SLD Consolidation

Currently I have two seperate SLD servers (one for DEV/QAS and one for PRD).  I am looking into installing NWDI and would like to consolidate these into ONE SLD server.  If I do an export of the CIM data from the DEV/QAS system and import it into the PRD system, will it overwrite any of the data in PRD?  Thanks.
Jon

Yes, source SLD data will overwrite the target SLD. To know how to consolidate the SLD's please check this:
Note 935474 - Grouping SLD instances
https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/9e76e511-0d01-0010-5c9d-9f768d644808
http://help.sap.com/saphelp_nwpi71/helpdata/en/a2/706851b7e62a4b9e697bce3ede967a/content.htm
Thank you,
Shyam

Similar Messages

  • CHARM activation check failing on "consolidation system for development system SSA-200 in project ZTEST2

    Hello,
    We are implementing Charmlite and want to activate in project landscape.
    We are Solution Manager 7.1 SP11 and testing this scenario in sandbox.
    Steps completed:
    1. in sandbox domain controller, created two virtual systems and made 3 system landscape, where, I can release the transport and see it in QA system (Virtual system buffer)
    2. The LMDB has been updated with Virtual system and in SMSY, the entries of virtual system shows up. The logical components have the client information.
    Issue:
    in /nsolar_project_admin ->System landscape -> change management, When consistency check is performed, we get error message saying
    Virtual RFC is miising (I am guessing, it should be okay)
    The logical component is incosistent (This might be the reason the CHARM is not getting activated.
    "No consolidation system for development system SSA-200 in project ZTEST2
    No track for project ZTEST2 with log. system SSA/200"
    For me, when i look in satellite system, the consolidation system is a virtual system and it should be fine.
    Please advise
    Regards,
    Durga PK Saitana

    Thank you Karthik. Still the problem persists
    I went through the blog earlier. I created l ABAP instance manually in SLD and moved into LMDB and can see the entry in SMSY. (I did not see any option of putting  virtual flag)
    We were trying harmonization of RFC from note 1384598 and since we had virtual systems, went with domain links.
    After domain links, the virtual systems are read. the Dev ABAP system is not able to find the consolidated system. In the satellite system, I can release transport and move the transport.
    Not sure, why this issue is persistent.

  • Consolidation with company DB in another SBO server

    Hello
    I am using SAP INTERCOMPANY addon and making journal consolidation with several DB. One question, how do i include in the consolidation a databse that is in another SBO server that has the same version ? Must I install addons on both SBO servers ?
    Regards
    Hector

    Hi Hector,
    As far as Intercompany is concerned, you needn't to install Integration component over each of the servers. It will be installed on a single server (where Intercompany solution is deployed).
    Then you need to create SLD entries for all Intercompany participating companies, referring to their databases in respective servers.
    Regards,
    Agneesh Jain
    SAP Intercompany Team

  • Component Reuse - Usage Dependency in SLD

    Hi there,
    I have an issue reusing objects in the repository. I defined a usage dependency at installation time from component H to component B. I want to reuse interfaces from B.
    Afterwards I reimported both B and I into the rep. I cleared tzhe cache, I refreshed and restarted the repository - but I still do'nt see the base objects from B in H - did I miss sth.? We're useing SP14.
    Thx in advance,
    helge

    Hi Michal,
    I have an issue for how to transport the usage dependency objects from Development to Consolidation (QA).
    We have done the usage dependency in the SLD for one swcv and after reimporting it into DEV from SLD , we can see the node basis objects but we are facing the problem in transporting the objects under basis objects of our new swcv to Cons(QA). other objects under the namespace of our swcv is already transported to QA.
    If you have some idea then pls. let me know.
    Regards,
    Gopesh

