hi all,
i have this req,
the price in sales order is determined based on quantity that has already good issued. i keep good issue quantity in info structure.
ex:
we have deliver/good issue 1000 PCS by last month.
in the beginning of this month, i create SO for 100 PCS.
Price master: 0 - 500 = 10$
                      501 - 1000 = 8 $
                     1001 - 2000 = 6 $
because we have GI 1000 PCS, so the price in sales order will be 8$ per PCS. so net value in so will be 8$ * 100 PCS = 800$.
how we do that? determined price based on qty already GI.
Best Regard,
Hendry

Hi Hendry,
You should go to VK12 t-code to change your condition records. in condition records, select your condition line and and go to scales by pressing F2. in this screen, you should maintain as below for your scale:
scales quantity----
amount
0 (should be blank;)----
10,00
500----
8,00
1000----
6,00
If you maintain it like that,you can meet your requirement.
I hope these will provide the solution.
Regards,

Similar Messages

  • Question Outbound Price Catalogue (VPRICAT) - Scales

    Hi to all,
    does anybody now how to activate scales in Outbound Price Catalogue (TCode VPRICAT)?
    Although we have maintained scale for price condition in TCode VK11/VK12, scales are not determined in Price Catalogue.
    Thank you for your help.
    BR, Simona

    Hi,
    I think Search UI is designed for reading standard Price Information.
    We use both standard Price Information and custom price field for sort purpose.
    Regards,
    Masa

  • Scale price get in KONM based on vbap quantity

    hi friends,
    i want take scale quantity price for the sale order materials . each material have 2 or mare prices . based on quantity i take scale price.
    example.
    materials quantity = 5.
    scale price:
    quantity price
    0 130
    2 120
    3 100
    i need to take scale price based on quantity < or = to scale quantity
    how to take this.
    please help me very urgent .give me the sample coding.
    regards,
    jayachandran

    Hi Jai,
    chec this.
    The condition type has on the section scale:
    Scale Base Type = Quantity.
    Rule for Scale Rates = Ascending.
    Maximum Number of Scale Dimensions = OneDimensional.
    Unit of Meas = KM.
    I want to determinate the price.
    If I have a product range of 1 to 5 the price is $ 10.
    If the units range is 6 to 10 the price is $ 20.
    quantity equal 1, price equal 10.
    quantity equal 2, price equal 10.
    quantity equal 5, price equal 10.
    quantity equal 6, price equal 20.
    quantity equal 7, price equal 20.
    quantity equal 10, price equal 20.
    Currently.
    quantity equal 1, price equal 10.
    quantity equal 2, price equal 20.
    quantity equal 5, price equal 50.
    quantity equal 6, price equal 120.
    quantity equal 7, price equal 140.
    quantity equal 10, price equal 200.
    cheers,
    Hema.

  • Schedule Agreement scale price is maintained, Pulling wrong price in GR

    Hi Experts,
    When good receipts of different quantities are entered, they all pick up the lowest price/highest volume regardless of the quantity.
    Case 1: Delivery schedule for 2 different quantity with same delivery date like eg. qty 5 & 6 and del. date 03/03/2011
    Case 2: Delivery schedule for 2 different quantity with different delivery date like eg. qty 6 & 7 and del date is 03/03/2011 & 03/04/2011
    In case 1 when doing GR first for qty 5 it is not pulling the correct price from the scale quantity 5 of scheduling agreement.
    In case 2 when doing GR for qty 6 it is pulling the lowest price not pulling the price from scale quantity 6
    Scale:    qty   Price                   please suggest me a solution for this issue
                     1    $20/pc
                     2    $18/pc
                     3    $15/pc
                     4    $12/pc
                     5    $10/pc
                     6    $8/pc
                     7    $7/pc
                     8    $6/pc                    Thank you in advance for your help                                                       Ismail
    Edited by: iismsyed on Mar 9, 2011 3:50 PM Is anybody their to help me out in this issue or who face this issue before.

    Hi Marco Antonio,
    For schedule agreements the SAP standard is to use the target quantity  for price determination. 
    User exit EXIT_SAPLEINR_003 exists using which you can influence the quantity and the date of the price determination at the time of the goods receipt for the scheduling agreement. However, you need to bear in  mind that when you call up the user exit, the quantity of goods received  actually to be posted does not yet exist. The schedule lines are  available in internal table CETT which can be used.                                                                               
    Hope this can help
    Regards,
    Mauro

  • Scale in purchasing

    hi friends
    my client want to maintain scales in price of material in contract please tell how to handle this.
    1 - 100 quantity fixed rs 900 so even if v order less then 100 we hav to pay 900
    101 - 200 10 Rs each
    More then 201 11 rs each.
    How i can maintain in contact?
    other we have a contract for courier
    0 - 50 gm 15 Rs fixed
    50 - 100 gm 30 rs fixd
    100 - 200 gm 35 rs fixed
    Tell me how to configure ...

    Hi Prabhat ,
    The first part need to be checked.
    For the second part , u can maintain the scales in Inforecord.
    Just Click on the conditions Eg : PB00 Goto Scales and maintain it.
    If u use "From Scale" the first value should be zero , if u use "To Scale " the first value should be 50 .
    Later test it in creation mode of PO .
    Bydeafult system proposes "From Scale" , u can change it in Inforecord after selecting scale Qty and then details.
    Regards
    Ramesh Ch

  • Using scaling of price after goods Receipt according to moisture content

    Dear All ,
             Is there any way of maintaining scaling in pricing after goods receipt .The scenario is like this .
    We are doing goods receipt for maize . Suppose the quoted price is Rs 900/ton . After goods receipt if the moisture content exceeds 14 % of the total weight the Payment price should reduce proportonately .
    My client has a scale of price for moisture % .Like if the % of moisture increases the price reduces proportionately .
             Kindly let me know where I can maintain this price scale so that during GR/MIRO I can enter the moisture % and the corresponding price should automatically pick from that .
    Regards
    Abhijit das

    Hi,
    It should be effectively done through raising of Credit / Debit note system only.
    Eventhough, it is configured through scales, it causes problems.
    Regards,
    VB

  • Pricing condition & price

    Hi Experts,
                 I have to acheieve the following functionality in CRM please help.
    I have to populate the price for certain pricing condition type PR00.
    For the some price maintinained in VK12 in ECC for a particular range of quanity.
    1-100 the price is 10$
    101-1000 the price is 20$.
    if the user had entered quanity as 50 i need to populate the price 10$ in the pricing condition type PR00.
    1. i have to check if the pricing condition type, if it is PR00.
    2. what is the quanity entered by user.
    3. for this quantity entered what is the price. ( what is the price scale based price table for this to get the price).
    4. how can i get the price for the range of quanity maintained.
    Please help
    Will rewarded with full points.
    Thanks.

    HI,
    if you have everything set up in ECC already, why don`t you just download pricing customizing from ECC to CRM?
    It will work the same way... all you need is to do additionally is install/activate IPC if not already done.
    Regards,
    Michael

  • Reference Price Conditions

    I want to reference a condition type Z001 from application area F against a pricing condition ZF00 in my sales order (application area V). I have maintained condition records against condition Z001 only. During Sales Order processing the system advises that no condition record can be found for ZF00, even though it also advises me not to create conditon records in transaction VK11 due to the reference.
    Is there an extra step missing? Do I need to point my ZF00 condition type to the access sequence from application area F? Is this possible?

    You can maintain Price conditions to vendor in MEKE transaction code.
    One you are in MEKE transaction - sytem will ask you purchase org and vendor name and after entering detail press execute button. Place your curser on vendor name and select create icon. it will direct to new fast entry screen to define the scales for price condition.
    The above will only work when you have already configure Schema Calculation. I mean following steps are required to calculate Schema.
    1.     Define calculation schema
    2.     Define schema group (Vendor Shema Group + Puchase Organization Schema Group)
    3.     Assign Vendor Schema Group to Vendor
    4.     Assign Purchase Organization Schema Group to Purchase Organization
    5.     Define Schema Determination.
    Hope it will help.

