Serial number error while creating the production order

Hello frds,
I am getting the following error while creating the production order.
"Item 000000 requires exactly 100 serial numbers for the asset".
If i give 100 serial numbers in the order, the error is solved. But i do not want to assign 100 serial numbers, i want to assign only 2 numbers.
I have tried using the new serial number profile also, but it is giving same error.
Kindly guide.
Regards,
Narendra Bora

Dear Narendra
Select the serial number profile and go to serialization procedure and set the ser. usage status 02 - Optional as below.
Procd Procedure description Ser.Usage
PPRL PP order release 02
since the serail number creation is optional for order relase this will allow you to relase with out error and with serail number assigned in partial.
Regards
Soundar

Similar Messages

  • Error while creating the product group by MC84

    Hello Friends,
    I am creating the product group by MC84, and in product group field i have given the product group name i.e P2345, and its description i.e product group for waluj, plant i.e cw01 and Base unit i.e KG.Now when i press enter system is throwing the error"The field is defined as the required field;it doesnot contain an entry."Message no.MG144.And with this error system is placing the cursor on product group field.As i have already given product group name than also system is throwing the error.
    Though i know the alternative method to create product group by MMO1 and selecting the material type PROD, then also i want to know why system is throwing the error while creating the product group by MC84.
       Please guide.

    Dear,
    This message says that you have not entered a mandatory field.Enter proper values for all mandatory fields and then you will not get this error.
    Try to create the product group as material of material type"PROD"
    Then you go on adding the memebers in SOP Transaction.
    In some of the versions of SAP it is the problem.
    I have also faced this problem in some versions.
    Regards,
    R.Brahmankar

  • Error while creating the sales order with billing reference

    hi alll
    i am getting error while creating the sales order with billing reference.The line items are coming in grey.I am not able to change the items as well as the quantity field.Can u guide me
    cheers
    shalsa007........

    Dear SAP SD 007
    I can confidently tell that an enhancement or an user exit has been applied in your scenario
    You have to check that
    Normally when creating a sales order with respect or referring billing documents the qty will be in editable mode and it is standard problem
    Your people has solved the standard problem by enhancement
    Usually OR--LF-PGI----F2 (SAY THE QTY IS 25 UNITS)
    Now you are creating returns order with reference to F2 in the return order type Re there is a standard issue that user can edit the qty to 30 from the original 25
    To solve this only your people have used userexit
    Line items and qty greyed out means definately there is some enhancement or user exit applied
    You have to check that
    Regards
    Raja

  • Error While saving the Production Order

    Dear Experts
    Pls let me know why am getting the below error while saving the production order after release..
    PSFC_STD_LAYOUT does not exist
    Message no. SSFCOMPOSER004

    Dear,
    Please check have you assigned the scheduling profile in work scheduling view of materail master?
    Then go to OPKP check the same scheduling profile where you have activited the On realese execute printing remove this tick mark and then try with new order.
    Or you can do the configuration in Tocde :OPK8 here assign the PSFC_STD_LAYOUT in forum.
    Regards,
    R.Brahmankar

  • Material Listing Error while creating the sales order

    Hi Guru's
    I have mantained a material in the lisitng for A002 combiantion for SO/DC/Pric. ref. material
    While creating the sales order is throwing an error as material is not listed so the transaction is not possible.
    I have done the basic invetingation on the folowing aspects
    1)checking the material in the listing
    2)Validity periods
    3)Material not blcoked
    4)Mateial is extened for the respective sales org
    Kindly help ASAP.
    Thanks & Regards
    Tarakaram

    Dear SAP SD 007
    I can confidently tell that an enhancement or an user exit has been applied in your scenario
    You have to check that
    Normally when creating a sales order with respect or referring billing documents the qty will be in editable mode and it is standard problem
    Your people has solved the standard problem by enhancement
    Usually OR--LF-PGI----F2 (SAY THE QTY IS 25 UNITS)
    Now you are creating returns order with reference to F2 in the return order type Re there is a standard issue that user can edit the qty to 30 from the original 25
    To solve this only your people have used userexit
    Line items and qty greyed out means definately there is some enhancement or user exit applied
    You have to check that
    Regards
    Raja

  • Serial number creation while confirmation of production order

    Hi team
             Can we crete serial numbers while confirmation of production order. I know how to create serial no while creation of proudction order, while taking usage decision in quality. Is there any way to create serial no while confirmation of production order.
    regards
    ssp

    Hi siva
        There is no way to create serial number at production order confirmation, only at creation and release the order.
    but u can maitain MMSL profile and the sno will create at GR from shop floor to warehouse
    I hope it will help to u
    Regards
    S.Anbalagan