  • Error importing XI directory objects into consolidation

    Hi,
    I have defined a track for XI directory transports in the CMS and have successfully exported directory objects from Integration Builder. However, when I try to import it in the consolidation tab of the transport studio, I get the following error
    Info:Starting Step Repository-import at 2006-03-09 23:26:04.0424 -8:00
    Info:Component:sap.com/SAP-INTDIR
    Info:Version  :PF_IDALL_D.1
    Info:1. PR is of type TCSChangeRequest
    Info:export and import XI are different: http://fmsap562:50000/dir/ -> http://fmsap699:50500/dir/
    Info:reading of XIb71be4e0b00311dab3f60002559f086c.cl for xichangelist b71be4e0b00311dab3f60002559f086c
    Fatal Exception:com.sap.cms.tcs.interfaces.exceptions.TCSCommunicationException: communication error: XiTransportException received:
    ClientServerException exception:Unable to find an associated SLD element (source element: SAP_XIIntegrationDirectory, [CreationClassName, SAP_XIIntegrationDirectory, string, Name, directory.nxl.fmsap699, string], target element type: SAP_XIIntegrationServer)
    com.sap.aii.ib.core.transport.api.TransportCsException: Unable to find an associated SLD element (source element: SAP_XIIntegrationDirectory, [CreationClassName, SAP_XIIntegrationDirectory, string, Name, directory.nxl.fmsap699, string], target element type: SAP_XIIntegrationServer)
         at com.sap.aii.ibdir.server.transport.impl.postprocessing.TransportPostprocessor.postprocessTransport(TransportPostprocessor.java:240)
         at com.sap.aii.ibdir.server.transport.impl.postprocessing.DirImportPostprocessor.postprocess30Import(DirImportPostprocessor.java:101)
         at com.sap.aii.ibdir.server.transport.impl.postprocessing.InternalPostprocessingService.postprocess(InternalPostprocessingService
    We use only a single SLD and I was able to do a successful transport of REPOSITORY objects in the same
    environment. The problem occurs only with DIRECTORY transport. Any help appreciated
    Thx
    Bhaskar

    Hi Bhaskar -
    You mentioned you're using single/central SLD.  In your SLD, in Technical Landscape and then Technical System Type->Exchange Infrastructure, do you have corresponding entries for your DEV XI and QA XI?  At a base count, there should be 12 total.
    If not, for both the DEV and QA XI, do you have Technical System type - Web AS Java?
    Regards,
    Jin

  • Error while consolidating. The operation could not be completed.

    Error while consolidating. The operation could not be completed. Cocoa error 13. (null)
    Got this when I was trying to consolidate some referenced photoshop files. If failed to create a new version as well when I tried to open the files in Photoshop. I rebuilt the the library and it displays and exports both masters and version just fine, but it won't let me consolidate the master to the library.
    What gives?

    I think that error was due to the fact that I hadn't upgraded MAC OSX after installing it. I have done that now and now I get another error saying the masters are offline.
    I found this old thread: https://discussions.apple.com/thread/1965601?start=0&tstart=0 which seems to be the same problem. This is a whole other topic so I will start a new thread, but leave this in case anyone gets the same problem as me. Upgrade your OSX. That's the solution :-)

  • Ipod consolidated all of my playlists into one

    While updating Ipod consolidated all of my playlists into one. And I thought if I got rid of the super playlist it would have to go back to the regular system. The library and all the other playlists are still intact but now it says, "Ipod cannot update becasue there are no songs in the playlist." But there are songs there and there are songs in the library as well. What's wrong? What happened? What did I do wrong?
    Ipod-Nano   Windows 2000   2GB

    Open iTunes prefs -> iPod.
    it should be set to Auto update only selected playlists.
    Select the playlists you want to go onto the iPod.

  • A Doubt in Creation of Tech. System for a BW Server in SLD

    Hi Experts,
    I want to access BI Queries in a BW System in VC 7.1.
    When I am trying to create a New Technical System in SLD of CE 7.1 Server, it is giving me the options, to Select the System Types as
    1. AS ABAP
    2. AS Java
    3. Standalone
    4. Third Party
    So, Whether we need to Select the System AS ABAP or we need to Install anyother thing to get a Systems Option as ABAP.
    Also, I read in a SAP Note, That we have to define the System as AS SAP_BW.
    Note: BI Kit is installed in my CE 7.1 Server
    Please help me to solve this issue.
    Thanks in Advance.
    Regards,
    Palani

