Steps for Creating Process chain!

Hi All,
I want to create process chain which can schedule IP and run the concern job to fill infocubes/ODS?Can someone please guide me stepwise how to proceed.Some sort of doc will eb appreciated.

Hi,
   You can either create a process chain directly in the process chain maintenance screen, or by using a maintenance dialog for a process
Creating a Process Chain Directly in the Process Chain Maintenance Screen
In the BW Administrator Workbench
  1.      Choose the  Process Chain Maintenance icon from the AWB toolbar.
  2.      Choose Create.
  3.      Enter the technical name and a description of the chain, and confirm your entry.
   4.      Create a variant for a start process.
       On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
       If you choose to schedule the chain directly, enter the start date value for a chain under Change Selections and save your entries.
       Save your entries, go back to the previous screen and confirm your entries in the Add Start Process dialog box.
The  Plan View of the process chain maintenance screen appears.
In the left-hand area of the screen, a navigation area is displayed. In the right-hand area of the screen, the process chain is displayed.
       5.      Use Drag&Drop or double-click to add the relevant processes to your process chain.
Choose  Process Types to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate  InfoSources and  Data Targets navigation trees.
               If you insert a process into the chain that is linked to additional processes by default, the respective process variants are generated and automatically inserted into the process chain. These variants are suggestions and can be changed, replaced or removed from the chain as required. Variant maintenance is called when the change run performs automatic insert.
a.       On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
b.       If you choose to schedule the chain directly, enter the start date value for the chain under Change Selections and save your entries.
The Maintain Start Process screen appears again.
c.       Save your entries, go back to the previous screen and confirm your entries in the Add Start Process dialog box.
The  Plan View of the process chain maintenance screen appears.
               The various process categories, the application processes, and collection processes are displayed in the left-hand area of the screen. In the right-hand area of the screen, the process chain is displayed.
                  If the process that you used to create a chain is linked to additional processes by default, the respective process variants are generated and inserted into the process chain automatically. These variants are suggestions and can be changed, replaced or removed from the chain as required. Variant maintenance is called when the change run performs automatic insert.
                  Choose  Process Types to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate  InfoSources and   Data Targets navigation trees.
        When you add a process, you need to select a process variant or create a new variant. For collection processes, the system uniquely determines the variants.
        Various functions for editing the process are available from the context menu
Maintain variants  With the exception of the variants in the collection processes OR and EXOR, you can use this function to change all process variants.
Exchange variants
You can exchange the variants for an existing variant or a variant that is to be created.
    You can use this function to link a process to a successor process. You can choose from the processes that are not yet linked to the current process. They are grouped according to process type in submenus.
      Display scheduled jobs
Once the process chain is active, you can use this function to display the jobs that have been scheduled.
       After at least one process chain run, you can display all of the scheduled jobs for a specific process and all of the jobs with which this process was run. The Job Overview appears and you can call the relevant job log.
Create message
    You can also send messages to an application process of the chain, depending on the success or failure of the process.
1.       To do this, using the context menu for a process, create another process variant of type Send Message.
2.       If you maintain a message, first specify whether you want the message to be sent when the process has been completed successfully or unsuccessfully. Then choose Next.
3.       A dialog box appears, in which you can select an existing process variant or create a new one.
4.       If you create a new process variant, edit the document that is going to be sent and maintain a list of recipients.
5.       Save your process variant and go back.
The message process variant is now assigned to your application process. When the message is sent, the status information and the process log are also sent.
Only use this function to debug a process run.
Specify how long (in seconds) you want the delay to be between one event being triggered and the next process starting.
You can capture the process in the debugger by using transaction SM37 (Job Overview) or SM50 (Process Overview).
Remove process
You use this function to remove a process from a process chain.
Manage data target
You use this function to call the data target administration for the following types of process variants:
         Construct index
         Delete index
         Construct database statistics
         Roll up filled aggregates
         Compress InfoCube
         Activate DataStore object data
       7.      Hold down the left mouse button to connect the processes with events.
Before you do this, select the process underneath the process type row, and position the cursor over the required process. When you select the process type row, the whole process is moved into the plan view.
From the context menu of a link, you can display the event or remove the link. To do this, select the link and right-click with the mouse.
       8.      If necessary, specify whether you want the event to be triggered after the previous process has been completed successfully or unsuccessfully, or whether you want the event to be triggered independently of the outcome of the process that precedes it. If the process that triggers the event has more than one option, choose the option after which the successor process is to be run
       9.      Assign a display component to the process chain using Attributes
     10.      Maintain additional process chain attributes if necessary.
     11.      Check your process chain in the  Check View and make any necessary corrections.
The  Legend explains the meaning of the different colors used to display the processes and links.
From the context menu for a process, you can display the messages resulting from the check.
During the check, the system calculates the number of parallel processes according to the structure of the chain . The result is compared with the number of background processes on the chosen server (or the total of all available servers if no server is specified in the attributes of the process chain). If the number of parallel processes is greater than the number of available background processes, the system highlights every level of the process chain where the number of processes is too high. The system produces a warning for these levels.
   12.      Save your process chain if it does not contain any errors.
You can activate and schedule your process chain. After scheduling, the chain starts in accordance with the start process selections. For example, if you scheduled the start process directly and chose Immediately as the start date value, the chain run starts immediately after scheduling.  In the  Log View, you can display the reports for the chain runs.
If ie helps assign points

