Sales order cost estimate

hi,
While saving the sales order cost estimate its getting the GL account from GBB-ZG0.
as we assigned Balance sheet account its asking the cost element.
can you please explain what is link to get the gl from GBB-ZGO, can we change this to pick from GBB-VBR.
Thanks,
Sudha

Hi,
Are you are working with unvaluated special stock ?  In this case, the system is looking for a consumption account via the account assignment category. For example if you are using requirement class ZPJ which uses account assignment category Q. In account assignment Q, you entered account modification VBR. Therefore, the system is looking for an account via the keys GBB / VBR.
regards
Waman

Similar Messages

  • User Exit or BADI on saving of Sales order cost estimate (CK51N)

    Hi,
    Can any one share with me what are the User Exit or BADI that gets triggered on saving of Sales order cost estimate (CK51N).
    Regards,
    Bijay

    Hi
    Check the link
    Need Enhancement Spot or BADI for transaction ck51n
    Regards
    Sanil

  • Sales Order Cost Estimates -- Versions?

    In our MTS plant we are creating cost estimates each month with different version numbers so they can easily be compared to review cost changes.
    This concept in our MTO plant is (of course) a problem.
    We would like to create a dummy sales order and on each line list a KMAT and build an "average" configuration.  We use variant config, so the sales order bom is built automatically.  It also costs automatically.  We would like to save this cost estimate and compare it with a cost estimate of the same configuration next month.   I do not have an option for version CK51n, nor do I see a Costing Date in KEKO table.  Either of these items for MTS would create a second cost estimat and allow comparison.
    Is there a way to compare Sale Order Cost Estimates across periods?
    Any other suggestions as to how to obtain the required data??
    Thank you for all suggestions!!

    Any one think of a solution?
    thanks

  • Sales order cost estimate with GIT account

    Hi,
    Business introduced Goods - in - Transit (Balance sheet account), so PGI will always post to GIT and Invoice it will get reversed.
    For one of the Configuratble material (MTO) scenario we need the Sales order cost estimate to get the Planned cost.
    When i try to execute the sales order cost estimate it says cost element doesnot exist for GIT GL (WHich is right).
    But with maintaining the GIT how to achieve the sales order cost estimate.
    I tried to create CE category 90 for GIT, in Cost estimate am getting error CE 90 not supported for Cost estimate.
    Kindly help this is kind of urgent req for us
    Thanks,
    Sudha

    Hello Ashley
    Yes, if you have done your settings correctly, especially Requirements class set up  (see the documentation link),  then the cost estimate will flow to a condition type in Pricing, usually EK01/EK02 conditions. These conditions are used to calculate sales prices (PR00) in cost-plus (mark-up) scenarios.
    Link: http://help.sap.com/erp2005_ehp_04/helpdata/EN/90/ba6da4446711d189420000e829fbbd/frameset.htm
    However Profit margin  as calculated in a sales order comes from VPRS condition  (which is based in Material Master) and is the difference of net value and VPRS condition value in normal circumstance.
    Hope other more knowledgeable experts will weigh in.

  • Sales order cost estimate not happening because of GIT B/S account

    Hi,
    Requirement is to have Goods in Transit account in PGI and reverse it in Invoice no issues iwth it.
    For the same sales order user wants to get cost using sales order cost estimate.
    When i run that am getting following error
    Item 00001 : Cost element 14001212 does not exist in CO area 0010 for 10/07/2011
    Message no. KK689
    Even though i maintain the CE for Balance sheet account with Cost element category 90 its not accpeting.
    Can you please help me on how to proceed for sales order cost estimate.
    Thanks,
    sudha

    hi,
    if you give a balance sheet account in obyc , you will not be able to create a cost elementin category 01 , accordignly system will give error in sales order costing , as its not able to get correct cost element in cost planning.
    if your requirement is just to post  cogs to a balance sheet account which is goods in transit and when invoice is done cogs to be posted.
    you should actually use  revenue based RA functionality on sales order instead of assinging a balance sheet account in obyc.
    in this approach;
    - first assign a p/l account in obyc and create cost element in cateogry 01.
    - create revenue based RA and assign RA key in requirement class.
    - in OKG8 for RA category  WIPR and your ra key assign , goods in transit account and give a offsetting account which is not cost element (credit entry in offsetting account nullify debit in account given in OBYC when GIT is posted , when billing is done system will automatically post a oppsite entry in both account).
    -in OKG8 for RA category COSR give the COGS account and a offsetting account without cost element (credit entry in offsetting account nullify debit in account given in OBYC when COGS is posted).
    regards
    rajesh

  • AFS grid value/valuation type not picked in sales order cost estimate

    Hi Experts,
    We have different valuation types in the material master. This is part of the AFS, where each grid value is a valuation type. While making a sales order cost estimate and in one sales order item, we have 3 grid values (valuation types), system is costing only for one grid value and that too for the entire quantity. This way the costing is wrong as different grid values have different BOMs and routings.
    Is there any specific setting to have the grid value to be picked up in the sales order cost estimate? Or am i missing some setting? in general product costing settings or AFS product costing settings?
    Best Regards
    Vimal

    Hi,
    Do you mean "sales order costing", please  if so then please ref. the link:
    http://help.sap.com/saphelp_46c/helpdata/en/90/ba6da4446711d189420000e829fbbd/content.htm
    Regards
    DSR
    Edited by: D.Srinivasa Rao on Nov 25, 2011 8:19 AM

  • Sale Order Cost Estimate

    Hi,
    We have maintained Material BOM (usage 1) as well as Sale Order BOM (usage 5).
    When we run the Sales Order Cost estimate, which BOM would be picked for costing the sales order.