  • RE: X1 Carbon windows 7 Professional 64bit error message

    Hi, Good Morning Everybody,  I wish somebody here would advise me of my problem, Thanks.
    Problem of Laptop
    =================
    [Message 01]
    Hi, I bought X1 Carbon and found an error message when right click on the
    1st page after startup. The error message reads
    Microsoft Visual C++ Debug Library
    Debug Assertion Failed!
    Program: C:\Windows\System32\igfxsrvc.exe
    File: D:\Program Files\Microsoft Visual Studio 9.0\VC\ATLMFC\INCLUDE\
    atlcom.h
    Line:2475
    Expression: 0&& "Release called on a pointer that has already been
    released"
    For information on how your program can cause an assertion failure, see
    the Visual C++ documentation on asserts.
    (Press Retry to debug the application)
    By right, right click should show the menu of View, Sort by, Refresh,
    ......Screen resolution, Gadgets, Personalize, but just cannot access
    into the right click menu immediately. I have to wait more 3 minutes and
    get out of the error message, then the right click menu appear. Why is
    this so?
    Please advise how to eliminate the message and have the right click menu
    immediately. Should I bring the laptop to your service center for repair
    or you can email me the steps to solve this problem.
    Regards, Simon.
    [Message 03]
    hi, head of customer service,
    below is a chat log i had online for your review. My concern is that
    everybody work for a living - if u r the specialist in this field, i
    respect that u can foresee what is going to happen if u tell somebody who
    is not a specialist to do a specialist's job. U should be able to provide
    advice n the possible outcome if things do not work out right, because it
    is the end user who needs to face it n live with it. Take for example, if
    the office building was on fire n the human instinct is to fight fire
    first. But the workers do not have the proper knowledge of fire n also
    not equipped with good PPE. This worker probably called the fire
    department to report a fire, n at the same time the fire department
    specialist at the other end of the line told that worker to
    "troubleshoot" the fire without giving him the possible outcome if the
    fire blown out of scale, what price this worker will have to pay.
    My questions are:
    a) what is the goal of having on-line chat service? Is it to resolve
    simple technical issues, that's why an average IT worker can do the job?
    b) if the end user already knew the problem he is facing and he is
    expecting the best advice/solution from an expert rather than from an
    average IT worker, would it be better for the end user to go straight to
    email? Or straight to the service center?
    c) Is there a team work spirit between your chat section and service
    center? Is it going to take a long time to communicate among themselves
    when they face the same problem real time - meaning they can't talk to
    each other over the phone to resolve the same problem which the end user
    is facing? If they can discuss over the phone, and possibly the service
    center also share the same steps to resolve the problem but could not be
    sure if something goes wrong, the os of the laptop need to be
    re-installed. Then, the end user would not have to do a double job - to
    chat online and go down to the service center only find out that it is
    the same answer. Would it be better for the chat person to do the double
    job internally for the end user?
    [Hi, I bought X1 Carbon and found an error message when right click on the
    1st page after startup. The error message reads
    Microsoft Visual C++ Debug Library
    Debug Assertion Failed!
    Program: C:\Windows\System32\igfxsrvc.exe
    File: D:\Program Files\Microsoft Visual Studio 9.0\VC\ATLMFC\INCLUDE\
    atlcom.h
    Line:2475
    Expression: 0&& "Release called on a pointer that has already been
    released"
    For information on how your program can cause an assertion failure, see
    the Visual C++ documentation on asserts.
    (Press Retry to debug the application)
    By right, right click should show the menu of View, Sort by, Refresh,
    ......Screen resolution, Gadgets, Personalize, but just cannot access
    into the right click menu immediately. I have to wait more than 3 minutes and
    get out of the error message, then the right click menu appear. Why is
    this so?
    Please advise how to eliminate the message and have the right click menu
    immediately. Should I bring the laptop to your service center for repair
    or you can email me the steps to solve this problem.
    Regards, Simon.]
    [Message 02]
    [GoToAssist (10:11:53):
    Connecting...
    GoToAssist:
    Dear Customer,
    Thank you for contacting Lenovo and showing your interest in Lenovo
    instant support program. I see you have a question on your product. I am
    going to take few moments to review the information of your product and
    message you back, right here, very soon. Please add this page to your
    favorites, in case you get disconnected or close your browser, so you may
    come back to this conversation.
    Saraswati (10:12:25):
    Thank you for contacting Lenovo Technical Support. My name is Saraswati.
    I will be happy to assist you with this issue.
    Saraswati (10:12:30):
    Hello Simon.
    Saraswati (10:12:35):
    Good Morning.
    Saraswati (10:14:47):
    Simon , Have you checked with the steps I have provided in the earlier
    session ?
    SIMON (10:14:55):
    hi, i just lost the session chatting with u. Can u show me all that again
    here?
    Saraswati (10:16:14):
    Sure , Let me paste the conversation in this session.
    Saraswati (10:17:26):
    Saraswati (06:54:46):
    Thank you for contacting Lenovo Technical Support. My name is Saraswati.
    I will be happy to assist you with this issue.
    Saraswati (06:54:59):
    Hello Simon.
    Saraswati (06:55:05):
    Good morning.
    Saraswati (06:55:35):
    Please be connected to the session while I check with the query.
    Saraswati (06:59:38):
    It appears we may have been disconnected. Please respond so that I can
    confirm our connection.
    SIMON (07:00:27):
    Hi, yes I can see u r writing....
    Saraswati (07:00:58):
    May I know the operating system installed? Windows Xp, Windows Vista,
    Windows 7 or Windows 8? Is it 32-bit or 64-bit?
    SIMON (07:02:20):
    it's windows 7 64bit, the laptop is i5-3rd gen with 4gb ram
    Saraswati (07:03:36):
    http://www.intel.com/support/graphics/sb/cs-003927.htm please click on
    the link to fix the issue.
    Saraswati (07:05:49):
    Let me help you with the latest graphics driver
    Saraswati (07:08:14):
    http://download.lenovo.com/ibmdl/pub/pc/pccbbs/mobiles/g1d625ww.exe
    Intel HD Graphics Driver for Windows 7 (64-bit)
    Saraswati (07:08:25):
    Please install this link.
    Saraswati (07:09:01):
    Before installing uninstall the same form the device manager under the
    display adapter option.
    SIMON (07:10:21):
    hi, the link u recommended mentioned something like reinstall graphics
    drivers. I don't have the drivers n think it's pre-installed inside X1
    Carbon. My concern is what is the worst case it could be if I execute the
    link file n something goes wrong?
    Saraswati (07:12:28):
    Simaon , I would like to inform you that it is only the driver
    reinstallation. It will hamper the system performance. It is the driver
    provided with the preloaded OS. Hence it should not cause any issue.
    SIMON (07:12:48):
    btw, the os is windows 7 professional, hope i get it right.
    Saraswati (07:13:09):
    However please check by uninstalling and reinstalling the Microsoft
    Visual C++ .
    Saraswati (07:13:31):
    Yes , I have provided the link for the Windows 7 OS 64 bit.
    Saraswati (07:13:58):
    Please check with the above steps. This should fix the issue.
    Saraswati (07:16:32):
    Please feel free to get back to us at any moment , we will resolve all
    the issues related to the Lenovo Machine.
    Saraswati (07:17:32):
    It is been my pleasure assisting you with the issue.
    SIMON (07:18:06):
    ok, i take some time to do this, how to get back to u? do i need to
    re-boot the laptop during the process? Please don't tell me i need to
    re-install the os again if everything fail, because there r some
    3rd-party software which i do not have the original serial
    Saraswati (07:19:18):
    Please reinstall the drivers from the driver link. Then restart the
    machine and check if the issue persists.
    Saraswati (07:19:57):
    If still the issue persists then reinstall the Microsoft Visual C++.
    Saraswati (07:20:12):
    Hope this information is helpful
    Saraswati (07:20:27):
    Thank you for choosing Lenovo's chat Support. Kindly note, that there
    will be a customer satisfaction survey once you close this chat session.
    Please provide your valuable feedback for the chat session with me on a
    rating scale between 0 to 10, where 9 to 10 being satisfied with the
    service provided.
    Saraswati (07:20:33):
    Please note that the survey is only for current interaction. If you have
    any comments or feedback, please mention same under customer comments.
    Our team will take actions based on these comments to help us to serve
    you better. Thanks for your understanding & Support.
    Saraswati (07:20:44):
    Thank you again for contacting Lenovo and have a great day Simon.
    Saraswati (07:22:00):
    You may close this chat session now.
    SIMON (07:22:06):
    hi, have any of your specialist face with this problem before?
    Saraswati (07:23:22):
    We donot remember , but we would have assisted in the similar manner.
    Please check with the steps.
    Saraswati (07:23:45):
    Thank you for choosing Lenovo and have a great day ahead.
    SIMON (07:24:48):
    my worry is as i mentioned that i dont have the serials n it will be a
    great price to pay for me if i miss some steps or something just not
    right, then i would rather leave it as it is.
    Saraswati (10:17:51):
    Saraswati (07:25:43):
    You can visit the nearest service center , so that the service technician
    will help you further.
    Saraswati (07:26:29):
    Please contact on "800 6011 343 (Local number only) +603 8315 6856
    (DID)"-- singapore
    Saraswati (07:27:03):
    Contact on the above numbers the concerned team will provide you the
    address of the service center.
    SIMON (07:27:55):
    do u think the technician is more capable than any on-line chat engineers
    because they can see the real problem of the laptop?
    Saraswati (07:28:54):
    The steps I have provided should fix the issue. If you need any further
    assistance please visit the service center.
    SIMON (07:30:37):
    if they r just feedback to me with the possibilities i already perceived,
    then it's not worth the trip for me to take time off work n travel
    2 hours to n 2 hours fro your repair center.
    SIMON (07:33:51):
    My question is that "is it very difficult to comm between u and the
    service technician side, then feedback to me online? so i dont have take
    time off work n i also have to face my boss n it will look bad on me.
    Please be more considerate?
    Saraswati (07:36:02):
    Simon , I understand your concern. Please check with the steps I have
    provided and get back to us if the issue is not fixed. if you are
    doubtful that the above steps might delete any of your files then you can
    visit the service center , so that the service technician will check with
    the issue personally.
    Saraswati (07:36:47):
    Thank you for choosing Lenovo and have a great day ahead Simon.
    Saraswati (10:23:17):
    Is there anything else that I can assist you with, at this moment ?
    SIMON (10:23:26):
    ok, I will take your advice n talk to some IT guys b4 i act on it, to be
    sure that i made an informed decision. if i really have doubts, then i
    would have to suffer in silence n just live with that error message for
    the time being.
    Saraswati (10:23:53):
    Alright.
    Saraswati (10:24:23):
    Thank you for contacting Lenovo and have a great day Simon.
    Saraswati (10:25:09):
    You may close this chat session now.]
    Regards, Simon.

