Stock transfer between Plant/Storage location to Plant/Storage location

Dear Experts,
This is a MM component of SAP Retail.
We have 4 brands ( Plants of type B, Plants of type C etc) that needs inventory from the same Distribution center (Plant A) for some common products. Here the direction is to prioritize the inventory per brand. The requirement is one brand should not take the inventory of the other brand.
To overcome this problem , the solution proposed is to have different storage location for different brands in the same DC.
When we run replenishment  planning for the brands and do a ATP check, the availability check should consider only the one issuing storage location in the DC which we allocated for the brand.
I do see the following set up in SPRO and I have done the following.
Step1: Activate Stock Transfer between Storage Locations
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> u2018Activate Stock transfer between storage locationsu2019
Step2: Assign Delivery Type and checking rule according to storage
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations->Assign Delivery Type and Checking Rule According to Storage
Step3: Define Shipping Data for Stock Transfer between Storage Locations
SPRO ->Material Management ->Purchasing ->Purchase Order ->set up stock transport order ->set up stock transport order between storage locations -> Define Shipping Data for Stock Transfers between Storage Locations

Step4: Define Rule for Determination off Shipping Point
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations -> Set-up Storage-Location u2013dependent shipping point determination->Define rule for determination of shipping point
Step5: Shipping Point Assignment According to Storage Location
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> Set-up Storage-Location u2013dependent shipping point determination-> Assign Shipping Points According to Storage Location
Question.No:1- After completing the above set up  in me21n, the issuing storage location field is greyed out. I am not able to enter any value here. Can you please help.
Question.No:2
I do see the following setting.
Under IMG ---> Material Management ---> Purchasing --> Purchase Order --> Set up Stock Transport Order -->Business Add-In for Determination of Issuing Storage Location
Display the IMPLEMENTATION
Double click on the method GET_SUPPLYING_SL
Click the Execute button
Click the detail button on IF_EX_MD_EXT_SUP
Execute GET_SUPPLYING_SL
There is a prerequisite for this BADI .I have done those things.What i dont understand is where to force the combination of supplying site/issuing stor.loc/receiving site/receiving stor.loc
Kindly provide your inputs.
Thanks,
Vasanthan

Dear,
Have You configure MRP in second plant (where you want to transport the Material).
Please try with this and do again Po for stock transport.
Regards
Piyush Patel

Similar Messages

  • Stock transfer between stor loc. of same plant triggered by Sales Order

    Hello everyone
    I need some input regarding triggerring Stock Transfer between 2 storage locations of the plant from a Sales Order.
    Sales Org: ABCD
    Plant: WXYZ
    Stor Location: 0001 & 0002
    Now here 0001 is the Picking location for the Delivery Document.
    However 0002 is where all the stock is stacked.
    Physically they both are different buildings in the same vicinity.
    The Business wants the Sales Order to trigger the stock movement from 0002 to 0001 on a daily basis.
    So from a end user prospective, they will move the stock from 0002 to 0001 for all the items needed to fulfill the Orders due for Shipment for that day.
    What options do I have for this ?
    Thanks
    Vin

    Well actually the Selling Org ABCD is of a different Company code .. it is a typical case of Intercompany Sales .. where the Plant WXYZ is belonging to another company code.
    I have setup the Intercompany Sales Process .. and want to trigger the Stock movement as mentioned above.
    I have configured the STO for storage location - stor. location in a Plant. ...
    However I am struggling to trigger a STO from a Sales Order.
    I tried using the Schedule Lines to trigger a Pur. Req ... however the Supplying Plant field remains blank (which is the same in this case as it is a stock movement between 2 locations of the same plant).
    The flow looks somewhat like this
    Sales Order -
    > Stock Transfer PR in Plant WXYZ -
    > Delivery Doc for the STO --- > MIGO to receipt the inventory in 0001 -
    > Delivery DOc for Sales Order -
    > Invoice for end customer --- > Intercompany Invoice
    If anyone has automated creation of a STO from a Sales Order .. please advice
    Thanks
    Vin

  • Stock transfer between 2 projects of different plants.

    Hi All,
    We have two plants and each plant as multiple projects. Some time it is required to transfer stock between two project which are of different plants. Currently we are using MOVEMENT TYPE 415Q , where stock transfer is done using 4 steps. Our client is insisting to do it in SINGLE step.
    Please advice whether it is possible.
    Thanks,
    Vengal Rao.

