Hi All,
Is it possible to Scheduling one background job inside another.? i.e In my Z program I am calling job_open, job_submit, job_close and to execute one standard report in background. And after that I am executing my Z program itself  from SE38 as Program->Execute->Background->Execute Immediately. Is this logically correct? I am asking this because I am not getting the desired result
Thanks & Regards,
Neethu.

HI,
Check the job steps in SM36.
First schedule the Standard job and in the job steps schedule the z report.
Schedule job in chain

Similar Messages

  • Schedule a background job for a program using ABAP code.

    Hi,
    I have to write a program to schedule a background job for another program.
    Need your help to understand how we can achieve this functionality.Any example of an abap code would be of great help.
    Need it urgently.
    Thanks in advance.
    Sandeep.

    Hi Sandeep,
    Here is the demo program regarding the BDC For the background job.
    report zprprbdc1
           no standard page heading line-size 255.
    include bdcrecx1.
    parameters: dataset(132) lower case.
    ***    DO NOT CHANGE - the generated data section - DO NOT CHANGE    ***
    *   If it is nessesary to change the data section use the rules:
    *   1.) Each definition of a field exists of two lines
    *   2.) The first line shows exactly the comment
    *       '* data element: ' followed with the data element
    *       which describes the field.
    *       If you don't have a data element use the
    *       comment without a data element name
    *   3.) The second line shows the fieldname of the
    *       structure, the fieldname must consist of
    *       a fieldname and optional the character '_' and
    *       three numbers and the field length in brackets
    *   4.) Each field must be type C.
    *** Generated data section with specific formatting - DO NOT CHANGE  ***
    ***data: begin of itab occurs 0 ,
    ***       matnr(20) type c,
    ***       mbrsh(30) type c,
    ***       mtart(30) type c,
    ***       kzsel(20) type c,
    ***       maktx(40) type c,
    ***       meins(5) type c,
    ***       end of itab.
    data: begin of record occurs 0,
    * data element: MATNR
            matnr_001(018),
    * data element: MBRSH
            mbrsh_002(001),
    * data element: MTART
            mtart_003(004),
    * data element: XFELD
            kzsel_01_004(001),
    * data element: MAKTX
            maktx_005(040),
    * data element: MEINS
            meins_006(003),
    * data element: MTPOS_MARA
            mtpos_mara_007(004),
          end of record.
    *** End generated data section ***
    start-of-selection.
    *perform open_dataset using dataset.
    perform open_group.
    **do.
    **read dataset dataset into record.
    **if sy-subrc <> 0. exit. endif.
    call function 'GUI_UPLOAD'
      exporting
        filename                      = 'c:\jitu\bdc\10002.txt'
       filetype                      = 'ASC'
       has_field_separator           = 'x'
    *   HEADER_LENGTH                 = 0
    *   READ_BY_LINE                  = 'X'
    *   DAT_MODE                      = ' '
    *   CODEPAGE                      = ' '
    *   IGNORE_CERR                   = ABAP_TRUE
    *   REPLACEMENT                   = '#'
    *   CHECK_BOM                     = ' '
    *   VIRUS_SCAN_PROFILE            =
    *   NO_AUTH_CHECK                 = ' '
    * IMPORTING
    *   FILELENGTH                    =
    *   HEADER                        =
      tables
        data_tab                      = record
    * EXCEPTIONS
    *   FILE_OPEN_ERROR               = 1
    *   FILE_READ_ERROR               = 2
    *   NO_BATCH                      = 3
    *   GUI_REFUSE_FILETRANSFER       = 4
    *   INVALID_TYPE                  = 5
    *   NO_AUTHORITY                  = 6
    *   UNKNOWN_ERROR                 = 7
    *   BAD_DATA_FORMAT               = 8
    *   HEADER_NOT_ALLOWED            = 9
    *   SEPARATOR_NOT_ALLOWED         = 10
    *   HEADER_TOO_LONG               = 11
    *   UNKNOWN_DP_ERROR              = 12
    *   ACCESS_DENIED                 = 13
    *   DP_OUT_OF_MEMORY              = 14
    *   DISK_FULL                     = 15
    *   DP_TIMEOUT                    = 16
    *   OTHERS                        = 17
    if sy-subrc <> 0.
    * MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    *         WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    endif.
    loop at record .
    perform bdc_dynpro      using 'SAPLMGMM' '0060'.
    perform bdc_field       using 'BDC_CURSOR'
                                  'RMMG1-MATNR'.
    perform bdc_field       using 'BDC_OKCODE'
                                  '/00'.
    perform bdc_field       using 'RMMG1-MATNR'
                                  record-matnr_001.
    perform bdc_field       using 'RMMG1-MBRSH'
                                  record-mbrsh_002.
    perform bdc_field       using 'RMMG1-MTART'
                                  record-mtart_003.
    perform bdc_dynpro      using 'SAPLMGMM' '0070'.
    perform bdc_field       using 'BDC_CURSOR'
                                  'MSICHTAUSW-DYTXT(01)'.
    perform bdc_field       using 'BDC_OKCODE'
                                  '=ENTR'.
    perform bdc_field       using 'MSICHTAUSW-KZSEL(01)'
                                  record-kzsel_01_004.
    perform bdc_dynpro      using 'SAPLMGMM' '4004'.
    perform bdc_field       using 'BDC_OKCODE'
                                  '=BU'.
    perform bdc_field       using 'MAKT-MAKTX'
                                  record-maktx_005.
    perform bdc_field       using 'BDC_CURSOR'
                                  'MARA-MEINS'.
    perform bdc_field       using 'MARA-MEINS'
                                  record-meins_006.
    perform bdc_field       using 'MARA-MTPOS_MARA'
                                  record-mtpos_mara_007.
    perform bdc_transaction using 'MM01'.
    **enddo.
    endloop.
    perform close_group.
    *perform close_dataset using dataset.
    &*****************Reward point if helpful************&

