Separate Dual Stack

Good Day:
I need a recommendation, i need separate the Java system from a dual stack system, this not is the problem, the  problem are 3:
1. Is a CRM System. (What i need look between systems to preserve the configurations and communications between systems)
2. Is a distributed system, the stack Java+ABAP is in one physical Hardware and the data base is in another, the destination for Java is another physical Hardware.
3. Taking on mind the point 2, is necessary install in the same DataBase.
Taks a lot for your answer!
Best regards!

MY MESSAGE TO SAP
Good day:
Context:
We update our version of SAP CRM 2006 and CRM 7.0 EHP1 with Netweaver 7.2 so far everything
is correct.
Technical Environment:
SAP EHP 1 for SAP CRM 7.0 is on SAP NetWeaver 7.02 and installed on ABC-Server on dual-
stack, a the second server DEF-Server is the database is required only to separate
instances of the ABAP-JAVA, Java go to the server GHI-Server, but the database is not
split.
Problem:
Once make the system upgrade, se second step is splitting the Dual-Stak, in this step we
don't found a tool for make the split, the cuestions are three, 1) exist a tool for make
this task? 2) if not. how we can make this? 3) this is supported by SAP
under what
specifications.
we try to make a split by the stardart sapinst but when we try to import the data base the
system say what this is not support on the database but is the same database engine
(Server).
Normally this task is simple but the option, system copy and extraction, for a new
installation and the creation of the other system with individual database is not possible

Similar Messages

  • How to separate ABAP+JAVA Dual stack in stand alone engins?

    Hello SDN!
    We are thinking about to separate our Dual Stack ERP 6.00 System on Windows/Oracle in two stand alone system Java und ABAP. Wie have afew small implementation in Dual Stack such as ESS and wie have no modifications at all.
    Has somebody an expiearence with that? Knows somebody about some tools for such an action?
    I will be very pleased for any help
    With best regards
    Vladimir

    You may  find attached link helpful and interesting
    [Doublestack : separate JAVA Stack from ABAP Stack ...;

  • Question about the number of ERS instances in a dual-stack MCS environment

    Hello to the group.
    I have a simple question for those running a NetWeaver 7.0 (i.e. 2004s) dual stack (ABAP/JAVA) setup in an MCS environment. On each individual node, do you have two separate ERS processes running on the node (as seen in Task Manager) that is opposite to the system running the ASCS/SCS instances? If so, do you have a set of profiles for each of these ERS processes (I am guessing that is true)?
    Thanks in advance for your help.
    J. Haynes

    Has anyone found a good description of the process that runs after one node fails over to another one? help.sap.com mentions that the ASCS will restart and run the command enstatus.cmd but I cannot find what is supposed to happen after that. Is the ERS service itself stopped?
    Thanks
    J. Haynes

  • EHP4 Dual stack

    hi guys,
    we plan to upgrade Enterprise Dual stack(ABAP+JAVA) System to EHP4 system.
    In EHP4 upgrade document it says, No dual stack supported for EHP4 installation..was that mean
    only for Installation or upgrade too.
    Seperate SID is required for EHP4 system after upgrade? Please confirm.
    thanks

    hi jaichan,
    yes, you are right ..For new installation of SAP ERP to EHP4 level, you cannot install dual stack system..i have read in sap note 855534..please find below the extract from this note:
    As of SAP Business Suite 7, you can no longer install Dual Stack Application Systems (ABAP+Java).
    If you want to use both SAP Business Suite ABAP and Java Components in your system landscape, you have to proceed as follows:
    1. Install a separate ABAP-based SAP Business Suite system.
    2. Install the required Java components in a separate Java-based SAP system.
    3. Configure the connection of the Java-based SAP system to the ABAP-based SAP Business Suite back-end system.
    The SAP Business Suite 7 comprises: EHP4 for SAP ERP 6.0, SAP CRM 7.0, SAP SCM 7.0, SAP PLM 7.0, SAP SRM 7.0
    As of now you will find the latest recommendations at a central place in SDN:
    https://www.sdn.sap.com/irj/sdn/landscapedesign -> Distribution Models
    You will also find information about the deployment of SAP NetWeaver usage types and the SAP Business Suite there.
    but you can upgrade your previously installed SAP ERP dual stack system without having seperate SID's thing...
    We have upgraded around 50 of our systems without any problem
    thanks sunny