    Dev environment - i mean Visual Studio
    But fist try to check in Event viewer if there's any error message that could help to find what the actual problem is.
    Regards
    Bartek

  • Find the user exit while creation and change of sales order

    Hi Team
    Below mentioned requirement , in which user exit i have to put below logic while creaion and change of sales order?
    u2022     The logic for the user exit to explode should consider the following assumptions and validations
    o     Customer master to have the entry at KNVV-KVGR1
    o     Material master to have the entry at MVKE
    o     UoM in the Sales order item (VBAP- VRKME) should be = Pallets PAL or tonnes (TES)
    o     Should have more than one line item or number of line items with UoM PAL or tonnes TES should be > 1
    for example :-->
    Product A with Scales mentioned below
    Product A     Quantity / Scale     UoM     Price(£)
         0-10     PAL/TES     20
         11- 20     PAL/TES     10
         21- 30     PAL/TES     5
         31-40     PAL/TES     2.5
         >41     PAL/TES     
    Product B with Scales mentioned below
    Product B     Quantity / Scale     UoM     Price(£)
         0-15     PAL/TES     25
         16-20     PAL/TES     20
         21- 30     PAL/TES     15
         31-40     PAL/TES     10
         > 41     PAL/TES     5
    u2022     Product A (qty 10PAL) + Product B (qty 15 pal) ordered in a single order with 2 line items.
    u2022     The expected results should be
    o     Product A qty 10 + B qty 15 added = 25Pal
    o     The system user exit should add the total number of pallets on the order line items and point towards the respective scales, so in this example prices against each line item should be the respective price against 25 Pal = 5£ for product A per pal and £15 for product B.
    Thanks in Advance.
    Puneet.

    Hi Team
    Below mentioned requirement , in which user exit i have to put below logic while creaion and change of sales order?
    u2022 The logic for the user exit to explode should consider the following assumptions and validations
    o Customer master to have the entry at KNVV-KVGR1
    o Material master to have the entry at MVKE
    o UoM in the Sales order item (VBAP- VRKME) should be = Pallets PAL or tonnes (TES)
    o Should have more than one line item or number of line items with UoM PAL or tonnes TES should be > 1
    for example :-->
    Product A with Scales mentioned below
    Product A Quantity / Scale UoM Price(£)
    0-10 PAL/TES 20
    11- 20 PAL/TES 10
    21- 30 PAL/TES 5
    31-40 PAL/TES 2.5
    >41 PAL/TES
    Product B with Scales mentioned below
    Product B Quantity / Scale UoM Price(£)
    0-15 PAL/TES 25
    16-20 PAL/TES 20
    21- 30 PAL/TES 15
    31-40 PAL/TES 10
    41 PAL/TES 5
    u2022 Product A (qty 10PAL) + Product B (qty 15 pal) ordered in a single order with 2 line items.
    u2022 The expected results should be
    o Product A qty 10 + B qty 15 added = 25Pal
    o The system user exit should add the total number of pallets on the order line items and point towards the respective scales, so in this example prices against each line item should be the respective price against 25 Pal = 5£ for product A per pal and £15 for product B.
    Thanks in Advance.
    Puneet.

  • User exit during creation and saving of Produciton order

    Hi folks,
    I need to append a row in the material component of transaction code COR1. This needs to be triggerd when an order is created and saved in COR1. Please help me out...........
    thanks in advance

    Hi Team
    Below mentioned requirement , in which user exit i have to put below logic while creaion and change of sales order?
    u2022 The logic for the user exit to explode should consider the following assumptions and validations
    o Customer master to have the entry at KNVV-KVGR1
    o Material master to have the entry at MVKE
    o UoM in the Sales order item (VBAP- VRKME) should be = Pallets PAL or tonnes (TES)
    o Should have more than one line item or number of line items with UoM PAL or tonnes TES should be > 1
    for example :-->
    Product A with Scales mentioned below
    Product A Quantity / Scale UoM Price(£)
    0-10 PAL/TES 20
    11- 20 PAL/TES 10
    21- 30 PAL/TES 5
    31-40 PAL/TES 2.5
    >41 PAL/TES
    Product B with Scales mentioned below
    Product B Quantity / Scale UoM Price(£)
    0-15 PAL/TES 25
    16-20 PAL/TES 20
    21- 30 PAL/TES 15
    31-40 PAL/TES 10
    41 PAL/TES 5
    u2022 Product A (qty 10PAL) + Product B (qty 15 pal) ordered in a single order with 2 line items.
    u2022 The expected results should be
    o Product A qty 10 + B qty 15 added = 25Pal
    o The system user exit should add the total number of pallets on the order line items and point towards the respective scales, so in this example prices against each line item should be the respective price against 25 Pal = 5£ for product A per pal and £15 for product B.
    Thanks in Advance.
    Puneet.

  • My current idea for having two synchronized libraries...will this work?

    I want to be able to have identical iPhoto libraries on my iMac and MacBook.. I understand that they can't be synchronized in the traditional way as other documents.
    My current idea is to move the library to an external drive. This would allow me to operate iPhotos off either computer in the house. But I would also (manually, I guess) then occasionally recopy the external library back onto each machine. (Essentially creating a backup of the library on the computer itself.)
    The iMac backup wouldn't need to be used. But the MacBook backup could be accessed when I left the house. Obviously, I then would have transfer the laptop changes to the external drive when I got back home.
    Seems cumbersome, but is there any better way to accomplish what I want? (Two computers. Identical iPhoto library. Ability to leave the house with the laptop.)

    Yes. I ran a test library from my G5 and MacBook Pro. Changes made by one computer was picked up by the other. Even though Dropbox states that if both change a document at the same time it the person who saves first will "win" and the other's document will be includes as a separate file so the user can decide. That might be OK for a Word document but for a library it could get messy. Primarily since the size limit on the free Dropbox is 2GB getting a second library would most assuredly run you over the limit and it would not be saved.
    The safest scenario is just allow one user at a time. I've contacted the developer regarding the 2 GB limit and the upgrade path. Currently there's only a 50GB upgrade at $99/yr. Both are too high in my opinion. I've suggested they consider a "family pack" of some type and with a sliding scale of upgrades, 5, 10, 15, 20, etc., with a similar scale for price.
    I'll add you to the library and you'll get an email from Dropbox. Just download and install, go to the DB web site and accept. It will immediately put the library (4 pictures) in your dropbox and we can test it out. The invite is on it's way.
    OT

  • SD Certification questions

    Hi all,
    Is there any way to get the SD certification questions anywhere
    I want to gothrough many.If some one has please let me know, I will contact .Please help me as much as possible on this
    Regards
    Mano

