Schedule Lines not generated for MRP Type PD

HI All,
I have created Schduling Agreement, maintained Source List with MRP Relevant - 2 option and maintained Vendor as Fix, maintained info record.
I have created a material with MRP type as PD and lot size as EX, and strategy group as MTS. Now when i enter requirement through MD61 and do MRP Run through MD02, system is generating PR instead of Del Schdule line inspite of schduling agreement. 
But If i change MRP type to VB and maintain reorder point and maintain min lot size, then system generates Del Schdule lines for the same material.
What could be the reason. I want delivery schedules based on MRP Type PD.
Where I am wrong in MRP Views or in any cutomization. It seems that purchasing part is fine since it creats scudles line so no problem in SA or in Source List.
Please help
Regards,
Vikas

I have created Schduling Agreement, maintained Source List with MRP Relevant - 2 option and maintained Vendor as Fix, maintained info record.
I have created a material with MRP type as PD and lot size as EX, and strategy group as MTS. Now when i enter requirement through MD61 and do MRP Run through MD02, system is generating PR instead of Del Schdule line inspite of schduling agreement.
But If i change MRP type to VB and maintain reorder point and maintain min lot size, then system generates Del Schdule lines for the same material.
What could be the reason. I want delivery schedules based on MRP Type PD.
Where I am wrong in MRP Views or in any cutomization. It seems that purchasing part is fine since it creats scudles line so no problem in SA or in Source List.
Hi Vikas,
                  After being thru with your query,i would like to reply your ultimate question"I want delivery schedules based on MRP Type PD"
Simple answer:put parameter 'delivery schedule line' as '3'(schedule lines in opening period) without simulation mode.
Please make sure you  don't make any change with previous settings(custom)
please get it done and revert.
Regards
Chandra

Similar Messages

  • Schedule lines not generated after MRP run

    Dear All,
    I am trying to create Schedule lines through MRP run , but instead system creates MRP element PRqRel  and its PurRqs when i check in MD04 ,  the following are the prerequisite i done before MRP run , but still Schedule lines are not generating.
    1.activated checkbox source list in material master.,Procurement type is F, MRP type PD , lot size MB , marked JIT  Scheduling indicator as 1 in Pur view of material master , no MRP group is used in our process.
    2.Maintained Inforecord.
    3.Maintained source list for the material and marked MRP relevant as 2. Validity also checked.
    4. Quota arrangement for this vendor only.
    5. Created New scheduling agreement.
    6. Material is not sent for subcontracting.
    7. Ran  MD02 with following parameters ,
    Processing key NETCH Net Change in Total Horizon
    Create purchase req. 1 Purchase requisitions in opening period
    Delivery schedules 3 Schedule lines
    Create MRP list 1 MRP list
    Planning mode 3 Adapt planning data (normal mode)
    Please let me know if i am missing something
    Thanks in Advance
    Benny

    Hi,
    Please check the below links...
    Schedule Lines not getting created in MRP
    Schedule Lines not generated for MRP Type PD
    Kuber

  • PR not generating for MRP type VB

    hi all,
          i have  bill of material wich contain some raw material. for this raw material i have maintained MRP type VB , along with reorder point and safety stock in material master
    but after MRP run, i am not gettting requirenemnt of raw material, if i changed the MRP type to PD , then requirenment (PR) coming for raw material. MRP control parameter are NETCH,1,3,1,1,1
    so why i m not geting requirenment with MRP type VB.

    hi,
    Try in the below way:
    Make the Create Preq. indicator as 2 in the planning file...make the delievery schedule as 1(ie. no schedule line)( this would be one of the mistake as you specified as 3)...
    Then maintain the source list with the MRP indicator as 1, make the vendor as FIX, Define proper valid dates in it and save...
    Now try and revert back...
    Hope it helps..
    Regards
    Priyanka.P

