Schedule lines should not change 3 weeks time from MRP date

Hi
Is there any specific customisation required to get following results in case of schedule lines.
1) MRP should not change/adjust the already send delivery schedule lines  which are lying within 3 weeks time from MRP date
2) System should not allow to book the GRN unless the messages / print out has been generated from the system in case of scheduling agreement.
Thanking you
Shantakumar
09944009752

Hi,
There are 2 possibilities:
     1. use MRP fixing using planning time fences, this is done by putting the relevant settings in the MRP1 view of the material master
     2. use the firming options of the scheduling agreement, these are set per material number that is entered in the scheduling agreement.
The GR can only be posted for schedule lines that have been processed aka output generated.
Regards,

Similar Messages

  • Scheduling Agreement -Schedule line should not pass the requirement to MRP

    Hi Friends!
    As we all know the scheduling agreements is outline agreement with future schedule lines, with this system will  pass the requirements to MRP for the schedule line which is even after 5 years, so my requirement is  if the schedule line date is above 15 days from the current date then requirement should not pass to MRP. 
    solution which we gave is, SA initially will determine the schedule line category as  CN (which will not transfer the requirement) and  a batch job program will run daily and it will check for each schedule line if any of the schedule is with in the 15 days from the current date then it will change the schedule line category from CN to CP. 
    Now the problem is , by using Batch Job which program I have to call to change the schedule line category?????
    1. we tried BAPI_SALESORDER_CHANGE but when we are changing the CN to CP it is not performing ATP where as if we do manually it is performing.
    2. we tried BDC but here also we facing some strange problem i.e. while recording the ATP screen is not populating where it is coming while doing manual.
    Can someone let me know which one program we should call in Batch job to do this change.
    Regards
    Nath

    Hi nath,
    i also failed in changing shedule line category in userexit and in BAPI.
    in one case, i succeded in doing it with a bdc after MV45AFZZ / userexit_save just bevore the datas are reset but after the commit-work is processed.
    the other possibility is, to change the accepted amount in userexit RV03VFZZ / USEREXIT_AVAILABILITY_OUT.
    3. possibility is, to block the order with a delivery - block , same as the credit-control-block. This block can be set in MV45AFZZ or perhaps in BAPI too.
    hans

  • Schedule lines should not be maintained with out release

    schedule lines should not be maintained with out release of schedule agreement......but system accepting to maintain the schedule lines.Please say how.
    regards,
    Sridhar kumar.a

    Hello,
    I have the same problem as you. Someone know something about it?
    kanyadhara, did yo solve this problem?
    Thanks a lot

  • Without release schedule agreement schedule lines should not be maintain

    Hi experts,
           i made a schedule agreement and i have given 2 level of releases for it.. so with out releasing i maintained schedule lines in me38, then i made migo then system says the document has not been released yet. but what my query is schedule lines should not be happened with out release means it should stop here only. So how to give check for it.i have searched in system messages but nothing is there in that. So please solve this problem its urgent.

    Hello,
    I have the same problem as you. Someone know something about it?
    kanyadhara, did yo solve this problem?
    Thanks a lot

  • Schedule line should not generate until SA release

    Dear All,
    We want when we run MRP against schedule agreement then "Schedule line should not generate until SA release"
    Abhinay

    HI Abhinay Sachan ,
    Bascially when we run the MRP the system generate the Schedule Lines for that  schedule line we are doing release .....
    If you have SA for a particular materail system gives the Error or warrning message based on the setting what we made...if it is error sysetm won't allow other wise it is warrning meaasge means we can cretae the PR for the particular materail i hope i wll help you
    Regards
    Murugan J

  • Delivery dates in schedule lines is not changing in sales order

    Dear all,
    delivery dates in schedule lines on line item in sales order is not changing.delivery dates are different in schedule line of partial qtys.i have to do same delivery date on all schedule lines.
    Regards,
    Praveen

    Hi Praveen
    1. Schedule Line dates can be changed manually or by doing an availability check only.
    2. In case if you change the delivery date in the header it will not change automatically in the line item level.
    3. You need to do it manually only.
    kindly let me know more details.
    reg
    dsk

