Solution Manager 4.0 Configuration: SLDAPIUSER role

In SPRO, SAP Reference IMG -> SAP Solution Manager -> Basic Settings -> SAP Solution Manager System -> System Landscape -> Automatic System Landscape Data Capture -> Connection of System Landscape Directory to Solution Manager -> Generate authorization roles for SLD users
When I display user SLDAPIUSER in client 001, there are no roles defined. I cannot continue with Authorizations without this role. Does anyone know what the default role for this user should be?
Regards,
Vince Ingram

Hi Vincent,
After my 1st reply I was goind through "Component Installation Guide: SAP NetWeaver 2004s Java on Windows: MS SQL Server", this what I found want in that document:
In transaction SU01 create the following <b>dialog users</b> (<b>you do not need to assign them to a role</b>):
Caution
You must have changed the initial passwords of these users [page 77] before you start the installation of the Java system.
<b>ADSUSER</b>:
User for Adobe document services
<b>SLD Data supplier user (optional):</b>
You only have to create this user if you want to install SAP System Landscape Directory (SLD). The SLD data supplier user name that you enter later on during the Java system installation must be identical to this user.
Recommendation
We recommend that you name this user <b>SLDDSUSER</b>
<b>SLD ABAP API user (optional):</b>
You only have to create this user if you want to install SAP System Landscape Directory (SLD). The SLD ABAP API user name that you enter later on during the Java system installation must be identical to this user.
Recommendation
We recommend that you name this user <b>SLDAPIUSER</b>
I dont know I am still confused about these users because they have been used in services.
Thank You,
Indasena Janga

Similar Messages

  • Solution manager service desk - configuration -pls help

    Hi Forum,
    I have completed basic configuration of service desk (solution manager 7.1) and able to realize things like create/process/confirm message and email notification after automatic support team determination (which works well based on component). However facing below issues and have few requirement.
    1. Once the support team gets determined automaitcally based on component field 'Support Team' gets filled with a predeifined value which is obvious however furhter to that when i wish to change the 'Support Team' manually its grayed out i.e. i am not able to change it as it goes to non-edit mode. how to solve this issue?
    2. In mail notification if message is raised from the satellite system or solution manager itself i am receiving the details of the system e.g. products installed and software components which makes message unneccesarily long. Can i configure system to produce e-mail noification without system info so that a notification can be kept short. (This is required as client needs to use service desk for internal purpose and not happy to see the system information as its increasing the length of the message)
    3. While creating organizational structure in /nppoma_crm . i have created organizational unit/Support team/support employees..now in support team determination e-mail notification goes to the determined supoport team (to bp for which e-mail id is entered) however it doesnt goes to the employees mapped under support team as members (pls note bp for each member is maintained along with the e-mail id)
    4. I would like to know the method used for automatic sold-to-party determination as like support team determination & is it possible to reset the number range as while test plenty of messages got created e.g. 8000000584/8000000585/8000000586 to be reset to 8000000001 again so client can start from 8000000001.
    Please help by sharing your thought on this at earliest.
    Regards,
    Rupesh
    Edited by: rupesh_modi12 on Dec 23, 2011 12:25 PM

    Hi Jitu,
    Thank you very much for sharing the links. However sad to say after succesful configuration still the issues mentioned below remains same :
    1. Once the support team gets determined automaitcally based on component field 'Support Team' gets filled with a predeifined value which is obvious however furhter to that when i wish to change the 'Support Team' manually its grayed out i.e. i am not able to change it as it goes to non-edit mode. how to solve this issue?
    2. In mail notification if message is raised from the satellite system or solution manager itself i am receiving the details of the system e.g. products installed and software components which makes message unneccesarily long. Can i configure system to produce e-mail noification without system info so that a notification can be kept short. (This is required as client needs to use service desk for internal purpose and not happy to see the system information as its increasing the length of the message)
    3. While creating organizational structure in /nppoma_crm . i have created organizational unit/Support team/support employees..now in support team determination e-mail notification goes to the determined supoport team (to bp for which e-mail id is entered) however it doesnt goes to the employees mapped under support team as members (pls note bp for each member is maintained along with the e-mail id)
    4. I would like to know the method used for automatic sold-to-party determination as like support team determination & is it possible to reset the number range as while test plenty of messages got created e.g. 8000000584/8000000585/8000000586 to be reset to 8000000001 again so client can start from 8000000001.
    Regards,
    Rupesh

  • Solution manager system monitoring configuration

    Hi
    I am configuring system monitoring in solution manager (Oracle / Solman 7.0 EHP1 / Windows 2008 / VM)
    I have added a satellite system to solution manager thru CCMS and CCMSPING agents. These are visible in RZ21 / Technical infrastructure / Overview. This has also been added in SMSY, SMSY when refreshed pulls out data from the satellite system. However I am having trouble with the transaction SOLUTION_MANAGER. This is where I setup system monitoring.
    Here I find the solution maanger system however am not able to find the satellite system which I had added.
    Thoughts?
    thanks
    Ravi

    Hi,
    Have you defined and added corresponding logical systems for the respective satellite systems?
    Here is the sequence of steps you've to do:
    in SMSY:
    1) Define server, DB, Systems
    2) Generate READ, TMW, TRUSTED RFCs to the satellite systems
    3) define logical systems and assign the satellite system to it
    in Solution_Manager:
    1) define new solution
    2) add the logical system into the solution
    If these steps are successful, you should be able to see the satellite system in SYSTEM MONITORING in Solution_Manager.
    Have you already done these steps?
    After performing these steps:
    Solution_Manager>choose relevant solution>operations setup>Solution Monitoring>System monitoring>Activate monitoring> choose the system and activate monitoring.
    Your system will then appear.
    Does this help any way?

  • SAP EHP 1 for SAP Solution Manager 7.0 configuration check

    Hi All,
    I have configured my SAP EHP 1 for SAP Solution Manager 7.0 according to the guide. Now i would like to test my configuration. Please provide me with a check list and test scenarios.

