SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
Your answers will be much appreciated and rewarded.
Thanks in advance,
Thiyagu

Hi,
In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
Thanks,
Thiyagu.

Similar Messages

  • Single inspection plan for all Inspection Plan usages

    Hi
    I have to prepare a single inspection plan, than can be used against inspection type '04' and '15' and '01'.
    Please tell me which inspection plan usage I should use, I tried '3' = Universal, but at inspection lot creation the system is unable to find inspection plan.
    Thanks in advance.

    My customer manufactures semi-finished good, some times he can purchase semi-finished from the market. Sample are reserved for future testing as well.
    so following inspection types are required for the same material
    1) GR against PO                '01'
    2) GR against Production    '04'
    3) Sample Management   '15'
    Almost all the time, the same specifications are tested and my customer wants to maintain a single inspection plan.
    I have one option that is to create 3 inspection types using all the above  inspection types and to use the same "Usage" say '5' in customizing of Inspection Type. But I don't know the consequences
    Please give me other solution or highlight the consequences of my solution
    Kindly help.
    Edited by: Chris SAP on May 13, 2010 11:36 AM

  • Inspection plan for inprocess inspection

    Hi QM Gurus
    please let me know can I use an inspection plan for inprocess inspection
    Thanks
    TR

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • Is it possible to create  inspection plan for "Inprocess Inspection"

    Hi,
    Is it possible to create  inspection plans for "Inprocess Inspection".
    If yes , what would be the "task List Usage".Is it "1"?
    If no ,then how to map this requirment?
    Regards
    Vemula

    Hi
    Vemula
    Generally as Per SAP std Routing is used for inspection of 03 type of inspection.
    but you can also customize the Inspection task list Usage for Inprocess Inspection.
    This is possible through
    QCC0>Quality Inspection>Insp lot creation>Assign Insp type to origine>
    here informt of 03 inspection type you can assign
    Task list type:Q
    Usage:either 1(Production) or 3(Universal)
    save
    Regards
    Poonam

  • Inspection plan for all materials GOODS Receipt

    Hi qm experts,
    I have a scenario. How could I make an inspection plan which covers all materials with variable base unit of measure. Its because my client is using winlims for their results recording. I want to create only one inspection plan to incorporate all materials for assignment, how could I make this one. I hope anybody could answer my question.
    Regards,
    Edsel matildo
    QM Consultant

    Hi,
      Say u have different materials with different base unit of measure ( kg / ltr / ea / pc /  --- -
    etc ) And u have assigned all these material in qulity plan having only one unit of measure (say mm )for characterisrics then there is absolutely no need to maintain conversion rule for all these
    Beacuse base unit of measure is different and unit of measure is different .
    Note Conversion rule is only required if ur using alterenate base unit of measure
    Amol

  • Measuring Instrument Needs to be added in inspection plan for each part

    Hi
    How to assign the Measuring Instrument in the quality inspection plan for all the materials.
    Whether i need to assign as material assignment or as PRT.
    how to use prt to assign to the operation in the quality plan (task list)
    Thanks
    VRAJ

    Hi,
    when i try to assign the Equipment for first Inspection Characteristics.
    the system thru the ERROR as,
    Production resource/tool is not intended for this type of task list
    Message no. CF230
    Diagnosis
    You want to use the production resource/tool in a task list or work order with task list type Q. However, according to usage 004 of the PRT, this task list type does not exist.
    Procedure
    Change the usage of the PRT in the master record or select a PRT which can be used in this task list type.
    How to resolve this issue.

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Muliple inspection plan for same material and same usage

    Hi,
    I need to create multiple inspection plans for same material with same usage.during the inspection lot creation i need to select any one inspection plan.
    In standard SAP its not possible.Any user exits available for this..
    Regards,
    S.P.Selvathangam

    Dear Selvathangam Palanisamy ,
                                                       My Dear Shayamal is absolutely correct and we are corrently using this SAP facility. You can create 'N' number of inspectio plans for a material and then whenever the inspection lot will created ( Thru a process order or Manual) then you will get the Inspection Lot Status 'CRTD' (Created mode) then you have to select your Inspection Task list manually by two way...
    Either go to QA02 and then select it from the list of multiple plans.
    Or you can directly go from QA32 ...select your inspection lot row and directly click on the Inspection Lot icon to go directly to the inspection lot window to slect the Task list.
    Further there is no need to remove the Automatic Assignment from the QM View of the Material Master as if there is only one task List then system will automatically assign the TASK LIST, if you deselect it then you have to select in every case.
    Thanks

  • Assignments of materials and vendors to inspection plans for the plant 1500

    Hi to all,
    Please give me solution for make assignments of materials and vendors to inspection plans for the plant 1500.
    Thanks,
    NAgesh

    hi gang,
    try to make usage decision ,kindly check in material document which you have created while making the GR, check in which storgare location you have specified and try to transfer the stock from quality to unrestricted.and also make a note on batch number also if you have activated the batch management
    regards
    thyagarajan

  • Inspection plan for Pipelines?