  • Pur req not generated for MRP element Planned order in stock reqmnts list

    Hi SAP Gurus,
    I have a problem where in MD04, pur req is not generated for the MRP element Planned order for a future date (about two months from now). Is there a specific reason? why is it not being generated? The MRP type is PD. The procurement type is F - external procurement. Can anybody please help me on this?
    Thanks
    Anusha

    Anusha,
    ??  Not sure I understand the question.  Are you saying MRP is creating planned orders instead of  purchase reqs?  Or, are you saying that no proposals at all are being created outside of two months?  Or, are you saying that the system is creating purchase reqs inside of two months, and planned orders outside of two months?
    Regardless, these problems are probably related to your MRP settings.  Try the following settings:
    NEUPL   Regenerative planning             
    1       Purchase requisitions             
    3       Schedule lines                    
    1       MRP list                          
    3       Delete and recreate planning data 
    2       Lead time scheduling and capacity planning
    on your MDBT screen.
    Regards,
    DB49

  • Schedule Lines not created from MRP

    Hi !!
    I have a finished product ""111-2523-64"" and in its BOM i have a semifinished product ""111-2523-64-010"" produced(Inhouse)& three raw materials .
    For the Raw Materials I have made the scheduling agreement & source list with indicator ("2"" create schedule lines automatically""
    Problem -: Now when I run the MRP using T-Code MD02 the system is planning the finished & semifinished product 
    *but no schedule lines are created for the raw materials.*
    Please Guide , Itz very urgent.
    Regards
    Rahul Bhardwaj
    9909986406

    Dear Rahul,
    When u r running MRP maintain '3' for Delivery Schedules Field under MRP Control Parameters ( T Code MD02). Sheduling Agreement should be valid. If there is sufficient stock on hand compared with the requirement then system will not create any Schedule Lines. In material master of raw Materials on MRP2 view Procurement Type should be Maintained as 'F'. If u have maintained 'E' or 'X' then MRP run will not create schedule lines.
    Regards
    Sunil Kumar

  • MRP Run error " Schedule Lines not generating properly"

    Hi Folks,
    I am facing a typical issue with MRP Run.
    Every time when I am running the MRP for a particular material I have made settings such that Schedule lines to be generated by maintaining the Source list and MRP relevancy as 2 in source list. Also I have fixed the vendor. Now my problem is I am getting Schedule lines for first run and Combination of Purchase requests and Schedule lines or only PRs for the next MRP run.. This is keep on repeating in such as way that the planning is shifting as said above for subsequent MRP Run.
    Note that the initial settings during MD02 remain same for all run.
    I want only schedule lines to be generated but not PR.
    Pls advise and provide input where the wrong might be.
    Quick responce would be appreciated.
    Regards
    Shash

    Dear shash,
    Check with What are the MRP control Parameters values which you are using for the MRP run.
    In MD02, For Deleivery schedules run with value 3 - That's -  Schedule lines.
    The other options are     1  No schedule lines
                                       2  Schedule lines in the opening period.
    check with this & revert back.
    Regards
    Mangalraj.S

  • Schedule Lines not confirmed for Consignment Fillup

    Hi
    I created Consignment Fillup, Schedule lines are not confirmed, even though stock is available in MMBE.
    Material per batch stock is available
    Help me out in this issue
    Regrds
    Srinivas

    Check what schedule line category is flowing.  I believe it should have been E1 and in VOV6, for this schedule line category, the box "Availability" is checked.  Next go to material master and check whether the availability check is either 01 or 02 is maintained.
    G. Lakshmipathi

  • Lines are not generated for holidays and sundays

    Hi
    creating a sale order shcedule lines are not generated for sunday for a particular plant .
    Schedule lines are generated for subsequent monday only.
    the plant calander  is also  correct
    with regards
    partha

    Hi
    I would really double check the factory calendar ans the  of the plant and sales organisation
    regards,
    Sidi