  • In ME38 If (EKET-MENGE) (EKPO-KTMNG)Schedule lines should not be created

    Hi,
    Our Requirement is in ME38 which is for creting Schdule line Agrement the system should not allow to create schedule lines
    if the Total of Schedule Line Quantity > Total Scheduled Quantity
              (Sum of all EKET-MENGE) > (EKPO-KTMNG)
    Can anybody give me the right User Exit,BADI for this Requirement and Coding for this

    Hello,
    I have the same problem as you. Someone know something about it?
    kanyadhara, did yo solve this problem?
    Thanks a lot

  • Schedule lines are not coming for HALB after MRP run

    Dear All,
    I am not getting schedule line after mrp run, inspite of all required setting only purchase requisitions are coming.
    Material type is HALB and involve a subcontracting process (30). For raw material I am getting the schedule line but in the case of HALB, it is not coming.
    Pls let me know if I am missing something and guide me further on this.
    Thanks & Regards
    Kundan Kumar

    Hi,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.

  • Profit Center should not change after copying from Template

    Hi,
    I have a scenario wherein there is an operative project which has a profit center maintained at the project definition level. I copy the WBS structure on to the 2nd level from a template which has a different profit center maintained at the WBS level. My requirement is that the profit center maintained in the template should remain as it is after i copy the template to the operative project.
    As of now after copying the template the profit center changes to the one maintained at the project definition level after i save the operative project. Is there a way by which i can restrict the system from copying the profit center maintained at the project definition level to the 2nd level WBS (which is copied from the template)?
    Regards,
    Gokul

    Hi Mohamed,
    Thanks for your response but i already checked that note and it seems that it doesn't cater to my requirement. Presently i am checking with my ABAPer if we can use some user exit and get this done which i think will require considerable amount of time. In case you have any other suggestions please suggest.
    @ Abdul Khader : - I already tried all the possibilities using substitution. Would appreciate if you could suggest something else.
    Regards,
    Gokul

  • Schedule lines are not getting confirmed even though stock is there

    HI,
    i want to discuiss one sensitive issues which is a simple one.
    my schedule lines is not getting confirmed even stock is there at sales order.
    there is no delivery block.
    there is no minimum stock level.
    there is no credit check for that.
    there is stock of 2 EA in that plant and storage location, but stock is not getting confirmed at sales order level or transaction level.
    even stock is there it is going to avaliability check overview screen and giving stock confirmation after 12 days.
    even i checked all the dates.............but its of no use.
    what to do ?
    after testing all the possible options i am taking help from
    please help me in this regard,
    regards,
    balajit

    Hi
    you need to check the following.....
    First check the Factory calander of your plant whethear some holidays or not
    Second most importantly you have to check which stretagy group is assigned  in the material . whethear it is make to order or make to stock. change it as make to stock.
    "What happened if material stretagy group is make to order then from sales order system generate requirement of that material against that particular stock, that time system do not consider the unrestricted stock and not confirm schedule line."
    Regards
    Shambhu Sarkar

  • I can not change the time in activity Appointment in WebUi

    Dear Experts!
    I can not change the time in activity Appointment when creating: calendar -> month -> click on the day
    snapshot of problem:
    http://imglink.ru/show-image.php?id=e7a096115a6371ffab46c701f8e470ba
    When I create a Appointment (Activities -> Create Appointment) of all good:
    http://imglink.ru/show-image.php?id=ef65a38bdf7fc77eb9a71ec5c3ad5603
    Help me this problem?

    You need to add that attribute using the config tool for your view configuration. Select the attribute All Day from the context node BTDATE in the available fields to your display field and then save it. It should now be visible in your UI and now you can select or uncheck it to make the time field enable. Check the below image
    http://imglink.ru/show-image.php?id=a9a660778c0fee2b3fd7409d620eddc5
    Regards,
    Shobhit

  • Schedule lines should be in gray mode

    Hi Gurus,
    Any idea how to make the schedule lines in gray mode.
    My client demand is when we save the sales order and
    we go to va02 schedule lines should show in gray mode to avoid
    the changes  quantity.
    Thanks in advance