    SOLMAN_SETUP will guide you to setup SOLMAN, after you setup you gotta make sure that everything is green or resolve the errors.
    SMSY---> Ssystem Check RFC Connections,check the SLDCHECK.
    Refer to OPERATIONS GUIDE under INSTGUIDES, which is very detailed.
    Thanks
    SM

  • What are configurations required on Solution Manager 7.0

    Dear Sir,
    I have asked to my Implementation Partner to implement Solution Manager with following details.
    Maintenance Optimizer Configuration, Usage, Hands on and Training. Patching using Solution Manager.
    a. Configuration Maintenance Optimizer
    b. Installation of Software Lifecycle Manager u2013 SLM
    c. Software Logistics Controller u2013 SLC
    d. SLD Registration
    e. Configuration for Transport Directory
    f. Support Package Manager u2013 SPAM (Specially on SM)
    g. Java Support Package Manager u2013 JSPM (Specially on SM)
    h. Usage of MO and Demo
    i. EWA Scheduling Using SM.
    j. EWA Recommendations Implementation
    Please let me know If I am forgeting any thing or needs to be configured for smooth running of our setup. What are thing to be configured??
    Please also let me give a brief(in addition to notes) about Usage of SLC, SLM, SLD, Transport Directory and How it will help in transport management system.
    Is it possible to apply patches from Solution Manager to all systems?
    Regards
    Dharmendra

    Dharmendra,
    There are many features with Solution Manager EHP1 SP 04.  See if you ask them to upgrade to latest level.
    Also following more features are available.  Depending on your company and your requirement you could configure it.
    - System Monitoring via central auto alert
    - System Availability monitoring (CCMSPING)
    - Central system administration
    - DBA Cockpit
    - CPH (Central Performance History)
    - Job Management
    - Project Administration
    and many more things are available.  Go through Link: [www.service.sap.com/solutionmanager] for more information
    Thanks,
    Digesh Joshi

  • Solution Manager Project

    When creating a project in Solution Manager (solar_project_admin) I am receiving an error when creating the IMG View for the remote system. The message states that I am not authorized to display the project even though I have SAP_ALL and SAP_NEW authorizations in both systems. When reading the extended help for the error (SPROJECT322) it states that I need the value 03 for the field ACTVT in the authorization object S_PROJECT, but I have confirmed that this is already set.
    It begins the process of creating the IMG in the remote system but does not complete the link back to the Solution Manager project.
    Are there any other reasons why this type of behavior might occur?

    Prince Jose
    Thank you for your suggestion, but let me provide you with a little more information to see if this is still the correct action to take.
    I currently have SAP_ALL and SAP_NEW authorizations in Solution Manager along with many different role assignments.  In the satellite systems I have the IMG_CUS_ADMIN role for managing the projects when they are published to those systems.
    In my most recent work I created a project in Solution Manager using 4 different logical components (BI, ECC, SCM, and SRM) for the systems that this project would interact with.  With my current Solution Manager security and authorizations I was able to create the IMG view from Solution Manager to the BI, SCM, and SRM systems, but received my error message described above for the ECC system.
    Based on that do you think I would still look at my security in the Solution Manager system, or a configuration in the satellite system?

  • Difference between Solution manager and ASAP

    Hi All,
    Can anyone tell me what's the difference between SAP solution manager and ASAP?
    Regards
    Saroj