    Dear Mano,
    SD SAMPLE CERTIFIED QUESTIONS
    I BASIS KNOWLEDGE AND SYSTEM NAVIGATION
    1. Name two ways to start a transaction.
    answer: Dynamic Menu and Command Field
    2. Why do you create user*specific parameters?
    Answer: They supply defaults to R/3 fields. If a field is indicated, the system automatically fills in
    default value. Depending on the field definition, the entry can also be replaced with a value
    entered by the user. (Concept of PARAMETER ID)
    3. Name the three different kinds of messages in the R/3 system. What is the difference
    between them?
    A message can have five different types. These message types have the following effects during
    list processing:
    A (=Abend):
    The system displays a message of this message type in a dialog window. After the user confirms
    the message using ENTER, the system terminates the entire transaction (for example SE38).
    E (=Error) or W (=Warning):
    The system displays a message of this message type in the status line. After the user chooses
    ENTER, the system acts as follows:
    While creating the basic list, the system terminates the report.
    While creating a secondary list, the system terminates the corresponding processing block and
    keeps displaying the previous list level.
    I (=Information):
    The system displays a message of this message type in a dialog window. After the user chooses
    ENTER, the system resumes processing at the current program position.
    S (=Success):
    The system displays a message of this message type on the output screen in the status line of the
    currently created list.
    4. What is a data dictionary or repository?
    Central catalog that contains the descriptions of an organization's data and provides information
    about the relationships between the data and its use in programs and screens.
    The data descriptions in a Data Dictionary are also called metadata, i.e., data that describes other
    data.
    The ABAP/4 Dictionary stores system*wide data definitions. When you create a new data
    definition, the Dictionary tool does all the processing necessary to create the definition. You can
    use the Dictionary tool to look up the "definition" of objects in your R/3 System.
    5. What is a matchcode?
    Comparison key. A matchcode allows you to locate the key of a particular database record (e.g.
    account number) by entering any field value contained in the record. The system then displays a
    list of records matching the specifications.
    If you want an end user to see a specific menu after logging on the R/3 system, how could you do
    that?
    User maintenance transactions allow the system administrator to create and maintain user master
    records. This includes the generation and assignment of authorizations and authorization profiles.
    1
    SD SAMPLE CERTIFIED QUESTION
    II CORPORATE STRUCTURE
    In R/3 you can represent a company's structure by defining and assigning corporate structure
    elements. What is the purpose of doing that?
    Enterprise organization diagram.
    Chart showing the organizational structure of an enterprise, its organization units and how they are
    related. A combined structure can be created from the point of view of accounting, MM, SD. This
    structure forms a framework in which all business transactions can be processed.
    Which three organizational elements make up a sales area and briefly explain their function?
    Sales organization: An organizational unit that sells and distributes products, negotiates terms of sale,
    and is responsible for these transactions.
    Distribution channel: Channel through which salable materials or services reach customers. Typical
    distribution channels include wholesale, retail and direct sales. You can assign a distribution channel to
    one or more sales organizations.
    Division: Product groups can be defined for a wide*ranging spectrum of products. For every division
    you can make customer*specific agreements on, for example, partial deliveries, pricing and terms of
    payment. Within a division you can carry out statistical analyses or set up separate marketing.
    Name the three internal organizational elements within a sales organization and briefly
    explain their function.
    Sales Office
    Geographical aspects of the organization in business development and sales are defined using the term
    sales office. A sales office can be considered as a subsidiary.
    Sales offices are assigned to sales areas. If you enter a sales order for a sales office within a certain
    sales area, the sales office must be assigned to that area.
    Sales Group. The staff of a sales office may be subdivided into sales groups. For example, sales groups
    can be defined for individual divisions.
    Sales Persons
    Individual personnel master records are used to manage data about salespersons. You can assign a
    sales person to a sales group in the personnel master record.
    What does the term "business area" refer to and how can it be used?
    Business Area. The system posts costs and revenue according to the business area. The business
    area can be equivalent to the:
    sales area (if the accounts are to be posted according to sales)
    plant/division (if the accounts are to be posted according to products)
    The business area is defined in Customizing for Sales.
    Business area. A unit in an enterprise, grouping product and market combinations as homogeneously
    as possible for the purpose of developing unified business policy.
    Financial Accounting (FI). A business area is an organizational unit within financial accounting which
    represents a separate area of operations or responsibilities within an organization. Financial accounting
    transactions can be allocated to a specific business area.
    Briefly explain the relationship between sales organizations and company codes.
    Many to One.
    What is the central organizational element in purchasing?
    Purchasing Organization.
    Explain the relationship between sales organizations and plants.
    Many to Many.
    Explain the relationship between sales organizations, plants and company codes.
    Many to Many to One.
    Can one business area be assigned to several company codes? Which (sub) module of SAP could make
    business areas obsolete?
    Yes in CO .
    2
    SD SAMPLE CERTIFIED QUESTION
    What is a credit control area? What relationship exists between credit control areas and
    company codes?
    Credit control area. Organizational unit in an organization that specifies and checks credit limits for
    customers. A credit control area can include one or more company codes. It is not possible to assign a
    company code to more than one credit control areas.
    Which organizational element is central in shipping? Give a definition of it.
    Shipping Point: Organizational unit at a fixed location that carries out shipping activities. A shipping
    point could, for example, be a company's mail department or a plant's rail depot. Each delivery is
    processed by only one shipping point.
    Give a definition of plant (in SAP).
    Organizational unit within Logistics, serving to subdivide an enterprise according to production,
    procurement, maintenance, and materials planning aspects.
    A plant is a place where either materials are produced or goods and services provided.
    Classification: Business object
    Structure: A plant can assume a variety of roles:
    As a maintenance plant, it includes the maintenance objects that are spatially located within this plant.
    The maintenance tasks that are to be performed are specified within a maintenance planning plant.
    As a retail or wholesale site, it makes merchandise available for distribution and sale.
    As a rule, the plant is the organizational unit for material valuation.
    The preferred shipping point for a plant is defined as the default shipping point, which depends on the
    shipping condition and the loading condition.
    For the placement of materials in storage (stock put*away), a storage location is assigned to a plant.
    The storage location depends on the storage condition and the stock placement situation.
    The business area that is responsible for a valuation area is determined as a function of the division.
    As a rule, a valuation area corresponds to a plant.
    Can you assign two different sales organization to the same company code?
    Yes.
    To what do you assign distribution channels and divisions?
    Sales Organizations.
    What are the highest organizational units in SD, MM.PP,FI,CO?
    SD: Sales Organizations.
    M: Plant
    PP: Plant
    FI: Company Code
    CO: Controlling Area
    Can you further subdivide a plant? If yes into what ?
    A plant can be subdivided into storage locations, allowing stocks of materials to be broken down
    according to predefined criteria (e.g., location and materials planning aspects).
    A plant can be subdivided into locations and operational areas. Subdivision into locations takes
    geographical criteria into account, whereas subdivision into operational areas reflects responsibilities
    for production.
    Can a sales organization sell from a plant belonging to a different company code?
    Yes.
    How many shipping points can you assign to a plant?
    Many.
    How many shipping points can you assign to a sales organization?
    None.
    If you have a warehouse management system active, to what would you assign the warehouse
    number?
    Plant & Storage Location.
    3
    SD SAMPLE CERTIFIED QUESTION
    III MASTER DATA
    Why does the customer master have different views?
    In addition to the sales and distribution data, the accounting data is also important for a payer.
    Therefore one can create a customer master record centrally for the following partner functions:
    For the payer
    For the sold*to party who, in addition to the other partner functions, also takes on the function of the
    payer.
    Which different partner functions can a customer master record serve?
    Customer:
    sold*to party
    ship*to party
    payer
    bill*to party
    One*time customer including all partner functions.
    What is the structure of data in the customer master record?
    Different data is maintained in each of the three areas:
    General data, like address and telephone number, etc., is maintained for every customer. This data is
    only identified by the customer number, not by company code or sales area. Maintaining the data is
    possible from both the accounting view and the sales and distribution view.
    Company code data is only of interest for the accounting department. It includes, for example,
    information on insurance or account management. This data applies to only one company code.
    Sales and distribution data is only of interest for the sales and distribution department. It includes, for
    example, data on pricing or shipping. This data only applies to one sales area, and therefore is
    dependent on the sales structure (sales organization, distribution channel, division).
    Would you have different customer numbers if your customer was serviced by more than
    one company code?
    No.
    Would you have different customer numbers if your customer was serviced by more than
    one sales organization?
    No.
    A material is produced in plant Boston, plant Dallas and in plant Chicago. How many
    different material master number do you need?
    Only one.
    Is it possible to have different data for the same customer for different sales areas?
    Yes.
    Give examples of general data in the customer master record ?
    Address, Control data, Marketing, Payment transactions, Contact person, Unloading points.
    Give examples of general data in the material master record ?
    This level contains the data applicable to all individual group companies, all plants, and all
    warehouses/stores belonging to an enterprise (corporate group). Examples of general data are details
    on a material's design (CAD drawings, for instance) and storage conditions (temperature range,
    whether the material is explosive or perishable, and so on).
    Give examples of company codespecific data in the customer master record?
    This data is only of importance to the accounting department. It includes, for example, data on
    insurance and account management. Company code data only applies to one company code. If you
    edit the customer master record you must specify customer number and company code in order to
    access the screens containing company code data.
    Which plant*specific data do you find in the material master record?
    4
    SD SAMPLE CERTIFIED QUESTION
    This level contains the data for each branch or plant location within a certain company. The data
    important to Purchasing is stored at this level. Examples of this data are the maximum and minimum
    order quantities of a material and the reorder level. You access the plant data by entering the plant
    key.
    If a customer wishes to receive goods on Tuesdays only, how could you ensure that in the
    SAP R/3 system?
    This can be done by specifying goods receiving hours * Time schedule of ship*to party which specifies
    the days and times that goods can be delivered.
    Do you find any sales prices in the material master record?
    Yes.
    Name at least five different partner functions.
    Examples of partner functions in Sales and Distribution:
    soldto party, shipto party, bill*to party, payer.
    Examples of partner functions (roles) in Materials Management:
    ordering address, supplier of goods, invoicing party, different payee.
    Which are the two partner functions in SD that have to be maintained in FI too ?
    sold*to party, payer.
    Can you assign a material to more than one division?
    No.
    If you want to create language specific sales texts for your material master, would you have
    to create a new material master record?
    No.
    What is a material type and which material types do you know?
    Raw materials, semi*finished products, finished products, trading goods, operating supplies.
    Name the four standard industry sectors in SAP for the material master. For what do you use
    them?
    Branch of industry.
    The industry sector groups together companies according to their activities (for example, plant
    engineering and construction, mechanical engineering, the chemical industry, and the pharmaceutical
    industry).
    Table*driven program support is provided via the industry sector: for example, for the selection of
    data fields on*screen, for the sequence of the screens, and for the allocation of a material to a
    material type.
    For what or why do you use the classification system in sales? Give examples of objects you
    can classify in R/3.
    For e.g., Variant Pricing of configurable products. Objects can be customers, products, condition types.
    Does storage*location specific data in the material master record apply for each plant?
    This level contains the data specific to a storage location. Stock levels are an example of the data