    Hi Palani,
    you don't need an SLD for configuring Bi connections. Please have a look at
    http://help.sap.com/saphelp_nwce10/helpdata/en/7e/6dbcea3700452195e3bddaa47c5906/frameset.htm
    how to define a BI connection for Visual Composer 7.1
    Best regards
    Hartmut

  • F.01 - extract to consolidation on company code level

    Hi everyone
    We're trying to do an extract to consolidation on company code level (1). When popup dialog "Filename for extraction file" appears we can choose between presentation server or application server.
    When choosing presentation server and logical filename ECCS_FILE we get error GC027 (Error opening file c:\temp\EXTRACT_CS_CO.txt).
    Doing so choosing application server however works (whereas path isn't the same).
    We already checked and double-checked settings of logical file name and logical path in transaction FILE.
    Any suggestions what to do or isn't it supposed to work via presentation server?
    Thanks in advance and best regards to all
    Renaud

    I have not seen anything that you have mentioned to enter file path?
    Is this being customised for your Company?
    How did you download this before?

  • NWDI in the XI Scenario - SLD

    Experts,
    I have created a track to transport the XI content.
    We have two SLD servers in the landscape. The first is used by XI and contains all the required XI business systems and the second is used only by NWDI and contains only the SC definitions.
    My question-
    DOes the SLD for NWDI need XI system details???? According to my understanding, NWDI needs only the component information from the SLD.
    Bascially, do i need to import the business system data into the SLD that is being used by NWDI???
    thanks,
    Vineeth

    Did a little research and found that the SC information is sufficient for NWDI.

  • Logical system name in business system (SLD)

    Hi,
    While creating business system in SLD what should give for the logical system name?
    Should the logical system name exists in ABAP stack or the new one?
    Thanks.

    Hi,
    If you are creating the BS for SAP R/3 in SLD means we have to give the LS name which we had in SAP R/3( goto SALE and take the LS from there)
    Goto Assign LS-----take the client which you are using for SAP R/3 and take the LS name assigned to that Client
    Regards
    Seshagiri

  • Best practice data source from ECC 6.0 for legal consolidation in BPC NW7.5

    Hi there,
    after scanning every message in this forum for "data source" I wonder if there isn't any standard approach from SAP to extract consolidation data from ECC 6.0. I have to say that my customer is not using New g/l so far and therefore the great guide "how to get balances from ECC 6.0 ..." does not fully work for us.
    Coming from the old world of EC-CS there is the first option to go via the GLT3 table. This option requires clever customization and the need to keep both GLT0 and GLT3 in line. Who has experiences regarding maintenance of these tables in a production environment?
    We therefore plan to use data source 0FI_GL_4 which contains all line items to the financial documents posted. Does this approach make sense or will it fail because of performance issues?
    Any help is appreciated!
    Kind regards,
    Dierk

    Hi Dierk,
    Do you have a need for the level of detail provided by the 0FI_GL_4 extractor? Normally I would recommend going for the basic 0FI_GL_6 extractor, which provides a much more manageable data volume since it only gives the periodic activity and balances as well as a much smaller selection of characteristics. Link: [http://help.sap.com/saphelp_nw70/helpdata/en/0a/558cabb2e19a4db3097b81bba4fd0e/frameset.htm]
    Despite this initial recommendation, every client I've had has eventually had a need for the level of detail provided by the 0FI_GL_4 extractor (or the New G/L equivalent - 0FI_GL_14). Most BW systems can handle the output of the line-item extractors without much issue, but you should test using production data and make sure your system sizing takes into account the load.
    The major problem you can run into with the line-item extractors is that if your delta somehow gets compromised it can take a very long time (days, sometimes weeks) to reinitialize and this can cause a large load in your ECC and BW system. Also, for the first transport to production, it is important to plan time to initialize the delta.
    Ethan

