Standard Price Update fo WBS Element

Hi SAP Community,
For a free stock material I can update the standard price by transaction code CK11N and mark/release by CK24;
For a sales order stock material I can update the standard price by transaction code VA02;
But how can I update a standard price for a WBS element stock material??
Thanks & Regards,
Daniel.

Hi,
If your order in Based on the Sales Oder they you can carryout easy cost planning for sales order
why do u want to standard price to be updated to WBS element
Need some more clarity on your question
let me know your process. what is the strategy you are using.
Regards,
Raj

Similar Messages

  • Standard network assigning various WBS Elements

    Hi,
    I am using Standard network and Stand WBS Element for creating actual project.
    There are Std WBS Elements, using the same Standard network. As i know, we can assign Std WBS Element in Std network. How can i make it using same std network for various Std wbs element to create actual project as Std network is same for most of the WBS Elements.
    I donot want to copy Std network for actual project once we create copying Std Project in CJ20N.
    Regards
    N.Raju

    create more standard wbs - there is no other way

  • Return Order Credit Memo updation in WBS element

    Hi,
    I have an issue on the automatic updation of return order for WBS element, once the sales order is been assigned to the wbs and billing is done payment also made by the customer and wen the customer sends the return order stating that in those goods he wont require some goods than in sales cycle credit memo is done for the payment return to customer but is there any place where the wbs gets updated for the revenues deduction of the payment given back to customer where its has to be deducted................how to do this
    Kindly help me doing this.
    Thanks and Regards
    Praveen B M

    Hello,
    Thanks for you reply and i just want to know that.
    If we assign the return order to the WBS element, the credit memo automatically has the WBS element assigned to it or do we have to manually assign the credit memo to a WBS element? if yes how?
    Thanks and Regards
    Praveen B M

  • SRM PO Update with WBS Element

    Hello,
    I have a requirement for a report in SRM which should update the account assignment in SRM-PO with the new WBS Element / Fund. Now, I am little new to SRM programming. Could some one give me detailed steps as to what FMs do I need to use and how do I go about updating the PO in SRM?
    Thanks,
    Venkata Phani Prasad K

    Closing thread.

  • Manual Standard Price updation

    Hi All,
    One of my client having 8 plants and have more than 1000 FG materials. We are not doing costing run. I have to update manually the standard price for all the FG materials for all the plants. How I can do the above updation in one screen.
    thanks
    Vinu

    HI,
    don't know why the s-price is not changed in your system but maybe the reason is the validity date of the future price.
    example: the validity date of the future price is 10.04.09. So you cannot release the price on 09.04.09 but only on 10.04.09 or a day after 10.04.09.
    BR Christian

  • Material Standard Price update.

    I've been trying to update a material standard price via BAPI_MATERIAL_SAVEDATA or MY_MATERIAL_PRICE_UPDATE, with no success.
    I've followed the example code give in the thread /message/9187089#9187089 [original link is broken].
    Has anyone gotten this to work?

    Sure.
    Costing Type (OKKI) : 01 Standard Cost estimate (material), in this Price update: Standard price & Valuation View: Legal valuation.
    Valuation variant components:
    001: Planned valuation Materials: priority 1. Price frm purchasing info records, 2. Valuation price according to price control in material master 3.Valuation price with user Exit.
    007: Production Order Actual: priority 1. Valuation price according to price control in material master.
    Edited by: KMadhumati on Aug 12, 2009 9:44 AM

  • Profit Center not updating for WBS Element

    Hello Gurus,
    We have a scenario in which we have level 1 WBS element to which their is no cost and revenue. Now we have level 2 WBS element which is billing element to which we are posted some actula cost and revenue. Below this we are creating level 3 , 4 WBS elements and posting some actual cost to it  (not billing elements).
    So we are running RA and Settlement for this billing WBS.
    Now if over project is over so we are assigning TECO to this Level 2 billing WBS. When we are running POC then it is 100 %. But when we are running settlement then it is showing error as Maintain Settlement Rule for XXX WBS element (level3 , level 4)
    As we are not maintaining any settlement rule for level 3 , level 4. We are only assigning settlement rule for Level 2 (billing) to PSG.
    So how to solve this issue ?
    Regards
    Keshav