    maintained for each storage location. You access the storage location data by entering the plant and
    storage location codes.
    This data structure facilitates the organization of material*related information within the entire
    enterprise. It prevents redundant storage of material data when the same material is used in more
    than one plant or stored at more than one storage location.
    Example: Suppose the same metal casting is stored at two different locations. The design and
    purchasing data for this material would be identical. However, the data on the stock levels at each
    location would differ.
    Name at least four views of the material master record.
    5
    SD SAMPLE CERTIFIED QUESTION
    . Accounting : Valuation and costing information. Examples: standard price, past and future
    price, and current valuation.
    . Materials planning and control: Information for material requirements planning (MRP) and
    consumption*based planning/inventory control. Examples: safety stock level, planned delivery
    time, and reorder level for a material.
    . Purchasing: Data provided by Purchasing for a material. Examples: purchasing group
    responsible for a material, over* and underdelivery tolerances, and the order unit.
    . Engineering: Engineering and design data on a material. Examples: CAD drawings, basic
    dimensions, and design specifications.
    . Storage: Information relating to the storage/warehousing of a material. Examples: unit of
    issue, storage conditions, and packaging dimensions.
    . Forecasting: Information for predicting material requirements. Examples: how the material is
    procured, forecasting period, and past consumption/usage.
    . Sales and distribution: Information for sales orders and pricing. Examples: sales price,
    minimum order quantity, and the name of the sales department responsible for a certain
    material.
    What are the possible units of measure for a material?
    A material can be stored, transported and sold in various units of measure. In the SAP R/3 System,
    you can therefore define various units of measure which are maintained in the sales and distribution
    screens. However, you only need to maintain the fields of the units of measure if they deviate from the
    base unit of measure. If no other fields with units of measure are maintained, the system
    automatically takes the base unit of measure as a basis for its calculations. You can enter the following
    units of measure in the sales and distribution screens:
    . Base unit of measure : Stocks of a material are managed in the base unit of measure. All
    quantity movements in other units of measure are converted automatically by the system into
    the base unit of measure.
    . Alternative unit of measure: If a product is managed in the base unit of measure "Piece" but is
    sold in the sales unit "Box", you must define the conversion factor. The alternative unit of
    measure can define, for example, that 1 box of this material contains 12 pieces.
    . Sales unit : The unit of measure in which materials are sold is referred to as a sales unit (for
    example, piece or bottle). The value you define in the material master record is proposed
    during business transactions relevant for sales, such as the sales order. You can replace them
    with other alternative units of measure in the sales order.
    . Delivery Unit : The delivery unit refers to the unit in which materials can be delivered. Only
    exact multiples of the delivery unit can be delivered. For example, with a delivery unit of 30
    bottles, 30, 60 or 90 bottles can be delivered, but not 100 bottles.
    . Quantity Specifications: Two different quantity specifications are used:
    . Minimum order quantity: The minimum order quantity refers to the minimum quantity the
    customer must order. A warning message appears if the minimum order quantity is not
    reached during order entry. The order can be entered in spite of the warning message.
    . Minimum delivery quantity : The minimum delivery quantity refers to the minimum quantity
    you must deliver to the customer. The minimum delivery quantity is automatically checked
    during delivery processing. A warning message appears during delivery processing if you enter
    a delivery quantity lower than the minimum delivery quantity. The delivery can be created in
    spite of this warning message.
    What is a Bill of material?
    A bill of material is a complete, formally structured list of the components that make up a product or
    assembly. The list contains the object number of each component, together with the quantity and unit
    of measure. The components are known as BOM items. A bill of material can only refer to a quantity of
    at least 1 of an object.
    Is the BOM used in the PP module only?
     No. Also used in SD.
    6
    SD SAMPLE CERTIFIED QUESTION
    Explain what a routing is?
    Routing contains the operations required in production, and the production resources/tools, material
    components, and test equipment required to produce the product.
    What is a work center?
    A work center is an organizational unit where a work step is carried out, producing an output. The
    work center defines where and by whom an operation is to be carried out. A cost center is assigned to
    each work center in the work center master record. The work center has a particular available
    capacity. The activities performed at or by the work center are valuated by charge rates, which are
    determined by cost centers and activity types. Work centers can be: Machines, People, Production
    lines, Groups of craftsmen .
    IN Personnel Planning and Development (PD) work centers are the physical locations where tasks are
    carried out. A work center can represent anything as general as a geographic location, for example,
    the New York branch office. Or work centers can be very precisely defined. For example, a work center
    could represent a specific workstation, with specific tools and equipment, on a specific floor, of a
    specific building.
    IN Workflow Management a work center is a particular place which has been set up specifically so that
    employees can perform their duties within the corporate work system using working materials.
    What does the account group of the customer /vendor control?
    A collection of properties of accounts which determine the creation of master records.
    The account group determines the data that is relevant for the master record and a number range
    from which numbers are selected for the master records.
    Each master record must be assigned to an account group.
    Changes to the account group and the accompanying partner functions can only be made from a lower
    level to a higher level. For example, this means that a sold*to party cannot be assigned the function of
    a payer as fields which have already been maintained for this sold*to party would have to be masked.
    However, you can assign the sold*to party function to a payer.
    The account group ensures that for the different partner functions of a customer only the necessary
    screens and fields are displayed for input.
    What are the two possible ways of control for the cost of a material in the material master
    record?
    Standard Price, Moving Average Price.
    What is a valuation class?
    Allocation of a material to a group of G/L accounts.
    Along with other factors, the valuation class determines the G/L accounts to be updated as a result of
    a valuation*relevant transaction (for example, a goods movement).
    Which valuation classes are valid depends on the material type. Several valuation classes
    can be valid for one material type. A valuation class can be valid for several material types.
    A customer master record in SD is also an A/R(accounts receivables)in FI. When you create a customer
    master record you also have to specify the reconciliation account. For what is the reconciliation
    account used?
    Account in G/L accounting, to which automatic entries are posted during a business activity. It is
    generally the case that several subledger accounts post to a common reconciliation account. This
    ensures that the developments in the subledger accounts are accurately reflected in the general ledger
    (i.e. in line with balance sheet conventions). You can set up a reconciliation account for, say, all
    overseas customers.
    7
    SD SAMPLE CERTIFIED QUESTION
    IV INTRODUCTION TO ORDER MANAGEMENT & SALES
    Briefly describe the types and structure of the sales document and give examples of data
    that you find on the different levels.
    Sales*related business transactions are recorded in the system as sales documents. There are, broadly
    speaking, four different groupings of sales documents:
    Sales queries, such as inquiries and quotations
    Sales orders
    Outline agreements, such as contracts and scheduling agreements
    Customer problems and complaints, such as free of charge deliveries and credit memo requests.
    Header Data
    The general data that is valid for the entire document is recorded in the document header. This data
    includes the:
    number of the sold*to party
    number of the ship*to party and the payer
    document currency and exchange rate
    pricing elements for the entire document
    delivery date and shipping point
    Item Data
    Whereas data in the document header applies to all items in the document, some data applies only to
    specific items. This data is stored at item level and includes the:
    material number
    target quantity for outline agreements
    number of the shipto party and the payer (an alternative shipto party or payer can be defined for a
    particular item)
    plant and storage location specifications
    pricing elements for the individual items
    Schedule Line Data
    An item consists of one or more schedule lines. The schedule line contains all the data that is needed
    for a delivery. For example, a customer orders 20 pieces of a material and you enter this as an item in
    the sales order. However, you can only deliver 10 pieces now and the remaining 10 pieces next month.
    In other words, you need to schedule two deliveries. The data for these deliveries (dates, confirmed
    quantities) are stored in two separate schedule lines. In sales documents where delivery data is not
    relevant *for example: contracts, credit and debit memo requests * the system does not create any
    schedule lines.
    Data recorded in the schedule lines includes the:
    schedule line quantity
    delivery date
    confirmed quantity
    What is the difference between an inquiry and quotation ?
    . Inquiry: Request made to a vendor for a quotation for required materials or services.
    No availability check is done for inquiry.
    . Quotation: Offer from a vendor to a purchasing organization regarding the supply of materials
    or performance of services subject to predefined terms and conditions.
    A quotation consists of a number of items, in which the total quantity and delivery date of an
    offered material or service are specified.
    The total quantity can be subdivided into several partial quantities with different delivery dates in the
    lines of a delivery schedule.
    Do you always have to have a material master record number when you enter an item on a
    sales document (inquiry and quote)? If not what would you have to use to be able to enter
    information at item level?
    No. Customer Material Information or Material Description.
    If a customer doesn't place an order with you after you have sent him a quotation, what happens to
    the quotation document?
    Remains active till the end of validity period.
    8
    SD SAMPLE CERTIFIED QUESTION
    Can you have alternative items in a sales order?
    Yes.
    If you reference an inquiry when creating a quotation ,would the inquiry be updated?
    Yes.
    Can you copy one inquiry to many quotations ?
    No.
    Can you copy several previous documents into one sales order?
    Yes.
    Do you always have to copy the entire quantities at item level when you reference a
    previous document?
    No.
    Can you make sure that business data in a sales order is only possible to maintain at header
    level?
    Yes.
    From where is the delivering plant transferred into the sales order?
    Customer Master, Material Master.
    Which partner function is relevant for the delivering plant? The soldtoparty ,
    billtoparty, payer, carrier or the ship* to* party?
    Ship*to party.
    Can you manually change the delivering plant in the sales order once it was defaulted from
    the master data?
    Yes.
    For what or why do you use the incompletion log?
    To have a complete document so that it doesnu2019t affect subsequent processes.
    Can you have different incompletion logs for different item categories? Schedule line
    categories?
    Yes.
    If a document is incomplete can you still save the document?
    Yes.
    Which reference status can a document have at item level? Which statuses at header level?
    Item level: Partial, Full.
    Header level: Full.
    What's the advantage of using text as a reference instead of duplicating it?
    Can be modified if needed.
    What three sources provide data for the creation of a sales document?
    Material Master, Customer Master, Previous referenced documents.
    Can you change addresses of partners manually in the sales document?
    Yes.
    Name several input tools that make order entry faster and give a definition of them?
    Customer Material Information, Product Proposal , Referencing Documents.
    9
    SD SAMPLE CERTIFIED QUESTION
    In which business environment would you use only the single*line entry screen to create
    and save the order?
    Telephone Sales, Simple Business.
    If you do not specify the delivering plant in the sales order, what could the system then not
    do?
    Delivery Scheduling.
    For what would you use the fast change function in sales entry?
    Alternate Plants, Delivery or Billing Blocks
    Name two ways to control that customers can receive only certain materials?
    Material Listing, Exclusion.
    What does the item category control?
    General Data
    . Should pricing be carried out for the item?
    . When should an item be regarded as completed? A quotation item, for example, can only be
    regarded as completed if the entire quantity has been copied into a sales order.
    . Is it an item that refers to a material or is it a text item?
    . Are schedule lines allowed for the item?
    . May general business data, for example, the terms of payment at the item level, deviate from
    those at the header level?
    . Should a system message appear if the item cannot be fully delivered?
    . Which fields are relevant for the incompletion log?
    . Which partner functions are allowed at the item level and which are mandatory?
    . Which output (for example, an order confirmation) is allowed for the business transaction and
    which output determination procedure is used?
    Shipping Data
    . Is an item relevant for delivery?
