SERVICE ENTRY SHEET IN CLASSIC SCENARIO

Hi,
Please let me know wheteher we can create service entry sheet in EBP in classic scenario.
Regards,
Manu

Hi Ramesh,
We are in SRM 5.0 using Classic Scenario. We are trying to Create Shopping cart for Services with Multiple Service Line items. What is the best way of creating SCs with multiple service line items. If we use request functionality, is it essential to use Bidding process??
Thank you,
Regars,
Ravi

Similar Messages

  • SRM-SUS for Service Entry Sheets - Classic Scenario

    Hi SRM Gurus,
    Our client wants to use SRM-SUS for the Service Entry Sheets (to being with and then later expand more in other SRM areas). The lead system will be R/3 system.
    We will be going with ECC 6.0 and SRM 5.0.
    Service Order will be created in R/3 and replicated into SRM (SAP have said this is new functionality in SRM 2007 and SAP will provide us with this functionality in SRM 5.0 as well)
    SAP are also recommending using MDM for hosting the catalogs for service entry sheets to enable vendors to selete their items during the confirmation / filling the service entry sheets. - they say this is mandatory
    SAP are also asking for XI for the data to be transferred from R/3 to SRM (and may be vice versa) - they say this is mandatory.
    Few questions:
    1) What kind of hardware size are we talking about to have SRM-SUS, MDM, XI and Portal (PI)
    2) Are MDM and XI mandatory as said by SAP and if yes, in what scenarios. What is they way around
    3) How good is the functionality provided by SRM-SUS for Services? Is it as good as in R/3 (or even better)? We will be having complex Services in our scnearios.
    4) What can be a typical time to install SRM-SUS, MDM, XI and Portal in the Dev environment to get moving onto the project?
    An early response shall be highly appreciated.
    Thanks in advance
    Regards
    Rahul

    few answers to your questions
    1) what is the release of SRM  you want to work with?
    2) services in SUS is not available as standard , and will be provided by SAP as consulting up on request.
    3) for hardware requirements , please refer to the master guide for the srm release you will be working on -->
    and also you can refer to the software component matrix in master guide --> to see if any component is mandatory..
    4) XI and MDM as far as i know is mandatory for SRM 6.0 and above , But in SRM 5.0 , XI is compulsory.
    5) so xi is mandatory in anyway in SUS as different systems are involved and therefore is required for routing the documents correctly.
    6) time for installation again depends on your supplier base , and your level of expertise.
    7) it is not always recommended to compare between two different systems , R/3 and SUS are different and so functionality will not be the same
    8) but as far as i know R/3 is stronger functioanlly..

  • ECS scenario - Service PO and Service Entry sheets in backend

    Hello,
    We are on SRM_SERVER 550, SP07 and  in the process of moving to ECS scenario.
    There are some questions from me on the Service procurement in ECS.
    1. When we create a PO with service item in SRM, will it get copied to backend as a Po with item category 'D'? This is how it happens in classic scenario,but does the same hold good in ECS?
    2. When creating the confirmation for the service PO in SRM for ECS scenario, this would be a time entry/service entry sheet.
    Would this be replicated to R/3 as a time entry sheet using RFC call?
    Standard SRM210 guide mentions that goods confirmation will flow to backend as GR thro ALE/IDOCs and service confirmation will flow to backend as service entry sheets using RFC calls.
    But I wanted a confirmation if this is entirely a standard SAP scenario or are there any restrictions on this?
    Regards,
    Srivatsan

    HI,
    Following are answers to some of your questions -
    1) What do you mean by default unit measure? If this is the unit of Service, then you may change this in Service Master (T Code AC03). If the unit is at line item, then it should be AU, because you may order multiple services under one line each having different units of measure.
    2) The message "No message record could be found for output of message. Save anyway?" is displayed because, you have not maintained output message for service entry sheet. Either define the output or remove the warning message at Attributes of system messages.
    3) The process of service PO is same as material PO. The difference is that the item category for service PO is 'D' & then you maitain services for the line item either with or without service master. After completion of service, you create service entry sheet at transaction code ML81N & after accepting the service entry sheet, service entry sheet based GRN is prepared. The person who is posting MIRO is not required to know Service Entry Sheet number to post MIRO. The system automatically checks the service entry sheets accepted. Anyway, the service entry sheet number can be displayed at Purchase Order History tab of the conccerned PO at PO display option (T Code ME23N).
    Hope your query is fulfilled.
    Reward points if the answer is helpful.
    Regards,
    Prashant Kolhatkar