  • MRP is not generating purchase requisitions consistently for MRP type VB

    Issue: When executing consumption based MRP in ECC 6.0 using the following parameters; purchase requisitions are not created for all material with stocks below max stock levels. In other words  requisitions are  created incase of some materials and requisitions are not created for others.  
    u2022     MRP type VB ( manual reorder point) with reorder point qty
    u2022     Lot size HB with Max stock level
    u2022     Procurement type F (external procurement).
    Additional info: Some of these materials are batch managed and results are inconsistence whether it is batch managed or not.
    Regards
    Sai

    I checked that and planning file entry is created.
    Example 1: MRP is not working. 
    MRP type = VB
    Lot size =HB
    Procurement type= F
    Material # = 1200045
    Reorder point =30
    Max stock level = 300
    Available qty = 139
    No PRs are existing before MRP.
    MRP is expected to create PR  for qty 161 (300-139= 161)
    Example 2 : MRP is working. 
    MRP type = VB
    Lot size =HB
    Procurement type= F
    Material # = 1200052
    Reorder point =100
    Max stock level = 1000
    Available qty = 87
    MRP created PR qty of 913 and results are as expected.
    MRP is expected to create PR  for qty 161 (1000-87= 913
    NOTE: I am directly creating Purchase requisitions by selecting creation Purchase Requisitions Indicator =1  during MD01/MD02 trxs . Not creating any planned orders.

  • No Scheduling line is generated when RUN MRP

    Hi Gurus,
    My SA type is 'LP', source list is marked with 2 'relevant to scheduling line'.
    then i RUN MRP with parameters 33132, but no scheduling line is generated, could you help me find the reason , thank you!
    BR,
    Dragsky

    Dear Dragsky,
    You need to create scheduling agreement in ME31L
    Also check this link
    [Schedule Lines not getting created in MRP;
    Regards
    Madhu

  • Error M8-688 - Creation of several vendor line items is not possible for document type RN.

    Hello All,
    We are using the Net Invoice Posting with document type RN(Invoice- Net). We are generating different vendor line items in the accounting document based on the withholding tax codes involved in the invoice posting. When it comes to net invoice posting system is giving an error message M8-688 - Creation of vendor line items is not possible for document type RN. Is there is any way to create multiple vendor items with net invoice posting? Please suggest.
    Thanks,
    Chandu.

    I dont think that there is any way because it is a hardcoded error message.
          IF NOT t003-xnetb IS INITIAL.
            MESSAGE e688 WITH pi_rbkpv-blart.
          ENDIF.
    SAP is checking the customizing for net/gross posting per document type in table T003
    And if it is set up as net, then it is a hard error.

  • Schedule line not determined

    the following is the data:
    1) the order is standard order type
    2) the schedule line category is consumption MRP with production allocation
    3)Item category is TAN
    4)the material is externally procurred and sold from the stock mainatined in company's plant
    5)customer is one-time customer
    Now for the above data when I create a standard sales order, I am not getting the scehdule line for the item and hence the quantity is not getting confirmed.

    hi rupali,
    1. go to VOV5, please check the determination i.e
    item category+MRP type= schedule line cat
    2. check the item category (vov7) where u wl find the field schedule line  allowed in the  in the right hand side . please check it.
    cheers
    reward

  • Calculate all days in month from schedule line delivery date for 12 mths

    Hi experts,
    I am trying to solve a problem and would appreciate any help! Im on BI7.
    The user will input a date for the schedule line delivery date via a variable.
    From this date I need to go forward 12 months exactly and display a key figure (outstanding value) by months but the first and last months must only use the days in that month i.e not the whole month if not selected by the user.
    I.e if the user types in 13.05.2008
    The display need to show (columns)
    May 08 (13th to end of May 2008)
    June 08   (All)
    July 08    (All)
    August 08    (All)
    Sept 08    (All)
    Oct 08     (All)
    Nov 08     (All)
    Dec 08    (All)
    Jan 09     (All)
    Feb 09    (All)
    Mar 09    (All)
    April 09   (All)
    May 09  (1st to 12)
    So I neen to restrict the key figure (Outstanding Value) by Schedule Line Delivery Date and display as above on a 12 month forecast basis from the day (sch line delivery daye) entered as a variable by the user.
    I also need the first month to only show the dates in the month remaining including the date entered as a variable. The last month must go up to the day before exactly a year in front.
    I have created the 12 months as a structure and can include the key figure and the schedule line delivery date. The schedule line delivery date for each period needs to be restricted. How can I do this to achieve the above?
    Thanks in advance. Will assign good points for a speedy solution.
    Best
    Steve.