  • Scheduling a background job depending on the output lenght.

    Hi every one,
    I have a small requirement. My client want me to run a program in a foreground if the output is small and should the program in background if the output is large.This has to be achieved through coding. The program downloads the netprices of products. The downloaded file is of .dat format. It is an urgent requirement.
    Guys you would throughly rewarded for your help.
    Thanks,
    Kumar.9886185040.

    Hi Nag
    that is not possible with codeing. To create a schedule a background job for the same program depending on its output is not possible.
    being a programmer you need to decide, how long the code will take to execute.. accordingly you can either schedule or run in foreground. You can make some mandatory fields in the selection screen, so that the output is big mostly.
    see the sample code for the Job scheduling using the fun modules
    IF p_bjob = 'X'.
    CONCATENATE sy-cprog sy-datum sy-uzeit
    INTO jobname SEPARATED BY '_'.
    CALL FUNCTION 'JOB_OPEN'
    EXPORTING
    jobname = jobname
    IMPORTING
    jobcount = jobcount
    EXCEPTIONS
    cant_create_job = 1
    invalid_job_data = 2
    jobname_missing = 3
    OTHERS = 4.
    CALL FUNCTION 'GET_PRINT_PARAMETERS'
    IMPORTING
    out_archive_parameters = arc_params
    out_parameters = print_params
    valid = valid
    EXCEPTIONS
    archive_info_not_found = 1
    invalid_print_params = 2
    invalid_archive_params = 3
    OTHERS = 4.
    IF valid = chk.
    SUBMIT yREP WITH s_kunnr IN s_cust
    AND RETURN
    USER sy-uname
    VIA JOB jobname
    NUMBER jobcount
    TO SAP-SPOOL
    SPOOL PARAMETERS print_params
    ARCHIVE PARAMETERS arc_params
    WITHOUT SPOOL DYNPRO.
    CALL FUNCTION 'JOB_CLOSE'
    EXPORTING
    jobcount = jobcount
    jobname = jobname
    strtimmed = 'X'
    EXCEPTIONS
    cant_start_immediate = 1
    invalid_startdate = 2
    jobname_missing = 3
    job_close_failed = 4
    job_nosteps = 5
    job_notex = 6
    lock_failed = 7
    invalid_target = 8
    OTHERS = 9.
    IF sy-subrc 0.
    * MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
    * WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    ELSE.
    MESSAGE i029 WITH jobname.
    ENDIF.
    ELSE.
    MESSAGE s000 WITH text-003.
    STOP.
    ENDIF.
    ENDIF.
    Also,
    Yes you can use job functions:
    JOB_OPEN
    JOB_SUBMIT
    JOB_CLOSE
    * You can add multiple steps into one job by using JOB_SUBMIT.
    Regards
    JJ

  • Background job within another background job

    Hello Experts,
    I have a BDC program (for BW tcode OLI7BW) which executes by scheduling a number of background jobs. This report works fine when run manually. But doesn't work if it is scheduled as a background job through SM36. The status of the job is shown as finished, but the data is not uploaded.
    Is it not possible to execute a background job within another background job?
    If it's possible, what could be the possible cause of error?
    Thanks In Advance
    Radhika