    Thanks Venkat,
    For the quick reply, but here I think using 415Q in MB1B  it has more than one step, and our projects are in different plants, I mean both project are of different plants.
    Please clarify.
    Vengal Rao.

  • Stock Transfer Between Excise and Non Excisable plants

    Hi Friends,
                                 I have created STO for excisable plant from non excisable plant. delivery created in excisable plant. But in non excisable plant, I am unable to capture excise invoice.I want the price in non excisable plant as Price+ excise. How to do this? please reply...
    Regards

    Non exciseable plant will create a STO and give it to Exciseanle plant.
    The Exciseable plant will transfer post the stock
    Along with Excise , J1IS created.
    The receipt plant,The Non Excise plant will do the GR . the stock + excise will get added up in the non exciseable plant .
    Rewgads

  • The Question about stock transfer between HU-Management and WM-Management

    Hi,
    There is a scenario about stock transfer between HU-Management and WM-Management storage location. I use transaction MB1B , movement type 313 , 315. After Good issue from WM-management storage location, outbound delivery will genarated, then Pack, Create/Confirm TO, at last post goods issue for the outboud delivery. But when i do movement type 315, there is a warning message "Data of preceding document was not transmitted", and from the F1 help i find this system reponse "You can maintain an indicator that makes information about preceding documents in this delivery available under delivery type in Customizing. For some characteristics of this indicator, the type of preceding document and the related document and item numbers must be transmitted to delivery creation. At least one of these parameters is missing.".
    So, My questions are:
    1. Generallily, Outbound delivery is created by SO, inbound delivery is created referenc PO, but how the stock transfer for 2 steps generate the outbould delivery and inbound delivery? Could you pls tell me the where i can config this in the IMG?
    2. What's "Data of preceding document was not transmitted" mean ? how to fix this issue ?
    Best Regards
    Boxer Du
    I am the SAP fans, focus on MM and WM. I am interesting TRM Yard Management and Cross Docking now.Very Gladly to talk you about these areas. I want to exchange the knowledge with you, and want to be a good friend of you. Pls contact me. You can find My MSN in the profile. Thanks.

    Hi,
    Sure, The inbound delivery type is set up in the IMG->Logistics General -> HU management -> Basics ->Delivery type -> Delivery type determination.
    For Inbound delivery type 'HID' is maintained in this view.
    Best Regards.
    Some One want to discuss the details , can contact me. Thanks.

  • Stock transfer between plants without STO and storage locations

    Hi.
    In case of stock transfer betwen storage locations with one step it is possible to do stock transfer between different stock types. But in Two step it is only possible to do stock transfer from unrestricted to unrestricted.
    In case of Stock transfer between Plants without STO in one and two step stock transfer, it is possible to do stock transfer  from unrestricted to unrestricted.
    Is there any reason for this?

    Hi
    Thanks for your reply. But i could not understand the sentence - But this is not possibles with 2 step procedure. becasue 2 step is recored will be maintained . In 2 step it not possible. Can you please eloborate on this
    Regards,
    Vivek Swarnapuri

  • Stock transfer between storage location in IS -Retail

    Hi,
    I want to have a Stock transfer order between two storage locations in the plant.
    I have activated the "Activate Stock Transfer Between Storage Locations", now i can create a STO and have the "Issuing SLoc" tab.
    Having that i get an error message "Not possible to determine shipping data for material XXX" Message no. 06280.
    I am trying to have the shipping data in customizing for set stock transfer  - "Define Shipping Data for Plants", but my site is not listed due to the use of IS Retail. Is there a way to configure it?
    Tnx
    Lior

    Hello Lior,
    in Retail your distribution center is a vendor and a customer, and your store is a customer. Therefore when you create master data for your distribution centre and store, you also create the vendor and customer masters that are required.
    By this link of the DC / Store to the customer master the shipping data is derived. I hope this answers your question.
    If you have further queries related to this, please do post them.
    Regards,
    Smitha