Similar Messages

  • Steps to create Process Chain in  Version 2004S SAP NetWeaver

    Hi,
    I have created a process chain in 3.5 version.Now i want to create a process chain in 2004s version.so what should be the steps to create this process chain.

    Hi
    1. Goto RSPC
    2.By using create icon create process chain.
    3.Now it will ask for process variant. Either assign already made or create new on.
    4. Now save it.
    5.Refresh the tree and u will find ur Procees chain in the list.
    Hope it helps, if so then assign points.
    Vinod.

  • Steps to create process chain please

    Hi Friends,
    I never worked on proess chain, can any one please tell the step i have to follow to create Process Chain.
    Thank
    Mark

    Mark,
    Check the following
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b0afcd90-0201-0010-b297-9184845346ca
    http://help.sap.com/saphelp_nw04s/helpdata/en/3d/320e3d89195c59e10000000a114084/frameset.htm
    BWQ

  • Can you please provide the solution for creating process chain..

    Hi Experts,
    i need to work on this process chain PC_UN_HR_SAP_PM_TD01, i need to add one more step before DSO load that means delete existing data from DSO
    please let u know as soon as possible.

    Hi Kavya,
    Here you can use proces type: 'Complete deletion of data target content' from Data target administration node.
    Here in this process type you need to specify the target of which data to be deleted.
    PFB links which specify the creation of Process Chains. You 'll get enough idea from these to modify the existing process chain.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/101bed70-f13d-2e10-e7ad-d5c9dabf4485?overridelayout=true
    http://scn.sap.com/people/juergen.noe/blog/2008/01/11/process-chain-creation--step-by-step
    Hope this 'll help you to get desired result,
    Thanks & Regards,
    Pradip

  • How to create process chains, infopackage groups & Meta chains

    Hi,
    can anyone explain me about process chains,infopackage groups & Meta chains.
    if possible give me examples for each.
    Thanks & Regards,
    cheta