  • Patching dual stacks ABAP + JAVA simultaneously

    Hi,
    I would like to know if I can patch ABAP and JAVA on a dual stack system at the same time. According to the patching document I can run an SGEN when the JSPM is running but it does not tell me why I can not patch a dual stack system simultaneously. I have discovered that the JSPM restarts the dispatcher in order to update itself. After this initial step the ABAP stack should remain available providing the kernel has been manually updated.
    Does anyone have any advice on this?
    Thanks,
    James

    Hi,
    I had a similar case where I had to install a java stack for an already existing CRM system running on Windows/SQL Server.
    I installed a different SID for Java on the same host and I installed the Java database as a second database in the same SQL server engine.
    Therefore I shared the hardware resources but still had 2 separate stacks as best practice.
    Regards,
    Olivier

  • LDAP configuration for HR Portal in dual stack EHP4 - Best Practice

    Hi Experts,
               Hello Experts,
    We are trying to use the JAVA Stack of ECC server for HR Portal i.e Dual Stack and have applied EHP4 package for ESS/MSS Appraisal. When we are trying to configure the LDAP ADS datasource through portal , we are not able to do it since ABAP datasorce file is available by default.This we are doing for HR(ESS/MSS) Portal.This is for access to the object data stored in the Active Directory.
    We have already checked note 718383.
    Also, for the scenatrio ,LDAP <-> ABAP <-> J2EE
    We have already checked sap help doc.here:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/e6/0bfa3823e5d841e10000000a11402f/frameset.htm
    What should now be the best practice to follow for configuration ? Should we go for separate Portal server or is it possible to use Java Stack of ECC server for configuration ?
    Also, LDAP <-> ABAP <-> J2EE scenario please suggest if it a best practice and we can follow the same .What are the limitations , risks and issues ? Please suggest if this has been implemented and running well in any live project .
    Are the suggestions applicable for load balanced production servers as well?
    Thanks,
    Rakesh

    Hi,
    the UME datasource must remain ABAP but you can sync the users between ABAP and LDAP using the LDAP connector:
    http://help.sap.com/saphelp_nw70ehp2/helpdata/en/48/74040175bb501ae10000000a42189b/frameset.htm
    Regards,
    Jozsef

  • Single stack vs. Dual Stack - Why does SAP recommend single stack?

    Hello SAP,
       I am a business partner who specializes in infrastructure consulting for SAP solutions.  The SAP Consultants I am working with recently have been recommending that customers install single stack systems.  I would like to know why? Are there problems with dual stack systems?  Is SAP changing things in a later release and they want customers to be prepared for the change?
      From an infrastucture point of view this recommendation combined with SAP NetWeaver architecture will result in an explosion of SID names which leads to an explosion of application server instances and DBMS instances and an explosion of installed servers.  I know it is possible to combine SIDs into a single DBMS using MCOD and to have multiple application servers in a single physical server, but there are issues with mulitple application server instances and MCOD use which make normal maintenance operations difficult.
      I think it would be much better for customers to install dual stack systems and simply adjust the SAP profile parameters to disable one stack or the other.  This way, you could still have 1 stack per application server instance and you would not be have to be creative with SAP SID names!!!  Creating a DBMS instance or installing an additional server is not a simple nor economical proposition.
    Regards,
    Zaz