  • Stock Transfer between Storage Location with Order

    Dear MM experts, 
    I am into SAP SD.
    Our client wants to Transfer Stock from one Storage Location to another Storage Location of the same Plant. (This can be easily done thru MB1B via Transfer Posting)
    But the unique requirement here is they require some kind of Delivery Order or Tansfer Order to be created first & only based on that document user can transfer Stock between Storage Locations of a same Plant. (Similar to Inter-Plant Stock Transfer where we create Stock Transfer PO & then move goods between plants).
    Can you please suggest on how to achieve the above scenario.
    Thanks,
    Jignesh Mehta
    Mumbai

    hi
    Stock Transfer between Storage Locations
    u2022 Function of stock transport orders between storage locations is available from ECC 6.0 onwards.
    u2022 As a result of which user can input issuing storage location with supplying plant.
    u2022 Facility of using different delivery types for different issuing storage locations is available.
    u2022 Shipping Point data can also be determined based on the issuing storage location.
    refer following
    http://sapfunctional.com/MM/StockTransfer/Configure.htm
    http://help.sap.com/saphelp_scm41/helpdata/EN/23/29cf20eabe094e957763a46aa5be9d/content.htm
    regards
    kunal

  • Stock Transfer between 2 Storage locations

    Dear All
    I want to configure Stock Transfer between 2 Storage locations.
    I have activated the same in configuration but can anybody provoide complete details at to how the process happens.Is there any standard document type to be used like UB in case of stock tranasfer between plants,do we craete SD Delivery etc.
    Regards
    Vaibhav Mahajan
    Edited by: Csaba Szommer on Aug 22, 2011 12:56 PM

    Hi
    Stock Transfer between 2 Storage locations,there is no seperate configuration needed( like stock transport order b/w plants  doc type UB), just goto MIGO
    There are 2 options are there for Stock Transfer between 2 Storage locations
    1. one step procedure movement type 311(from unrestricted to unrestricted)
                                                                   323(from quality to quality)
                                                                   325(from blocked to blocked)
    2. Two step procedure movement type 313 and 315(only possible from unrestricted to unrestricted stock)
    During this transfer no accounting document will generate because you are transferrring the stock within the plant,
    Thanks

  • Stock Transfer between plants two steps.

    DearAll,
                 We are using the scenario stock transfer between plants two steps.in the source plant we are issueing the goods  with on 303 movement in MIGO with Remove from storage option. in the receiving plant we are receiving the goods with refernce to 303 material document in MIGO with place in storage option.
              we are using the version SAP 4.7.
    my problem is at the time of goods receipt SAP is allowing to the posting date less than the source plant 303 document date. it should allow the posting date as Greater than equal to source plant document date at the time of GR.
    Any standard pracktise is there.
    for example  source plant 303 document date is 08.06.2009 wrongly i have entered the receiving plant 305 document posting date as 06.06.2009 it is allowing to post it is not throw any information. it should not allow to know.
    i want to control this. any standard controls is there. kindly help.
    Regards
    P.Anandhakumar
    Edited by: Anandhakumar Palanisamy on Jun 9, 2009 10:46 AM

    Except user exit , Is it possible any standard functionality.?
    why SAP not controlled this?.
    this is SAP bug or not?. kindly clarify..
    Regards
    P.Anandhakumar....

  • Billing in Stock Transfer between two plants of two different company codes

    Hi Friends,
    I am doing the scenario of stock transfer between two plants of different  company codes.
    I have some issues in Billing for this..
    What are the settings do i need to to for Pricing in SD point of view.
    Ex:
    Supplying         /         Receiving
    Com.Code:2000     /        CompanyCode:1000
    Plant:2100              /         Plant:1100
    SA:2000/10/00      /          SA:1000/10/00
    I created Customer 5555 w.r.t sales area of supplying company code (2000/10/00)
    I created Vendor  7777 and assigned Supplying Plant 2100 in add purchasing data.
    In IMG Settings:
    Define Shipping Data for Plants: In Receving Plant i assigned customer 5555 and sales area blank
                                                        In Supplying Plant i assigned customer blank and sales area as 2000/10/00
    Create Checking Rule: Standard(B SD Delivery)
    Define Checking Rule: Standard(Avallability-01assigned to checking rule B)
    Assign Delivery Type and Checking rule: Document type(NB)-Supplying Plant(2100)-Delivery Type(NLCC)-Checking Rule-(B)
    Assign Doc Type:Supplying Plant(2100)-Receving Plant(1100)-Doc type(NB)
    What are Pricing settings in SD i have to do?????????
    Process:
    ME21N->VL10B->VL02N(PGI)->VF01(IV)->MIGO->MIRO
    I have gone through many threads in Forum but confusion in Pricing Part..
    Some are mixing with the inter company sales proces..
    Pls guide me..
    With Regards