    Dear SAPIENTS,
    Business scenario: Various pipelines located in plan and need regular inspection depending upon requirement. It can be 3 MOnth, 6 MOnth or anything. Inspection lot and result recording required.
    Doubt: How can i link pipelines in system and how can i create inspection plan for them?
    Regards,

    Dear,
    If i create as a equipment than where should i enter about its functional location and installation details.
    i.e the reason i am asking if create an object link for the pipeline between two equipment or functional location than how can i create lot, notification for this link?
    Regards,

  • Assigning a different inspection plan to an inspection lot

    Hi,
    I have a situation where the incorrect inspection plan is assigned to an inspection lot. Is there any mechanism to assign a different inspection plan to an inspection lot i.e. without having to reverse a goods receipt.
    Regards,

    >
    Shyamal Joshi wrote:
    > Hi Kaushal,
    >
    > There are more than one reason for this error. Check the followings.
    >
    > - The key date for inspection lot should be later than the key date for the inspection plan, later then the date when you assigned the material to the plan.
    > - The usage of lot and inspection plan should be same.
    > - The status of inspection plan must be released.
    >
    > Regards,
    > Shyamal
    Why are you not checking these things I am sure the reason would be there only. If dont wana check it is your wish. Any ways best of luck

  • Quality Mgt - can I create a new inspection type for source inspection

    I want to create a new inspection type for surce inspection and I will assign it to Miscellaneous insp lot origin.
    What is the application of vendor inspection lot origin ? Can be used for source inspection ?

    HI,
    For source inspection.
    If existing insp types are not going to solve your purpose , you can create insp type & assign it to insp lot origin 01.
    But before that , check whether you can use  the existing insp type 01 / 0130.
    You need to assign that inspection type in the Q-info record , in the source insp field of insp control.
    Also go through the help tips provide by SAP
    Inspection Type for Insp. Lot Origin (Source Inspection)
        Inspection type for the source inspection
    Use
        If you enter an inspection type for inspection lot origin 01 in this  field, you can create an inspection lot for the source inspection within the lead time before the (scheduled) delivery date.
    Dependencies
        The inspection type must be active in the inspection setup (Quality Management view) of the material master.
        If a status profile is stored in the quality info record for the supply  relationship, a goods receipt inspection takes place instead of a source  inspection.
    Regards
    K.M.Arun

  • SAP MII 15.0 released for all customers?

    Hello,
    Is the product SAP MII 15.0 released for all customers or is it still in Ramp-up?
    Best regards,
    Pekka

    Pekka,
    The MII 15.0 release is currently in Ramp-up (started back in May 2014) and is planned to exit Ramp-up in Mid-November 2014.  There is also a Feature Pack that is currently planned for release in January 2015 which will provide additional features and enhancements to the 15.0 release.
    Hope this helps,
    Sam

  • How can I set the default home page for all new users in Firefox 4

    I'm trying to deploy FF 4.0rc1 in a corporate environment but I can't find a way to set the default home page or any other settings for that matter.
    Is there a way to set the default home page for all new users and lock it so that the users can't change home page?
    Best regards
    Jonas

    In Firefox 4 the template folder for new profiles (C:\Program Files\Mozilla Firefox\defaults\profile\
    ) doesn't exist. You can create that \defaults\profile\ folder and place a file user.js in it with the prefs that you want to initialize.
    See:
    *http://www-archive.mozilla.org/catalog/end-user/customizing/briefprefs.html
    You can also use a mozilla.cfg file to set the default value for prefs.<br />
    See: http://kb.mozillazine.org/Locking_preferences
    defaultPref(); // set new default value
    pref(); // set pref, but allow changes
    lockPref(); // lock pref, disallow changes

  • How to configure default parental settings for all users (10.7)?

    Hello,
    I've made a silent installation of iTunes using MSI files and it works well.
    I need to enable parental controls and configure it. Users must be preventing of changing these settings.
    At the end of the iTunes installation I automatically created registry keys :
    [HKEY_LOCAL_MACHINE\SOFTWARE\Apple Computer, Inc.\iTunes\Parental Controls]
    "AdminFlags"=dword:001b7ac5
    "AdminMoviesLimit"=dword:000000c8
    "AdminTVShowsLimit"=dword:000001f4
    "AdminRatingSystemID"=dword:0000000b
    "AdminGamesLimit"=dword:0000012c
    According to http://support.apple.com/kb/HT2102 it is the procedure to set default parental settings for all users and to lock these settings.
    When iTunes is first launched, parental settings are not set nor locked.
    I use iTunes 64 bits on Windows 7 64 bits.
    Where is the mistake?
    Thanks in advance.

    You can set up a system cache for sharing jars: See here: http://java.sun.com/j2se/1.5.0/docs/guide/javaws/developersguide/enterprise_config.03.06.html

Maybe you are looking for

  • Kingston Hyperx & Neo2 problem!

    KHX3200AK2/1GR Kingston HyperX pc3200 ram, dual channel kit 2x512mb MSI Neo2 board with 1.4 official bios 0441RPBW 3500+ winchester -- stock speeds Of course when first building new system I stuck both modules into dimms 1&2 for dual channel. Didn't

  • CS6: Where are smart objects stored?

    I've been working on some very large files where the primary image is converted to a smart object. For security I've backed up the PS files to another drive. Is the smart object part self contained? or stored as a separate lined file? Like if I had a

  • How to find and replace a URL in content

    See this page: http://democraticpartyofgeorgia.org/events/index.cfm?Fuseaction=Week&sm=9&sd=9&sy=2007 It's pushing the margins way out because some people are typing in long URLs in their event description (See the meeting on September 10). I'd like

  • How to implemented Planning Layout for other plan

    Hi, I have one planning layout for X plant now I want to use same layout for anothr plant. Can I copy the same layout for another plant...? If yes pleast let me know the step with tr.code. In this senario what I have to copy Planning area, Level or l

  • ATV keeps restarting on its own