       I am a business partner who specializes in infrastructure consulting for SAP solutions.  The SAP Consultants I am working with recently have been recommending that customers install single stack systems.  I would like to know why? Are there problems with dual stack systems?
    The problems are:
    - difficult to size and maintain - Java + ABAP will fight for resources (memory,CPU) and there´s not much one can do to tune if either ABAP or Java as dual stack instance on a single box is running nuts (for whatever reason).
    - System copies via R3load - if you want to copy a huge system (let´s say ERP 6.0 + Java stack) you need to use sapinst + R3load to do the copy. Imagine if the system is 1 TB or bigger, this is very time consuming
    - Upgrades are complicated - if you upgrade a dual stack system you need to run two PREPARES and two upgrades at the same time - there are sync points each upgrade wait for the other to finish --> difficult to plan in sense of runtimes and even more notes/preparation to do (a dual stack SolMan upgrade from 3.2 to 4.0 had almost 100 notes (technical!) and two upgrade preparation guides...)
    - interdependencies - example: you run ERP + EP + BI-Java on one system. You upgrade your BI (which is on a different box) to a new support package. Since the BI-Java need to be in sync with the BI ABAP support package you need to upgrade the EP too - and since there´s a direct dependency (doublestack system) you will need to install support packages on your ERP. So you finally end up in having dependency chains that a total different system (BI) will force you to upgrade/patch your ERP. And if you have e. g. a CRM connected to the same EP you will need to patch that too...
    Is SAP changing things in a later release and they want customers to be prepared for the change?
    No - the possibility of having a dual stack installation will be still there.
      From an infrastucture point of view this recommendation combined with SAP NetWeaver architecture will result in an explosion of SID names which leads to an explosion of application server instances and DBMS instances and an explosion of installed servers.  I know it is possible to combine SIDs into a single DBMS using MCOD and to have multiple application servers in a single physical server, but there are issues with mulitple application server instances and MCOD use which make normal maintenance operations difficult.
    I agree - MCOD is not a good solution for this problem.
      I think it would be much better for customers to install dual stack systems and simply adjust the SAP profile parameters to disable one stack or the other.  This way, you could still have 1 stack per application server instance and you would not be have to be creative with SAP SID names!!!  Creating a DBMS instance or installing an additional server is not a simple nor economical proposition.
    There are 36 * 36 * 36 (minus a few reserved) names for SIDs- this should be enough - also for the biggest customers
    Of course one could install both and disable the one you don´t need - but this won´t help in dependency thing. If you e. g. install a dual stack instance for CRM and disable the Java part, you can nicely run it. In case of an upgrade, you will need to upgrade the Java part too (see above) although you don´t use it. The upgrade will detect the doublestack and wait for the java instance to be upgraded too. Same is true vice versa. And believe me: you don´t want that
    In fact it is better to separate - that´s at least our experience. The main no-go for such a configuration on our side was the dependency thing. Since they are there and you can´t do much about them we decided to have a 1:1 relationship for ABAP backend and Java "frontend". You will get more instances (and names and databases) but you can patch applications independently from each other. So an implementation of a  BI patch won´t imply that you finally also patch your ERP production and other systems that connect to that portal.
    There are virtualization techniques available to not need more boxes, you can consolidate them on one machine as if you were installing a dual stack so that is not really an issue. This depends, of course, on the platform and database you use (e. g. Oracle does not support production installations in VMWare). We use for our Java instances Solaris on Opteron (or Intel 64bit) and zones/containers and for the ABAP part we use Linux + Xen. Both virtualization methods come with the OS (so no additional $$$) and both are supported by SAP.
    The propagated advantage of having a dual stack installation (shared memory access etc.) is so small that it doesn´t outban the additional complexity - which is definitely there.
    I hope those arguments will help to understand SAPs (and the consultants) position - get back if you want more
    Markus

  • Removing J2EE stack from dual-stack installation

    Hello.
    Does anyone know if it's possible to remove the JAVA-stack from a ERP6.0 dual-stack installation ?
    We have a ERP 6.0 system running HCM services. The ERP system is installed as dual-stack, but the JAVA-stack is not in use as we also installed a separate NW 7.0 JAVA system hosting portal and java hcm services.
    Thank you.
    Gerhard.

    Hi,
    Yes, you can drop Java part from existing dual stack system.
    1) Stop cenrtal service instance and all dialog instances of your system.
    2) Also, stop J2ee engine of CI from SMICM.
    3) Hash out all Java parameters in your default and instance profile (like j2ee, exe/j2ee, exe/jlaunch, jstartup etc.)
    4) Delete central service instance.
    5) Delete Database schema
    6) Delete directories (/usr/sap/<SAPSID>/DVEBMGS<xx>/SDM and /usr/sap/<SAPSID>/DVEBMGS<xx>/j2ee)
    Thanks
    Sunny

  • OSDB Migration  using the migration monitor with dual stack

    Hi
    How can i use the  migration monitor for dual Stack system. i knew that migration monitor use the R3LOAD. i never find using  the JLOAD. how migration monitor export the Java.
    Please advice me
    Thank you
    Vish

    > We are using the NFS filsystem. its mounted the two systems.
    Good!
    > Can i know which ExchangeDir we need to use.
    >
    > i saw two of them
    >
    > 1. NetExchangeDir
    > 2. FtpExchangeDir
    So assuming that you have not read the documentation (which you really should):
    - You need to create a separate directory on the NFS where both systems have access
    - you need to configure the export machine as "server" (read the docs!)
    - you need to configure the exchange directory on both export and import migmon
    Markus

  • Dual stack split

    Hi.
    I've found the dual stack split procedure to be intersting.
    After reading some informaton I still have a doubt.
    The result for splitting a dual stack is two separate systems that wil still be in the same server or.. is there a way to have two standalone instaces running on separate servers?
    Thank you.
    David.