    ASAP stands For Accelerated SAP........its a SAP implementation methodology. It consists of Five phases---
    1. Project Preparation
    2. Business Blueprint
    3. Realization phase
    4. Final preparation phase
    5. Go live and Support
    For Solution manager u can follow this link:
    http://www.sap.com/services/pdf/BWP_SB_SAP_Solution_Manager.pdf
    ASAP and Solution Manager are tools used for managing SAP implementation and roll out project. Both supports sevral stages of the project as mention by Raj.
    The main Difference between three tools (ASAP, VSAP and Solution Manager) are as follow:
    ASAP:
    - Offline CD set with tools, content and a methodology for component-based implementation projects
    VSAP:
    - Offline CD set with tools, content and methodologies for Evaluation, Implementation and Continuous Business Improvement
    - ASAP CD set is used as a tool platform. ASAP content is included to cover the implementation phase
    Solution Manager:
    - Onsite platform to support key implementation actitivities
    - Including key ASAP concepts and tool features
    - Enhanced concepts to encompass the specifics of mySAP.com implementations
    - Integrated platform to support Implementation and operation of mySAP.com
    - Solution Manager is server based tool.
    More informaiton you can find from the following links:
    ValueSAP : https://www.service.sap.com/valuesapupdates
    Solution Manager: http://service.sap.com/solutionmanager
    some documents what is the duty of asap and solution manager i think with u can understand the difference.
    asap means,
    ASAP
    ASAP stands for Accelerated SAP. Its purpose is to help design SAP implementation in the most efficient
    manner possible. Its goal is to effectively optimize time, people, quality and other resources, using a proven
    methodology to implementation.
    ASAP focuses on tools and training, wrapped up in a five-phase process oriented roadmap for guiding
    implementation.
    The road map is composed of five well-known consecutive phases:
    • Phase 1 Project Preparation
    • Phase 2 Business Blueprint
    • Phase 3 Realization
    • Phase 4 Final Preparation
    • Phase 5 Go-Live and support
    In today's post we will discuss the first phase.
    Phase 1 : Project Preparation
    Phase 1 initiates with a retrieval of information and resources. It is an important time to assemble the
    necessary components for the implementation. Some important milestones that need to be accomplished
    for phase 1 include
    • Obtaining senior-level management/stakeholder support
    • identifying clear project objectives
    • architecting an efficient decision-making process
    • creating an environment suitable for change and re-engineering
    • building a qualified and capable project team.
    Senior level management support:
    One of the most important milestones with phase 1 of ASAP is the full agreement and cooperation of the
    important company decision-makers - key stakeholders and others. Their backing and support is crucial for a
    successful implementation.
    Clear project objectives:
    be concise in defining what your objectives and expectations are for this venture. Vague or unclear notions of
    what you hope to obtain with SAP will handicap the implementation process. Also make sure that your
    expectations are reasonable considering your company's resources. It is essential to have clearly defined
    ideas, goals and project plans devised before moving forward.
    An efficient decision making process:
    One obstacle that often stalls implementation is a poorly constructed decision-making process. Before
    embarking on this venture, individuals need to be clearly identified. Decide now who is responsible for
    different decisions along the way. From day one, the implementation decision makers and project leaders
    from each area must be aware of the onus placed on them to return good decisions quickly.
    Environment suitable for change and re engineering:
    Your team must be willing to accept that, along with new SAP software, things are going to change, the
    business will change, and information technology enabling the business will change as well. By
    implementing SAP, you will essentially redesign your current practices to model more efficient or predefined
    best business practices as espoused by SAP. Resistance to this change will impede the progress of your
    implementation.
    Building a qualified project team:
    Probably the most important milestone early in assembling a project team for the implementation. If you are
    implementing the materials management and plant maintenance modules, you need to include people from
    both of these departments. The team should also represent management as well as non management or
    "functional" personnel. Sometimes management is less aware of the day-to-day functions of an organization,
    including how implementing SAP will tactically influence those function
    ASAP- Second Phase- Business Blueprint
    SAP has defined a business blueprint phase to help extract pertinent information about your company that is
    necessary for implementation. These blueprints are in the form of questionnaires that are designed to probe
    for information that uncovers how your company does business. As such, they also serve to document the
    implementation. Each business blueprint document essentially outlines your future business processes and
    business requirements. The kinds of questions asked are germane to the particular business function, as
    seen in the following sample questions:
    1) What information do you capture on a purchase order?
    2) What information is required to complete a purchase order?
    Accelerated SAP question and answer database:
    The question and answer database (QADB) is a simple although aging tool designed to facilitate the creation
    and maintenance of your business blueprint. This database stores the questions and the answers and
    serves as the heart of your blue print. Customers are provided with a customer input template for each
    application that collects the data. The question and answer format is standard across applications to
    facilitate easier use by the project team.
    Issues database:
    Another tool used in the blueprinting phase is the issues database. This database stores any open concerns
    and pending issues that relate to the implementation. Centrally storing this information assists in gathering
    and then managing issues to resolution, so that important matters do not fall through the cracks. You can
    then track the issues in database, assign them to team members, and update the database accordingly.
    ASAP Phase- 3 - Realization:
    With the completion of the business in phase 2, "functional" experts are now ready to begin configuring SAP.
    The Realization phase is broken in to two parts.
    1) Your SAP consulting team helps you configure your baseline system, called the baseline configuration.
    2) Your implementation project team fine-tunes that system to meet all your business and process
    requirements as part of the fine tuning configuration.
    The initial configuration completed during the base line configuration is based on the information that you
    provided in your blueprint document. The remaining approximately 20% of your configuration that was not
    tackled during the baseline configuration is completed during the fine tuning configuration. Fine tuning
    usually deals with the exceptions that are not covered in baseline configuration. This final bit of tweaking
    represents the work necessary to fit your special needs.
    Configuration Testing:
    With the help of your SAP consulting team, you segregate your business processes into cycles of related
    business flows. The cycles serve as independent units that enable you to test specific parts of the business
    process. You can also work through configuring the SAP implementation guide (IMG). A tool used to assist
    you in configuring your SAP system in a step-by-step manner.
    Knowledge Transfer:
    As the configuration phase comes to a close, it becomes necessary for the Project team to be self-sufficient
    in their knowledge of the configuration of your SAP system. Knowledge transfer to the configuration team
    tasked with system maintenance (that is, maintenance of the business processes after Go-live) needs to be
    completed at this time.
    In addition, the end users tasked with actually using the system for day-to-day business purposes must be
    trained.
    ASAP Methodology - Phase 4 - Final Preparation:
    As phase 3 merges into phase 4, you should find yourselves not only in the midst of SAP