  • Transfer time from CATS to SERVICE entry sheet against PO No in Days

    Hi All.
    We have one scenario in that we need to transfer time from CATS to SERVICE entry sheet against PO No for conforming service receipt.
    We need to transfer time in days which i am able to enter in Time sheet data entry by selecting days as a units of measure but it gets convert to Hours in Approval table.
    We want to Hi All.
    We have one scenario in that we need to transfer time from CATS to SERVICE entry sheet against PO No for conforming service receipt.
    We need to transfer time in days which i am able to enter in Time sheet data entry by selecting days as a units of measure but it gets convert to Hours in Approval table.
    We want to transfer time in Days to service entry for conforming service receipt.
    Pl. help us how to transfer time in days to target component.
    regards,
    karan hon.for conforming service receipt.
    Pl. help us how to transfer time in days to target component.
    regards,
    karan hon.

    Hi,
    I think maintaining suitable Data Entry Profile will solve your problem. Take help from HR consultant.
    SPRO->Cross Application Component->Timesheet->Specific Settings for CATS Classic->Setup Data Entry Profiles.
    Regards

  • How to update sales order number (KAUFN) characteristic in the profitability segment of the PA document created at the time of service entry sheet confirmation, as a result of shipment cost document

    Hi,
    We have a scenario wherein we create shipment cost documents against delivery. As a result of shipments fully transferred, a PO for freight vendor is automatically created and a service entry sheet confirmation happens. As a result of service entry sheet confirmation, we have Financial accounting, Controlling and profitability analysis documents created. We have a requirement wherein we need to have the characteristic “sales order number (KAUFN)” populated in the profitability analysis document created as a result of service entry sheet confirmation.
    Could someone please advice how could this be attained in COPA. Thanks for your help in advance.
    Regards,
    Sandeep

    Hi Ajay,
    Thank you for the quick update.
    The document is updated to COPA through OKB9 settings. The profitability segment is updated with fields like customer, product, company code, plant, sales area data, profit center, etc; however the sales order number is missing.
    Could you please elaborate further how could FI substitution be implemented to call for the FM COPA_PROFITABILITY_SEGMENT through user exit? Are you recommending the substitution through GGB1? What could be the possible validation to call for the user exit to be implemented?
    Regards,
    Sandeep Kulkarni

  • Changing GR/IR clearing account in Service Entry Sheet process

    Hi,
    We are using one Gr/ir clearing account for both Material and Service Entry sheet process.
    Now for clear process we want to create new account for the Service entry sheet.
    We have given blank valuation class for Service entry sheet and it has been assigned to the g/l account.
    After analysing the scenario we had two options.1.  Whether we can change the valuation class
    or 2. we can create new G/l account.
    But i had a doubt will it impact anywhere if i change the valuation class.
    Can anybody advice me??
    Thanks n regards,
    Veena

    Dear Javeed and Sadhashivan,
    Thanks for your answers. Yes we have sort key set on both the accounts and also we have tried to display all the PO relevent fields but unable get through.
    Please note we need PO no line wise on the ledger of adjustment accounts NOT on the GR/IR account.
    1) Goods Delivered but not yet invoiced
    2) Goods Invoiced but not yet Delivered
    Hope I have made my point clear.
    Thanks
    Ayaz

  • GR/IR and Service entry sheet

    Hello,
    Is there any option, where we can define separate G/L a/c for GR/IR clearing a/c for Material receipt and GR/IR clearing a/c for Service entry sheet for services completed?
    Thanks in advance
    radhakrishna