    . Should the weight and the volume of an item be determined?
    Billing Data
    . Is an item relevant for billing?
    . Should the cost of the item be determined?
    . Is it a statistical item? Pricing is carried out for statistical items. However, they are not added
    to the value of the order, that is, the customer is not charged for them.
    . Should a billing block be set automatically for an item? For example, this may be important for
    items whose prices have to be clarified before billing
    . Is it a returns item?
    . Name the influencing factors for determining the item category in the sales document?
    . Sales Document type, Item Category Group, Higher Level Item, Item Usage.
    . Name the influencing factors for determining the scehdule line category in the sales document?
    . Item Category, MRP Type.
    . What does the sales document type control?
    General Data
    . Can the document be entered only with reference to a preceding document?
    . Should the existing customer
    . material info record be taken into consideration?
    . Should the delivery date be proposed?
    . Must a customer number be entered when creating a document? For example, product
    proposals can be entered without reference to a particular customer.
    . Which order probability is defined?
    . Should the division be taken from the material master record for every item or should an
    alternative division specified in the header take precedence over the item specifications?
    10
    SD SAMPLE CERTIFIED QUESTION
    . How should the system respond if the division entered in the header deviates from the division
    in the items?
    . Should a credit limit check be made?
    . From which number range should the document number for internal or external number
    assignment come?
    . Which fields are relevant for the incompletion log? The validity period, for example, is
    important for contracts and must therefore be specified in the document.
    . Can an incomplete document be saved or must all data be complete?
    . Which partner functions are allowed and which ones are mandatory?
    Shipping Data
    . Which delivery type should the delivery resulting from the order have?
    . Should delivery scheduling be carried out?
    . Should transportation scheduling be carried out?
    . Should a delivery block be set automatically for a specific reason? For example, a delivery
    block may be appropriate for a freeofcharge delivery.
    . You can define shipping conditions for a sales document type. These are copied into the
    document regardless of what is defined in the customer master record.
    Billing Data
    Which billing type should the invoice resulting from the order or the delivery have?
    Should a billing block be set automatically for a specific reason? For example, a billing block may be
    appropriate if a credit memo request should first be checked before it is used as the basis for a credit
    memo.
    Can the sales document type be determined by the system?
    No.
    In R/3, can you automatically substitute one product for another? How? What would you
    have to create?
    Yes. Product Selection / Material Determination.
    Give a definition of replenishment lead time?
    Total time for the inhouse production or for the external procurement of a product. In inhouse
    production the replenishment lead time is determined to cover all BOM levels.
    What's the difference between checking availability with or without replenishment lead time (RLT)?
    With RLT : Availability check is done only upto end of RLT. If material is not available the date on
    which RLT ends is displayed as Material Availability Date.
    Without RLT : Availability check is unrestricted. Displays Delivery Dates as on which partial deliveries
    can be made with available stock.
    Name at least three item categories?
    Standard Items : AFN, AGN, TAN.
    Free of charge Items: AFNN, AGNN, TANN.
    Non*stock Items : AFX, AGX, TAX.
    Text Items : AFTX, AGTX, TATX.
    Why would you use different item and schedule line categories?
    Item categories are defined to provide additional control functions for the sales documents and thus
    meet the demands resulting from the different business transactions.
    The items in a sales document are divided into one or more schedule lines. These schedule lines differ
    from each other with respect to date and quantity. For some schedule lines, material requirements
    planning is not carried out; for other schedule lines, it is carried out. Also goods receipt, not goods
    issue, is posted for a schedule line defined in a returns document.
    Can you change existing standard item categories?
    Yes.
    11
    SD SAMPLE CERTIFIED QUESTION
    Can you create new sales order types?
    Yes.
    Different dates will be calculated in order entry scheduling . Can you name the lead time
    variables that will be taken into account?
    Transportation lead time, Pick/pack time, Loading time, Transit time .
    If you run out of stock in a specific plant can you check if there are quantities available in other plants?
    Yes.
    When you carry out availability check, which quantities or movements can the system take
    into consideration?
    The following elements can be included in the availability check:
    Stocks : safety stock, stock in transfer, stock in quality inspection, blocked stock.
    Inward and outward movements : purchase orders, purchase requisitions, planned orders, production
    orders, reservations, dependent reservations, dependent requirements, sales requirements, delivery
    requirements.
    Give some examples of sales document types (description, not necessary the short code)
    that already set up in the standard system?
    Indicator used to control the processing of the various sales documents which are defined in the
    system. E.g., OR, SO, BV, KR. Document types allow the system to process different kinds of business
    transactions, such as standard orders and credit memo requests, in different ways.
    Can you maintain texts for a specific customer and store them in the system? If yes, where?
    Yes. Customer Material Information.
    When the system checks availability which scheduling would it use first?
    Backward Scheduling.
    Name the influencing factors for the determination of the availability date?
    The following data is required for determining this date:
    Route from the shipping point to the ship*to party location
    Shipping point from which the goods are issued
    Loading group from the material master record
    Weight group determined from the order using the order quantity.
    Name the three delivery possibilities when there is not enough stock available?
    One Time Delivery, Complete Delivery, Partial Deliveries.
    Can you think of an example why you would have to create a text for a customer and copy it
    to the sales order?
    Customer specific instructions.
    What is the function of item category group?
    The item category group determines how a material is processed in the sales order. It defines, for
    example, that pricing does not take place for a free of charge item, such as a business gift; or that
    inventory management is not carried out for a service. When processing sales and distribution
    documents, the system uses the item category group to determine the item category. The system
    determines the item category based on the item category group of the material and the current
    business transaction, and proposes it in the respective document.
    When creating the material types non*stock material and services, DIEN is proposed in both cases for
    the item category group, because the order processing for both material types is identical: for
    example, pricing is carried out for both, but no availability check.
    On sales order, when the system confirms 20 pieces to be available at a certain date, would
    these 20 pieces still be available for other new sales order coming in later?
    No.
    What is a delivery group and why would you use it?
    12
    SD SAMPLE CERTIFIED QUESTION
    The complete delivery and delivery group functions enable you to combine some or all of the items in a
    sales order so that they are delivered to the customer together. The system determines automatically
    the latest delivery date possible for the delivery group and adjusts the schedule lines accordingly.
    Corresponding requirements for material requirements planning (MRP) are changed or re*determined.
    What is backorder processing?
    The backorder processing functions enable you to list relevant sales documents for specific materials
    and process them from the point of view of availability. You can assign available to promise (ATP)
    stock to outstanding order quantities. In addition, you can withdraw already confirmed quantities and
    reassign them to different items.
    Backorder processing is only available for materials with individual requirements.
    Can you link items in a sales order? If yes, when would you do that?
    Yes. Promotional Items.
    For what would you use BOMu2019S in sales? What two methods of BOM processing do you have
    in sales order entry? How can you control if the system should/should not explode a BOM in
    the sales order.
    A bill of material (BOM) describes the different components that together create a product. A BOM for
    a bicycle, for example, consists of all the parts that make up the bicycle: the frame, the saddle,
    wheels, and so on. When you enter the material number of a bill of materials that is relevant for sales
    order processing, the system displays the material that describes the whole bill of materials as a main
    item. The components are displayed as sub*items.
    Processing by Main Item : ERLA & Processing by Sub*Item : LUMF
    BOM explosion can be prevented by specifying Item Category Group as NORM.
    Credit limit checks is an example of a very close link between which two SAP modules?
    SD & FI.
    What are the two techniques in delivery scheduling?
    Backward Scheduling & Forward Scheduling.
    How does a third party deal work? Do you use a special sales order type for that? How could
    the system know that you want to process a third party deal?
    By specifying item category as TAS using double*line entry in the sales order.
    No special order type is available.
    By the item category group and/or material type in Material Master .
    Name the several steps in consignment processing.
    Consignment fillup, Consignment issue, Consignment pickup, Consignment return.
    Whatu2019s the difference between consignment pick*up and consignment return?
    In consignment pick*up, customer returns consignment stock. When goods issue is posted, the
    relevant quantity is deducted from the customer's special stock and is added back to regular stock at
    the plant where the goods are returned. Total valuated stock remains the same since the returned
    stock was regarded as part of inventory even while it was at the customer's premises.This transaction
    is not relevant for billing.
    In consignment return, customer wishes to claim on consignment goods which have already been
    issued. When goods issue is posted, the relevant quantity is added to the customer's special stock at
    the plant where the goods are returned. Since the ownership of the goods is passed from the customer
    back to the company, the transaction is relevant for billing. In this case, the customer receives a credit
    memo for the returned goods.
    Can you control that an end user cannot copy a quote of customer A to a sales order for
    customer B? If yes, where?
    Yes. By customizing Copying Control for header data.
    Give some example for data that is copied from the customer (soldto, payer, shipto) to the sales
    order as well as for data that is copied from the material?
    General data, payment terms, shipping details, delivery agreements, delivering plant.
    What is returnable packaging processing?
    13
    SD SAMPLE CERTIFIED QUESTION
    Returnable packaging consists of materials that are stored at the customer location but which remain
    the property of the company. The customer is only required to pay for the returnable packaging if he
    does not return it by a specified time.
    Name the two outline agreements in R/3 standard and explain the difference between them.
    Agreements are arrangements between business partners regarding the granting of conditions over a
    specified time period. The agreement contains conditions which apply over a particular time period and
    which are settled together at the same points in time. An agreement can be settled once or
    periodically. The two outline agreements include Contracts and Scheduling Agreements.
    Unlike a contract * which only contains an overall target quantity or value * a scheduling agreement
    also contains specific order quantities and delivery dates.
    How many documents do you create when you release, deliver and invoice the first order
    from a contract?
    Three : Sales order, Delivery note, Invoice.
    What types of output can you have in sales?
    Printer, Telex, Fax, Mail, EDI.
    Can you automate output processing ? Do you always have to specify it manually?
    yes. No.
    Where would you specify which data should be copied (at header, item and schedule line
    level)when you copy from one document to another one?
    Customizing Copy Control.
    SHIPPING
    Describe the flow of data from the sales order into the delivery for header and item and
    schedule line level data?
    Header à Header
    Item à Header, Item.
    Schedule line à Item.
    Can you combine several sales orders into one delivery document ? If no, why not? If yes,
    would the system check certain criteria? What criteria?
    No. When ship*to party or plant is different.
    Yes. Availability of all items are confirmed.
    Name a few prerequisites that have to be fulfilled if you want to create a delivery for the order.
    Header Level
    There cannot be a delivery block at header level.
    The sales document must contain at least one item due for delivery before a delivery can be created
    for this document.
    Item Level and Schedule Line Level
    The schedule line must be due for shipping on the specified selection date.
    A schedule line becomes due for shipping as soon as the material availability date or the transportation
    scheduling date is reached.
    The schedule line cannot be blocked for delivery.
    The delivery quantity must be greater than one.
    The items in the order must be fully processed.
    If they are incomplete, you must first edit the incompleteness log in the order. You will find
    information on the incompleteness log in the R/3 SD online documentation on sales.
    The product status of the material must permit delivery.
    For example, the product status for new products which have not been released for delivery does not
    allow them to be included in a delivery.
    Sufficient quantity of the material must be available.
    If you create a delivery, would this automatically update the sales order?