    Hi Radhika,
    If you are trying to upload data from a file on ur desktop to Internal table, then background job doesn't work. Always remember GUI means ur front end and all background jobs are run on application server and they dont run w.r.t ur desktop.
    Kindly check it and get back to me incase of any queries.
    Dont forget to reward points, if found useful.
    Thanks and Regards,
    Satyesh

  • Schedule a background job

    Hi All,
    I have an urgent query here regarding the Bakcground job.
    Let's say I need to schedule a background job on hourly basis to fetch the data.
    If first job runs more than 60 minutes, then will the second job will fetch the data.
    What will happen in this scenario?
    Thanks
    Neeraj Manocha

    My question is............
    Let's say, I have a SAP standard table. In which our transactional data stores. I have also maintained my our database and build a program (i.e. Ztest) to fetch the data from the SAP standard table and store into my own database.
    So I schedule a background job for the program (Ztest) to fetch the data. I schedule this job on hourly basis.
    once first job will be runnig it will create one more instance to run after one hour.
    Here my question is...
    What if first job schedule on 1pm and runs for more than 60 mins (let's say it takes 90 mins to complete)?
    Till what time it will fetch data (either till 1pm or 1pm +90 mins)?
    If it fetch the data till 1pm +90 mins, then when second job will start and from what time it will start to fetch the data.
    Hope this clears.
    Thanks
    Neeraj Manocha

  • How to schedule a background Job based on events

    Hi,
    We are on 4.6 C.
    We have a background job that has two ABAP programs.
    We need to start the 2nd ABAP program only after the first one has run successfully.
    If the second ABAP program does not run, the the job should have a status "FINISHED".
    Help appreciated.
    Thanks
    Mala

    Hi,
    How to schedule a background Job based on events,please refer to the follow SAP help:
    You can use events that have already been defined, or you can create new events for scheduling background jobs.
    If you wish to use new events, do the following to implement the event scheduling:
    Define and transport the event as a user event with transaction SM62.
    You must define only event IDs; event arguments are not defined in the R/3 System. Instead, you specify event arguments when you schedule a job to wait for an event and when you trigger the event.
    If you define a new event, you must also transport it to your production systems. The event transaction does not have a connection to the transport system. Instead, you must create a transport request for the event yourself.
    Do this to transport an event:
    Create a transport request.
    Start the editor in the transport request and enter the following:
    R3TR TABU <table name> where table name is BTCSEV for a system event ID, BTCUEV for a user event ID.
    Press F2 with the cursor on the table name to call up the screen for specifying the table entries to transport. In this screen, enter the event ID’s that you have created.
    Save and release the transport request. Ensure that it is imported into your production system(s).
    To trigger an event, add:
    – the function module BP_EVENT_RAISE to your ABAP program, or
    – the program SAPEVT to your external script, batch file, or program.
    When your programs execute these keywords, an event will be triggered in the R/3 background processing system. The event-based scheduler is started immediately. It in turn starts all jobs that were waiting upon the event, subject to normal background processing restrictions, such as the requirement that the job has been released to start.
    Schedule the jobs that are to run when your events are triggered.
    You can schedule jobs for one-time start or to be started whenever an event is triggered.
    Regards,
    collysun

  • How to schedule a background job using the Event concept..?

    Hi Folks,
    I have a requirement that, I need a schedule a background job.
    Once after the previous job successful only, new job should get triggered. How to go ahead with this..?
    For Eg, I am scheduling a job called ZTEST periodically for 1 minute. If the job is not get completing with in 1 minute, I dont want to start my new job. Only after the success of my old job, I want my new job to run.
    Waiting for ur replies.
    Regards,
    Savi.

