Single inspection lot for multiple operation

Hi
I am creating a process order having 10 operation. the 3,5 and 8 are quality inspection (inprocess inspection) & last is PP operation that is for final confirmation.
The control key in quality operations are pi02 and for production operation are pi03.
i am using insp type 03 in material master
Curently only one inspection lot is trigerring for all operations hence while RR, all operation are appearing (Quality & production).
User needs diffirent inspection lots for different quality operation.
How can i triggere lots per QC operation??
I would be vary thankful if i get it.
AYK

Hi
Std will create one inspection lot for 1 process order
and RR will show all operations which is related to inspection
ask PP guy that cotrol indicator Pi03 - insp. char to be uncheck
then it will not show those operations not relevant for inspection
is't fullfill your requirement
why your business needs individual inspection lot for each operation?
give info
Thanks
Sami

Similar Messages

  • Single inspection lot for multiple plant

    Dear Experts,
    I am from pharma industry, my requirement is, there is any possibility to create single inspection lot
    for multiple plant.
    please guide.
    Thanks in advance.
    Yuvraj S. Dhotre

    Don't open multiple threads for same query. It makes the solutions to be scattered.

  • Single Inspection lot for multiple line items.

    Hi,
      We have a scenario while receiving goods.We receive boxes and want to print labels.For eg we have a Purchase Order and receive 10 Items and a material document is created for 10 qty and a Inspection lot is created.
    Since we want to print a label for each item we propose to create a line item on a GR thus creating 10 line items.
    The problem is we get 10 Inspection Lots which we dont want.
    Our requirement is to print 10 labels by having ...
    1.One material Document with QTY 10 and one Inspection Lot with QTY 10.
    2.Have 10 line items in GR to print lables but have one Inspection Lot.
    We do not have batch management activated.
    Thanks in advance for help.
    Regards
    SM

    Hi SM,
    It's very easy,
    If I am not wrong you are asking about the inspection type 01, correct?
    Then go to material master->Qm view>Inspection set up---> now for the detailed information for inspection type 01,, set the option "FOR EACH MATERIAL, BATCH AND STORAGE LOCATION" ( i know you are not batch managed but set this option) for the field "Control InsLot"
    Have the fresh PO and then GR, system will do exactly as you asked for,
    Regards,
    Shyamal

  • One inspection lot for multiple materials of purchase order line items

    Hi All,
    My client requirement is one inspection lot for multiple materials of purchase order line items.
    Please share your thoughts.
    Thanks in advance for early reply.
    Regards,
    Jishu

    I totally agree with Amol.
    I don't think I would touch that development nor would I ever tell a client it could reliably be done through development.
    Knowing what I know about the table structures, I don't think you could create any development for this that could use a significant amount of the existing tables and functionality.  I think you'd have to create all your own Z tables and basically rebuild the functionality.  Tying it back in with SAP data will be difficult.
    You're even looking at all custom screens for your results recording and UD as well.  And if you have follow-on functions like batch classification requirements, batch determination, COA publication, results copy functions, use of DMR and sampling procedures, physical samples, quality notifications, etc. etc.. you could be looking a whole lot of development.
    Craig

  • Inspection Lot for Inhouse Operation Not Creating

    Dear Friends,
          My process is Like this, in production Order Out of ten operation eight operation are subcontracting Process.I am getting inspection Lot for this eight operation by maintaining inspection type 0130.But i am not getting inspection lot for inhouse operation by maintaining inspection type 03 also.So Please tell me what setting i have to do to get inspection Lot for inhouse operations.
    Your Valuable solution is important for me...
    Regards,
    M.M.S

    Hi Mohammed,
    Check Inspection type maintained in Material master, it must be checked for "active". If it is active then system will create inspection lot as soon as you release your order.
    Regards,
    Shyamal

  • Single concurrent program for multiple operating units

    HI
    I am working on XML/BI publisher to generate AR invoice reports.
    We have single rdf report using which rtf templates are generated.
    There are 10 operating units (10 ORG_ID's) and 10 rtf templates, one for each operating unit. There are 4 different responsibilities for each ORG_ID
    Eg: ORG_ID's = 11, 12, 13, 14..........etc
    Eg: Responsibility = xx, yy, zz...........etc
    I want to register a single concurrent program. When a user submits a request from "XX" responsibility, then the template associated with that org_id should be generated. Whichever responsibility the user is accessing from, that particular template must be shown as output.
    How can i register one concurrent program for multiple operating units.
    Thanks!
    Edited by: 994628 on Mar 18, 2013 4:39 PM
    Edited by: 994628 on Mar 18, 2013 4:42 PM

