming in Actual cost.
    Where as in preliminary cost estimation, consider the operation correctly .
    REM profile is defined with " Post Activities  -  Using data from prelim. costing f. product Cost collector "
    Thanks.
    Kiran

    Dear Himakar,
    A rate routing is a routing for repetitive manufacturing. It enables you to easily reproduce the lean
    production process.In the rate routing, the production rate per operation is defined (production time
    according to a base quantity). *Set-up time is not usually defined, since no changes to setup are
    planned.*
    So its not required to mention any value for set up time ,so that its not considered for costing and the
    other processes.
    http://help.sap.com/erp2005ehp_04/helpdata/EN/60/c6c50f146347e1933b4c15144ec31b/frameset.htm_
    Check these links,
    Re: Very Strange: SET UP  time is not calculated Automatically Even for sta
    Re: Set up time not coming while confirming in MFBF
    Regards
    Mangalraj.S

  • ISCSI boot with Intel NICs added to windows 2008 r2 routing table causes non iscsi traffic to attempt default routes on iscsi networks

    I have a server with Intel 82576 Gigabit Dual Port Nics.  I have configured them to use iSCSI boot the primary looks to 10.0.0.1/24 and the secondary looks to 10.0.1.1/24.  The target is configured correctly.  Everything boots as expected.
     I have added the MPIO feature and configured MPIO for the iscsi initiator as per: http://blogs.technet.com/b/migreene/archive/2009/08/29/3277914.aspx.
     My issue is that the iSCSI networks show up in the routing table like so:
    I did not configure a default route in the Intel setup utility:
    I tried to explicitly remove the 0.0.0.0 entry and leave blank, with no change.  As you can see with the above routing table traffic attempts to travel over these routes:
    C:\Users\Administrator>ping google.com
    Pinging google.com [209.85.145.99] with 32 bytes of data:
    Reply from 10.0.0.201: Destination host unreachable.
    Reply from 10.0.1.201: Destination host unreachable.
    Reply from 209.85.145.99: bytes=32 time=23ms TTL=51
    Reply from 209.85.145.99: bytes=32 time=22ms TTL=51
    Ping statistics for 209.85.145.99:
    Packets: Sent = 4, Received = 4, Lost = 0 (0% loss),
    Approximate round trip times in milli-seconds:
    A ping to the outside world first attempts on 10.0.0.x/24 network, then on 10.0.1.x/24 network and then finally on the network the traffic should go over.  I don't want my iSCSI traffic to ever show up with a default route.  How do I get rid of it?
    route delete 0.0.0.0 mask 0.0.0.0 "on-link" results in: The route deletion failed: The parameter is incorrect.
    route delete 0.0.0.0 mask 0.0.0.0 on-link results in: The route deletion failed: The parameter is incorrect.
    route delete 0.0.0.0 deletes all default routes, then I have to add back in the "valid default route" of 192.168.100.6.
    I would like to not have to do a route delete though.

    So I've sort of given up on fixing the gateway assignment in the route for iSCSI boot.  I configured a DHCP server to give out the information required by iSCSI boot and configured the network cards to use DHCP for their configuration.  I insured
    that my DHCP server gave out no default gateway entry.  However, I still got the undesired routes in the routing table.  This makes me assume that there isn't a "fix" for it, only the workaround.
    Here is the script I run on each iSCSI Boot initiator (you would obviously change the ip number to suit your environment):
    @Echo off
    Rem fixes iscsi route problem as shown below:
    Rem IPv4 Route Table
    REM ===========================================================================
    REM Active Routes:
    REM Network Destination Netmask Gateway Interface Metric
    REM 0.0.0.0 0.0.0.0 On-link 10.0.0.200 10255
    REM 0.0.0.0 0.0.0.0 On-link 10.0.1.200 266
    REM 0.0.0.0 0.0.0.0 192.168.100.6 192.168.100.98 266
    REM The top 2 lines are on the iscsi interface and traffic tries to go out it
    REM We need to delete the routes, so we'll just delete all gateway routes and
    REM add back in the one we care about.
    route delete 0.0.0.0 >c:\iscsibootroutefix.log
    route -p add 0.0.0.0 mask 0.0.0.0 192.168.100.6 >>c:\iscsibootroutefix.log
    After running it I get:
    IPv4 Route Table
    ===========================================================================
    Active Routes:
    Network Destination Netmask Gateway Interface Metric
    0.0.0.0 0.0.0.0 192.168.100.6 192.168.100.98 11
    10.0.0.0 255.255.255.0 On-link 10.0.0.200 10255
    10.0.0.1 255.255.255.255 On-link 10.0.0.200 10255
    10.0.0.200 255.255.255.255 On-link 10.0.0.200 10255
    Then I added a task in “task scheduler” of "administrative tools"  that ran as the user “system” “when the computer starts” that runs this script.