    Hi,
    You can use events that have already been defined, or you can create new events for scheduling background jobs.
    If you wish to use new events, do the following to implement the event scheduling:
    Define and transport the event as a user event with transaction SM62.
    You must define only event IDs; event arguments are not defined in the R/3 System. Instead, you specify event arguments when you schedule a job to wait for an event and when you trigger the event.
    If you define a new event, you must also transport it to your production systems. The event transaction does not have a connection to the transport system. Instead, you must create a transport request for the event yourself.
    Do this to transport an event:
    Create a transport request.
    Start the editor in the transport request and enter the following:
    R3TR TABU <table name> where table name is BTCSEV for a system event ID, BTCUEV for a user event ID.
    Press F2 with the cursor on the table name to call up the screen for specifying the table entries to transport. In this screen, enter the event ID’s that you have created.
    Save and release the transport request. Ensure that it is imported into your production system(s).
    To trigger an event, add:
    – the function module BP_EVENT_RAISE to your ABAP program, or
    – the program SAPEVT to your external script, batch file, or program.
    When your programs execute these keywords, an event will be triggered in the R/3 background processing system. The event-based scheduler is started immediately. It in turn starts all jobs that were waiting upon the event, subject to normal background processing restrictions, such as the requirement that the job has been released to start.
    Schedule the jobs that are to run when your events are triggered.
    You can schedule jobs for one-time start or to be started whenever an event is triggered.
    Regards,
    Raj.

  • How to schedule a background job in realtime

    Hi,
    Can you tell me how to schedule a background job in realtime.
    give some example scenerios in scheduling the background jobs in realtime.
    Thanks.
    sam.

    And also.....
    There are two ways for you to handle,
    one manually setting up the job through SM36 which is better and convinient,
    secondly through program using FM's JOB_OPEN, SUBMIT, JOB_CLOSE.
    Find below steps in doing both:
    Procedure 1:
    1. Goto Trans -> SM36
    2. Define a job with the program and variant if any
    3. Click on start condition in application tool bar
    4. In the pop-up window, click on Date/Time
    5. Below you can see a check box "Periodic Job"
    6. Next click on Period Values
    7. Select "Other Period"
    8. Now give '15' for Minutes
    9. Save the job
    Procedure 2 via Program:
    Below is a sample code for the same. Note the ZTEMP2 is the program i am scheduling with 15mins frequency.
    DATA: P_JOBCNT LIKE TBTCJOB-JOBCOUNT,
    L_RELEASE(1) TYPE c.
    CALL FUNCTION 'JOB_OPEN'
    EXPORTING
    JOBNAME = 'ZTEMP2'
    IMPORTING
    JOBCOUNT = P_JOBCNT
    EXCEPTIONS
    CANT_CREATE_JOB = 1
    INVALID_JOB_DATA = 2
    JOBNAME_MISSING = 3
    OTHERS = 4.
    IF SY-SUBRC 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
    SUBMIT ZTEMP2 VIA JOB 'ZTEMP2' NUMBER P_JOBCNT
    TO SAP-SPOOL WITHOUT SPOOL DYNPRO
    WITH DESTINATION = 'HPMISPRT'
    WITH IMMEDIATELY = SPACE
    WITH KEEP_IN_SPOOL = 'X' AND RETURN.
    CALL FUNCTION 'JOB_CLOSE'
    EXPORTING
    JOBCOUNT = P_JOBCNT
    JOBNAME = 'ZTEMP2'
    STRTIMMED = 'X'
    PRDMINS = 15
    IMPORTING
    JOB_WAS_RELEASED = L_RELEASE
    EXCEPTIONS
    CANT_START_IMMEDIATE = 1
    INVALID_STARTDATE = 2
    JOBNAME_MISSING = 3
    JOB_CLOSE_FAILED = 4
    JOB_NOSTEPS = 5
    JOB_NOTEX = 6
    LOCK_FAILED = 7
    INVALID_TARGET = 8
    OTHERS = 9.
    IF SY-SUBRC 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
    Hope the above helps you.
    ***********reward points,if found useful

  • How to schedule the background job if report have Presentation server files

    Hi All,
    I have searched the forums and found , the way for the scheduling the background job if report selection screen have the presentation server file input.
    1. Using the Open data set method.
    And my client is not OK with Open dataset way, it there any other way to do this, As we are using the EXCEL file.
    Thanks and Regards,
    Bharani

    Hi,
    As said above it is generally not possible. Since your client most obviously doesn't like graphical background I would recomend storing data as till now, but show it with your own report in more userfriendly way. For example:
    - as ALV Grid
    - in excel with use of OLE either as embedded in SAP or new window (check transaction OLE for example)
    - with use of webdynpro
    BR
    Marcin Cholewczuk

  • How to Schedule SAP background job at OS Level

    Hi All,
    Can Anyone tell me how to Schedule SAP background job at OS Level (unix).
    Regards,
    Anil

