Standard price of material to be included in pricing procedure
Hi Gurus,
Can I include the standard price of material from material master in my pricing procedure? If yes, how? Also, I want to tax 7% of this material in the pricing procedure. Can I configure a condition type this way?
Thanks,
Paul
HI John,
1. Please maintain the condition type VPRS in your pricing procedure, the standard cost from Material master will come in to your pricing procedure.
2. If you want to maintain tax in your pricing procedure you need to maintain Tax related condition type Ex: MWST and you create condition record for that condition type in VK11
Define Tax procedure and assign to country (Please take help of FI people)
Maintain Taxcode at FTXP
I hope it will help you,
Regards,
Murali.
Similar Messages
-
Process will not be created with zero standard prices in material master
Hi,
I have two type of material;
1. In process material say A1
2. Finished Goods say B1
Both materials price control are standard price. I do not run costing. So , after creation of material master , standerd price has to update through MR21 in the account1 tab before start production .
Suppose, if I forget to update standard price in material master and prepared process order, it will carry zero value of production cost.
Hence, I want to restrict the creation of process order with zero standard prices in the material master.
In order words, as long as standard price will not be updated after creation of the material master, user will not be allowed to create process order, if wrongly try, system will give message u201Cwith zero standard price creation of process order will not be allowedu201D.
Please let me know either standard configuration or name of User exit or Badi.
Regards,
AmitHi,
You need to use BADI: workorder_update.
Method: At release.
check MBEW-STPRS field in the code ..and flag error and reject error if STPRS = 0.
Regards,
Santosh Sarda -
Standard Price in material master and MBEW
Hi
We have unique problem. The currency was setup with out decimal places due to some valid reason. Due to which STANDARD PRICE in MATERIAL MASTER looks alright (lets say 1000) but in MBEW(field STPRS) it is 10.
I would like use value which is in Material master for calculations in ABAP program. How can i achieve this? Is there any function module for the same so that I can convert value in MBEW-STPRS to value in material master.
Thanks in advance.Hi ,
Try to use the following FM's:
CONVERT_MATPR_TO_MBEW_MTPER
use the BAPI "BAPI_MATERIAL_GET_DETAIL" and take the price from the Export parameter MATERIALVALUATIONDATA. This parameter points to the structure BAPIMATDOBEW which has all the material price details like :
Price control indicator
Moving average price/periodic unit price
Standard price
Price Unit
Currency Key
ISO code currency
Hope this solves your problem.
Thanks,
Greetson -
How to view previous standard price in material master?
Dear expert,
in material master Costing tab 2, i can view the current and future cost estimate price. but i want to view the previous month standard cost estimate price in material master?
For these, is there any configuration setting needed?
Thanks for advanceHi
When you re-release a Std Cost - The Future cost would become the CURRENT cost and the Existing curent cost would become the PREVIOUS cost.... You can then see the Previous cost estimate in material master
br, Ajay M -
Why can't I create a report for standard price by material
Any ideas? All reporting I have tried in SQO1 and even in SE16 returns 0 value for standard prices?
Firstly why is this? and secondly is there another way I can pull a report by material showing standard price?
Points awarded, many thankshi,
In MM60, u can get report for materials having standard & moving average price based on ur input in selection screen like material,plant,material type,material group & created by only. As of my knowledge,
there is no option to get list of materials with standard price in std.SAP.
There are two options to generate report for materials with standard price.
1. It is better go for customization . selection screen must contains price control field. if u enter price control like 'S' or 'V' in intial screen , report is generated.
2. create a ABAP query for this.
I hope this info is helpful to u. -
Standard Price in Material Ledger
Dear Gurus,
On one hand we need to update on finished products (manufactured) a standard cost estimate (CK11N or CK40N) in order to analyse variances on the corresponding production orders (during period en closing with KKS2 transaction), on another hand, because we are implementing material ledger component, we would like to update the standard price of these finished products with the periodic unit price (PUP) with CKME transaction.
The problem is that the system returns an error when we try to release the price with the PUP,
CKPRCH "A current or future standard price exists for material &".
Could you help me ? Thank you very much
ChristopheHi
I suspect standard price can only be saved once for any period. You can make use of the other price fields in the material master to store different prices
Thank You, -
Negativ Standard Price in Material Master Record
My customer (a cement producer) purchase a rohmaterial (bone) and get mony for it, so that the quantity on stock is positiv but the total-value negatic;
--> standard price negativ.
Do somebody have a solution???Hi ,
Try to use the following FM's:
CONVERT_MATPR_TO_MBEW_MTPER
use the BAPI "BAPI_MATERIAL_GET_DETAIL" and take the price from the Export parameter MATERIALVALUATIONDATA. This parameter points to the structure BAPIMATDOBEW which has all the material price details like :
Price control indicator
Moving average price/periodic unit price
Standard price
Price Unit
Currency Key
ISO code currency
Hope this solves your problem.
Thanks,
Greetson -
Changing standard price in Material Master.
Hi Gurus,
Can anyone please tel me in material master Accounting1 view,is there any way to change the standard price field immediately,once its created?When I go in change mode the standard price field is disabled.
Thank you all in advance.
T6Hi,
Use MR21 Tcode and change the moving average price if u have a stock means no problem bcaz in the OBYC T code Cost (price) differences- PRD u have to give the G/L account and that value goes to that account. System Does not allow to change the price in MM02 Transaction. U must do it in MR21 only.
Regards,
Venkatesh
MM consultant -
Want to update Moving or Standard price from material master to ***.Value ?