    training, but also in the midst of rigorous functional and stress testing. Phase 4 also
    concentrates on the fine tuning of your configuration before Go-live and more importantly, the
    migration of data from your old system or systems to SAP.
    Workload testing (including peak volume, daily load, and other forms of stress testing), and
    integration or functional testing are conducted to ensure the accuracy of your data and the
    stability of your SAP system. Because you should have begun testing back in phase 2, you do
    not have too far to go until Go-live. Now is an important time to perform preventative
    maintenance checks to ensure optimal performance at your SAP system.
    At the conclusion of phase 4, take time to plan and document a Go-live strategy. Preparation for
    Go-live means preparing for your end-users questions as they start actively working on the new
    SAP system.
    ASAP - Phase 5 - Go-live and Support:
    The Go-live milestone is itself is easy to achieve; a smooth and uneventful Go-live is another
    matter altogether. Preparation is the key, including attention to what-if scenarios related not only
    to the individual business processes deployed but also to the functioning of technology
    underpinning these business processes and preparation for ongoing support, including
    maintenance contracts and documented processes and procedures are essential
    solutionmanager means,
    SAP Solution Manager
    Purpose
    The SAP Solution Manager supports you throughout the entire lifecycle of your solutions, from the Business Blueprint thru configuration to production operation. It provides central access to tools methods and preconfigured content, that you can use during the evaluation, implementation, and productive operation of your systems.
    Features
    Implementation of the mySAP Business Suite
    • All phases of the implementation project (Business Blueprint, Configuration) are performed centrally in the Solution-Manager system.
    • Central project documentation repository in the Solution Manager
    • Integrated Project Administration allows you to manage planning schedules, human resources and other project data.
    Customizing Synchronization
    • The Customizing Scout, with which you can compare customizing in various SAP components, e.g. an ERP system with SAP MDM
    • The Customizing Distribution, with which you can synchronize customizing in various SAP components.
    Test
    • You can use the Test Workbench to organize and perform tests at the end of a project phase.
    • Reuse of the project structure for process-oriented tests
    Global rollout
    Integrated authoring environment, with which customers and partners can create their own templates, which they can reuse in subsidiaries, e.g. in a global rollout
    E-Learning management
    Creation of training material and learning maps (computer-supported self-tuition courses) to train end users after the implementation of new functions
    Solution Monitoring
    • Central system administration
    • Analyze your system landscape with Service Level Reporting
    • System monitoring in real time
    • Business Process Monitoring
    Services
    Access to programs and Services, which help you to monitor and optimize the performance and availability of your system landscapes, and minimize your operational system risks
    Service Desk
    Solution support with workflow to create and handle problem messages
    Change Management
    Management of change requests, with workflow for the monitoring and audit of changes and transports in your system landscape, with the Change Request Management.
    See also:
    • Projects
    • Solution Monitoring
    SAP Solution Manager Roles
    Authorization Concept
    • Project Authorizations
    The following composite roles contain the authorizations required for the tasks to be performed in a project:
    &#9675; Project Leader
    &#9675; Application Consultant
    &#9675; Development Consultant
    &#9675; Technical Consultant
    There are individual roles for Roadmap administration.
    • Production Authorizations
    Production authorizations are in individual roles for the functions:
    &#9675; Solution Directory
    &#9675; Solution Monitoring
    &#9675; Service Data Control Center
    &#9675; Service Desk
    &#9675; Corporate Functionality
    &#9675; Solution Manager Diagnostics
    &#9675; Solution Reporting
    Use
    Adjust the SAP Solution Manager roles to your requirements.
    Overview of Roles in Solution Manager
    If you use trusting-trusted RFC connections, assign the authorization profile S_RFCACL to the user, as well.
    Scenario Role
    Implementation and Distribution SAP_SOL_PM_COMP
    SAP_SOL_AC_COMP
    SAP_SOL_BC_COMP
    SAP_SOL_TC_COMP
    SAP_SOL_RO_COMP
    SAP_SOL_RE_COMP
    SAP_SOL_LEARNING_MAP_DIS
    SAP_DMDDEF_DIS
    Implementation and Distribution (Roadmaps) SAP_RMDEF_RMAUTH_EXE
    SAP_RMDEF_RMAUTH_DIS
    Implementation and Distribution (E-Learning Management) SAP_SOL_TRAINING_EDIT
    Service Desk (Service Desk) SAP_SUPPDESK_ADMIN
    SAP_SUPPDESK_PROCESS
    SAP_SUPPDESK_CREATE
    SAP_SUPPDESK_DISPLAY
    Service Desk (Corporate Functionality) SAP_SUPPCF_ADMIN
    SAP_SUPPCF_CREATE
    SAP_SUPPCF_PROCESS
    Service Desk (Issue Tracking) SAP_SV_SOLUTION_MANAGER
    SAP_SV_SOLUTION_MANAGER_DISP
    SAP_SUPPDESK_ADMIN
    SAP_SUPPDESK_PROCESS
    SAP_SUPPDESK_DISPLAY
    Change Request Management (Schedule Manager; Service Desk, cProjects)
    SAP_CM_CHANGE_MANAGER
    SAP_CM_DEVELOPER_COMP
    SAP_CM_TESTER_COMP
    SAP_CM_OPERATOR_COMP
    SAP_CM_PRODUCTIONMANAGER_COMP
    SAP_SOCM_REQUESTER
    SAP_CM_ADMINISTRATOR_COMP
    Solution Monitoring
    (Service Data Control
    Center)
    SAP_SDCCN_ALL
    SAP_SDCCN_DIS
    SAP_SDCCN_EXE
    Solution Monitoring
    (Solution Directory)
    SAP_SOLMAN_DIRECTORY_ADMIN
    SAP_SOLMAN_DIRECTORY_EDIT
    SAP_SOLMAN_DIRECTORY_DISPLAY
    Solution Monitoring
    (Operations)
    SAP_SV_SOLUTION_MANAGER
    SAP_SV_SOLUTION_MANAGER_DISP
    SAP_SETUP_DSWP
    SAP_SETUP_DSWP_SLR
    SAP_SETUP_DSWP_SM
    SAP_SETUP_DSWP_BPM
    SAP_SETUP_DSWP_CSA
    SAP_OP_DSWP
    SAP_OP_DSWP_SLR
    SAP_OP_DSWP_SM
    SAP_OP_DSWP_EWA
    SAP_OP_DSWP_BPM
    SAP_OP_DSWP_CSA
    Solution Reporting SAP_SOL_REP_ADMIN
    SAP_SOL_REP_DISP
    Solution Manager Diagnostics SAP_SMDIAG_WIZARD
    SAP_SMDIAG_TEMPLATE
    Cf.:
    &#9679; Overview of Roles and Profiles in Satellite Systems
    &#9679; SAP Solution Manager 4.0 configuration guide
    &#9679; SAP note 834534
    &#9679; SAP note 803142
    Overview of Roles and Profiles in the Satellite Systems
    Use the profiles below for SAP R/3 Release before SAP Web Application Server 6.10. Use the profiles below from SAP R/3 Release SAP Web Application Server 6.10.
    If you use a trusting-trusted RFC connection, assign the authorization profile S_RFCACL to the user, as well.
    Scenario Roles (Release > 6.10) Profile ( SAP_S_CUS_CMP S_CUS_CMP Data read access
    SAP_S_CMSREG S_CMSREG Central system repository data
    SAP_S_BDLSM_READ S_BDLSM_READ SDCCN data
    Adjust Roles and Profiles
    Before you assign SAP standard roles and profiles to users, copy and specify them.
    SAP delivers roles and profiles with default values. If they are missing, you must set the values in the authorization objects yourself. Proceed as follows:
    1. Load the roles/profiles from client 000 into your target client. You can:
    &#9675; Transport client 000 into your target client (roles and profiles)
    &#9675; Upload und Download (for roles in transaction PFCG)
    &#9675; RFC connection in transaction PFCG (for roles; menu path: MENU ® READ FROM OTHER SYSTEM WITH RFC). In this case, you must have set-up the RFC connection (transaction SM59).
    2. Copy the roles/profiles into your namespace.
    a. Choose Role Maintenance (transaction PFCG).
    b. Enter a role name and choose Copy Role.
    c. Enter the name of the new role in the To Role field.
    d. Choose Copy All.
    e. Save.
    3. Complete missing values in the authorization objects.
    a. Choose the Authorizations tab.
    b. Choose ChangeAuthorization Data.
    c. Enter your own values for the authorization objects, or double-click on the yellow traffic light.
    The authorization objects appear with a green traffic light.
    d.
    When you double-click on the yellow traffic light, the value “*” appears. This grants full authorization for this field of the authorization object.
    e. Save.
    f. Generate the authorization profile.
    4. Assign the role to users.
    a. Choose the Users tab.
    b. Enter the user names.
    c. Choose User Adjustment.
    d. Save.