    Hi Anil,
    I donu2019t know your requirements, anyway itu2019s possible to setup your SAP job in order to start after an event, and after that you can get the event triggered from the Operating System in the following way:
    - log into you Operating System with the SIDadm user id (at the Operating System level) and go to directory /usr/sap/SID/SYS/exe/run
    - Run the SAPEVT executable as follows:
    sapevt YOUR_EVENT -t pf=/usr/sap/SID/SYS/profile/DEV_DVEBMGS00_server001 nr=01
    This will raise the event, and cause the job scheduled within SAP to execute.
    You can periodically execute this job with crontab.
    Thanks,
    Federico Biavati

  • How to schedule the background job using current selection screen field val

    Hello Friends,
    How to schedule the background job using current selection screen field values.
    after completion of the job the spool should be sent as a mail to SAP Inbox.
    Is there any way to create the variant dynamically by reading the current selection screen values.
    Thanks,
    Ravi

    Hi,
    To get the variant details you can use teh following FM.
    'RS_VARIANT_CONTENTS'.
    Regards,
    Ankur Parab

  • How to schedule the background job daily twice?

    Hi,
    How to schedule the background job daily twice? any conditions?
    Regards,
    Srihitha

    see the step by step procedure.
    Scheduling Background Jobs:
    1. Background jobs are scheduled by Basis administrators using transaction SM36.
    2. To run a report in a background, a job needs to be created with a step using the report name
    and a variant for selection parameters. It is recommended to create a separate variant for each
    scheduled job to produce results for specific dates (e.g. previous month) or organizational units (e.g.
    company codes).
    3. While defining the step, the spool parameters needs to be specified
    (Step-> Print Specifications->Properties) to secure the output of the report and help authorized users
    to find the spool request. The following parameters needs to be maintained:
    a. Time of printing: set to “Send to SAP spooler Only for now”
    b. Name – abbreviated name to identify the job output
    c. Title – free form description for the report output
    d. Authorization – a value defined by Security in user profiles to allow those users to access
    this spool request (authorization object S_SPO_ACT, value SPOAUTH). Only users with matching
    authorization value in their profiles will be able to see the output.
    e. Department – set to appropriate department/functional area name. This field can be used in
    a search later.
    f. Retention period – set to “Do not delete” if the report output needs to be retained for more
    than 8 days. Once the archiving/document repository solution is in place the spool requests could
    be automatically moved to the archive/repository. Storage Mode parameter on the same screen
    could be used to immediately send the output to archive instead of creating a spool request.
    Configuring user access:
    1. To access a report output created by a background job, a user must have at
    least access to SP01 (Spool requests) transaction without restriction on the user
    name (however by itself it will not let the user to see all spool requests). To have
    that access the user must have S_ADMI_FCD authorization object in the profile with
    SPOR (or SP01) value of S_ADMI_FCD parameter (maintained by Security).
    2. To access a particular job’s output in the spool, the user must have
    S_SPO_ACT object in the profile with SPOAUTH parameter matching the value used
    in the Print Specifications of the job (see p. 3.d above).
    3. Levels of access to the spool (display, print once, reprint, download, etc) are
    controlled by SPOACTION parameter of S_SPO_ACT. The user must have at least
    BASE access (display).
    On-line reports:
    1. Exactly the same configuration can be maintained for any output produced
    from R/3. If a user clicks “Parameters” button on a SAP Printer selection dialog, it
    allows to specify all the parameters as described in p. 3 of
    “Scheduling background jobs” section. Thus any output created by an online report
    can be saved and accessed by any user authorized to access that spool request
    (access restriction provided by the Authorization field of the spool request
    attributes, see p. 3.d of “Scheduling background jobs” section).
    Access to report’s output:
    1. A user that had proper access (see Configuring user access above) can
    retrieve a job/report output through transaction SP01.
    2. The selection screen can be configured by clicking “Further selection
    criteria…” button (e.g. to bring “Spool request name (suffix 2)” field or hide other
    fields).
    3. The following fields can be used to search for a specific output (Note that
    Created By must be blank when searching for scheduled job’s outputs)
    a. Spool request name (suffix 2) – corresponds to a spool name in p. 3.b in
    “Scheduling background jobs” section above).
    b. Date created – to find an output of a job that ran within a certain date range.
    c. Title – corresponds to spool Title in p. 3.c in “Scheduling background jobs”
    section above).
    d. Department - corresponds to spool Department in p. 3.e in “Scheduling
    background jobs” section above).
    4. Upon entering selection criteria, the user clicks the Execute button to
    retrieve the list of matching spool requests.
    5. From the spool list the user can use several function such as view the
    content of a spool request, print the spool request, view attributed of the spool
    request, etc. (some functions may need special authorization, see p.3 in
    Configuring user access)
    a. Click the Print button to print the spool request with the default attributes
    (usually defined with the job definition). It will print it on a printer that was
    specified when a job was created.
    b. Click the “Print with changed attributed” button to print the spool request
    with the different attributes (e.g. changing the printer name).
    c. Click the “Display contents” button to preview the spool request contents. A
    Print and Download functions are available from the preview mode.