    14
    SD SAMPLE CERTIFIED QUESTION
    Yes. The delivery status of the entire order results from the delivery status of the items. Until all items
    in the order have been fully delivered, the order has the status "Partially delivered". The entire
    document acquires the status of fully delivered once all the items have been fully delivered.
    Name the different ways of creating deliveries.
    Partial Deliveries, Complete Deliveries, Deliveries without reference, Grouped Deliveries.
    How does the system determine the shipping point and the route in the sales order?
    A shipping point can be determined for each order item. How the shipping point is determined depends
    on three factors:
    The shipping conditions from the customer master record (Shipping screen). A condition might be that
    the goods are to be delivered to the customer as soon as possible.
    The loading group from the material master record (Sales/Plant Data screen).You could, for example,
    specify a loading group that defines that the goods must always be loaded with a crane or a fork lift.
    The delivering plant. This plant is determined per order item either from the customer master record
    or from the material master record. However, you can also enter it manually for each order item. You
    will find detailed information on determining the delivering plant in the sales order in the R/3 SD online
    documentation on sales.
    Can you change the shipping point determined in the sales order manually?
    Yes.
    If you have several shipping points in a sales order at item level. What would that have on
    the delivery?
    Each item will individual deliveries.
    Why would you carry out route determination in the delivery again?
    To reconfirm the weight of the item.
    At which different levels can you specify pick/pack and loading time?
    Shipping point determination level : loading time.
    Route determination level : pick/pack time.
    Where do you specify the departure zone and the arrival zone for route determination?
    Shipping point, Ship*to party.
    How can the route influence the material availability date?
    Transit time & Transportation lead time.
    Why would you carry out availability check in the delivery?
    The availability check is calculated using planned inward and outward movements of goods. Therefore
    the delivery situation might have changed in the meantime due to unforeseen circumstances, such as
    lost output. The availability check in the delivery takes any such changes into account.
    Where would you store partial/complete shipment agreements and over/under delivery
    tolerances?
    Customer Master and Customer Material Information.
    Explain the effects of printing out the picking list.
    Updates the picking quantity in the delivery.
    How does the system automatically determine the picking storage location in the delivery?
    Storage Condition.
    Shipping Point.
    Plant.
    What is a transfer order and for what would you use it?
    Document used to support every stock movement in the warehouse.
    It contains all the important movement data, such as the material to be transferred, the quantity to be
    transferred, the storage bins involved, and so on
    Define a shipping unit?
    15
    SD SAMPLE CERTIFIED QUESTION
    Combination of materials which are packed together in a shipping material at a particular time.
    Shipping units contain items which in turn are made up of shipping units or delivery items.
    What effects does goods issue have?
    When the goods have left your plant, the business transaction is regarded as completed from the point
    of view of shipping. When goods are issued, the following functions take place in the system:
    The material stock is reduced by the goods issue quantity and the corresponding value changes take
    place in accounting. This ensures that the quantity and value flows are parallel.
    Material requirements for the delivery are reduced
    The delivery status is updated
    If you bill after goods issue, the delivery enters the billing work list
    How can you delete a good issue?
    You cannot cancel a goods issue posting in isolation. You are also unable to change goods issue
    quantities. If you make a mistake when processing a delivery, or if the goods are damaged leaving
    your plant and cannot be delivered, you must cancel the entire business transaction.
    Procedure
    After you have invoiced the delivery, for which the incorrect goods issue posting was carried
    out, proceed as follows:
    1. Enter a returns order (order type RE) for the customer and the material involved.
    2. Create a returns delivery for the returns order. The system proposes the delivery type. The
    delivery quantities in the returns delivery must correspond to the goods issue quantities in the
    incorrect goods issue document.
    3. Post "goods issue" for the returns delivery. The system automatically recognizes the returns
    delivery as goods receipt and clears the original goods issue posting by carrying out reverse
    posting.
    4. Invoice the business transaction with a returns credit memo. The system proposes billing
    type. The original billing document for the incorrect goods issue document is cleared by this
    credit memo.
    Is it possible to work without specifying a pick/pack or loading time for a shipping point?
    Yes.
    When do you initiate packing activity*before or after goods issue? What is the material type
    for shipping material?
    Before goods issue . VERP.
    When you post goods issue after packing, which two documents do you create?
    Picking List, Invoice.
    Can the delivery quantity and the picking quantity in the delivery document be *different?
    Yes.
    PRICING
    Could you explain what condition technique in SAP is?
    Hierarchy of elements defining a data combination which leads to certain actions.
    In pricing the condition technique refers to the method by which the system determines prices from
    information stored in condition records. In Sales and Distribution, the various elements used in the
    condition technique are set up and controlled in Customizing. During sales order processing, the
    system uses the condition technique to determine a variety of important pricing information.
    Name three areas/processes which use condition technique in SD?
    Material determination, Output determination, Account determination.
    16
    SD SAMPLE CERTIFIED QUESTION
    What are the four basic elements of condition technique?
    Condition Types, Condition Tables, Access Sequences, Pricing Procedures.
    Please explain graphically the relationship between the four basic elements in condition techniques?
    Procedures à Condition Types à Access Sequence à Condition Tables à Condition Records.
    Explain what a pricing procedure is?
    The primary job of a pricing procedure is to define a group of condition types in a particular sequence.
    The pricing procedure also determines:
    Which sub*totals appear during pricing
    To what extent pricing can be influenced manually
    Which method the system uses to calculate percentage discounts and surcharges
    which requirements for a particular condition type must be fulfilled before the system takes the
    condition into account.
    Explain what a condition table and an access sequence is and the relationship between
    them?
    A condition table defines the combination of fields (the key) that identifies an individual condition
    record. A condition record is how the system stores the specific condition data that you enter in the
    system as condition records. For example, when you enter the price for a product or a special discount
    for a good customer, you create individual condition records.
    An access sequence is a search strategy that the system uses to find valid data for a particular
    condition type. It determines the sequence in which the system searches for data. The access
    sequence consists of one or more accesses. The sequence of the accesses establishes which condition
    records have priority over others. The accesses tell the system where to look first, second, and so on,
    until it finds a valid condition record. You specify an access sequence for each condition type for which
    you create condition records.
    What is a condition type? What are the two main groups of condition types?
    A condition type is a representation in the system of some aspect of your daily pricing activities. For
    example, you can define a different condition type for each kind of price, discount, or surcharge that
    occurs in your business transactions.
    Fixed Amount & Percentage.
    Is SD the only module that uses condition technique?
    No.
    What is a condition supplement and why would you use it?
    A condition supplement is a supplement for a particular condition type. For example, you can include a
    supplement every time you apply a material price. The supplement can contain various discounts.
    During pricing, the system automatically applies the discounts defined in the supplement every time it
    accesses a material price. You define for which condition types you want to use condition supplements
    in Customizing for Sales.
    Which partner function is relevant when it comes to tax calculation in the sales order?
    Ship*to party.
    Name at least three different condition types in pricing?
    Price, Discounts, Freight. PROO, K007, KF00.
    You can create scales for prices and discounts. Name the four possible scale basis in R/3.
    Value, Quantity, Gross weight, Net weight, Volume.
    Where would you specify that a condition type is a discount or a surcharge?
    In Condition Type Details Screen.
    If somebody adds price elements manually in the sales order or if somebody changes a
    discount the system determined automatically, do you have a possibility to see that in the
    sales order?
    Yes.
    You want to list all condition records for a certain material or a certain sales organization.
    How would you do that?
    17
    SD SAMPLE CERTIFIED QUESTION
    By creating Pricing Reports.
    Does the pricing procedure apply for the pricing data at item level or for the pricing data at
    header level?
    Both.
    When you create a header condition manually in the sales order the system can copy the values in
    different ways to the items. Where would you specify how the system should process?
    Condition Type.
    Which data do you have to maintain in SD so that the system can determine the sales taxes
    in the sales order automatically?
    Tax rate with or without Jurisdiction.
    What does the condition exclusion indicator do for you?
    The system can exclude conditions so that they are not taken into account during pricing in sales
    documents.
    Can you explain what a statistical condition is? Give an example for a statistical condition?
    VPRS.
    For what do you use customer hierarchies?
    Pricing , Rebate.
    Can you track cumulative values in R/3? If yes, it could be based on what?
    Yes. Maximum Value, Maximum Orders, Maximum Quantity.
    If you want to make sure that conditions records apply for a certain time period only what
    would you have to do?
    Validity Period to be specified in condition record.
    What is a group condition?
    Condition which can be used to determine a scale value based on more than one item in a document.
    The system groups the items using either the condition key for the appropriate condition record or a
    separately defined condition key.
    Name the influencing factors for pricing procedure determination during sales order entry?
    Customer, Sales Document Type and Sales Area.
    Can you copy condition records? If yes, are there any restrictions?
    Yes. Field specific.
    If you create a new condition type*do you also have to create a new condition table and a
    new access sequence?
    Yes.
    Where can you specify that a condition is mandatory?
    In Pricing Procedure.
    Tax jurisdiction processing is a close link between which two modules?
    FI & SD.
    Do you have to create a condition record for taxes in the SD application?
    Yes.
    BILLING
    Name several billing types?
    F1 : Order related Invoice F2 : Delivery related invoice.
    F5 : Proforma Invoice for Sales Order F8 : Proforma Invoice for Delivery.
    Can you delete an invoice?
    No. You can cancel it and create cancellation document.
    18
    SD SAMPLE CERTIFIED QUESTION
    When you create an invoice in SD, how do you post it to FI?
    Select Billing document à Release To Accounting.
    The system displays a message that the accounting document has been saved. If the billing document
    contains an error, the reason for not forwarding the document is displayed. If the release was
    successful, the posting status in the billing document is set to C (accounting document has been
    created). You find the posting status by selecting Header à Details in the billing document.
    When you create an invoice can you carry out pricing again?
    Yes.
    From which documents can you create a proforma invoice?
    Based on sales order or delivery.
    Do you transfer a proforma invoice to FI ? If yes, how? If no, how do you customize the
    system in a way that the proforma invoice is not transferred to FI?
    No. Billing status not assigned to proforma invoice. Posting bock in the billing document.
    When you create a credit memo request do you always have to refer to a sales order or any
    other previous document?
    Only sales order.
    In R/3 how can you make sure that invoices for a customer are always created at a specific
    date?
    Billing Schedule.
    Can you combine deliveries into one invoice? When would you do that?
    Yes. If the header data and header partners for specified delivery or sales order are identical and if
    requirements for splitting do not apply.
    Can you combine orders into one invoice?
    Yes.
    Can you split deliveries into several invoices? When would you do that?
    Yes . If the data from the related reference documents differs in the header fields of the billing
    document. The system will automatically split the invoice.
    For what do you use the billing due list? What previous step in the process is necessary that
    a delivery appears in the billing due list?
    Selection criteria u2013 sold*to party, billing date or receiving partner.
    a) separate invoice for each delivery
    b) split one sales order for delivery into several invoices.
    c) combine several sales orders for delivery into one invoice.
    Name the five possible influencing factors for account determination for invoices?
    Chart of accounts of the company code
    Sales organization
    Account assignment group of the customer (from the customer master record, Billing screen, Account
    group field)
    Account assignment group of the material (from the material master record, Sales 2 screen, Account
    assignment group field)
    Account key (from the pricing procedure)
    Can one business area be valid for several company codes?
    Yes.