    <b>Metachain</b>
    Steps for Metachain :
    1. Start ( In this variant set ur schedule times for this metachain )
    2.Local Process Chain 1 ( Say its a master data process chain - Get into the start variant of this chain ( Sub chain - like any other chain ) and check the second radio button " Start using metachain or API " )
    3.Local Process Chain 2 ( Say its a transaction data process chain do the same as in step 2 )
    Steps for <b>Process Chains</b> in BI 7.0 for a Cube.
    1. Start
    2. Execute Infopackage
    3. Delete Indexes for Cube
    4.Execute DTP
    5. Create Indexes for Cube
    For DSO
    1. Start
    2. Execute Infopackage
    3. Execute DTP
    5. Activate DSO
    For an IO
    1. Start
    2.Execute infopackage
    3.Execute DTP
    4.Attribute Change Run
    Data to Cube thru a DSO
    1. Start
    2. Execute Infopackage ( loads till psa )
    3.Execute DTP ( to load DSO frm PSA )
    4.Activate DSO
    5.Further Processing
    6.Delete Indexes for Cube
    7.Execute DTP ( to load Cube frm DSO )
    8.Create Indexes for Cube
    3.X
    Master loading ( Attr, Text, Hierarchies )
    Steps :
    1.Start
    2. Execute Infopackage ( say if you are loading 2 IO's just have them all parallel )
    3.You might want to load in seq - Attributes - Texts - Hierarchies
    4.And ( Connecting all Infopackages )
    5.Attribute Change Run ( add all relevant IO's ).
    Start
    Infopackge1A(Attr)|Infopackge2A(Attr)
    Infopackge1B(Txts)|Infopackge2B(Txts)
    /_____________________|
    Infopackge1C(Txts)______|
    \_____________________|
    \___________________|
    __\___________________|
    ___\__________________|
    ______ And Processer_ ( Connect Infopackge1C & Infopackge2B )
    __________|__________
    Attribute Change Run ( Add Infobject 1 & Infoobject 2 to this variant )
    1. Start
    2. Delete Indexes for Cube
    3. Execute Infopackage
    4.Create Indexes for Cube
    For DSO
    1. Start
    2. Execute Infopackage
    3. Activate DSO
    For an IO
    1.Start
    2.Execute infopackage
    3.Attribute Change Run
    Data to Cube thru a DSO
    1. Start
    2. Execute Infopackage
    3.Activate DSO
    5.Further Processing
    6.Delete Indexes for Cube
    7.Execute Infopackage
    8.Create Indexes for Cube

  • Help needed in creating process chains

    hi friends...
    iam unable to work on process chains..
    can anyone plz give me detail description on creating process chains and working on them.....

    Hi,
    check this forum
    Re: Steps for the process chain creation]
    regards
    babu

  • How to create process chain for 0EMPLOYEE

    I want to create process chain for 0EMPLOYEE attribution and text, how to create it and make a schedule for daily loading? Could anyone write steps in my case? Thanks!

    Hi,
    Follow the following steps:
    1. Go to RSPC->create->give name and disc of your chain.
    Start Variant Creation
    2.  Now you will be prompted to give a start variant,create a  new variant(click on page icon )
    3.Change Selections->date/ time.
    4.give date and time for start of the chain.
    5.click the check box for periodic job->period values->daily->save->save
    Addition of process types
    6.Select the process type "Execute Infopackage"
    7.select the name of the infopackage which loads attr data to 0EMPLOYEE.
    8.Attribute Change run will come automatically( if not then drag it as well and create variant )
    9.select the name of the infopackage which loads text data to 0EMPLOYEE.
    10.Attribute change run wil again follow.
    (connect the process types which are not connected,by right clicking the process types )
                                 start
                           IP A     IP  T
                          attr          attr
    A = attribute
    T = Text
    Please Reward points if useful
    Manish

  • How to create Process chain for Aggregate for Master data

    Hello friends,
    I created Aggregates on Navigational Attributes.
    Now they are working fine, but i need to know that how shall i create the Roll up for Aggregates on Navigational Attributes.
    The point is the master data changes frequently a lot of time for e.g. for 0customer etc.....
    So if any one can send me the step by step documents so as to know how to roll up the Aggregates for Navigation attributes or for aggregates created on Master data....
    How to create process chains for the same ?????????
    Because if master data changes, then rolling up the aggregates straight forward will not help.
    So we need to write a process chain so that it deactivates the aggregate and reactivate again and fill up again..........
    If i mis interpreted something please rectify it.......
    Please advise

