Setting needed for Capacity Planning.

Hi PP Gurus,
I want to know what setting we have to do for capacity planning.
what I know is:
1. W/C should be set for finite scheduling.
2. In scheduling parameters for process order tick "Generate capacity Requirement".
This both setting are made in my scenario, but it is'nt loading the work center fot that week.
Any other setting nedded?
Thanks, in advance.

Dear ,
You need to have following set up at basic level frist before you perfomr the capacity requirement planning  :
1.In OPKP-Define Production Scheduling parameter -Availability check -Confirm Capacity and also Finite Scheduling chekc box ticked .
2.In OPU3/OPU5-Define Scheduling Parametesr -you should mark the following
1.Automatic Scheduling check box should be marked
2.Scheduling Log check box should be marked -generate in case there is a scheduling error due to capacity over load .
3.Scedulinga and Generate Capcity should be ticked .
3.In OPJK Imaintain check capacity with SAPSFCG013 overall profile and set indicator -1 -Release Order -by user decision if capacity is insufficient
4.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
5.Routing - enter the values for the standard values. Use control key with scheduling and CRP activated .
6. OPD0 and have the following set up  : Overall profile : SFAPSFC015 --Inside the over all profile I have the following set up
1.Selection Profile -SAPSFCS013 SFC: Order view, standard overview
2.Control Profile : SAP___C004 : Gen Capacity Availability Check for 1.5 months
3.Time Profile : SAP___Z006 : Gen Capacity Availability Check for 1.5 months
4.Evalution Profile : SAPSFCA013 : Gen Capacity Availability Chek =3.0D
5.Strategy Profile : SAPSFCVER1-Gen Capacity availability Check
6.Period Profile : SAP___P001 -Weekly period
7.List Profile : SAPSFCI001-Production Planing
Check all of them in place .Then you can go ahead with Capacity Req.Planning -Evalution and Leveling -CM21/CM22/CM05/CM07  etc.
Refere the below theread for farther reference :
Capacity problem in production order
capacity planning
Hope this will be useful .
Regards
JH

Similar Messages

  • BAPI needed for Material Planning T-code MD20

    Hi,
    BAPI needed for Material Planning T-code MD20.
    Thank You.

    Hi,
    I looked as I needed one too - no BAPI for this - I guess you need to go with batch input for MD20 (worked fine in my LSMW so I guess in ABAP it should be also good)
    BR,
    Tomek

  • Blocking of work center capacity for capacity planning

    How can i block a work center capacity for capacity planning during Machine breakdown( via a Preventive maintenance order)?
    i believe it will reduce machine capacity, yet how can i view this, against the previous capacity? is there a possible report or can it be shown through a transaction?

    Hi,
    In capacity header details screen not exactly as "can be used for capacity evaluation " but
    "relevent to finite sceduling"
    "can be used for several operations"
    "long term planning"
    these all indicators you can deflag this and check the results ,it may helpful to you.

  • Any good table for Capacity Planning?

    HI all,
    Is there any table for capacity planning?
    we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    Thanks!
    Harvey

    Dear
    Please find below SAP tables for CRP :
    CRHD         Workcenter Header Data
    CRCA         Workcenter Capacity Allocation
    CRCO         Workcenter Cost Center Assignment
    CRHH          Hierarchy Header
    CRHS           Hierarchy Structure
    CRTX          Workcenter Text
    KAKO         Capacity Header
    KAZY          Intervals of Capacity
    Regards
    JH

  • Tables for capacity planning?

    HI all,
    Is there any table for capacity planning?
    we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    Thanks!
    Harvey

    >
    harvey wu wrote:
    > HI all,
    >
    > Is there any table for capacity planning?
    > we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    > Thanks!
    >
    > Harvey
    Hi Harvey,
    Kindly check if the Below tables satisfy ur requriement
    KBED      Capacity Requirements Records
    KBEZ      Add. data for table KBED (for indiv. capacities/sp
    KBKO      Header Record for Capacity Requirements
    Reg
    Dsk

  • Customization needed for capacity setting

    Hi all
    I cofigured the work center (Shift defination,shift sequence,break time)
    I have given for one shift there is 21 hours capacity available (as for three machines
    and each machine working 7 hours per shift)
    But when I check in t-code CM03(Capacity Planning in Standard Overview it is given only 21 hours per day but it should be (63 for three shifts i.e per Day)
    Why it is any costomization needed . Pls provide solution
    Hoping for reply
    Dev