  • Standard report for pricing condition.

    Hello everyone,
    Is there any standard report to see the price maintain in particular condition record in VK11 with different key combination. can anybody tell me in which table it is maintain.
    Regards,
    Naveed Ansari.

    Hi
    The Standard report for Pricing condition is V/LD.
    You can get datas like Material prices, Individual prices, discounts & surcharge prices, Material list/Material pricing Group with & without scal display, Price list types with & without scale display.
    V/LB   SAPMV14A       Change Pricing Report
    V/LC   SAPMV14A       Display Pricing Report
    V/LD   SAPMV14A       Execute pricing report
    V/LE   RV14ALLE       Generate pricing reports
    Award if useful to you
    Thank you
    Edited by: narendran vajravelu on Oct 14, 2008 7:23 AM
    Edited by: narendran vajravelu on Oct 14, 2008 7:25 AM

  • Condition Record as per validity Period with variation of Qty.

    Hi, Experts
    I have a querry in pricing -
    Suppose i have contract of 30 tons of validity period is 3 months.For this i ahve maintained a condition record(Customer/material) Rs1000/1ton.
    That means customer has to give a order of 10 tons/month.
    If customer is ordering bellow 10ton/month, then i will charge as a price of Rs1100/1ton.
    Otherwise if customer is ordering morethan 10tons, then i will charge market price of exceeding qty.
    For example customer order 15ton/month ,for this i will charge 10tons for as usual our contract price i.e Rs1000/1 ton & rest
    5 tons i will charge for market price.
    which is having material specific condition record for normal scenario
    Kindly revert back if any clarification--
    Thanks'
    Soumya

    Hi ,
    Ifyour asking for any Scale Base Prices follow as required
    Maintain Condition records (VK11)----
    >   1 ton Rs1100 with Dates as per ur requirements
    Then Click on "Scales Icon"  Ther u can maintain  required scales
    1 ton Rs1100
    5Tons< Price is Rs1100
    10 tons> Price Rs 1000
    Regards,

Maybe you are looking for

  • I can't get clips from one imovie 4 project to another.

    Why can't I have two imovie project open at once? I have an imovie that I want to copy some clips from and when I open another imovie, the original close so I can't drag them in. I also cannot copy a clip and then paste it into another imovie. Accord

  • Image in table column

    Hello All, I have a table with some data in it, but one of the columns of the table I want to put an image. Is that possible? How do I do that? Thanks & Regards, Chris Bogers

  • Is there a problem using popup LOVs in a portal form with a bind variable?

    I have a portal form with 2 LOVs. The second LOV is a dependent LOV whose bind variable can be NULL. I have read Note 263923.1, "How To Create Dependent Lovs In Forms", and my form works as long as I use combo boxes to display the LOVs. I need to use

  • Touch and passwords (doesn't work).

    I just tried to check my Gmail by logging into m.google.com and discovered that you can't enter a password... every character is upper case and caps lock doesn't have any effect, pressed or not pressed everything's still upper case. Some people have

  • Rman writing to two archiving destination

    Hi all, Oracle Database 10g Express Edition Release 10.2.0.1.0 - Product Windows XP I have implemented a rman backup, but I changed the archiving, data and autobackup destinations: ALTER SYSTEM SET log_archive_dest='C:\oraclexe\Backup\archivelog\arch