    Hello Ashok,
    We are having all the material & services masters without valuation class. In this case how do we handle the scenario. In WRX if we define two G/L a/c, how it will validate/identify during the automatic posting that This G/L a/c is for GR/IR materila receipt and another a/c is for Service entry sheet for services completed.
    regards,
    radhakrishna

  • How to cancell PO from Service Entry sheet

    Hi,
    We have many open service Purchase orders in the system(More than 1800) and we would like to cancell these PO's as business dont need the service.
    Scenario:
    We have raised PR, which is approved by multi level approvals
    After PR is approved, PO is created again approved by multi level approvals
    Now 1% of the above PO's required to be cancelled which is almost aroung 1800 in number.
    Pls note that we have Funds management active, so budget has consumed in the system during PR/PO process.
    Now if we cancel PO's then even PR's also to be cancelled which is very lengthy process, Is there any other way to do this.
    Can we do anything from service entry sheet?
    Regards,
    Sunil

    Hi Sameer
    I don't think you can close the PO from ML81N without posting some form of service receipt.
    Do you have any experiences with the mass maintenance transactions?
    After reading some of the discussions below I would suggest you use the MEMASSPO transaction to set the deletion indicator on each PO item (EKPO-LOEKZ) to "L".  Running transaction MASS for business object will get you to the same functionallity.
    There is also a MEMASSRQ transaction (or MASS for business object BUS2105) which you can use to quickly set the closed indicator for the corresponding requisition lines.
    This doc http://scn.sap.com/docs/DOC-25758 written by Parag Parikh should help if you don't have any experience.
    Regards
    Robyn

  • Price error while entering Service Entry sheet.

    >HI All,
    >the scenario is like this :-
    >We have enter uncoded services in the Services Tab of item details and have entered qty and gross price alongwith wbs element. There are about 63 lines ltems, while selecting the first only three are getting selected correctly the line items 04 to 08 are giving the following error. The line items 09 to 63 are also giving no error. But the below said error is coming for line item no. 03 to 08.
    Enter a price.
    When we try to enter a price it does not accept.
    and gives an error message SE316.
    Enter a price
    Message no. SE316
    The functionality requires that a price must be entered for service lines in purchase orders and service entry sheets.
    If you have to enter a line with the price "0", you can mark the line as an informatory line.
    We try to sent the price in the column but it is not accepting the price.
    What could be the solution to this error.

    Hi,
    Take help of FI Consultant and write a Substitution in GGB1.

  • Get Tax Code from PO to service entry sheet in ML81N

    Hello,
    I am looking for a suitable user exit/Badi, which would get the Tax code from Purchase Order to Service Entry Sheet (ML81N). Currently user changing the tax code manually in service number line item (ML81N). Here is the process we are following.
    1. Create the PO with service number in ME21N.
    2. Goto ML81N and selecting Other POs.
    3. enter the PO and Service number . At this stage this line item should pull Tax code form PO. But it is defaulting with some value.
    I tried with all ML81N exits and could not find the solution.
    Please let me know the suitable Exit /Badi.
    Appreciate your suggestions and Points will be rewarded.
    Thanks in Advance.
    Lakshmi

    Hi,
    I think maintaining suitable Data Entry Profile will solve your problem. Take help from HR consultant.
    SPRO->Cross Application Component->Timesheet->Specific Settings for CATS Classic->Setup Data Entry Profiles.
    Regards

  • Service Entry Sheet Deletion

    Hello Friends,
    My client is facing a problem while creating a service entry sheet for a PO. In the PO history it is showing a service entry sheet(SES) is created for a line item. But that SES has been revoked and deleted also. But the concern is although the SES is deleted, total values (Amt in LC) is still showing in the PO history. The value is not being changing to zero in PO history.
    When user is attempting to make another SES for that line item, as the PO is open now, an error messege displaying which says the entered quantity exceeds the PO quantity. Messege No - SE363.
    When i am trying to do the same scenario in development, system is working fine, i am not getting that error. I am able to make futher Service Entry Sheet.
    It will be great help if anyone can give me some feedback on this at the earliest.