Hai Experts,
As per Subcontract Logic, 1.1 % of the standard price should be update in J1ID Asseable value..
so I need to update Standard price value should be automatically update in Assesable value whenever it price changes..
Kindly guide meHi,
I think its not possible to shiftf from th MAp to J1Id assessable value.
Need to maintina in the field place of J1ID.
Regards,
Andra -
Standard price in Material master
Hello,
in the Table MBEW und Field STPRS ther is the actual standard preis.
We actualise (change) the preis every Friday. It means we have another price on saturday
How can I see the Preis from wednesday on saturday. It's there any table for change history where i can get the last price.
ThanksHI,
try following
[http://help.sap.com/saphelp_erp60_sp/helpdata/en/b3/7e6da267a4cd47bbba47d3536adeeb/content.htm]
Regards
Kailas Ugale -
Standard price comes from material master
Dear All
How to get Material master standard price into purchase order instead of Purchase Info record.without creation P.R
best regrads
R.THi,
That can be possible.. Pl go throgh the below process..
IMG- MM- Purchasing - Conditions- Define price determination process-
Define condition type- Select ur condition type(PBXX or PB00)- In condition there is option "Cond.Category" here put T or S.
Then create PO system automaticaly pick ur MAV or standard price from Material master.
Arun -
How to set material standard price to zero
Hi,
I am facing a problem relating to standard price of material. The material price control indicator is S. The standard price of that material is 300/-. I need to change 300/- to zero. How can i do that?
Pl. advise. I will assign the points for the answer.
ByeIs this a purchased part?
does the material have a cost estimate?
The price control is "S" ?? -
Material Moving Price and Standard Price
Hello All,
what could be the reason for having both the Moving Av.Price and Standard price in Material Master of FERT?
Can anyone explain me the business case
Thanks
Arshad
Edited by: arshad ahmed on Apr 21, 2009 8:35 AMhi
Standard price for FERT, it is assumed that the FERT material is in_house produced and is subject to costing, that is price will be subjected to changes due to reasons which are internal. for example Inhouse cost run, manual change or costing during confirmation. This price becomes the basis for sales of teh product, where we further add other expenses like transport/insurance/ handling or any other cost before sellling it.
Moving Avg price means that the material is subject to price Variations due to Procurement or trading activity as it is a Finished material. If only activity would have been Trading then might be HAWA could have been the solution, since Procurement is involved the Moving Price indicator is there for weighted avg price updation of the material.
Best regards -
How can i update material master standard price.
Hi Everyone,
i would like to know if there is any way i can update my MM Std Price everytime i make any purchase.
I.e i have std price 40, but next time when i make PO and update Inforec for 70 so i want this 70 also take effect in my material master. Is any expert can tell me about this functionality or any alternate. would be great help
AliIf you are using std prices then these do not vary unless someone is manually changing them (or using a program to do this). That is the main point of std prices, they do not change unless you change them yourself.
MAP and standard prices are used in material master and it has nothing to do with price with which you will sell your customer.
MAP and Standard prices will just hit you inventory account and COGS account once you will do PGI.
I am assuming that you are talking about the price at which you sell to your customer.The easy way of tracking changing prices is that you can make them manual conditions and based on your information you can put them manually in your sales order.
It is not recommended to change standard price constantly. At this period end, modify the standard price in material Master & continue.
This can be a regulr activity at period ends, say every month end or quater end or half yearly or yearly. In general it is prctices on yearly basis, but as per the requirement you can consider the period.
Just go throught the links given below
http://www.sap-img.com/materials/purchasing-tips.htm
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMIVMVAL/MMIVMVAL.pdf
Primarily, You cannot maintain both Standard Price & MAP. You can maintain only one of it.
It is recommended that standard price should not be changed at randomly, but as a policy, if required, it should be changed at period end, say monthly, quaterly, Half-yearly or yearly.
You can also check out transaction CK40N
reward points if it helps
regards
Biju -
Report on Standard Prices & Moving Average Prices
Hi,
Would like to have a report on List of Materials with Standard Price & Moving Average Price per plant?
Though we use Standard Price, since material master also gets updated with Moving average Price.
Regards,
VengatHi,
Try MM60 tcode, see if it is suitable to you.
It shows you both (average / standard price)
Best Regards,
Natan
Maybe you are looking for
-
A/c Determination for special stock
Dear Only we are receiving the QUANTITY but no financial document we nee it only material qty are enter check the path 1:First we create sales order 2:Transaction code MB1C with M/T 501 (E) we received the stock (ONLY MATERIAL QTY NO FINANCIAL DOCUME
-
Resultset in the same order as saved in the database
Hi Folks! I'm having some trouble with an old development, because for some really strange reason, the same select statement i'm getting the same records but in different order from time to time randomly. For example in day 1 i can get: 1 Text1 2 Tex
-
Since upgrading to iTunes 9.1.0.74 a couple of days ago, the com.apple.IE.client.exe process, which starts during the Calendars phase of a Mobile Me manual sync process, fails to shut down when the sync process is complete. The Calendars phase now ru
-
Dear all, i am trying to integrate active directory i am getting LDAP connection error LDAP Connection Error javax.naming.AuthenticationException [Root exception is com.tarantella.tta.webservices.TTAException] and cannot proceed. i selected on the pr
-
Can i use onload event in XSLT
Hi all, I am working on xml and xslt. After the xslt tranfermation i wants to call a function defined in javascript. I just wants to use onload event but its i dont have idea how to call an onload event. thnx, raj