    You can also assign the roles to the users, in the user maintenance (transaction SU01).
    e.
    Project Authorization
    Roles
    The roles in the SAP Solution Manager are composite roles, which contain individual roles, which in turn contain authorizations for individual functions, e.g. for the Business Blueprint.
    The following composite roles contain the central authorizations which they require for projects, and can be tailored to suit individual projects:
    &#9679; Project leaders are responsible for organizing and planning the project, and monitoring costs and deadlines.
    &#9679; Application consultants consultants are responsible for business content and the documentation of operational activities. This composite role has limited authorization and is intended for project members who need to be adjusted individually.
    &#9679; Development consultants are responsible for the development of customer-specific programs and authorizations.
    &#9679; Technical consultants are responsible for installing systems and providing technical support to users.
    &#9679; Display user/Read only : contains SAP Solution Manager display/read only authorization.
    &#9679; Read authorization depending on status in Document Management : only contains read authorization per status in Knowledge Warehouse Document Management
    See also:
    &#9679; Solution Manager Roles Overview
    &#9679; Overview of Roles and Profiles in Satellite Systems
    &#9679; SAP Solution Manager 4.0 configuration guide
    &#9679; SAP note 834534 (Roles in the Solution Manager)
    &#9679; SAP note 803142 (Roles in Satellite Systems)
    Project Manager
    Technical name: SAP_SOL_PM_COMP
    Tasks
    Project managers are responsible for the realization of the desired project results and the daily management of the project. They anticipate deviations from the project direction and carry out the necessary corrective measures immediately. Project managers should also understand the integration of the business processes within the enterprise.
    Project managers are also members of the steering committee. They have decision-making authority in matters concerning the program and budget. He forwards strategic questions to the sponsor in order to make joint decisions.
    Activities in SAP Solution Manager
    The main responsibilities of the project manager include:
    • Organizing the entire project
    • Developing strategies and procedures for an efficient SAP implementation
    • Developing and maintaining the time schedule for the implementation project
    • Finalizing and managing the project scope, budget and deadlines in accordance with the approved plans
    • Assigning and managing resources
    • Monitoring project progress on a weekly basis
    • Carrying out evaluations and analyses
    • Carrying out a formal review at the end of each phase
    • Clarifying open issues in good time
    • Reporting regularly to the review committee on the progress and status of the project
    • Representing the project internally and externally
    • Giving status updates to the whole project team
    Project managers can also copy content from a ValueSAP Edition 2 project into an SAP Solution Manager project. See the migration tool documentation.
    Notes on Tailoring
    If you require additional authorization, you can use the role SAP_BC_CUS_ADMIN: It contains authorization for the administration of customizing projects in the component systems.
    The SAP Solution Manager configuration guide contains further information about authorizations in the component systems.
    Integration
    The project manager defines the content and the time frame of an implementation project, manages resources and monitors project progress. The application consultant reports to him and supports him in an administrative function.
    Application Consultant
    Technical name: SAP_SOL_AC_COMP
    Tasks
    Application consultants are responsible for making sure that the Business Blueprint and software configuration are tailored to the business processes and that analysis and report requirements are fulfilled. They use their knowledge of proven business procedures to support them in these tasks. Application consultants also function as advisers and work closely with the rest of the project team.
    They also work in close cooperation with legacy system experts, when extraction of legacy data is necessary.
    Activities in SAP Solution Manager
    The main responsibilities of the application consultant include:
    • Supporting definition and modeling of business processes
    • Checking how the business model works with the SAP products
    • Configuring the software to suit the required business processes and to meet analysis and report requirements
    • Determining the global and local standardization requirements
    • Determining requirements for organizational change in the enterprise
    • Supporting knowledge transfer to other project team members
    • Supporting organization and performance of tests
    • Defining requirements for authorization profiles and access authorizations
    • Analyzing statistical performance and passing on recommendations for improvement to support
    • Creating and developing data solutions and strategies to meet the requirements of the corresponding SAP component (for example, APO, BW, CRM)
    • Creating end user training materials for the new functions
    The application consultant is not responsible for:
    • The technical implementation of the solution
    • The programming of interfaces and other developments
    • Recurring problems with the quality of data (problems with data quality should be passed on to the project manager)
    Notes on Tailoring
    This role only contains basic functions. The following roles are available for additional authorizations:
    • SAP_BC_CUS_CUSTOMIZER contains authorizations for working with IMG activities.
    The following role is useful for the application components:
    • SAP_BC_CUS_CUSTOMIZER
    Integration
    Application consultants are responsible for the development of business content and the documentation of operative activities in accordance with the appropriate standards. The development consultant develops customer-specific programs and their authorizations.
    Development Consultant
    Technical name: SAP_SOL_BC_COMP
    Tasks
    Development consultants work with the project manager and the application consultant on the planning and organization of the authorization concept. They also perform developmental tasks and customer-specific developments.
    Activities in SAP Solution Manager
    The main responsibilities of the development consultant include:
    • Organizing authorizations
    • Developing ABAP programs, for example, interfaces, forms, or modifications
    • Working with the ABAP Workbench
    Notes on Tailoring
    The following roles are available for additional authorizations:
    • SAP_BC_DWB_ABAPDEVELOPER contains authorization for implementing new applications and enhancements and for changing and modifying standard applications using the tools and services provided in the ABAP Workbench.
    • SAP_BC_TRANSPORT_ADMINISTRATOR contains all authorizations for the Change and Transport System
    Integration
    Development consultants work for the project manager and the application consultant and carry out programming tasks, in contrast to technical consultants who act as system administrators and are responsible for installing systems and providing technical support to users.
    Technical Consultant
    Technical name: SAP_SOL_TC_COMP
    Tasks
    Technical consultants plan the technical requirements for a project with the project manager and the manager of the technical team and then carry out the required technical tasks in the system.
    Depending on the scope and complexity of the implementation, technical consultants may work in several areas, for example, system administration, database administration, network administration, operating system administration, development of cross-application components, or ABAP development.
    For international projects, technical consultants also manage consultancy in the following areas:
    Country-specific business requirements and country-specific SAP software requirements
    Language-specific or codepage-specific requirements
    Time-zone issues
    Activities in SAP Solution Manager
    The main responsibilities of the technical consultant include:
    Setting up and installing the system landscape
    Managing the system landscape and the corresponding transport landscape
    Providing support and advice in all technical questions during an implementation project