    Hi Dev,
    Ultimately system would consider what you see in the "Available cap profile" in your work center master from Capacity view.
    The below are main functions in Capacity and scheduling
    <u><b>One is the Capacity availability check</b></u> - Here the systems checks just for the available capacity, i.e it will only consider the available capacity maintained in the <b>interval available capacity</b>, if its not maintained there, then system would check the <b>available capcity profile</b>. Once systems finds that capacity is available, system would reduce the available capcity once the capacity is confirmed. And available capacity profile is updated automatically by the system once you change the header or the interval available capacity
    <u><b>The second one is detailed scheduling </b></u>
    - Here the system does scheduling . The <b>shift sequence</b> plays a role here to give precise timing.
    <b><u>The third one is Capacity levelling</u></b>
    This is the one is where you precisely allocate the work centers or resources via planning table - Here the shift sequence and availability check both are considered also system would block particular work center for the dispatched dates and times.
    Hope the above clarifies.
    For your requirement, you need to make sure that 63 hrs is shown by the system in the Available capacity profile.
    Moreover, interval available capacities' function is to override the header data and Hence always this would have higher priority. System also would show this data in available capacity profile populated automatically.
    Please get back to me if you have further clarifications
    Regards,
    Jayakandan

  • Selection profile sets for capacity planning

    Hi,
    Could you please explain me in details about different sets in selection profiles configuration (work center set, order set, capacity category set, initial set) thorugh OPA2  and how they are related to sets in OPD1 configuration (Object, filter sets).
    Does these sets will effect capacity availability check calculations or they only for different display options for user.
    Please provide if there is any detailed document available since I have a problem where CM01 list is not matching with overall profile used for capacity availability check while creating orders.

    run t-code OPD0 and make adjustment for your overall profile (change a control profile)

  • Bandwidth Utilization Avg or Max for capacity Planning best practice

    Hello All - This is a conceptual or Non-Cisco product question. Hope you can help me to get this best industry practice
    I am doing a Capacity planning for the WAN Link Bandwidth. To study the last month bandwidth utilization in the MRTG graph, i am seeing  two values
    Average
    Maximum.
    To measure how much bandwidth my remote location is using which value i have to use. Average or Max?
    Average is always low eg. 20% to 30%
    Maximum is continuous 100% for 3 hour in 3 different intervals in a day and become 60% in rest of the day
    What is the best practice followed in the networking industry to derive the upgrade size of the bandwidth by using the Utilization graph
    regards,
    SAIRAM

    Hello.
    It makes no sense to use average during whole day (or a month), as you do the capacity management to avoid business impact due to link utilization; and average does not help you to catch is the end-users experience any performance issues.
    Typically your capacity management algorithm/thresholds are dependent on traffic patterns. As theses are really different cases if you run SAP+VoIP vs. youtube+Outlook. If you have any business critical traffic, you need to deploy QoS (unless you are allowed to increase link bandwidth infinitely).
    So, I would recommend to use 95-percentile of maximum values on 5-15 minutes interval (your algorithm/thresholds will be really sensitive to pooling interval, so choose it carefully). After to collect baseline (for a month or so)  - go and ask users about their experience and try to correlate poor experience with traffic bursts. This would help you to define thresholds for link upgrade triggers.
    PS: proactive capacity management includes link planning for new sites and their impact on existing links (in HQ and other spoke).
    PS2: also I would recommend to separately track utilization during business hours (business traffic) and non-business (service or backup traffic).

  • Expert Help Needed for Preventive Plan Creation

    Hi,
    I'll need to set up a preventive maintenance plan for a performance based cycle which has a different task for 2500hrs, 5000hrs and 7500hrs with a single measuring point. How should I set up using strategy plan (IP42)? Following is the example of counter reading and its tasks to performed:-
    2500H - Task 1
    5000H - Task 2
    7500H - Task 3
    10000H - Task 1
    12500H - Task 2
    15000H - Task 3
    17500H - Task 1
    20000H - Task 2
    22500H - Task 3
    Every 2500H will have a task. And each task will repeat itself from task 1 then 2 then 3 and go back to task 1 again when cycle due. Appreciate any help and advice from you guys.
    David

    David
    you can create a strategy in ip11 with the below hierachy and assign it to task list.  show you a sample:
    package 1  2500hrs  hierarchy = 1 (H1)
    package 2  5000hrs  hierarchy = 2 (H2)
    package 3  7500hrs  hierarchy = 3 (H3)
    Then assign the above package to task 1, task 2, task 3 in opration tab page of ia06, after that the system should work as you expected.
    Hope it helpful.
    Regards,
    Jane

  • Setting Alert for Project Plan deviation and changes

    Hi
    I am trying to figure out if there is any alert function (automatic email sent) for project plan deviation
    For example:  original planned milestone date reached while the status has not yet marked complete
    Also, I would like to check if there is any notification to senior management can be set if somebody change the project plan.
    Many thanks,
    Norine

    You need to create a UDM based on a SQL Query.
    If you want an alert of elapsed_time of a sql query, you can to query the v$sql and if you want history results you can query the dba_sql_history.
    If you need help with the sql send me a mail to [email protected]

  • EXtractor for Capacity planning

    HI, I cant find any extractor for manufacturing capacity planning, data are stored in tables KBED + KBKO  on R3 side. Have You any advice
    Thanx

    Hi,
    Check with 2LIS_04_* datasources.
    Thanks
    Reddy

  • What technical scenario need for an Plan Driven?