    Hi David
    The result for splitting a dual stack is two separate systems that wil still be in the same server or.. is there a way to have two standalone instaces running on separate servers?
    Its depends on your requirement it can be same or different systems. but the SAP SID will be different, Database can be same.
    you can use the SWPM it will be easy to do the all the integration tasks.
    Regards
    Sriram

  • Dual stack on tunnel interface

    Is it possible to run dual stack IP schemes over an ipsec-protected tunnel interface on IOS? I am able to assign the IPv6 addresses like a normal interface on both ends however when i try to ping across the tunnel with IPv6 there is no response. Here is an example of my config:
    R1
    interface Tunnel0
     description Tunnel to R2
     ip address 172.30.1.237 255.255.255.252
     ip mtu 1400
     ip nat inside
     ip virtual-reassembly
     load-interval 30
     ipv6 address FE80::172:30:1:1 link-local
     ipv6 address 2001:1::172:30:1:1/126
     keepalive 5 4
     tunnel source GigabitEthernet0/1
     tunnel mode ipsec ipv4
     tunnel destination 1.2.3.4
     tunnel protection ipsec profile protect-gre
    R2
    interface Tunnel0
     description Tunnel to R1
     ip address 172.30.1.238 255.255.255.252
     ip mtu 1400
     ip nat inside
     ip virtual-reassembly
     load-interval 30
     ipv6 address 2001:1::172:30:1:2/126
     ipv6 address FE80::172:30:1:2 link-local
     keepalive 5 4
     tunnel source FastEthernet0/1
     tunnel destination 1.2.3.5
     tunnel mode ipsec ipv4
     tunnel protection ipsec profile protect-gre
    The only solution i can clearly see is running a separate tunnel, which i would like to avoid. Any assistance is greatly appreciated!

    Hello,
    In my System preferences the IPv6 settings are set to "automatic", my DSL router (Cisco 787) supports IPv6. When visiting sites like www.sixxs.net and www.apnic.org (which are reachable by both IPv6 and IPv4), some pages are reached by IPv6 and some by IP4. Even the same page may load in IPv6 first, but a second time via IPv4. This behaviour has changed since my upgrade to Leopard, under Tiger the behaviour was much more stable.
    Gerard

  • Error in phase import Homogeneous system copy from a BI 7.3 dual stack ABAPJAVA