    Dear Protan,
    the solution suggested above with the help of user-exit USER_EXIT_FIELD_MODIFICATION (Include MV45AFZZ) is the correct way to make the schedule lines unchangable. But please take into consideration that in the "normal" sales orders you do not need to go to the schedule line screen to change date or quantity. It is sufficient that you change the date or quantity on the item level. Then the schedule lines will be changed (created/deleted) in the background automatically.
    So, if you really want to grey out the quantity and date fields, you have to do this on all screens (Sales Overview, Procurement, Shipment etc.) also on  the item level. Then the item will be unchangable at all. Please be careful with this.
    So, you have to grey out all item date and quantity fields in all screens of the order. To do unchangable only schedule line screen is then not sufficient.
    As Manam said above, the USER_EXIT_FIELD_MODIFICATION is the only correct place to make the fields unchangable. I can only confirm this.
    I hope, this additional info was also helpful for you.
    Kind regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • MRP - Auto creation of del schedule lines based on planned delivery time

    Hi,
    We have activated MRP (type PD) where Purchase requiesition is auto created by system for requirement quantity. We require to optimize delivery schedule in such a way that entire PR quantity is broken into various delivery schedule based on planned delivery time and requirement.  Scenario can be further explained with following example.
    Material Requirement for a month is say 1,25,000 units
    Closing Stock say 25,000 units
    PR Generated by system for 1,00,000 units. The entire quantity is schdulled with only one delivery schedule line as per planned delivery time. 
    The requirement is to generate multiple delivery schedule lines automatically in Purchase requisition based on planned delivery time so that Purchase orders can be placed with system generated delivery schedule lines.
    How can it be achieved ?
    Regards,
    Nirav Kinkhabwala

    Nirav,
    This subject has been discussed repeatedly in this and other forums.  I must assume that you overlooked the rules of engagement, which state that you should first search the forums and other public sites, before posting questions here.
    Standard SAP MRP cannot be made to generate multiple items in a Purchase requisition.  The functionality you seek is usually achieved when converting purchase reqs to Purchase orders, where many single purchase reqs can be adopted into a single Purchase order.
    You also might want to investigate use of Vendor Scheduling agreements.
    Best Regards,
    DB49

  • Mail info panel top line does not show subject or from subsequent lines do.

    mail info panel top line does not show subject or from, subsequent lines do.

    DOrk4L,
    Have you tried re-calibrating the battery? To re-calibrate it, let the battery drain completely and then charge it fully. You should see correct battery usage after that.
    Hope this helps,
    Jennifer B.

  • DST: the SQL Cluster did not change the time by itself..

    Hello,
    DST: the SQL Cluster did not change the time by itself..
    Where should I look for the issue. The time was changed manually to continue processing....
    Thanks,
    Dom
    System Center Operations Manager 2007 / System Center Configuration Manager 2007 R2 / Forefront Client Security / Forefront Identity Manager

    Hi,
    Thanks for your posting.
    For the Sql cluster issue, i think you may ask in:
    http://social.msdn.microsoft.com/Forums/sqlserver/en-US/home?category=sqlserver&filter=alltypes&sort=lastpostdesc
    Regards.
    Vivian Wang

Maybe you are looking for

  • Report to get current inspection status of material

    Hi All, In our company the Dynamic Modification Rule is active in task list for all materials. Is there any report to provide the present inspection status of incoming lot of those materials, whether they are skip or under inspection? Or any table to

  • Dynamic Picklist in a switcher

    Hi I have a requirement as follows: Populate picklist in a Switcher: <oa:table id="CompTable" shortDesc="Competencies" width="100%"> <ui:contents> <oa:switcher id="GlobalYesNoSwitch" prompt="Proficiency Rating" viewName="CompetenceElementsVO" viewAtt

  • Verify physical hard disk drive health MCS 7825-H3

    Hi Everyone, I have Cisco MCS 7825-3 that installed CUCM ver 6.1.1 inside it. A few days ago the system was crashed and have been recovered. And the symtomp why the system crashed is because corrupted hard disk drive. Now the system is running well.

  • Web Interface Unreadable

    try to access the web interface I can login however once in the screen must charecters are unreadable and none of the links aperas or seem to work, i used ie,firefox and opera browsers and none seem to display the page correctly, i am running firmwar

  • Ideapad yoga 11s WITHOUT a pen - can I get it to work with a pen?

    Got the ideapad yoga 11s for a surprise gift on christmas. And just  found out there is also a version of the ideapad yoga with a stylus/wacom pen. That would have made this apparatus just perfect for me. So my 3 questions quite simply are:  1. Can a