    Hi,
    The issue is not with respect to selection of the Sale order BOM or routing. System is correctly selecting the specific BOM and routing for costing.
    However, when we display the sale order cost estimate, when we navigate to the Qty Struc tab and double click on the sale order BOM or Routing Group, it does not take me to the specific Sale Order BOM.
    Please suggest.

  • WBS planned cost in Sales order cost estimate

    HI Experts,
    Can you please help me in below:
    Will it be possible to include WBS planned cost in Sales order cost estimate.
    ETO Scenario
    Creating Project and booking planned cost
    Creating Sales order and assigned the WBS at line item level
    WHen i do the sales order cost estimate it calculating cost from Sales order BOM includeing Chars value for KMAT.
    I want to know if there is any way to include the WBS planned cost also in the sale order cost estimate.
    Can anyonce please provide inputs.
    Thanks,
    Sudha

    Hi Sudha
    Are you saying the WBS Planned cost is in addition to the Sales Order cost estimate? Well, as far as I know, there is no such possibility
    you can use Unit Costing feature in Req Class instead of Quantity Structure Based Costing... Then you can enter whatever items you want
    br, Ajay M

  • Sales order cost estimate to be updated in Info Record (ME11)

    Hi,
    We have two plants: (a) Sales plant and (b) Manufacturing Plant.
    At sales plant, sales order (external) is created and for same external sales order we create another sales order (internal) at the manufacturing plant.
    At the manufacturing plant we have the option of doing sales order cost estimate (VA02/ CK51N).
    We want to update info record (ME11) at sales plant with sales order cost estiamte value at the manufacturing plant. How this is possible? please suggest.
    Regards,
    Bijay

    Hi
    Ask your SD guy which routine is used during the pricing.. You need to write ABAP code in the routine in order to fetch the values from the Sales Order cost estimate
    usually, the sales order cost estimate is stored in EK02 condition type... You can read the value from EK02 cond type in Mfg plant and update it in Sales plant
    br, Ajay M

  • Different versions in Sales order cost estimate

    Hi,
    Is it possible to calculate different versions of "sales orders cost estimate"?
    Greetings.

    Create another costing variant with a different valuation variant, while within valuation variant you can choose different things, among those is CO planning version for activity prices.

  • CATS vs. Sales order cost estimate

    Hi Gurus,
    If I sent some hours to the sales order item thru CATS, can I have them in the sales order cost estimate?
    Thanks
    g

    Thanks.
    So the one way to have CATS hours in sales order cost estimate is somehow squeeze these hours into the sales order BOM, init?
    What is the best way to do? Plan it in the routing and put the actual hours thru CATS into the production order? Or some other way?
    Regards
    g

  • Automate Sales Order cost estimate

    Hi Experts,
    Can anyone please let me know about the automate sales order costing. We are suggesting to client pl follow the following method:
    1.Create Req class
    2.Create Req type
    3.Assign req type to class
    4.Define Cositng variant, costing ID etc., in req class through controlling.
    Otherthan this is there any alternative method to calculate automate sales order costing for MTO?
    Please suggest us and looking forward your valuable comments
    thanks
    vk

    hi,
    check this link
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/90/ba6794446711d189420000e829fbbd/frameset.htm
    Thanks,
    Rau

  • Sales Order cost estimate with variant config

    Hi
    I'm hoping for some advice on costing on a variant material.
    I have created a sales order for a variant material and ran a cost estimate to get costs for the sales order.  Should this populate a cost condition within the sales order pricing?  How can the margin be seen in the sales order?
    Thanks for your help.
    Ashley Shannon

    Hello Ashley
    Yes, if you have done your settings correctly, especially Requirements class set up  (see the documentation link),  then the cost estimate will flow to a condition type in Pricing, usually EK01/EK02 conditions. These conditions are used to calculate sales prices (PR00) in cost-plus (mark-up) scenarios.
    Link: http://help.sap.com/erp2005_ehp_04/helpdata/EN/90/ba6da4446711d189420000e829fbbd/frameset.htm
    However Profit margin  as calculated in a sales order comes from VPRS condition  (which is based in Material Master) and is the difference of net value and VPRS condition value in normal circumstance.
    Hope other more knowledgeable experts will weigh in.