    Hi
    I'm doing a Homogeneous system copy from a BI 7.3 dual stack ABAP+JAVA system with an Oracle DB (11g version, 11.2.0.3.0 patch level) with AIX ibm OS.
    Before starting export I've executed in the source system the report SMIGR_CREATE_DDL, as described in sap note 888210, and I generated *.SQL files.
    After, during the import in the target system I get the following error message:
    vi /expdb2/tmpDB0/sapinst_instdir/NW730/ORA/ORA/COPY/ORA/SYSTEM/STD/AS/import_monitor.log
    INFO: 2014-03-08 00:21:57 com.sap.inst.migmon.LoadTask run_report
    Monitor jobs: running 0, waiting 1, completed 60, failed 5, total 66  finish processing of package SAP0000
    You can see below the detail of the 5 packages in error:
    SAPAPPL0_1_5
    DbSlExecute: rc = 99
      (SQL error 2216)
      error message returned by DbSl:
    ORA-02216: tablespace name expected
    (DB) INFO: disconnected from DB
    /usr/sap/DB2/SYS/exe/uc/rs6000_64/R3load: job finished with 1 error(s)
    /usr/sap/DB2/SYS/exe/uc/rs6000_64/R3load: END OF LOG: 20140307141347
    SAPZPSA
    DbSlExecute: rc = 99
      (SQL error 2216)
      error message returned by DbSl:
    ORA-02216: tablespace name expected
    (DB) INFO: disconnected from DB
    SAPDODS
    DbSlExecute: rc = 99
      (SQL error 922)
      error message returned by DbSl:
    ORA-00922: missing or invalid option
    (DB) INFO: disconnected from DB
    SAPDFACT
    DbSl Trace: Error 1741 in exec_immediate() from oci_execute_stmt(), orpc=0
    DbSl Trace: ORA-01741 occurred when executing SQL stmt (parse error offset=8126464)
    (DB) ERROR: DDL statement failed
    (  ALTER TABLE "/BI0/F0TCT_C01"    ADD PARTITION "/BI0/F0TCT_C010000001131" VALUES LESS THAN ( 0000001131  )    TABLESPACE "" )
    DbSlExecute: rc = 99
      (SQL error 1741)
      error message returned by DbSl:
    ORA-01741: illegal zero-length identifier
    (DB) INFO: disconnected from DB
    SAPZOSO
    DbSl Trace: Error 922 in exec_immediate() from oci_execute_stmt(), orpc=0
    DbSl Trace: ORA-00922 occurred when executing SQL stmt (parse error offset=242024448)
    (DB) ERROR: DDL statement failed
    (CREATE TABLE "/BIC/B0000989000"    ("REQUEST" VARCHAR2 (000090)      DEFAULT ' ' NOT NULL,    "DATAPAKID" VARCHAR2 (000018)      DEFAULT '000000' NOT NULL,    "PART
    NO" NUMBER (000010)      DEFAULT 0 NOT NULL,    "RECORD" NUMBER (000010)      DEFAULT 0 NOT NULL,    "PLANT" VARCHAR2 (000012)      DEFAULT ' ' NOT NULL,    "MATERIA
    L" VARCHAR2 (000054)      DEFAULT ' ' NOT NULL,    "RPA_CURUOM" VARCHAR2 (000015)      DEFAULT ' ' NOT NULL,    "RPA_MVF" NUMBER (000017, 000002)      DEFAULT 0 NOT N
    ULL,    "PRICE_UNIT" NUMBER (000017, 000003)      DEFAULT 0 NOT NULL,    "RPA_QTYUOM" VARCHAR2 (000009)      DEFAULT ' ' NOT NULL,    "RT_SSMFGR" VARCHAR2 (000024)
        DEFAULT '00000000' NOT NULL,    "BASE_UOM" VARCHAR2 (000009)      DEFAULT ' ' NOT NULL,    "FRE_PLNPUR" VARCHAR2 (000036)      DEFAULT ' ' NOT NULL,    "FRE_MINS
    TK" NUMBER (000017, 000003)      DEFAULT 0 NOT NULL,    "FRE_SERLEV" NUMBER (000017, 000003)      DEFAULT 0 NOT NULL,    "FRE_SELCLS" VARCHAR2 (000003)      DEFAULT '