  • Co- Product Error while creating a production order

    Hi,
    While performing the Co-Products Approtionment at the time of creation of Production order..
    we are facing a problem regarding cost apportionment I have crated a Source Structure and the cost element is assigned to that Source Structure but still iam facing this issue
    kindly help me out.
    the error msg is
    Debit with cost element 9460404 cannot be settled.
    Message no. KD549
    Diagnosis
    Costs/revenues exist for cost/revenue element 9460404.  This cost/revenue element was given source assignment 40 in the source structure (-> settlement rule for sender -> parameters).  However, there is no distribution rule with settlement type FUL for this source assignment or the total of the percentages for the rules is less than 100.
    Note:
    Full settlement settles all the costs and revenues which have occurred up to the settlement period and have not already been settled. In the case of periodic settlement, you can configure the settlement profile so that all the costs occurring in the settlement period are settled, or if an amount less than 100% can be settled.
    Procedure
    Maintain the distribution rules for source assignment 40 and settlement type FUL or use periodic settlement to settle less than 100%.  Change the settlement profile for the sender as necessary.
    Change settlement profile
    Note:
    Cost and revenue elements receive source assignment " " if you have not entered a source structure in the settlement rule parameters.

    Hi Krishna Murthy I went through the note but i couldnt recive a big help from that note.
    I will explain the step by step process that i have done.
    I am attaching the Screen shots of the issue.
    1. For co-products I have created a source structure and Sec. Cost Elements were assigned in the source structure.
    2. The source structure was assigned in the Material Master for co-products equally distrubuting the amount between 2 materials.
    3. When we are trying to create a production order the error was displayed but the costs was getting calculated properly.
    4. When I was settling the production order the same error was getting displayed.
    I have tried various methods to resolve it.
    1. I have created a periodic settlement rule and tried to settle but it didnt work
    2. I have assigned the source structure in the settlement profile this also didnt work.

  • ERROR WHILE CREATING THE SALES ORDER

    Hi,
    When creating the sales order i am entering "mode of transport"in TSW details and while trying to save it im getting a message saying "Express document "update was terminated"" recieved from the author "Rahul". If i dont enter the TSW detail while creating i am able to save the order and later in change mode i can enter the mode of transport.
    When i check the inbox, it says "definately cannot transfer message to node SMTP due to connection error".
    This is hapenning for only one user.
    What could be the problem?
    Regards,
    Rahul.

    Hi Rahul,
    I think you need to enter the mode of transport in external details where it will take for further processing. TSW is different process.
    Thanks
    Pravin

  • Error while creating a production order

    Dear PP gurus
    I am trying to create a production order of a material  through CO01 , I am getting a error   05.05.2016 date comes after end of valid factory calendar. (Please correct
    Although  for all other  material , no error is coming.
    My factory calender is till 2015, but i am not able to understand why and how it is capturing the above date.
    please help me how to correct it?
    Thanks in advance
    Regards

    Dear Aadi,
    When your in operations screen
    Extras > Scheduling > Schedule > operation overview = operation segments > Click on Gang chat icon
    it should show you the days for ur base qty
    then click on scheduling results then click on update material master & save
    then Go to CA96
    input plant
    then mark a tick for ur material & click on update material master icon
    then check in material master work scheduling view
    Regards
    Madhu

  • Run time error while saving the production order in CO02

    HI Experts,
    While i am releasing and saving the production order the system is giving the runtime error. Please help.
    Runtime Errors         UNCAUGHT_EXCEPTION
    Exception              CX_SLD_API_EXCEPTION
    Error analysis is
    An exception occurred that is explained in detail below.
    The exception, which is assigned to class 'CX_SLD_API_EXCEPTION', was not
    caught in
    procedure "GET_ACCESS_DATA" "(METHOD)", nor was it propagated by a RAISING
    clause.
    Since the caller of the procedure could not have anticipated that the
    exception would occur, the current program is terminated.
    The reason for the exception is:
    Internal error in method
    A Quick response is required.
    Regards
    Dinakar Sarma

    Hi,
    Please check below  link for your issue , it may useful
    http://forums.sdn.sap.com/thread.jspa?messageID=10815298#10815298
    Regards,
    Ram

  • Error while Closing the Production order.

    Hi ,
      We are doing operation Subcontracting Process. This process works on the basis of Production order, once the Production order generated automatically system generates a Purchase requisition which we are converting to Purchase order  and doing the sub contracting process.
    Now i have received all the material from the Subcontractor ( GRN and MIRO ) has been completed , for the Production order all the confimration and Delivery has also been completed , now i have done Technically completion for that order , now i am closing the Order ( Functions -Restrict processing - close ) , while closing it gives me an error saying that Purchase order still exists .
    Wat is this error ?? why is it coming so ??
    Regards
    Rajesh

    hi,
    You have to ensure that the order is not having any WIP, if you have any WIP for that order you have to complete the order and then only you could abale to clsoe the order.
    Check the WIP for the order thorugh KKAX.
    Regards,
    Rama Mohan