    >
    There are 10 operating units (10 ORG_ID's) and 10 rtf templates, one for each operating unit. There are 4 different responsibilities for each ORG_ID
    Eg: ORG_ID's = 11, 12, 13, 14..........etc
    Eg: Responsibility = xx, yy, zz...........etc
    I want to register a single concurrent program. When a user submits a request from "XX" responsibility, then the template associated with that org_id should be generated. Whichever responsibility the user is accessing from, that particular template must be shown as output.
    >
    interesting case for 10 OE set 10 template
    what is purpose? for each OE different requirements for layout?
    BTW
    if each Responsibility associated with one org_id then
    - you can get current org_id when you run concurrent program
    - create main template (will be #11) with condition like
    <?choose:?>
    <?when: ORG_ID=11?>
    <?import:xdo://FND.XX11_SUB.en.00/?>
    <?call:TEMPLATE11?>
    <?end when?>
    <?when: ORG_ID=12?>
    <?import:xdo://FND.XX12_SUB.en.00/?>
    <?call:TEMPLATE12?>
    <?end when?>
    <?otherwise:?>
    <?import:xdo://FND.XX21_SUB.en.00/?>
    <?call:TEMPLATE21?>
    <?end otherwise?>
    <?end choose?>so based on org_id will be import of needed subtemplate
    - re-register your "10 rtf templates" as subtemplates
    another way is substitution of template for concurrent then it running
    in before_report trigger set needed template
    l_conc_request_id := fnd_global.conc_request_id;
        if ORG_ID = 11 then
          UPDATE fnd_conc_pp_actions t
             SET t.argument2 = 'XX11'
           where t.concurrent_request_id = l_conc_request_id
             and t.action_type = 6;
      if ORG_ID = 21 then
          UPDATE fnd_conc_pp_actions t
             SET t.argument2 = 'XX21'
           where t.concurrent_request_id = l_conc_request_id
             and t.action_type = 6;

  • Multiple notification against single inspection lot (03 inspection type)

    Dear friends
    While recording the defects multiple times against single inspection lot (03type) , all the defects are added in single notification, but my client requirement is they want different notification.  if any body knows please tell me.
    Note : in inspection type there is a option of multiple notification against single inspection lot, but this is
    not working (i think it will work only serial number,equipment and  functional location get changed)
    Please do the needful
    Regards

    Hi Karthikeyan
    As you mentioned it is not possible to create notification  other than based on the object types.
    A work out can be make an action box in the notification for creating another notification with the help of ABAP ( call transaction QM01) and while doing this the entire datas of the inspection lot gets copied into the notification. you may have to use a user exit also.
    Defect can be recorded in the item level by the user.
    Sounds difficult but certainly possible
    Regards
    gajesh

  • Single billing document for multiple delivery documents

    Hi,
    Can someone tell me how to configure or proceed to make single billing document for multiple delivery documents.
    Document flow: Contract--> Order---> Delivery----> Billing
    -Thanks

    Being an old member of the forum, there is no need to stress the importance of adhering to forum rules where it has been clearly spelled out to avoid posting repeated queries.
    If you search the forum or Google it, you will find lot of documentations available on the same topic.  Take the inputs and try on your own.  Still if you face any issue, update here.
    G. Lakshmipathi

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Creation of one inspection lot for more than 1physical sample

    hello SAP,
    we have one common question.I have created 3 physical sample 20000006,2000007,2000008 and now i want to create one inspection lot for these 3 physical sample through QPR5 Transaction but system is generating each inspection lot for each physical sample which is wrong process. this is common scenario for most of the industry.SO please clarify and provide the solution

    Hi,
    I hope this solution gives some way out for you to solve your problem . I assume the sample is for  the same material , phy. sample type and category
    Create a new physical-sample drawing with refernce to :
    Using this function, you can create a new physical-sample drawing (with one or more physical samples) that references:
    An inspection lot
    A production order or process order
    A production version
    You use this function to create physical samples that have not been planned in a sample-drawing procedure and which you can draw from a production process according to your specific needs. In an inspection during production, for example, you can draw physical samples from the process on the basis of time or quantity (for example, a physical sample every three hours or for every 1000 liters of material produced). You can freely specify the inspection-relevant operations in which you want to inspect the physical samples for the new physical-sample drawing.
    please do let us know wether you were able to create one inspection lot .Or else please ellaborate the question step wise t-code and functions Will try to find a solution .
    cheers
    kp
    source of information : SAP

  • Inspection lot for external service

    Hi Gajesh/ Sujit/shyamal/ all
    we are planning to use service master for external vendor's service, i have couple of questions
    please share your experience, if anyone of you come across this kind of requirement
    1. is it possible to create an inspection lot for external service?
    2. we want to capture / validate the vendor's external service, weather it is accepted or not? sometime we need to enter quantitative value also
    3. is there any setting or config for assign /create inspection lot for service master?
    what I know is without material master we cannot create inspection lot but i don't know about service master.
    thanks
    Sami