    0' NOT NULL,    "FRE_REPLST" VARCHAR2 (000006)      DEFAULT ' ' NOT NULL,    "ABCKEY" VARCHAR2 (000003)      DEFAULT ' ' NOT NULL,    "RECORDMODE" VARCHAR2 (000003)
        DEFAULT ' ' NOT NULL,    "RT_SERVLEV" VARCHAR2 (000003)      DEFAULT ' ' NOT NULL,    "RT_SUPS" VARCHAR2 (000003)      DEFAULT ' ' NOT NULL,    "VAL_TYPE" VARCH
    AR2 (000030)      DEFAULT ' ' NOT NULL,    "PUR_GROUP" VARCHAR2 (000009)      DEFAULT ' ' NOT NULL,    "RT_VPNEU" NUMBER (000017, 000002)      DEFAULT 0 NOT NULL,
    "CURRENCY" VARCHAR2 (000015)      DEFAULT ' ' NOT NULL,    "RT_VRKPE" NUMBER (000017, 000003)      DEFAULT 0 NOT NULL,    "DISMM" VARCHAR2 (000006)      DEFAULT ' '
    NOT NULL,    "SALES_UNIT" VARCHAR2 (000009)      DEFAULT ' ' NOT NULL,    "RT_VP_BT" NUMBER (000017, 000002)      DEFAULT 0 NOT NULL,    "RT_VPE_BT" NUMBER (000017,
    000003)      DEFAULT 0 NOT NULL,    "RT_VP_NT" NUMBER (000017, 000002)      DEFAULT 0 NOT NULL,    "RT_VPE_NT" NUMBER (000017, 000003)      DEFAULT 0 NOT NULL,    "R
    T_VWAERBT" VARCHAR2 (000015)      DEFAULT ' ' NOT NULL,    "RT_VWAERNT" VARCHAR2 (000015)      DEFAULT ' ' NOT NULL,    "RT_VPMEIBT" VARCHAR2 (000009)      DEFAULT '
    ' NOT NULL,    "RT_VPMEINT" VARCHAR2 (000009)      DEFAULT ' ' NOT NULL,    "LOC_CURRCY" VARCHAR2 (000015)      DEFAULT ' ' NOT NULL,    "UNIT" VARCHAR2 (000009)
      DEFAULT ' ' NOT NULL,    "CM_MCATDIV" VARCHAR2 (000054)      DEFAULT ' ' NOT NULL,    "CM_CDT1" VARCHAR2 (000054)      DEFAULT ' ' NOT NULL,    "CM_CDT2" VARCHAR2
    (000054)      DEFAULT ' ' NOT NULL,    "CM_CDT3" VARCHAR2 (000054)      DEFAULT ' ' NOT NULL,    "CM_CDT4" VARCHAR2 (000054)      DEFAULT ' ' NOT NULL,    "CM_HIEID"
    VARCHAR2 (000006)      DEFAULT ' ' NOT NULL,    "CPSTLC" NUMBER (000017, 000002)      DEFAULT 0 NOT NULL,    "CPSVLC" NUMBER (000017, 000002)      DEFAULT 0 NOT NULL
    ,    "STOCK_VAL" NUMBER (000017, 000002)      DEFAULT 0 NOT NULL,    "STOCK_QTY" NUMBER (000017, 000003)      DEFAULT 0 NOT NULL,    "RT_SEASON" VARCHAR2 (000012)
      DEFAULT ' ' NOT NULL,    "RT_SEASYR" VARCHAR2 (000012)      DEFAULT '0000' NOT NULL,    "CALDAY" VARCHAR2 (000024)      DEFAULT '00000000' NOT NULL,    "CALWEEK"
    VARCHAR2 (000018)      DEFAULT '000000' NOT NULL,    "RF_BNDID" VARCHAR2 (000012)      DEFAULT ' ' NOT NULL,    "/BIC/ZCATTR3" VARCHAR2 (000006)      DEFAULT ' ' NOT
    NULL,    "/BIC/ZCSTYLE" VARCHAR2 (000006)      DEFAULT ' ' NOT NULL,    "/BIC/ZCIMAGE" VARCHAR2 (000006)      DEFAULT ' ' NOT NULL,    "/BIC/ZCBRNDTYP" VARCHAR2 (000
    003)      DEFAULT ' ' NOT NULL,    "/BIC/ZCGROUPE" VARCHAR2 (000054)      DEFAULT ' ' NOT NULL)    PCTFREE 10    PCTUSED 00    INITRANS 001    TABLESPACE    STORAGE (
    INITIAL    0000000016 K            NEXT        0000001024 K            MINEXTENTS  0000000001            MAXEXTENTS  2147483645            PCTINCREASE 0000
        FREELISTS  001            FREELIST GROUPS 01)      PARTITION BY RANGE ("PARTNO")      (      PARTITION "/BIC/B00009890000000000002" VALUES LESS THAN      (00000
    00002)      NOCOMPRESS      ) )
    DbSlExecute: rc = 99
      (SQL error 922)
      error message returned by DbSl:
    ORA-00922: missing or invalid option
    (DB) INFO: disconnected from DB