    Hello experts.
    First of all; thanks four yours help and sorry for my english...
    I want implant an Plan Driven with SRM 5.0 and ECC 6.0. My dude is the follow: what is the best technical scenario ? Classic or Classic extended ?
    I explain a little:
    1.- We don´t want makes Shopping cart in SRM.
    2.- We bring the documents of ECC for Sourcing.
    3.- We makes bids from Sourcing cockpit ( bbpsoco01 )
    4.- We simulates that the vendor into the system to makes quots. we don´t want SUS.
    5.- The contract are local in SRM but it´s replicated in ECC.
    6.- PO are locals in ECC.
    7.- Invoice and confimance goods / services in ECC.
    I need helps please!
    THANKS FOR ALL.
    José Luis

    Hi Jose,
    I would recommend you to implement the Classic Scenario for a simple reason that you want the leading P.Os  in ECC.
    If you implement the classic scenario all your requirements get fulfilled except taht even contracts will be created in ECC but not in SRM.
    Confirmation and invoice can be done in either ECC or SRM based on your convenience.
    Hope this makes you more clear and helps in resolving your issue.Clarifications are welcome.
    Award points for helpful answers.
    Rgds,
    Teja

  • Question for Capacity Planning

    We are planning a large expansion of users and regions and therefore, data in our application. I am trying to figure the most important items that need to be covered for this move from an oracle architecture standpoint. So far I have:
    # of users currently connect
    # of new future users
    # of current transactions per day
    These should help with things like # of processes and cursors and PGA size.
    I cant seem to find any good documenation on data in oracle to review to try to best guestimate parameters that need to be changed. If someone can point me in the right direction or maybe give me some ideas of other things I should be looking at, it would be much appreciated
    Thanks

    I cant seem to find any good documenation on data in oracle to review to try to best guestimate parameters that need to be changed.Maybe because this doesn't really exist ...
    See following AskTom thread: http://asktom.oracle.com/pls/ask/f?p=4950:8:12270935817190372191::NO::F4950_P8_DISPLAYID,F4950_P8_CRITERIA:14258091776835
    and Oracle9i Database Performance Planning: http://download-uk.oracle.com/docs/cd/B10501_01/server.920/a96532/toc.htm

  • Colour Coding for capacity planning

    Hello Everyone,
    Please tell me is there any way where we can show different colours in CM25 transaction.
    means my orders are showing in red colour lets say if my order crosses the finsh date of my last operation is should show in different colur..?
    is it possible in any config setting or do i need to go for development.
    Best Regards,
    Ramansingh Thakur

    Hi,
    thanks for your quick response
    Lets say if my production order quantity is showing in red colour now my client wants that watever quantity is confirmed it should show in green colour.
    is it possible..??
    Best Regards,
    Ramansingh THakur

  • IE version or any other special setting needed for HTMLDb 1.6

    Hi All,
    Is there any special IE setting is needed or any IE version restriction for HTMLDB 1.6.
    Because some of my user is facing "Page not found" error.
    Please Advice ITS URGENT.
    Thanks
    Dikshit

    Hello,
    There are not any IE specific settings.
    Can you get to the pages in Firefox or Netscape, IE from a different maching.
    What do your error logs say?
    Carl
    Message was edited by:
    Carl Backstrom

Maybe you are looking for

  • Back button no longer works in some specific situations; also, it appears that clearing cache isn't working.

    The "back" button no longer works in certain specific situations on certain specific websites -- especially on the very website on which I need to use it very frequently. This has been going on for a couple of weeks. Also, I noticed today that the "c

  • Issues Downloading on Mac OS X 10.6.5

    Hi, I've been trying to install photoshop elements 9 on my Mac and I cannot get it to work. I'm using the correct Mac CD.  A couple times it just spit the CD back out, a couple where the initializing install would not work, and a couple times when it

  • HT1918 Lack of Access to edit payment info on new computer.  Computer is authorized.

    I am trying to purchase ITunes Match.  I have a new computer so I had to verify my credit card info.  The system will not allow me to put in the security code for the card.  If I try to redeem an ITunes card, I can't even enter the code so I can rede

  • Preview Locks up

    Each time I open preview it tries loads previous files and locks up.  I have to go to Force Quit, which says Preview is unresponsive.  So, I downloaded PDF Suite to get my work done, but I would like to fix Preview.  Any ideas?

  • OSS notes for Talent Mgt and Development Eph4

    Dear All, Greetings. We are on ECC 6, Eph4 , Support pack 28. We see some inconsistencies in the system. Hence would be helpful if you can list down all the required notes to be applied in Talent Management and Talent Development. Would appreciate yo