  • Sale order costing process : Help required

    Hello All,
    Belatted Happy New Year 2011 to all.
    I have a question related to Sale Order Costing. It goes like this,
    My client is into Pipe coating business who receives the pipe from the customers, coats it as per there requirements and despatches it thereon. There is no concept of FG here as its only the service he is doing on it and also when he receives the pipe there is no raw material cost on it. Raw materials for him would be chemicals etc which he uses to coat the pipe.
    And also this demands variant configuration from SD and PP angel.
    As this scenario is customer specific, it demands Sale Order based costing(Sale order cost estimate).
    My doubt is, how the sale order costing process goes with.
    In general scenarios, Make to stock, we use production order based costing where standard cost estimate is calculated for planned cost and actuals are incurred on PO settling the variance to COPA
    Similarly how the costing goes with if Sale order cost estimate is used. What i think is, here instead of Standard cost estimate for plan, we will go with Sale order cost estimate at sale order level, and incur actual cost at production order and settle the cost of Production order to Sale order. Correct me if i am wrong, and request you ppl there to explain me the process of costing in the scenario said above.
    apart from that, my client wants the flexibility to change the cost estimate at quotation level.
    Please suggest me with solution explaining the process of costing here.
    Thanks in advance,
    Ravi Kumar

    Hi Ravi
    Your understanding of the scenario is very much right...
    In your case, you need to have sales order as cost object...
    Process
    Your stock would be non valuated stock, because the FG is not your stock.. You are just doing a service
    Based on the characteristics chosen in the Sales orders, system would determine the Sales order BOM
    Based on sales order BOM, Sales order cost estimate would be calculated....
    You would receive the Customer pipe in your stock against the sales order... It would be a non valuated GR... You can track the Qty only
    Sales order would trigger a production order... The prod order can have its planned cost, which is only for information sake
    The Customer Pipe, Chemicals would be issued to prod order to coat the pipe... And also Labor/machine hrs may be confirmed
    There after your production order would be settled on Sales order
    Then you would do PGI (Post Goods Isue).. This will not trigger any accounting doc
    Then you do billing... The sales revenue would be posted on the sales order
    Then you settle the sales order to COPA.. This will close the cycle
    Configuration
    The IMG Settings required would be as below
    1. You would use account assignment category (AAC) E
    2. Create a Requirement class with
    a. AAC = E.... (Means sales order is CO Object)
    b. Valuation Indicator = BLANK (Means Non Valuated Stock)
    c. Costing ID/Costing Method = As per your choice to calculate the Sales order cost estimate
    3. Assign this req class to Requirement Type
    4. Give this req type to your PP/SD team.. They would assign it to Strategy group / Item Category to determine it in the sales order
    Regards
    Ajay M

  • Sales Order Costing

    Hi friends
    In case of sales order costing i have few doubts mentioned below 
    can anybody help on same subject?
    1. While raising the sale order it allow to save the sale order prior to sales order costing.             Is there any solution on same so that sale order will not be save prior to sales order costing ?
    2. with point no 1 (i.e. after sale order saved without taking sale order cost estimate ) if we take the MRP run it will create the planned order & subsequent production order against planned order. in the same it will determine the cost based on latest production cost estimate.
    we have also made the sale order costing as required in requirement class.
    Thanks

    Hi Mahesh,
    You have to go to Sales Order(VA02)>Extras>Costing in order to see the Costing. I don't think any warning or error can be given for this Costing problem.
    If u maintain all the settings pertains to sale order costing i.e. in requirement class u have to maintain condition type line items u have to maintain EKO1. U can sea the sale order costing VA02 from costing option u will get the costing irrespective of wheather u saved the sale order or not.
    Regards,
    Ramesh

Maybe you are looking for

  • How can I check the data transfer rate of my FW800 port

    I have an iMac 2.4 20 inch (MB323LL/A) with a Lacie external rugged hard drive (320 GB). I have attached it using my FW800 port with the cable supplied with the drive. It seems slow to me so I was wondering if there is any way to see what the current

  • I have forgotten my passcode to unlock my ipod touch 4th gen how do I fix it

    I have changed my pass code to unlock my home screen on my Ipod touch 4th generation and have forgotten it how do I get into my ipod?

  • Creating a Form with Report based on View

    Hi All, I wanted to create a form with report based on two tables so: 1. I created a view (called COMBO) based on two tables 2. I then created a form with report based on the view Everything seemed fine thus far until I tried to edit existing records

  • Unknown error (-39) = cannot sync iPod Nano 3rd gen.

    Hi There, Got an Imac G5 PPC with OS 10.5.2 and the latest version of iTunes and so. I use 2 nike plus kits (my wife and myself) on 1 iPod and 1 Imac. Each time when synching I get error (-39). Anybody familiar with error-numbers as -39? Inspite I ha

  • How to create a ALV table

    Hi experts, I have to show an ALV table with the list of errors at the end of an operation. I have two separated views for this: one view when I run the operation and, at the end of this operation, I show a button and when I click on this button I ca