    Hello,
    the changerun that you have to schedule in order to activate the master data will adjust the aggregates automatically.  There is no need to deactivate them after master data loads.
    Best regards,
    Ralf

  • Problem in creating process chains for CO

    Hi Friends,
                     I have a CO cube "0OPA_C11" getting data from Three datasources,
    those are 0CO_OM_OPA_6(supports delta), 0CO_OM_OPA_1(full only), 0CO_OM_OPA_2(full only), i have already created process chain to this cube using these three datasources, the chain is like this,
    1. delete indexes
    2.0CO_OM_OPA_6(supports delta
    3.0CO_OM_OPA_1(full only),
    4.0CO_OM_OPA_1(request overlapping)
    5.0CO_OM_OPA_2(full only),
    6.0CO_OM_OPA_2(request overlapping)
    7.create indexes
            Is it right? here the chain is running, after completion of that, in manage of cube, it is showing only the request for 0CO_OM_OPA_2(full only), the request which were there earlier like Init request and new delta request for .0CO_OM_OPA_6, full request for 0CO_OM_OPA_1 are getting deleted, it is showing the request only for 0CO_OM_OPA_2,
      the way how i created the process chain is right or wrong? can anybody give me the solution?
    Thanx in Advance
    BalajiReddy

    Hi Nick,
              Thanx for your reply, everthing is ok what you've asked me to check, i think there is certain scenario to create the process chains for the data targets, which are getting data from multiple datasources, which support delta's as well as full.
              I want that scenario, can you tell me? or can anybody tell me?
    The right points are assigned to the right answers.
    Thanx in advance
    balajireddy

  • How to create process chains for Master Data?

    I need information on " how we can create process Chains for Master Data"

    Hi Sachin,
      http://help.sap.com/saphelp_bw33/helpdata/en/ad/6b023b6069d22ee10000000a11402f/frameset.htm
    and also Modelling aspects in process chains (ppt)
    https://websmp109.sap-ag.de/~sapidb/011000358700002337702003
    Hope this helps.
    Srini

  • How to Create Process Chain for Remote Cube.

    Hi,
              I created Remote info cube, data from ECC, loaded Successfully, I want to create Process Chain for Reomte Cube, Please Help me.
    Thanks,
    Nandish Gowda

    Hi Nandish,
    After initialization, th next delta will come as per your delta nature, if it is 0calday: Then your next delta will come tomorrow only.
    If you are able to 7 records in RSA3, why not in PSA( Why it's only 5 records). Analyze this closely.
    Sometimes, RSA3 exactly doesn't match with PSA because, RSA3 works on update mode F.
    Regards,
    Suman

  • HOW TO CREATE PROCESS CHAIN FOR PSA ARCHIVING

    SDN EXPERTS,
    i like to create process chain for archiving. but i dont see any event for archiving when i go to create a process chain for PSA archiving. please let me know.
    thanks

    Hi,
    In the below document on the 14th page it says it is not possible to archive the master data & PSA.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/f47fec9f-0501-0010-ce84-8a7231715ae6
    As per my understanding..
    But one thing you can do is use another ODS and load the same data that you're loading to something else and try to archive that data(Only if you have transformations in the current CUBE/ODS).
    Correct me if i was wrong and eloborate your requirement.
    Regards, Siva

  • Go about creating Process Chains for BW-HCM Implementation.