    Giving daily updates on the technical direction of the project including communicating deviations in the project
    Developing and realizing the Cutover Plan before going live
    Communicating effectively with the business process team
    Transferring knowledge effectively to employees in system administration
    In order to be able to carry out these tasks, the technical consultant should meet the following requirements:
    A sound knowledge in the areas of databases, networks, programming and Internet technology
    A sound knowledge of the SAP solutions
    Notes on Tailoring
    The following roles are available for additional authorizations:
    SAP_BC_RRR_SAA_ADMIN provides the authorization for executing all the tasks in the System Administration Assistant.
    Integration
    The technical consultant acts as a system administrator and is responsible for installing systems and providing technical support to users, in contrast to the basis consultant who works under the instruction of the project manager and the application consultant and carries out programming tasks.
    Read Authorization by Document Status
    Technical name:
    Use the specified individual role to:
    &#9679; display business process scenarios, business processes steps, etc. of your solution, in the Solution Directory.
    Integration
    Use the Solution Monitoring role SAP_SV_SOLUTION_MONITORING_DISP to display the Solution Directory and sessions in Solution Monitoring.
    Adjustment
    Adjust Roles and Profiles
    Solution Monitoring Roles
    Tasks
    Authorizations specified for the Solution Monitoring in the SAP Solution Manager:
    for the Solution Monitorin sessions, classified by the areas Operations Setup and Operations
    general individual role to display all sessions
    Display all Sessions
    general individual role to edit all sessions
    Edit all Sessions
    Activities
    Authorizations are assigned to the roles. Specify user access to the session. There are the following authorizations:
    A The user with the role has full authorization for the transaction or session.
    D The user with the role can call the transaction or session in display mode.
    N The user with the role has no authorization for the transaction or session.
    Operations Setup session authorizations
    Individual role Service Level Reporting System Monitoring Central Administration Business Process Monitoring
    SAP_SETUP_DSWP A A A A
    SAP_SETUP_DSWP_SLR A N N N
    SAP_SETUP_DSWP_SM N A N N
    SAP_SETUP_DSWP_CSA N N A N
    SAP_SETUP_DSWP_BPM N N N A
    Operations session authorizations
    Individual role Early Watch Alert Service Level Reporting System Monitoring Central Administration Business Process Monitoring
    SAP_OP_DSWP A A A A A
    SAP_OP_DSWP_EWA A N N N N
    SAP_OP_DSWP_SLR D A N N N
    SAP_OP_DSWP_SM N N A (1) N N
    SAP_OP_DSWP_CSA N N N A (1) N
    SAP_OP_DSWP_BPM N N N N A
    SAP_SV_SOLUTION_MANAGER_DISP session authorization
    Individual role Early Watch Alert Service Level Reporting System Monitoring Central Administration Business Process Monitoring
    SAP_SV_SOLUTION_ MANAGER_DISP D D D D D
    SAP_SV_SOLUTION_MANAGER session authorization
    Individual role Early Watch Alert Service Level Reporting System Monitoring Central Administration Business Process Monitoring
    SAP_SV_SOLUTION_ MANAGER A A A A A
    (1) – from Release 3.20 SP02
    Cf.:
    Overview of Roles and Profiles
    SAP Solution Manager 3.2configuration guide
    SAP note 625773
    Notes on Tailoring
    You can use and combine the individual Solution Monitoring roles individually, according to your requirements.
    Special authorizations for specific checks in individual sessions, are described in the online documentation of the sessions:
    See also:
    Set-Up Central System Administration
    Using business process monitoring
    Integration
    If you need authorization for specific areas in the SAP Solution Manager, in addition to the authorizations for Solution Monitoring, use the associated individual roles with the specific authorizations:
    Change Request Management
    Service Desk
    Service Data Control Centre
    Solution Directory
    General Administration and Display Authorization
    Technical name: SAP_SV_SOLUTION_MANAGER
    Technical name: SAP_SV_SOLUTION_MANAGER_DISP
    Tasks
    Authorizations are assigned to the roles. Specify user access to the session. The following authorizations are available for your project:
    A The user with the role has full authorization for the transaction or session.
    D The user with the role can call the transaction or session in display mode.
    N The user with the role has no authorization for the transaction or session.
    Activities in
    Both individual roles have full authorization for the sessions in their areas.
    If you only assign one of the roles to a user, the system only offers the user this area in the system interface.
    They have display authorization for other transactions, according to the requirements of the session types:
    &#9632; SDCCN (Service Data Control Centre) for SAP EarlyWatch Alert and Service Level Reporting
    &#9632; SOLMAN_DIRECTORY (Solution Directory) for business process monitoring
    Special authorization objects
    Authorization Object Activity Meaning
    D_SOL_VIEW 20 (Operations) Determines which area can be processed and displayed in the SAP Solution Manager.
    D_SOLMANBU A (Bundle ID) Restricts processing by sessions.
    &#9632; SDCCN (Service Data Control Centre) for Service Level Reporting
    &#9632; SOLMAN DIRECTORY (Solution Directory) for business process monitoring
    Special authorization objects
    Authorization Object Activity Meaning
    D_SOL_VIEW 10 (Operations Setup) Determines which area can be processed and displayed in the SAP Solution Manager.
    D_SOLMANBU A Restricts processing by sessions.
    Activities in the session type roles
    &#9679;
    Functional roles
    Role Technical name Bundle ID Further explanation
    Operations Setup
    Service Level Reporting SAP_SETUP_DSWP_SLR EWA_CUST Additional display authorization for the transaction SDCCN (Service Data Control Centre)
    System monitoring SAP_ SETUP DSWPSM SOL_MON Additional authorization to call the Solution Manager Diagnostics wizard
    Central System Administration SAP_ SETUP_DSWP_CSA SOL_CSA Authorization object S_SAA_ADMI controls authorizations for customizing
    checks.
    Business process monitoring SAP_SETUP_DSWP_BPM BPM_JOBM
    CP_BPM
    CP_BPM_R
    SOL_BPMO
    Additional display authorization for the Solution Directory
    Operations
    SAP EarlyWatch Alert SAP_OP_DSWP_EWA EW_ALERT Additional full authorization for the transaction SDCCN (Service Data Control Centre)
    Service Level Reporting SAP_OP_DSWP_SLR EW_CONS Additional display authorization for the transaction SDCCN (Service Data Control Centre)
    Central system
    administration
    SAP_OP_DSWP_CSA SOL_CSA
    System
    monitoring
    SAP_OP_DSWP_SM SOL_MON Additional authorization to call the Solution Manager Diagnostics wizard
    Business process
    monitoring
    SAP_OP_DSWP_BPM BPM_JOBM
    CP_BPM_R
    SOL_BPMO
    Additional display authorization for the Solution Directory
    &#9632;
    Adjustment
    You can adjust the roles to your requirements.
    If you also need authorization to display the Business Process MONITORING session, as well as the functional role for Service Level reporting in Operations , to check the business processes for the Service Level report, you can:
    i. copy the authorization object D_SOLMANBU into the role and adjust it to your requirements (activity: 1; bundle ID: BPM_JOBM; CP_BPM_R; SOL_BPMO)
    ii. give the user the role and adjust the authorization object D_SOLMANBU to your requirements (activity 1).
    Integration
    You can combine the functional roles with other roles in the area:
    &#9679; Service Desk
    &#9679; Change Management
    &#9679;
    If you want to create a Service Desk message from a Business Process MONITORING session, you need the role for the user in a message system , as well as the functional role for business process monitoring .
    The online documentation for the sessions describes the scenarios in more detail.
    Solution Reporting Roles
    Technical name: SAP_SOL_REP_ADMIN
    Technical name: SAP_SOL_REP_DISP
    Tasks
    The individual roles administer and display Solution Reporting.
    Activities in
    Tasks
    The specified role sets up service connections to SAP.
    Adjustment
    Adjust Roles and Profiles
    Simple way to differentiate is ASAP is a methodology for SAP Project Implementation where as Solution Manager is a document repository to store the documentation that u will create during all phases of the project.