    Gajesh,
    thanks for quick response.
    2 business req. are as follows
    1.  vendror is performing periodic service, MM side external service order (service contract/PO)created, bsaed on thatPO vendors performing service.
    service entry sheet they are capturing man hours and date of service.
    business wants quality of service to be captured in QM inspectiion lot.
    2. production order ---> routing -- operation ---> vendor & service PO number  assigned external work --> now inspetion lot will be created for that material/production order.
    how can we link service master, service entry sheet and inspection lot?
    how to map for this req.?
    again is't possible to create inspection lot for service master?(without material master)if your answer is yes, then where/how can we assign inspection type ? which inspection type?
    thanks
    Sami

  • In QA16 i given material doc no ,i am not getting inspection lots for UD

    iam using QA16 for quality inspection .
    Iam given material doc no in QA16,but iam not getting inspection lots for UD(usage decession).its comming empty screen in QA16.
    iam using multiple UD at a time.

    Dear check this below points.
    1. Check if Material Master Auto usage decision has been checked.
    2.All characteristics should be optional if not make all the char as "Optional " through control indicator This can be done for next lots only.
    3.All chracteristics must be calculated and status should be 5 completed and no defect recording done.
    4. Check mic indicator activated in material master and you have to do RR for this inspection lot or u can force fully complete all MICs and male IL status INSP and check again in QA16
    5.Did you selected releavant UD selected set for inspection lot in QA16.
    Cheers
    KK

  • Recorded results of inspection lots for several materials

    Hi Experts,
    Can any body explain how can I get recorded results of inspection lots for several materials?
    Regards,
    Shivkumar Dachawar

    There is no standard report.  You can use the inspection report button in QA02/QA03 to generate a report on a single inspectoin lot.  You'll want to modify the SAPscript provided by SAP more than likely as the one provided is provided only as an example.
    FF

  • Single idoc generation for multiple sales orders

    Hi,
    Pls let me know how do we generate single idoc for multiple sales orders.
    Its not collecting idoc. As we know we can generate an idoc for one sales order correspondingly
    my requirement is to generate single idoc number for multiple sales orders.
    Do we need to write a program.

    Amar,
    To understand take HRMD_A04 as example. Root segment has Maximum 9999999999 defined.
    Segm.type       E1PLOGI
    Minimum number  1
    Maximum number  9999999999
    Parent segment
    Hier.level      2
    This means that this IDOC types has capability to hold multiple HR Master data objects. PFAL program creates this IDOC and it has facility to mention the Objects per process, check selection screen.
    I checked for INVOICE01/02 its not possible there. Hope this clarifies.

  • Single Transfer Order for Multiple Handling Units

    I have been researchig the ability to create a single transfer order for multiple handling units.  My assumptions are if it can be done that:
    1) A transfer order can have a single source, so if the source document for the handling unit (delivery) is different, that means different transfer order
    2) A TO can have multiple materials (line items) with different destination bins and quantities per bin
    I looked at the configuration for TO Split, but it's not clear that this will handle my requirement.
    I also saw this http://aq33.com/material-management/Articles-005798.html and it also says that my requirement can't be meant.  I'm just checking before I tell my customer this cannot be done.

    Yes you are right, if Source document is different, you need to go with different TO.
    But you can choose the Handling unit split, while creating a TO itself. i.e., You can quantify the goods for each handling unit.
    Edited by: Ganesh M on Feb 29, 2012 6:20 AM

Maybe you are looking for

  • Message limit exceeded error thrown by Adobe and field becomes blank

    Hi, I'm facing a strange problem with Adobe Forms. We've created custom MSS scenario to suit customer requirements. In that we are required to display drop down values. All drop down values and form is displayed <b>correctly the first time</b> i.e. w

  • Problems creating my own JTextField

    i'm trying to write my own textfield that will get a string of the following format: 1-4 digits, "/", 2 digits. so I wrote a new class, but it doesn't work at all. help, please. package union.General; import javax.swing.*; import javax.swing.text.*;

  • Unable to install Xcom after download from MAS

    Since yesterday i try to install the game Xcom: Enemy unknown - Elite Edition from the Mac App Store (MAS). The game downloads fine - wich takes close to 2h for the 13,5gb - and then the button switches to "installing" wich suddenly ends with "unknow

  • MacBook Pro 15" ~2009-10 won't boot

    Last night by MacBook Pro 15" froze and manually shut it down (holding down the power button.) Now it won't boot up. I get the Apple symbol and nothing else happens. I've tried holding the shift key and the c key and nothing happens. I have a relativ

  • Quick Time X

    After installing Snow Leopard a new version of QT, version X is installed. No I cannot use anything that QT Pro supported, eg mpg files - it tells me these are not valid video files. Furthermore trying to open them in QT Pro 7 gives the same error de