    Hi,
    The answer is there in your query itself. You say that you are booking some actual costs on the WBS elements on level 3. Since you are incurring costs on these WBS elements these costs need to be settled to some receiver. Either the WBS on level 2, which is a billing element or to some PSG. Since there is no settlement rule defined for these WBS elements at level 3 system is throwing this error.
    Maintain a proper settlement rule for the WBS elements in question and then run the settlement. It should work.
    Regards,
    Gokul

  • Mat standard price update in Mafg and DC plant at single runof CK11N

    HI,
    we have two plants US01 as Manfg and US02 as DC and we have same mat A in both the plants.
    If i do cost estimate in us01 and again in US02 and release CK24 then mat in both the plants are getting updated with following config.
    Will it be possible to update the stand price in both the plants at single  CK11N run without running in two plants seperatly.
    Special proc can be defined by PP guys or you can also define as below
    1. Go to OMD9
    2. Click on New entries: Enter your Plant = Plant 2 (receiver plant) "SP Pr Type" = Z1 and Proc Type = F;
    3. Under Special Procurement Secrion
    Enter U as special procurement and Plant 1 in the Plant Field (Transferring plant)
    4. Save this entry, and in Mat Master of Plant 2, specify F as Proc Type and Z1 as Special proc key
    5. Run CK11N in Plant 2... and release from CK24
    Thanks,
    sudha

    Dear Sudha,
    Special procurement is configured when there is a stock transfer from one plan to another plant. By this way there will be no new cost estimate in the receiving plant.
    Below document explains in details on the topic:
    http://www.sap-topjobs.com/SpecialPP/overviewdoc.pdf
    We also have transfer control configuration to avoid unnecessary costing estimates for already costed materials to get it transferred to the new material cost estimate when we have same components.
    Kind Regards
    Umapathi G

  • Updating WBS element in a sales order

    There is application in Project System (PS) module where I am creating the Project using bapi BAPI_PROJECT_MANTAIN and then uploading the budget for the same using bapi KBPP_EXTERN_UPDATE_CO. After this when I am trying to update the sales order to update its WBS element using bapi BAPI_SALESORDER_CHANGE it’s going into short dump. Dump description as follows :
    Category               ABAP Programming Error
    Runtime Errors         MESSAGE_TYPE_X
    ABAP Program           SAPLBPFC
    Application Component  FI-FM
    Date and Time          17.07.2014 15:11:07
    Short text of error message:
    System error in : LBPFCFE2 Table:   Report:   Routine: DETERMINE_OBJ_ENQ
    _MODE
    Long text of error message:
    Diagnosis
         An internal error has occurred.
    System Response
         Processing will be discontinued.
    Procedure
         Contact your system manager.
    Technical information about the message:
    Message class....... "BP"
    Number.............. 005
    Variable 1.......... "LBPFCFE2"
    Variable 2.......... " "
    Variable 3.......... " "
    Variable 4.......... "DETERMINE_OBJ_ENQ_MODE"
    Whereas when I am running the bapi BAPI_SALESORDER_CHANGE standalone using se37 with same test data its updating sales order properly.
    After debugging the standard bapi I have found out that there is a subroutine determine_obj_enq_mode which is setting the variable u_enq_mode.In our case this variable is blank that’s y its going into dump.I tried hardcoding this variable to 2 then it updates the bapi properly.So will you suggest for the enhancement where we can hardcode this variable or is there any other solution you will suggest.
    Thank you