  • Solution Manager in EP

    Dear Experts,
    I am facing 2 issues in relevant for solman in EP.
    1) I have created Portal standard Component for (com.sap.portal.epsolman)(solution Manger) create support message from EP.
    I have mentioned all connection properties. when I click on the submit button with short text and description the message was posted to  solution manager system without any error. Where as when am try to post the message with attchment, system is throwing the error message
    "Message was not created on SAP Solution Manager. Return code from RFCfunction call: 0"
    2) I want to know is there any option where i can my solman ticket status in EP.?
    Regards
    Ashwini

    Hello,
    Could you please check whether there is a problem to create messages with attachments also from the Solution Manager itself, with the SAPGUI?
    As for what you mention to view the message status, I guess that the only way is to have an URL point to a BSP or the issue management Work Center from the Solution Manager itself, and configure it so that the user can look at his own messages and see when they require his action. There is no specific EP iview that I can give you for users to follow their Service Desk support messages. I have seen the Solution Manager Work Centers or BSPs integrated in a portal, but not a special iview.
    Best regards,
    Miguel Ariñ

  • Using OTO CTS+  in Solution Manager 4.0

    Hi everybody,
    I'm trying to configure the OTO in Solution manager, I somehow configured something as described in the CTS+ guide, I also was able to create a Project as shown in the RKT-solman.
    What i'm missing now is how do i use this tool, from beginning , creating a request and transporting it to the different systems.
    thanks for your help
    Murat

    Hi Murat,
    You are doing the Java Transports for XI or EP system?For EP systems create the tpz files.
    1.From solman create the TP using the normal/urgent correction.
    2.Then using CTS borwser attach the TPZ file to the TP created
    3.Relase the TP from Solution manager
    4.Import to quality using solman and check if it is moved.
    Revert for clarifications.
    Regards,
    Avinash.

  • Solution Manager.

    Hi SolMan Experts,
    I am working in an SAP implementation project, which is in its project planning phase.
    Since i am new to Solman ,i have few things in my mind to clear.
    How is Solman used while Implementation ?
    Can Solman store multiple project docs centrally in 1 server ? Can it have a link to other SAP    
       systems  ?
    In post-implementation support activity ,can we log problems in Solman for getting solutions
      directly from SAP support ? If yes then how it is done ?
    Can we apply new patches directly from SAP market place into multiple SAP systems linked to
      SolMan?
    Thank your for your answers.
    These will help me while using SolMan in our project.
    Thanks and Regards,
    Umesh Karane.
    Mobile - 98196 25133.

    Hi Umesh,
    How is Solman used while Implementation ?*
         During implementation you can use projects to manage your implementation.
                 solar_project_admin  -> To create projects
         You can use it build blueprint of the project and basing on the blue print you can configure the target system.
               SOLAR01 - Blue printing SOLAR02 - Configuration.
    for more information please check http://help.sap.com/saphelp_sm40/helpdata/en/9a/90b441b60e3331e10000000a155106/content.htm
    Once the blueprint is in place you can configure Business Process Monitoring later on this blue print during support.
    Can Solman store multiple project docs centrally in 1 server ?*
               You can store all the documentation you create during blue printing in solution manager under project documentation.
            Can it have a link to other SAP
            It can connect to target system which is to be configured ( After configuring some RFCs) .
           If this doesnot answer your question please explain what you are looking for ?
    In post-implementation support activity ,can we log problems in Solman for getting solutions*
    directly from SAP support ? If yes then how it is done ?
    The support messages raised in satellite systems will be created in Solution manager once you configure support desk and there is automated workflow through which you can send messages to SAP and you can get the replies of SAP in solution manager itself.
    for more info please look at http://help.sap.com/saphelp_sm40/helpdata/en/ff/6ea7a870ac469ea54cedd12666cc5d/content.htm
    Can we apply new patches directly from SAP market place into multiple SAP systems linked to
    Now you can only download the Support packs once you approve them through Maintenance Optimizer. After approving you still need to download through Download manager and apply them in systems. It is not handled by solution manager.
    you can appy notes through SNOTE in all system through solutioin manager. You need to select the system where you want to apply from solution manager itself and it will apply that note in that system.
    The complete documentation of Solution Manager 4.0 can be accessed at http://help.sap.com/saphelp_sm40/helpdata/en/45/51fbdbd4941803e10000000a1553f7/frameset.htm
    regards
    Mrutyunjay