    Hi,
        Check "OVLY" and "OVLZ" and If the sceduling is active for he shipping point /sales document type.  Check "OVXD" and see If the Loading time/ Pick/pack time is determined from it. If they are getting determined from shipping point check the shipping point calender in "SCAL" .If it has saturday and sunday as holidays ,then you may have to change them. And check If the customer has goods recieving hours assigned to him (In customer master unloading point). If he has only 5 working days and If he accepts only goods at 8 am in the morining then system would propose like this.Kindly please let me know If you need any more Information on this.
    Regards
    Ram Pedarla

  • Planning File Entry not generated for items releveant to PM

    MRP procedure used for material is reorder based planning , in April -09 the stock for this material is consumed and becomes
    zero (reorder point is 8 ,Maximum Stock Level is 8 ) and after that in MRP run the requirement is not generated .
    But as per the setting of reorder point PR should be initiated.
    When checked the MD21 , material is not flagged ,
    I want to know the specific reason why only  this material is not flagged for MRP run.
    What all settings i can check ?
    MATERIAL TYPE : YMRO   OP Maint/ Repair/OperSup
    Lot size : Repl. to max. stock level after cov. req
    Procurement type   :  F

    Hi,
    Run the reports MDRE & MDAB to ensure the planning file entries are correct.
    About your query what might have caused a entry not to be in planning file, well it could be many. So run the above reports & then run MRP & check the results.
    Regards,
    Vivek

  • Schedule line getting created for material whose stocks are maintained

    Hi Friends,
    I am having an unusual problem of schedule line getting created for material whose stocks are there in the system. I have created an SO for some material, and all the material is having sufficient qty in the system but still the system is generating schedule line.
    Can someone please advice what could be the problem and the solution to it.
    Regards,
    Wasim.

    Hello Wasim,
    - In TCode MM02, Check Scheduling in MRP2 Tab of Material master (if MRP is active.)
    - In Tcode OVZ9 - AvC control, for your Availability check maintain (eg. 02) in material & Checking Rule:A-SD order.
    Whether Check availability without replenishment lead time is unchecked, as this Indicates whether, during the availability check, the system checks the replenishment lead time. So, Items for which the delivery date falls within the replenishment lead time, but for which there is no inventory, are confirmed for delivery after the replenishment lead time. In the case of items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be confirmed.
    Thanks & Regards
    JP

Maybe you are looking for

  • Need Win 8.1 drivers for HP Pavilion dv6-6121tx

    Now i am using Win 7 in my HP Pavilion dv6-6121tx laptop,now i plan to upgrade Win 8.1 ,so i need all the drivers for it ,please help me

  • Need to compile nvidia driver for a custom kernel [SOLVED]

    I compiled a custom kernel following this wiki page: http://wiki.archlinux.org/index.php/Ker … rom_Source I can boot into it just fine.  I now want to compile an nvidia driver for use with it and followed the steps on this wiki page: http://wiki.arch

  • MDM tools

    Hi,      Can any body give me a link to get the tools for MDM on which i can work??

  • When starting SAP client always ask about license server

    Dear Users, from few days every user who is loggin into SAP 8.8 PL16 is asking about license server address. After typing license server address everything works fine until next start of the SAP client - prompt for license server shows again and agai

  • Disabling item in a tabular form - Urgent Issue!

    I'm using Apex 3.0. My tabular form has a text item with a following PL/SQL expression: TO_CHAR(:P44_DEFAULT_DATE,'YYYY/MM/DD'). When I either change the item type to "display - save state" or place "disabled=true" into its attribute or try to disabl