  • Standard routing and rate routing

    Hi All,
    Can someone tell me what tables I should use to get the standard routing and rate routing for the query?
    Thanks
    Edward.

    Dear,
    Yes you are right.
    The main difference between routing and rate routing is you can not create parallel sequence in rate routing CA21 only nothing else.
    There are lot of different opinion on this topic but there is no too much difference in them only we use rate routing in REM and normal in Discrete manufacturing.
    Also check this thread ,
    Difference between routing and rate routing
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Difference between Routing & Rate Routing

    Hi All,
    can anyone tell me difference between Routing & Rate Routing? can we use routing for REM? if no, then what will be the effect?
    Thanks,
    Rinky

    Hi Rinky ,
                   Routing and rate routing are task list in broad manner .
    standard task list: Describes the worksteps necessary to produce a material or perform an activity without reference to an order.( that means they are created without reference to order )
    Essential objects of a task list are header, operations, material component allocations, production resources/tools and inspection characteristics.
    Together with specific dates and quantities, task list data forms an important part of the order.
    The following task list types exist in the R/3 System:
    routing
    reference operation set
    rate routing
    reference rate routing
    inspection plan
    maintenance task list
    standard network
    master recipe
    Routing is created with ca01 and rate routing by ca21 .
    Routing is used in discrete manufacuting and rate routing in repetitive .
    Rate routing generally has only one operation  and prod line instead of work centers and operations in routings .
    Both routings can be used for scheduling , cosing and capacity planning .
    Hope this was helpful answer !
    Neal
    Edited by: Neal Gibson on Jun 30, 2008 11:46 AM

  • Reg REM scenario

    Dear all,
    Please clear my doubt what is the difference in REM profile when , we create REM profile we use in control data  back flush from standard cost estimate  for material instead of data from product cost collector
    Can we use normal routing in place of rate routing in REM scenario
    Regards
    venkat

    Dear Venkat,
    Yes we can use a normal routing instead of rate routing in REM scenario.
    When creating REM profile you have 2 option whether to post activities and whether to post as per the standard cost estimate
    details or based on the preliminary cost estimate of the product cost collector.
    If the option is elected for standard cost estimat is a mandatory before production booking that's backflush using MFBF.
    Check and revert back with your queries.
    Regards
    Mangalraj.S

  • REM-PRT

    Hi.
    Im working on a REM envirornment.
    1. I have a routing and Attached a PRT to one operation.
    2. But in MY planned order i dont find the PRT
    3. I have checked the SAP library -in rem no prt is supported -is this true..
    Reg
    DSK

    Hi
    REM Process with  PRT
    Description                                                                     T-Code
    Create an Equipment as a PRT                           IE25
    Create a measurement point as a counter      IK01
    Attach a task list to the equipment                           IA01
    "Create a maintenance plan
    (In plan attach the equipment,task list,cycles/unit)"     IP41
    "Attach the maintenanace plan to the created
    equipment in the PRT tab"                                                IE02
    Attach the PRT equipment in routing            CA02
    REM Backflush                                                MFBF
    "The backflush quantity is not getting updated
    in the measurement document"     
    Regards
    Venkat

  • What's the difference between routing and rate routing

    As we all know that routing normally used in discrete manufacture, and  rate routing used in REM, one of my client, the just use routing for REM instead of rate routing, are there any gurus can tell me some detail information about them?
    Thanks!
    Eric

    Hi,
    对于routing和rate routing来说,区别并不是很明显,但从流程的角度来说,routing适用于所有的离散型制造业,而rate routing适用于重复制造业!
    如果非要找出差别的话,就是routing可以定义并行序和可选序,而且rate routing只能定义并行序!
    具体的使用差别可以参考如下链接:
    http://help.sap.com/saphelp_45b/helpdata/en/03/bb1d0ca6e811d189010000e8323492/frameset.htm