    Dear Experts
    We are implementing SAP BW in HCM (HR) module. I am done with Build and would like to create Process Chains.
    I have nearly 150 InfoObjects to load Master Data and 15-20 to load Transaction Data. I understand there are certain main Master Data InfoObjects which need be loaded before others and then the Transaction Data into DSOs and InfoCubes.
    Questions:
    1. Are Hierarchies need to be loaded first of all, if so, can this be done using Process Chain?
    2. Which InfoObjects should be loaded before Transaction Data and is this need to be sorted out irrespective of different Functional Areas such as OM, PA, PY, etc?
    3. Is it documented anywhere, the sequence of loading Objects in SAP BW-HCM Implementation that l can Benchmark my project to?
    Thanks for your time.
    Regards,
    Chandu

    1. Hierarchies can be loaded using the process chain like the other loads..
    2. Its specific to the Application in whcih you are working.. Here its HCM related Master data. So list of the main master data elements which are key so that you can load transaction data loads once after the MD loads are done.
    3. One way to find the kind of characteristics that you are using in HCM. Also you can verify the kind of Navgational attribuites that you are using at DSO or at CUBE level based on that you can list of the respective master data which needs to be loaded prior to the TD loads.. And also you need to cross verify the existing Rotuines which ever is reding the MD.
    For more information you can refer Help.sap.com on HCM application.
    Hope this helps..

  • Process has no predecessor while creating process chains for Inventory

    Hi Experts,
    I have created process chain for Inventory and this inventory cube have compression also.so, i included compression of the infocube after create index.
    Here while i am checking the chain ,am getting the error called :  PROCESS HAS NO PREDECESSOR.
    Please give some inputs,what does it mean and how to solve.
    Thanks
    Lakshmi

    Hi Murali,
    Thanks for your reply.
    You mean to say that i should not include BX-IP,DTP in the list.as we know that this is only one time job.
    But in prodn system with out including BX in the list,how to initialise for the first time.
    So,first time we need to manually run the IP,DTP in prodn system.
    Plz let me know.
    Note:Murali, In the process chains list after create index,i dragged "COMPRESSION OF THE INFOCUBE" and i specified 0IC_C03 CUBE and continued.
    Along with compression of the infocube there is one more box has come into picture i.e SIGMA ADJUST(GENERATED FROM COMPRESSION ZPC_INV_0IC_C03_COMPRESSION) like that its came.
    Do we need to remove that or should i keep it in the list.
    Thanks
    LaxmanNaidu

  • How to create process chains,and how to use process like and or xor

    Hi,
    How to create process chains,and how to use process like and or xor.
    can any one please give me a example in each.
    Thanks,
    cheta.

    Hi Cheta,
    Here is step by step procedure to create process chains
    Process chain is nothing but executing a process ..(or) loading the data any process we can do in background.. that means.. automatically we can execute our process based on Time or any event..
    Creating Process Chains
    Prerequisites
    If you want to include a load process in the process chain, you need to have already created an InfoPackage.
    You cannot load flat file data from a client workstation in the background. For this reason, you have stored your data on an application server.
    Creating Process Chains
    You have the option of creating a process chain in the process chain maintenance screen directly or by using a maintenance dialog for a process:
    Creating a Process Chain Directly in the Process Chain Maintenance Screen
    You are in the BW Administrator Workbench.
    1. Click on the Process Chain Maintenance icon in the AWB toolbar.
    The Process Chain Selection dialog window appears.
    2. Choose Create.
    3. Enter the technical name and a description of the chain, and confirm your entry.
    The Add Start Process dialog window appears.
    4. Create a variant for a start process.
    1. a. On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
    2. b. If you choose to schedule the chain directly, enter the start date value for the chain under Change Selections and save your entries.
    The Maintain Start Process screen appears again.
    3. c. Save your entries, return to the previous screen and confirm your entries in the Add Start Process dialog window.
    You are taken to the Plan View of the process chain maintenance screen.
    In the left-hand area of the screen, a navigation area is displayed. In the right-hand area of the screen, the process chain is displayed.
    5. Use the drag-and-drop function to add the relevant processes into your process chain.
    You use the Process Types function to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate InfoSources and Data Targets navigation trees.
    Hope this helps
    Regards
    Karthik