  • How to use one hash table inside another hash table

    Hi everyone,
    Any example of hash table inside another hash table.
    Can one here help me how to write one hash table inside another with repeating keys for the first hash table.
    Thanks,
    kanty.

    Do you mean you want the 'value' entries in a hash table to themselves be hash tables? Easy but this often indicates a design flaw.
    Hashtable<String,<Hashtable<String,Value>> fred = new Hashtable<String,<Hashtable<String,Value>> ();But what do you mean by "with repeating keys for the first hash table"?
    Edited by: sabre150 on Jul 2, 2010 10:11 PM
    Looks like you have already handled the declaration side in your other thread. I suspect you should be writing your own beans that hold the information and these beans would then be stored in a Map. The problem I have is that your description is too vague so I can't be certain.

  • BAPI for Scheduling a background job

    Hi all,
    is there any bapi for scheduling a background job?
    i mean can we do background job using bapi
    If not how can we create a bapi for scheduling a background job.
    Thanks & Regards,
    Azhar

    Hi,
    Use following BAPIs for scheduling a job in background
    BAPI_XBP_JOB_OPEN - This BAPI solves the first step in scheduling a job in the R/3 background processing system. You can create the job with this method.
    Using additional BAPI calls BAPI_XBP_JOB_ADD_ABAP_STEP and BAPI_XBP_JOB_ADD_EXT_STEP, you can add job steps to the job.
    With the BAPI call BAPI_XBP_JOB_CLOSE, you can finish defining the job and transfer it to the background processing system with the status Scheduled without start date.
    You have execute the job with the BAPI calls BAPI_XBP_JOB_START_IMMEDIATELY or BAPI_XBP_JOB_START_ASAP.
    I hope it would help you.
    Regards,
    Venkatram

  • How to de-schedule a background job?

    Dear all,
         I have scheduled a background ABAP report titled ZHRWFIT19 at SM36 to trigger a workflow.
         Initially I scheduled this background job to 9 A.M.
         Later I changed to schedule this background job to 10 A.M at SM37.
         Now my workflow triggers twice i.e., at 9 A.M. once and 10 A.M once.
         I want it to start at 10 A.M. only.Though I changed the schedule time to 9 A.M. to 10 A.M, still my background job triggers the
         workflow at 9 A.M. and 10 A.M.
         How to de-schedule this background report at 9 A.M.?
         Please suggest for which I will be grateful forever.
    Thanks and regards,
    S.Suresh

    Dear Shastri,
             Thank you so much for your reply.
             As you have rightly pointed, I have 2 entries with same background job at SM37.That's why my workflow triggers twice.Now I want to permanently delete the background job entry at SM37 which triggers my workflow at 9 A.M.
            I couldn't delete this entry at SM37 permanently.Please suggest me how to permanently delete the entry that triggers the workflow at 9 A.M., for which I will grateful.
    Thanks and regards,
    S.Suresh

Maybe you are looking for

  • I want to add a keynote slide show to my new slideshow.

    How do I merge, insert two slide shows?

  • Report Painter : How to check table for form

    Hello I am creating a report at FSI2 using form 0SAPROLLP-01 I would like to modify or add a field present here. How can I determine which table the form belongs too? regards ken

  • How do I get Photo Elements full version downloaded

    I purchased (for $129+) the FULL Version of Photo Elements 12 & Premier Elements 12.  Photo Elements 12 all of a sudden stopped working and said my TRIAL had expired.  I have uninstalled the program and reinstalled the program and it still says my TR

  • How to extract 2LIS_11_VAHDR

    Dear Consultants, When i extract 2LIS_11_VAHDR, I can not gain datas. About using tcode: LBWE, RSA5, RSA6, RSA3. What executing procedure i ought to implement ?  And what other tcodes  i  ought  to  execute ? Please consultants provide good advises a

  • Error in integration builder

    Hi All, My issue is if I give SXMB_IFR, it takes me to url http://hostname:port/dir/start/index.jsp but am getting   "Internet Explorer cannot display the webpage" But if I manually give url as "http://hostname.<domain>.<ext>:port/dir/start/index.jsp