  • Tricky design problem

    The system I'm working with stores travel paths. The tricky thing is that these travel paths must be unique.
    Path, [Locations]
    1, [A, B, C]
    2, [A, C]
    3, [C, A]
    4, [A, B, C, D]
    Note that path 2 and 3 are fine since the order of the locations has changed.
    Since the number of places a path can include is relatively small, I thought I could create a compound unique secondary key for each path consisting of the UID of each place in the correct order (in the correct order and separated by a hyphen). To bind a path to Locations and vs. I'd add an associative PathLocations Table (including sequence information) and implement an insert/update/delete trigger that would modify the associated Path's compound key. This would fail if the unique constraint was violated.
    Mechanically this will no doubt work, but it feels so ugly I wonder if anybody had an elegant solution for this problem.
    Thanks for any ideas and pointers in advance.
    Pete
    Edited by: petehug on Mar 11, 2012 3:10 PM
    Edited by: petehug on Mar 11, 2012 3:11 PM

    In the year 2042, when we might finally have got support for the CREATE ASSERTION statement, we could implement your requirement with the following 'patterns':
    create table points -- Aka. locations
    (id     number not null primary key
    ,c1     varchar2(10) not null)
    create table lines -- Aka. paths
    (id     number not null primary key
    ,c1     varchar2(10) not null)
    create table line_vertices -- Pathlocation
    (line     number not null
    ,from     number not null
    ,to     number not null
    ,check(from != to)
    ,unique(line,from)  -- prevents splits
    ,unique(line,to)    -- prevents merges
    ,foreign key (line) references lines
    ,foreign key (from) references points
    ,foreign key (to) references points)
    Rem
    Rem Prevents disjunct line-segments within a line (route).
    Rem Also prevents 'loops'.
    Rem
    create assertion one_origin_per_line as
    check(not exists
            (select 'a line without exactly one origin'
               from lines l
              where 1 != (select count(*)
                            from line_vertices v1
                           where v1.line = l.id
                             and not exists
                                   (select 'a previous hop'
                                      from line_vertices v2
                                     where v2.line = l.id
                                       and v2.to = v1.from)))
    Rem
    Rem Redundant, but mentioned for clarity.
    Rem
    create assertion one_destination_per_line as
    check(not exists
            (select 'a line without exactly one destination'
               from lines l
              where 1 != (select count(*)
                            from line_vertices v1
                           where v1.line = l.id
                             and not exists
                                   (select 'a next hop'
                                      from line_vertices v2
                                     where v2.line = l.id
                                       and v2.from = v1.to)))
    Rem
    Rem All lines must be 'unique'.
    Rem
    create assertion no_duplicate_lines as
    check(not exists
            (select 'two lines with same vertices'
               from lines l1
                   ,lines l2
              where l1.id !=l2.id
                and not exists
                      (select 'a l1-vertice not in l2'
                         from line_vertices v1
                        where v1.line = l1.id
                          and not exists
                                (select 'a matching vertice in l2'
                                   from line_vertices v2
                                  where v2.line = l2.id
                                    and (l2.from,l2.to) = (l1.from,l1.to)))
                and not exists
                      (select 'a l2-vertice not in l1'
                         from line_vertices v2
                        where v2.line = l2.id
                          and not exists
                                (select 'a matching vertice in l1'
                                   from line_vertices v1
                                  where v1.line = l1.id
                                    and (l1.from,l1.to) = (l2.from,l2.to)))
    /Edited by: Toon Koppelaars on Mar 16, 2012 11:16 AM

  • No automatic goods receipt in MFBF

    hi all,
    we encounter the following serious problem:
    ECC 6.0, REM environment, specific routes (CA01), Rem Profile with obligatory reporting points and Goods receipt at last reporting point.
    aditionally in the operation that is backflushed, the control key is set so that GR Automatic takes places.
    however, with all those settings (and proper cost calculation) NO goods receipt takes place.
    help appreciated & suggestions are welcome. cheers

    Dear mebuzing,
    1.First check what REM profile have assigned to the material in the material master in MRP4 view.
    2.Now check the settings for this REM profile in OSP2 for reporting point backflush and automatic GR
    posting atlast RP when backflushing.
    3.Now for the last operation which you confirm 131 (GR) will be happening for the product which is
    getting confirmed.
    4.Check the document that's getting generated during MFBF through MB03.
    Come back with your queries.
    Regards
    Mangalraj.S

  • REM Routing set-up for SFG & FG

    Hi all,
    I just want to ask a question on what is a more logical set-up in REM, to have 2 separate routings for the FG and its SFG, where there are final backflushes for both, or 1 long routing where both routings of FG and SFG are combined, where the last operation is the final back flush of the FG and there is a reporting point back flush in the middle of the routing, for the SFG?
    Thanks in advance!