    hello,
    Before anything update DB shared lib, R3load, R3ldctl and R3szchk in the target system. Also Check in source system if you have any tables o index missing in db02 transaction, If this system wa upgraded from a previous release please check TAORA and IAORA tables in source system and check all the tablespaces named in those tables are created in the target system.
    let me know how it goes.
    Regards,
    Michael

  • Dual Stack NW 7.0 installation with R/3 Backend as UME

    I have a quick question guys. I am about to install a dual stack NW system with ADS(SQL server database on windows) and will use a R/3 Enterprise running on unix as the UME datasource. Now this R/3 enterprise backend already acts as bakend for Portal system and uses sap logon tickets and as such already has the user SAPJSF.   Now when i actually perform the NW 7.0 installation and enter a master password during the course, would this override the SAPJSF user in R/3 backend system at all.
    What are the general problems that are caused with using an existing ABAP only system as the UME for your Java stack(Dual stack actually) systems. Can you advise.
    Regards
    Kalyan

    Hi,
    Now when i actually perform the NW 7.0 installation and enter a master password during the course,
    would this override the SAPJSF user in R/3 backend system at all.
    NO....Not at all..
    SAPJSF user is used for the communication between ABAP  and JAVA stacks. SAPJSF user is an independent user of each independent ABAP stack.
    ABAP data/user-store is the place where the users, roles and authorizations of an ABAP System are stored.
    And with the same concept, the UME is the same mechanism for users, roles, permissions of an JAVA system.
    After installation of your new NW ABAP+JAVA Stack, you will have to specify the SAPJSF user of ur old R/3 ABAP system which you want to use as User Data Store for ur Newly installed Java System's UME.
    In ABAP System section u will have to provide all details of ur SAP R/3 application server, which ur portal is already using as User Data Store.
    What are the general problems that are caused with using an existing ABAP only system
    as the UME for your Java stack(Dual stack actually) systems. Can you advise.
    It depends on the usage of your new application server.
    Regards
    Bhavik G. Shroff

  • PI 7.1(dual stack) and PI 7.31(Single stack) -

    Friends,
    I have a proxy to proxy scenario - Proxy --> PI --> Proxy
    We have two servers PI 7.1(dual stack) and PI 7.31(Single stack)
    i did the development in ESR and my ESR is pointing to PI 7.1, when i execute the scenario i receive one error message "receiver could not be determined", i ensured that all my input is correct, still i get the same error message.
    the expectation is my scenario should point to PI 7.31, Can some one help me where and what settings i need to make in-order to make it work.
    Please Note: All my data is correct and i read some scn forums wherein they asked to refresh the cache , i have refreshed the cache also still the problem persists.
    Thanks in advance!

    Iñaki Vila
    Communication component in ID is the same as sender side.
    could you share your sender configuration?
    Did you mean Tcode - SXMB_ADM and under that Sender/Receiver configuration
    Krupa Rao Atluri
    In ID steps are correctly defined.
    I spoke to my colleague he hinted that at RUN TIME we want to point to PI7.31, he mentioned config change needed in SXMB_ADM
    any further inputs from any one could be useful.

  • Mapping error in PI 7.4 dual stack

    Dear Experts,
        Recently we upgraded our system from PI 7.1 to PI 7.4 dual stack.
    Scenerio is ECC->PI->SOAP(Webservice) synchronous
    Issue in detail:
         We are creating a invoice in ECC system through PI its updating in third party site using SOAP webservice and will get a reference number from that site and then updating in ECC as in synchronous way.
    Invoice data's are reached PI sucessfully from ECC but it not updating in the site and getting below mapping error after upgarded to PI 7.4.
    Your points will be highly appreciable.
    Kindly help to sort out this issue.
    Best Regards,
    Monikandan

    Hi Monikandan,
    It seems you are trying the sign the payload in your java mapping. So, looking at the attached error, there could be 2 possibilities:
    1) Either there is no certificate with alias: *_PRD
    2) This certificate is stored in some "System" type keystore view which is not accessible from you mapping code. Try to move your certificate to some "User" keystore view.
    Thanks & regards,
    Piyush

Maybe you are looking for

  • Same Code not doing Same thing

    Hello, Using the actionscript 2 below: This first button stops the main timeline, everything works fine. The other three do not. I have checked and rechecked my instance names, etc. I can't find any difference in my code anywhere and after of couple

  • Extract the node value of the input schema in a mapping

    I want to extract the value of request_id in the xslt of the mapping where the input schema format is in the below image. I tried the following, but I am not able to pull out the value. Could anyone help with it. <xsl:template match="/s1:Translations

  • Why won't my macbook load Facebook?

    My macbook has quit loading one specific page - my facebook page. It loads any other page I try. It just won't load facebook. How can I get my macbook to load my facebook page again?

  • Send(email)  method  is delaying servlet's response

    hello , i have a servlet that store a message in the DB , after the message was stored , a requestDispatcher is called to forward to the "msg sent" screen. than there is method that makes a call to an ejb method to send the msg via email like.... use

  • Premier CS3 Essential Project Housekeeping Query

    I hope someone will help with their experience I have created several home film projects over the years, which take me a long time as I am constantly working out how to work the program. Typically after a year or so and I become more accomplished, I