    There is application in Project System (PS) module where I am creating the Project using bapi BAPI_PROJECT_MANTAIN and then uploading the budget for the same using bapi KBPP_EXTERN_UPDATE_CO. After this when I am trying to update the sales order to update its WBS element using bapi BAPI_SALESORDER_CHANGE it’s going into short dump. Dump description as follows :
    Category               ABAP Programming Error
    Runtime Errors         MESSAGE_TYPE_X
    ABAP Program           SAPLBPFC
    Application Component  FI-FM
    Date and Time          17.07.2014 15:11:07
    Short text of error message:
    System error in : LBPFCFE2 Table:   Report:   Routine: DETERMINE_OBJ_ENQ
    _MODE
    Long text of error message:
    Diagnosis
         An internal error has occurred.
    System Response
         Processing will be discontinued.
    Procedure
         Contact your system manager.
    Technical information about the message:
    Message class....... "BP"
    Number.............. 005
    Variable 1.......... "LBPFCFE2"
    Variable 2.......... " "
    Variable 3.......... " "
    Variable 4.......... "DETERMINE_OBJ_ENQ_MODE"
    Whereas when I am running the bapi BAPI_SALESORDER_CHANGE standalone using se37 with same test data its updating sales order properly.
    After debugging the standard bapi I have found out that there is a subroutine determine_obj_enq_mode which is setting the variable u_enq_mode.In our case this variable is blank that’s y its going into dump.I tried hardcoding this variable to 2 then it updates the bapi properly.So will you suggest for the enhancement where we can hardcode this variable or is there any other solution you will suggest.
    Thank you

  • How to update WBS Element in already posted FI documents

    Hi All,
    I would like the procedure to update the WBS element in already posted Finance documents. We have Fund center is also activated in our system.
    Kindly suggest the procedure for the same please.
    Thanks and Regards,
    Sarvendra Negi

    Hello,
    All PS_PSP_PNR fields, as COBL-PS_POSID are dependent on the
    project settlement. By posting a document you can enter the fields
    independent of the fact, whether the project settlement is active or
    not. Only the field status is crucial. As soon as such a document is
    changed, the activity of the project settlement is relevant.
    If it's active, these fields must not be changed in general.
    Otherwise you would get a inconsistency between FI and CO, because
    there is no interface updating the project settlement tables
    In this case TBAER (transaction OB32) does not play a role anyway.
    But if the project settlement is not active, the fields can be filled
    informatively by posting the document. And thus there must be a
    chance in FB02 to change them again. Therefore the settings of TBAER
    are crucial and TCOBX must not be changed like in note 966428.
    Furthermore the entries of TCOBX are used in the coding for different
    queries. So it would be very critical to change these entries.
    The only solution can be, that you adapt TBAER accordingly. In the
    standard it is not possible.
    BR,
    Raquel

  • How to create and use templete or standard network / activity and wbs

    dear
    i have define the structure for my project which have WBS elements, network and activties. the strucutre is same for all the projects that i define.
    i wanna know whether to use templete or standard wbs network and activities as templete for the project.
    for a network there are almost 150 activties across 10 wbs elements i want this structure as a templete what can i do create it.
    Further, how can i use LSMW to create relationship for ativities?
    regards
    saqib usman