    Dear Frnd,..
    This is a std system bug. Which is not reproducable.
    Please use SAP note - 126285.
    Whice will provide you with Report RMBESTK2.
    with following coding. create a report with this coding and assign a T-Code to it. And use it when you face such an issue in future.
    Amit P hiran
    Njoy SAP...
    Njjoy Lyf...
    Edited by: Amit P Hiran on Jun 21, 2010 4:59 PM

  • Service Entry Sheet Accounting Entries??

    Dear All,
    At the time of Service Entry sheet our client is asking to post the accounting entries as below.
    WIP A/C-Dr      xxxx
       To SR/IR A/c xxxx
    For WIP we have to give the WBS so that at later stage this WIP has to be settled (wbs settlement to GL) to the COGS Account.
    Lets see the Functionality for this.
    Ex: Customer orders A construction of Cell Tower.
    To constuct a Tower It involves 1) Supply of Material 2) Erection work 3) Civil
    for supply of material directly it will be purchased from the 3 rd party and send it to the customer location and do the billing.
    For Erection work Internal employees will go and do the erection work and billing to the customer.
    For Civil work where we dont have human resources, so we give this civil work to the sub contractors and once the job is done we will pay to the sub contractor.
    in this scenario with respect to the civil work as we are paying the money on behalf of customer (receivable from customer) client is asking to post the service entry sheet entries to WIP account.
    Please suggest us the proper process or how to it.
    I also will explain the problems we are facing to post to WIP.
    As WIP is balance Sheet Item and its assigned in GBB system is not allowing to create cost element for that, so at the time of posting the service entry sheet I am able to post the transaction without WBS.
    As we planned to settle wbs to cogs now it cant be done.
    Please suggest me some solution.
    Regards,
    Shashi Kanth.

    Result Analysis is a concept in CO which enables you to post WIP when the project is not closed yet.  Once the project ends, you run the RA again and reverse the posting to post the actual values.  You can speak to your CO consultant for this.  You can refer the following link to get the document.
    http://help.sap.com/bp_bl603/BBLibrary/Documentation/183_BB_ConfigGuide_EN_ID.doc
    Also, you'll get lot of other resources on this if you google. 
    Ravi.

  • Purchase Order: Queries related to Service Entry Sheet (ML81N)

    Requirement:
       A user exit to be trigger during the changing (update) of service entry sheet, This user exit should have a code which will go and check the credit memo in RSEG- SHKZG where the value is “H” and will check RSEG- LFBNR number with ESSR-LBLNI and compares RSEG- SHKZG with ESSR- NETWR value of the service entry sheet. if the value is less then or more then ESSR- NETWR (service entry sheet) value it should throw an error “"Amount must equal Service Entry”.
    If the RSEG- SHKZG value and ESSR- NETWR value are equal it should allow to revoke the service entry sheet. 
    Scenario: When user clicks on Change button in ML81N for changing the Service Entry Sheet(existing one), an exit should trigger the error message and should not allow to change.
    Please suggest how to achieve it, which Exit to use where I should code?

    Hi Amol
    Why you created Framework Order ?.. You can not change account assignment category in service entry sheet..e.g. K-Cost Center.. F- Order
    But depending upon settings, you can change account assignment values such order 1 to order 2
    If there are requirement that SES can created for  Account assignment F or K. I recommend you to use following approach
    1. Create a Contract - ME31K with AAC as U- Unknown (If business already have rates negoiated with vendor for services)
    2. Create release order with reference to contract and system will prompt you to enter AAC- it can be K or F
    3. Perform SES w.r.t to Release Order.
    Other Approach can but not strong one.. create two line items in the PO. one with K and Other with F.. then choose the line item at time of SES creation that business want to book the cost on CC or Order.
    Thanks,
    Jagdeep

  • Service Entry sheet creation - Using a diffent contract diff from line item

    Hi,
    Here is the scenario...
    I have a services purchase order referring to contract  and its service item with services ( service masters) attached to it.
    And the PO  item is a limit item with some limits maintained on the limits tab, but contract reference is specified at the limits level it is only at the line item level.
    System version : ECC 6.0
    Lets say PO number : 123456789
    Lets say contract number and item is : 2323232323  item 10 ( Account assignment U )
    My supplier is : 111111111
    Now I am creating the Service Entry sheet  and I am trying to add the services  ( services selection button)  I get a pop up to  search for services  by certain selection criteria  and one of them is purch document ( remember it doesn't pre-populate and grey out the purch doc field with that the contract number from the item level) and now I can select any service contract that belongs to any supplier and select the services from it and complete my  SES.
    So lets say the contract from which I chose the service is : 3232323232
    And the supplier on the contract is 2222222222
    Is this a valid scenario or not?
    Has any body ran into this situation  before?
    Hope I was clear in explaining my scenario....  
    Thx,
    Krishna.