  • FAQ - SAP Solution Manager for VARs

    You can find further technical questions around configuration & functionalities in a comprehensive
    FAQ to SAP Solution Manager for VARs.
    This FAQ covers questions and answers around:
        > SAP Solution Manager, enterprise edition
        > SAP Solution Manager VAR setup: configuration of Service Desk
        > Work Center Service Desk: functions & configuration
        > Work Center System Monitoring: setup of SAP EarlyWatch Alert
    You can access the FAQ directly thru the following link [FAQ - SAP Solution Manager for VARs|http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000722612&_OBJECT=011000358700000490172009E].
    Navigation path: SAP Service Marketplace > SAP Support Portal > SAP Support Infrastructure > SAP Solution Manager > SAP Solution Manager for Partners > Information for Service Provider > Training and HowTo Documents > Administrator
    Please notice: The FAQ will be updated from time to time.
    Edited by: Susanne Schlehf on May 4, 2009 2:48 PM
    Edited by: Susanne Schlehf on May 18, 2009 12:56 PM

    Hello Richard,
    (1) regarding network connections see document [Draft:Technical Support Network Connections for VAR Scenario|http://service.sap.com/~form/sapnet?_SHORTKEY=00200797470000089947&_OBJECT=011000358700000880802009E] as overview and with a lot of detailed information. 
    (2) yes, you have to setup once all your customer connections at the beginning but then only add/remove with customer contract changes
    (3) the workaround by sending by email can handled a anexception. EWA has to be done for productive systems like nowadays done by SAP. Additional EWA services could meas additional business case for a VAR - that's contract between VAR and customer.
    (4) whatever you think may be a business to sell - do it ! (and get a monetary bonus from your boss
    Kind regards
    Heinrich

  • Regarding authorization in solution manager for Central system monitoring

    Hi,
    I want to Prevent users from deleting Task logs in central system monitoring
    in solution manager
    I have assigned the roles SAP_SV_SOLUTION_MANAGER_DISP
    But it gives display authorization for everything unable to keep track of
    changes in monitoring
    Can anyone please help me to prevent users from deleting task log history
    Since I have to keep track of one month data
    What can be the suitable role for it ? or what authorization objects i should
    make a change to prevent deleting tasklog.
    Kindly help me in this regard
    Regards
    Sanjeev.S

    Thanks for your prompt reply
    I am not saying about SDDCN
    In transction solution_manager  => opertation set up = > central system
    administation
    we  will do manual monitoring for sattelite systems in this path. what we monitored
    will be entered in task log history.
    So what can be the suitable role to prevent the deleting of the task log history.
    There is option delete task history. if any one by mistake clicked on that ,all the
    records of monitoring will be lost.
    so kindly suggest me a suitable solution

  • More than one Solution Manager

    Hi,
    We have 3 data centres around the world and each have a number of SAP systems, ABAP, JAVA and ABAP+Java. At present we have one central Solution Manager that is configured primarily for ASAP, change management etc and not really configured for CEN or RCA.
    So my question is, has anyone setup more than one Solution Manager when they have multiple data centres around the world or is everyone just using a central Solution Manager?
    Any advise would be greatly appreciated.
    Regards
    Brian

    Thank you for your reply. Our Central Solution Manager is already 4p/8c with 20Gb on Windows Server 2003 and when we connect all our SAP instances, some 120 of them then the Solman basically stops. So I am curious, very eager to find out if anyone has setup more than one Solman to handle large numbers of SAP instances and handle geographic separation of SAP instances.
    But thanks for your reply.
    Brian

  • Does somebody have experience to manage SAP project with solution manager?

    Hi friends,
    I will implement new project for my client. As I know, solution manager is already part of SAP Netweaver. To install SAP NetWeaver, solution manager must be installed. Meanwhile, solution manager provides a project management tool, for example, the business process definition, blueprint...
    But I never use it to manage project. Could somebody share experience in this area?
    Regards,
    Watson

    Hi Ragu,
    Thanks for your posting. I will implement a SAP APO project. What I need is the methods to use solution manager, for example, configuration manual, step by step guide. I'm also interested in the advantages of SAP solution manager.
    Regards,
    Watson

  • Default user for solution manager

    Hello,
    i just finished installing the Solution Manager and now i have a problem with logging in to the Solution Manager.
    I configured the Sap frontend and can log in with several users which names occured during the installation but all of them have no rights to any transactions.
    is there a default adminuser after installation ?

    SAP*
    DDIC

Maybe you are looking for

  • Barcode using api

    Hi, I'm trying to solve problem with showing barcodes when generating html or pdf documents using api. I have function in db which generates barcodes 128b with correct start, control and stop chars, I've tested it notepad, using font AdvC128b, printe

  • Characters in String : Unicode 16-bit to custom 32-bit

    I understand that internally in Java, characters in Strings are actually Unicode characters, with each character represented with 16 bits. So, character �L� in Unicode is 0x004C which is also 0000 0000 0100 1100 Now, I wish to encode each of the 4 bi

  • About Database Design

    Hello All, I am using Oracle 11g R2 SOE. What is the best practice for Real Estate Data Model ? This one : http://www.databaseanswers.org/data_models/real_estate_properties/index.htm Or As I got, In this thread {thread:id=2521579} I was advised to st

  • SHD0 Tcode IE02 Error

    Hi SAP Expert, I have problem with creating screen variant for tcode ie02. I copied the tcode into zie02 then i try to create screen variant for this tcode. in first screen when i tried to save the screen variant, the error message appears, Requested

  • Expression to Read Timecode of main / outer comp

    I have a video with some User Interface animations. I want to include a time code (reader effect) on all the instances of that GUI, BUT... I don't want it to read its own comp's TC (beacuse this would be 00:01 and going...), It should read the main /