    I have create std wbs level 1 5 wbs further i create std nwrk and activities and assignMENT are as follows
    h1.*Create std wbs from CJ91 *
    STD DEFINITION IS
    E00-BSS-CO-BTS-0000              STANDARD BTS
    LEVEL 1 WBS ELEMENTS
    E00.BSS.CO.BTS.0000.RFP     RADIO FREQUENCY PLANNING
    E00.BSS.CO.BTS.0000.SA     SITE ACQUISITION
    E00.BSS.CO.BTS.0000.TXN     TRANSMISSION
    E00.BSS.CO.BTS.0000.CW     CIVIL WORKS
    E00.BSS.CO.BTS.0000.PMO     PMO
    RELEASE THE STD PROJECT OPTIONAL BY EDIT > STATUS > RELEASE
    h1.CREATE STD NETWORK FORM "CN01" tcode
    NEWORK HEADER WITH FOLLOWING SETTING
    9000000    STD NETWORK CORPORATE BTS 0001
    Network usage     UNIVERSAL
    Planner group   1      1
    Network status     RELEASE (GENERAL)
    Std.WBS element     E00.BSS.CO.BTS.0000.BSS
    Predefined plnt      CO01
    press activity overview button or (shiFt+F7)
    I ASSIGN ACTIVITY TO STD WBS ELEMENTS
    ACTIVITY    OPR. SHORT DESC  STD WBS ELEMENT
    A01            ZERO VERIFICATION   E00.BSS.CO.BTS.0000.RFP
    A02            DESIGN DOCUMENT   E00.BSS.CO.BTS.0000.RFP
    B01            SITE SURVEY 1          E00.BSS.CO.BTS.0000.SA
    B02            SITE SURVEY 2          E00.BSS.CO.BTS.0000.SA
    C01            CIR Doc Input              E00.BSS.CO.BTS.0000.CW
    C02            CIR CW Input by RM    E00.BSS.CO.BTS.0000.CW
    D01            CIR Doc Input              E00.BSS.CO.BTS.0000.TXN
    D02            CIR TXN Input by RM    E00.BSS.CO.BTS.0000.TXN
    E01            Rollout Month               E00.BSS.CO.BTS.0000.PMO
    E02            ON Air Date                 E00.BSS.CO.BTS.0000.PMO
    h1.PREREQUISITE FOR ASSIGNMENT OF STD NETWORK and WBS are:
    PROCESS TRANSACTION "CJ20N" TO INCLUDE STD NETWORK ALONG WITH ASSIGNED ACTIVITIES AND STD WBS.
    FURTHER, I WANT TO COPY STD NTWORK SEVERAL TIMES with different network number. EACH TIME I COPY STD NWK TO OPERATIVE STRUCTURE THE SYSTEM SHOULD PROMPT NEW NUMBER FOR NETWORK AND ALSO PROMPT TO ENER ASSIGNED STD WBS ELEMENTS WITH REPLACE OPTION for operative WBS NUMBER.
    STANDARD WBS                                               OPERATIVE WBS
    E00.BSS.CO.BTS.0000.RFP     REPLACE BY     E00.BSS.CO.BTS.0003.RFP
    E00.BSS.CO.BTS.0000.SA     REPLACE BY     E00.BSS.CO.BTS.0003.SA
    E00.BSS.CO.BTS.0000.TXN     REPLACE BY     E00.BSS.CO.BTS.0003.TXN
    E00.BSS.CO.BTS.0000.CW     REPLACE BY     E00.BSS.CO.BTS.0003.CW
    E00.BSS.CO.BTS.0000.PMO     REPLACE BY     E00.BSS.CO.BTS.0003.PMO
    IN MY OPERATIVE STRUCTURE
    I HAVE TWO LEVEL FOR WBS I.E.:
    E00.C0.BSS            LEVEL 1
         E00.BSS.CO.BTS.0001    LEVEL 2    ASSIGNED NWK  0001 WITH ACTIVITIES AND WBS
         E00.BSS.CO.BTS.0002    LEVEL 2    ASSIGNED NWK  0001 WITH ACTIVITIES AND WBS
         E00.BSS.CO.BTS.0003    LEVEL 2    WHERE I WANT TO ASSIGN STD NWK AND WBS
                                                                  (I HAVE CREATED EXTERNAL NUMBER FOR NETWORK)
    I GO TO THE TEMPLETE AREA AND CLICK ON STD NETWORK BUTTON AND DRAG STD NETWORK 09000001-1 TO E00.BSS.CO.BTS.0003. ENTER NAME FOR NETWORK "BTS 0003". SYSTEM PROMPT TO ENTER EXTERNAL NETWORK NUMBER I.E.
    Enter network number
    WBS elem:E00.BSS.CO.BTS.0003
    Copy from network:
    E00-BTS-0003
    h1.CLICK CONTINUE BUTTON  NOW REAL PROBLUM COMES A DIALOG BOX APPEARS
    Include standard network
    You want to include a standard network that has assignments to standard WBS elements. However, the selected WBS element does not correspond to the standard WBS element.
                   Copy Assignment                            Ignore Assignment
    In case, if i select button Copy assignment or select Ignore Assignment then:
    New network created E00-BTS-0003 under WBS     E00.BSS.CO.BTS.0003 with all assigned activitites but no WBS elements i.e.
    STANDARD WBS                                               OPERATIVE WBS
    E00.BSS.CO.BTS.0000.RFP     REPLACE BY     E00.BSS.CO.BTS.0003.RFP
    E00.BSS.CO.BTS.0000.SA     REPLACE BY     E00.BSS.CO.BTS.0003.SA
    E00.BSS.CO.BTS.0000.TXN     REPLACE BY     E00.BSS.CO.BTS.0003.TXN
    E00.BSS.CO.BTS.0000.CW     REPLACE BY     E00.BSS.CO.BTS.0003.CW
    E00.BSS.CO.BTS.0000.PMO     REPLACE BY     E00.BSS.CO.BTS.0003.PMO
    After all my finding i am not able to bring activity assigned WBS elements. Kindly help and provide information to resolve the problum.