  • Error while creating the sales order using Proxy

    Hi Folks,
    I am trying to create a Sales Order using Proxy via BAPI "BAPI_SALESORDER_CREATEFROMDAT2" :
    and i got this type of standard error message
    <Message>FB call: insufficient parameters</Message>
    few days back only i used the same bapi for creating the Sales Order and did it successfully...using the same parameters
    I don't have any clue about this type error .
    Kindly guide .
    Regards,

    Hi Nikhil,
    How refreshing the cache and restart the server will help ?
    basically i am testing the scenario at R/3 end only by generating XML template in SPROXY.
    My ECC 6.0 is on sp 12....I am not sure is it configuration related error or a bug ? as i have used the same code in ECC 6.0 with sp 09.
    regards,

  • Error while creating a production order from a sales order

    Hi
       Even though the product has BOM when i try to create order with a sales order reference it is showing a warning message " NO BOM FOUND" . How to correct this error .
    regards,
    PradeepM.

    Dear ,
    Goto -CS02-Enter FG -Goto Header -Staus Long Text -Check wether BOM status is set to 1 -Active .
    Check the usage of the BOM -Should  be 1-Production .
    Check wether BOM is locked and Deltion Flag set -Header Status Long txt tab
    Check the valididty of the BOM and Sales Order Schedule delivery date
    Try and come back
    Regards
    JH
    Edited by: Jiaul Haque on Jul 6, 2010 9:03 AM
    Edited by: Jiaul Haque on Jul 6, 2010 9:04 AM
    Edited by: Jiaul Haque on Jul 6, 2010 9:04 AM

  • Error while creating the repair order

    I am getting an error when the repair order automatically creates the services it giving the error...."No entry for plant 1200, service object 01 CSREPAIR in table T399A" So please can any one tell me that why its performing like that?
    Thanks
    Mohsin

    You have to maintain entries in transaction OISD for the service material in order to generate the service order automatically.
    thanks
    Bala

  • Error  while giving the production line in repetitive mfg

    Hello friends,
       When i am maintaining the production version in material master for repetitive mfg, and in production line when i am giving the workcenter which is in operation of rate routing, system giving me the error message that "REP01(which is my workcenter) is not maintained in plan (planning type = plant = smp1)".Message no. is CFVO90.
          Though i have got the solution of this message, but i am not able to understand the solution.
          Actually while creating the production version in material master, for task list data i was only maintaining the task list type, Group Number and Group counter for  Rate Based only as Rate Routing.And when i would give the workcenter which is in operation of rate routing then  system would give me the error.
           Later on when i maintained the Task list type, Group Number and Group counter for Detailed scheduling, Rate Routing, and Rough cut scheduling and than maintained the workcenter in production line,system didn't give the error.
          My question is as we are doing the repetitive mfg, and as we have maintained the rate routing, so why it so that in Detailed scheduling and rough cut scheduling also we have to maintain the Task list type, Group Number and Group counter.
         Plz guide.

    Hello pravin,
    Thanks for the reply.
      Actually if i give the details of Task list type, Group, Group counter for Rate based scheduling only in production version and if i maintain the workcenter which i have given in the operation of Rate Rounting in production line then system is throwing the error mentioned above.
        Unless and until i mention the details of Rate Routing for all i.e. Detailed scheduling, Rough cut scheduling and Rate based scheduling, system is not allowing me to save the production version.
           As per your answer, even i am confused that as i have ticked the repetitive mfg in mrp 4 view and as i have given REM profile, so system should not give me the error when i only maintain the rate routing data in Rate based scheduling in production version.
          Is there any other way to solve this error.If not than whats the logic behind it.
               I hope u have understood my query.

Maybe you are looking for

  • How do i install reason 4

    I recently got a new Mac book pro for Christmas. It's running OSX 10.9. I was trying to install reason version 4 onto it.  When I insert the disk into my external disk drive the reason prompt comes up. I dragged both the reason icon and the sound ban

  • Problem in AT selection screen validation

    Hi, I am having problem in AT SELECTION SCREEN Validation. I have 2 radiobutton and 6 parameter. if i click first radio button  all the 6 radiobutton should enable and take the user input, that is working fine for me. if i click second radiobutton ,

  • Missing GTA5 preorder points

    Hi, I have emailed the best buy account already and have received no response yet, but I have had the 94 points issued for gta 5 ps4 purchase. The purchase was done the day before street release and I was sure that the preorder bonus was still active

  • Configuring DWS for "split" shifts (or multiple shifts in same day)

    We need to set up a work schedule that spans a two week time period - employee works 42 hours per week - three 12 hour shifts and one 6 hour shift.  The rotation is as follows:                               Mon                    Tues                

  • Can someone recommend some good Impulse Responses!

    Hi, i need some really good impulse libraries. i am not really happy with the default pack from space designer. i have just acquired a license of waves ir-1 but i use space designer the most. at least till now. any thoughts ? thanks - curtis