  • Problem with business systems in SLD

    Hey guys
    i m doing a IDOC to file scenario and m creating two business systems in SLD
    the first one uses the logical system name of the R/3 server and has been configured as WAS ABAP.
    when i try to create the second one as a third party using the logical system name i defined in BD54(on R/3 server),i get the error sayin that a business system already exist with the logical system name.
    i do have one businees system which is using the same logical system but that has been configured as WAS ABAP.
    cant i assign two different business names to same logical systems?
    thanx
    ahmad
    Message was edited by:
            Ahmad

    Hey
    thanx ,now when i try to use the same business system name for the R/3 server in the second scenaario,i dont see the business system in ID,i did cache refresh,
    also just want to make sure
    i have configured my SLD as under for the first scenario
    created two business system,first one is using the logical system name of the R/3 server configured as WAS ABAP and the second one is configured as third paarty and using the logical system name created in BD54.
    do these setting looks good to u?
    now can i use both these business system in my second IDOC to File scenariio?
    thanx
    ahmad

  • How to create Business Services in SLD

    Hi Experts,
    I'm working on SAP background and wanted to learn SAP-XI.
    I'm interesting to work in XI and for this need your support.
    I installed XI in my PC and wanted to start learning.
    But there are no Business Services (or) Systems configured in the SLD.
    I want to start with a simple FILE to FILE scenario.
    Could anyone please tell me how to create services in SLD and carry on from there.
    Thanks,
    Prajwal

    Hi,
    please look at the bleow links
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/4013f6bb-7ec3-2b10-62b5-e5be01e498f7
    Blogs
    /people/srinivas.vanamala2/blog/2007/02/05/step-by-step-guide-xml-file-2-xml-file-scenario-part-i  - Step by Step Guide: XML File 2 XML File Scenario: Part I
    /people/srinivas.vanamala2/blog/2007/02/05/step-by-step-guide-xml-file-2-xml-file-scenario-part-ii - Step by Step Guide: XML File 2 XML File Scenario: Part 2
    Regards,
    Pradeep A.
    Edited by: Pradeep Amisagadda on Apr 16, 2010 9:39 AM

  • Setting Business Systems in SLD

    Hi,
    In our SLD, we have two different Business Systems associated with the same ABAP Technical System and same client too. One BS is related to one Integration Server (XI) -this BS was imported in SLD- whereas another BS is related to another one (PI).
    When we run a soap interface in XI, we see the request reaches the correct BS (XI BS). However, the response is sent by the PI BS through the XI interface, getting an error.
    We need to have both Business Systems due to we are using the same SLD for XI and PI.
    Any idea?
    Thanks in advance,
    Samantha.

    Hi Luqman,
    Their names are different. Each BS is related to a different Integration Server, but their ABAP TS and client are equal.
    XI interfaces should use the XI BS, whereas PI interfaces should the PI BS, but this is not so.
    Is there any option that selects by default a particular BS in SLD when both BS using the same TS?
    Thanks,
    Samantha.

Maybe you are looking for

  • To Do List item not appearing in Reports

    Has anyone had success in implementing the To Do List? I followed the instructions posted on Adobe (written by Peter Grainge): Create a New To Do item (or Edit an existing one) Check it as completed for a topic Add To Do List to the items that will a

  • Issue in Partner Function

    Hi all, I have an issue. I have created a customer say 'A' and a ship to party say 'B' and 'C'. In customer master of 'A', I have assigned ship to party 'B'. At the time of order creation for 'A', system shows me 'B' as possible option for ship to pa

  • How to make a narration in Keynote?

    I have some recording (.m4a) that i want to add to a keynote. How could i do that? Tx

  • Help please wrong date in browsing history??

    Hi I have recently had to do a system restore and since then my browsing history has been a day behind. For example, anything I looked at on the 20th will show up on my browsing history as the 19th? How do I change this and has anyone else experience

  • Larger Hard disk access

    I am having a sparc ultra 10 machine. I have 2 20GB HDD installed with solaris 8. But in solaris i could see only 8.4GB x2. i.e 16.8GB. What happened to 23.2GB?. Please let me know the solution. Thanks in advance. I have upgraded the BIOS also. E.V.S