  • RFC function to get the WBS Element formatted string

    Hi,
    Is there an RFC function I could use which would do what the CONVERSION_EXIT_ABPSN_OUTPUT does?
    We are using Project IDOC to replicate WBS element in our procurement system. The IDOC only provides the unformatted version of the WBS Element id.
    Thanks
    Michael

    hi michael,
    I believe BAPI_PROJECT_MAINTAIN is the bapi you are looking for ..
    also you could refer the thread below for sample code of the same
    [LINK|Update WBS element;
    This bapi will help you update the WBS element ..
    you could also refer the following wiki
    http://wiki.sdn.sap.com/wiki/display/PLM/HowtouseBAPIinProjectSystem+Module
    Best regards
    Manthan.

  • WBS element updation through MASS transaction

    Hi,
    I am trying to update WBS element in Sales order - Item data (Account Assigmanent Tab) using MASS transactiomn, After executing MASS transaction it is updating the same.
    Can any one help in this??
    Regards,
    Srikanth

    Hi Mr.Srikky,
    I am not sure but try to do the following things
    1) Change the WBS manually and save the order, see whether the system allow you to save the order or not.
    2) If 1st point is ok then might be you are not executing the MASS correctly, Try MASS for any other feild like payment term.
    Please dont mind, I am just looking for possibilities.
    Please also cross check the MRP details of your materials.
    Regards,
    MT

  • Issue in Update Standard Price using BAPI_M_REVAL_CREATE PRICE CHANGE

    Hi folks,
    I was using BAPI_M_REVAL_CREATE PRICE CHANGE   to update standard price, but this BAPI is not working for me..
    Can anyone give me an example to run it?
    My code is like this:
            t_comp_code                              = t_thold_final-bukrs .
            t_material_price_list-plant             = t_final-werks.
            t_material_price_list-material         = t_final-matnr.
            t_material_price_list-val_type         = t_final-bwtar.
            t_material_price_list-change_std_price = t_final-stprs.
            APPEND t_material_price_list.
            CLEAR  t_material_price_list.
          CALL FUNCTION 'BAPI_M_REVAL_CREATEPRICECHANGE'
            EXPORTING
              comp_code           = t_comp_code
              pstng_date           = sy-datum
            IMPORTING
              ml_doc_num          = w_mblnr
            TABLES
              material_price_list = t_material_price_list
              return                   = t_return1.
    Please help as after runing this there no error in return and no material document no created.
    thanks,
    varun
    Edited by: Varun Gupta on Jun 12, 2009 4:06 PM
    Edited by: Varun Gupta on Jun 12, 2009 4:08 PM

    No idea
    no error in return and no material document no created
    just try debugging it

  • WBS element is updated while settling cost from WBS to AUC

    Hi Experts
    At the time of settlement , when we settling the cost from WBS to AUC , WBS element is updated in AUC line item of accounting document , but it should not be updated actually.
    As result AUC cost is loaded on WBS and budget of WBS is get affected , furthermore system is not allowing for MIGO even budget is available but in CJ30 it is showing assigned value is more then original budget.
    Please suggest.
    Thanks & Regards
    shailesh

    Hi Saurabh ,
    I totally agree with you , but in our case system is not allowing(Error Message: Budget Exceeded) MIGO against capex PO - > WBS.
    Note : in our case , system is checking budget at the time of MIGO also.
    in our case , report  S_ALR_87013558 is showing wrong actual value and  also in CJ30 , total assigned value is larger then total distributable budget , As result our available budget gets negative figure in report S_ALR_87013558 , even i have already run CJEN->CJBN 2 or 3 times.
    Note: Our Commitment value is correct.
    Actually , according to report S_ALR_87013542 , system is showing correct actual value , that means we have sufficient available budget for further MIGO's
    Now may be , due to WBS element is updated in AUC line item of accouning document of settlement (WBS to AUC) , system loads AUC values to WBS unnecessarily , our available budget gets negative figure.
    For your reference , i am attaching screen shot of accounting document which is generated at the time of settlement from WBS to AUC.