    Dear Bear,
    what i understand a little bit from your query
    1) the reason for maintaining two Rate-Routings with two different Group Counters is
    if a material can be processed on two lines at a time then we maintain two lines
    2) i.e Combination of Bom & Rate-Routing is Production version
    3) so per the Lot sizes defined in Production version system will check the demand qty & Pick
    the Production version in MRP
    4) so if you want to distribute the total qty into two PV's then you can go with MF50 ( Planning table )
    Regards
    Madhu Kumar

  • Manual routing selection in REM.

    Dear Gurus,
    Is there any configuration settings for manual routing selection in REM ??
    Regards,
    Pradeep

    Dear Pradeep,
    Why do you want to select the Rotuing manually?
    Once if your Product has got 2 different routing ,it might be
    because of Shop Floor constraint or for costing purpose,after
    creating a new routing,you have to create a Production version
    for a combination of Rate routing And BOM.
    After that you have to create a Product Cost collector using the
    new Production version and create a preleminary product cost
    estimate for the product cost collector and save.
    If You want to decide at that time of production
    confirmation,which routing has to be used,then before this step
    you have to change the REM profile for that particular product (
    whose activities are posted  using the Preleminary cost of the
    Product Cost collector).
    Check with this,your problem will be solved.
    If still exists,revert back to forums.
    Regards
    Mangalraj.S

  • Error while creating product cost collector in REM ?

    HI, all SAP expert,
                 I have to run repetitive manufacturing .
    I create work center of category production line and use in rate routing of semifinished material.
    In mm02 -- mrp 4 view of semifinished material , i select rem profile , production version.
    Now I create product cost collector ( t-code kkf6n) for semi. material by giving order type (yrem), production version after enter it shows error
    Error in number management (notify your system administrator)
    in help it shows
    Error in number management (notify your system administrator)
    Message no. KO162
    Diagnosis
    A system error occurred in the number management.
    Procedure
    Please contact your systems analyst or the SAP hotline.
    Edited by: Nitin Nerkar on Sep 30, 2009 12:16 PM

    Dear Nitin,
    Check whether is the number range maintained properly for the order type RM01,check the config setting in T Code
    KOT2_PKOSA.
    This is related to CO Module.
    Check and revert back.
    Regards
    Mangalraj.S

  • Production Order in REM

    Experts,
    I found that even if the material (Fert) is having REM scenario set up, it is possible to create production orders for the same material.
    One of the material is having MTS REM scenario for which production is driven by planned Orders(run schd). Periodic settlement is done.
    By mistake production Order was created for the same material.Goods receipt/issue is also done for this production Order.
    How to restrict the system for not allowing to create the Production Order for REM scenario?
    Thanks.
    Suresh

    Please note that Routing is required to create a Production order as the std setting in production ordere dependent parameter-OPL8.
    Any way my sugestion is please delete the production order types if you are not using production order types.
    In case if you are using production order for other materials then
    goto OMS4
    create  a status - XX , with production PO header message = E,
    Assign this status in baisc data1 of the material - X material status (for which system should not create a Production order)
    You will get following message
    In-house production is not intended for material XXX status cannnot produce with descreet manufactreing                                                                               
    Message no. CO 050                                                    
    best of luck

Maybe you are looking for

  • How to include photo descriptions in iCloud sharing?

    When I share photos to iCloud, I find that the online album (stream) does not include any photo descriptions I have added in iPhoto (or any other "metadata" for that matter). As a workaround I have manually added a comment to each shared photo, with

  • My Contacts is refusing to open on my Mac.

    I had some contacts in which I had imported from MS Exchange. The data was there yesterday but today when I click on Contacts nothing happens. An ideas?

  • Clearing a G/L account

    Hi, I have an issue about a G/L account. There is a difference between amounts which were posted on the G/L account and the amounts which appear when trying to clear the account via transaction F-03. What can cause these variances? Thank you. Kind re

  • Warning: PC is not authorized for apps

    Every time I want to sync my new iPhone 6, iTunes says that this computer is not authorized for the apps on my iPhone. But when I authorize my PC, it says it has been already authorized. What can I do? Thx for Help

  • Sporadic failure dng conversion

    I've recently upgraded from Windows XP (SP3) to Windows 7 Ultimate 64 bit. At the same time I upgraded from 2 gb of RAM to 4 gb. Since the upgrade I've been experiencing random errors in DNG conversion. I usually convert to DNG inside Lightroom 2.5 b