    Hi Krishna,
    the External Services Management distinguishes between planned and unplanned services.
    In case you have ONLY limits, no planned services in the PO item, it does not matter if you have entered a contract number into the PO item - in this case this contract will be not a real reference for your services.
    If you have entered limit values only as overalllimit and expected value and you did not enter a contract limit on the contract limit tab, then you will not have a special contract reference on unplanned level neither.
    In this case it is NOT an error when you start the entry sheet creation and you can select services from other contracts or purchase orders against your limit values in the PO into the entry sheet.  The system does NOT check for a different vendor when you select services from other documents than the contract which you have specified in your PO item, because it is NOT a real reference - nor on services level as you have only limits in your PO item, nor on limit level since you have NOT entered a contract limit into your PO item.
    In order to understand this process please study the unplanned scenario and contract reference scenarios.
    Regards,
    Edit

  • Service Entry Sheet creation!!!!

    Hi all,
    I am working on service procurement with ECS scenario.The Service Entry Sheet in the backend R/3 system is subject to release strategy(for a material group).
    Whenever I create a Service Entry Sheet(SES) based on a EBP PO, then the SES is subjected to a release strategy.
    Whenever I create a confirmation in the EBP system(which doesn't have a workflow for confirmation), the follow-on document i.e. Service Entry Sheet is getting created in the backend with absolutely no release strategy whatsoever.
    Why is the SES getting created automatically,even though there is a release strategy attached to it at the backend?? This release strategy is functioning fine when I create a SES manually in the backend.
    I found a thread { Service Entry sheet auto released when created through EBP } wherein someone had faced the same issue that I faced, but no one gave him a clear picture as well.
    Help me!!
    Regards
    Hari

    Hi,
    This is standard SRM design.
    The Service Entry Sheet created from SRM in ECC is directly released to create a material document (good receipt).
    This is because, there is no release functionnality available from SRM.
    Thus, if there were a release strategy, there is no way in standard to pilot it from SRM.
    If you need a release straegy, you need to use the confirmation WF in SRM that will occur before the Service Entry sheet is created in ECC.
    Kind regards,
    Yann

Maybe you are looking for

  • Problem with Adobe Reader/Pdf?

    Any time a word comes up that has a apostrophe, it will change the word. For instance don't becomes don’ It's becomes It’s doesn't becomes doesn’t and so on and son. So anyone know what i can do about this? and yes i just downloaded the newest

  • Condition types related to planned delivery costs (Freight) from a PO.

    Hi Friends, I want to know which condition type is related to Freight in a purchase order. I have a PO which has different conditions like PBXX, FRB1, FRC1, etc. under the conditions tab. I want to get only freight related conditions through a bapi.

  • I updated to flash 11.7.700.224 and now cannot play DoubleDown Casino Slots while in Facebook.

    Anyone know why I can no longer play DoubleDown Casino Slots while in Facebook after upgrading to Flash 11.7.700.224?

  • Failed PDF Creation due to Offending pdfmark

    I have a large book from which I need to create a PDF. I can create PDFs of individual files; however, when I go to distill the .ps file, creation fails with the following error message in the log file: %%[Page: 672]%% %%[ Error: ioerror; OffendingCo

  • Spa508 firmware upgrade failed

    I bought a spa500ds and need to upgrade the firmware on my 508G to use it. When I try to upgrade to 7.5.4, or 7.5.3 I get a failure.  I was able to upgrade to 7.5.1a fine.  All firmware was downloaded from cisco this morning and unziped I see my tftp