    Do the following steps for STO Customizing:-
    1. Create a customer master record for the issuing plant.
    2. Create a vendor master record for the issuing plant, and enter customer account number in the Customer field on the Control screen.
    3. Repeat steps 1 and 2 for the receiving plant.
    4. Assign the plants to the customer master record in Customizing for Materials Management (MM), by choosing Purchasing <Purchase Order < Set Up Stock Transport Order< Plants.
    The Process Flow would be as follows :-
    Create a stock transport order, following the standard procedure, and send the order to the issuing plant.
    Issuing plant has processes your order, and when it is ready to ship,the storeperson at the issuing plant issues the goods using a transfer posting. The excise clerk there creates an excise invoice.The excise supervisor verifies and posts the excise invoice.It then sends the goods to you, together with the excise invoice.
    Once the goods arrive, you follow the standard procedure for incoming excise invoices:
    The excise clerk captures the excise invoice, using the stock transport order as the reference document. The storeperson enters the goods receipt, again using the stock transport order as the reference document.Alternatively, you can first enter the goods receipt and then capture the excise invoice.
    The excise supervisor then posts the excise invoice.
    Best Regards,
    Ankur

  • Stock transfer between the two manufacturing plants

    Dear Experts,
       I am doing the stock transfer between the 2 excisable plants
      1.First we will transfer the Semi finished material from one manufacturing plant to another manufacturing plants.
      2.After receiving the material in the receiving plant, they will convert SFG to FG.
      3.FG material will transfer to another non excisable plant.
    Is we need to pay the excise 2 times (1st time as a SFG material, 2nd time as a FG material)
    What is the exact procedure for this scenario.
    Regards,
    Narendra

    Respected Lakshmipathiji,
    i was little confused here...
    """Coming to your query, you need to levy tax on the selling price / assessabale value when sending the FG to non-excisable plant""""
    Tax means are you talking about sales tax?
    when we transfer the Finished goods from manufacturing plant to Non-manufacturing plant---Will it attracts Sales tax?
    Please throw some light here sir..
    Note to Narendra: this will be completely depends on your client--currently at my client they will transfer semi finished/Finished goods from one plant to another as sales cycle(attracts only excise values)--once after receival of stock--the receiving plant will raise PO to supply plant followed by MIGO and MIRO--there by the same excise values will be settled in MIRO settings(user will enter excise values manually in MIGO/MIRO to match the origin of stock transfer sales invoice)( i was not completely aware why they do so--may be need to get more clarity from my MM counterpart)
    Phanikumar

  • Stock Transfer Between two plants within same company code

    Hello,
    We are using scenario-'Stock transfer between two plants within same company code. Scenaro is like Plant A is receving plant and Plant B is delivering Plant.
    Plant A release PO for 100 nos to Plant B
    Plant B issues 100 nos (via delivery) to Plant A
    But Plant A receives only 50 nos physically so they do Goods receipt for 50 nos , but document got generated for 100 nos (when plant B issues material).
    Now Plant A do not want to receive remaining 50 nos physically, but wants to reduce material document which got created when goods issue posted by plant B
    Now stock in transis (mb5t) is 50 nos.
    How to reduce this material document. or any another alternative solution for this?
    Thanks,
    Shailesh

    Hi There
    Reversal of partial is not possible ,
    But you can use the Mov Type 557 and 558 to do the adjustments in Stock in transit qty
    Few more details on STO adjustments
    Hi There
    it can be settle in many ways,,,
    1. Receive the goods as 100 and Scrap the 50 nos from the received plant,,- If the receiving plant is responsible
    2.Revert the PGI/Transfer movement(Vl09) and send the 50 nos again from the supplying plant- of the Supplying plant is responsible,
    3.Also we have the movement type 557 and 558 without doing the above two steps you can correct the qty from stock in transit itself,,
    4. also you can check the below similar thread
    STO - material lost during tranfer from plant A to plant B
    5. If above are not ok, then receive the goods as 100, And raise the STO as your plant as supplying plant and receiving plant is (Supplied 50 nos less) plant,, Do the process without sending the material.. in this way that 50 nos can be adjusted,,
    6.Here is some more details
    557 Issue from stock in transit (adjustment posting)
    Only use this movement type (also the reversal movement type) under the following circumstances:
    Using movement type 557, you can correct purchase-order-independent stock in transit if
    - a good receipt cannot be posted to a purchase order without stock in transit, even though there is still stock in transit according to the purchase order history
    - stock in transit still exists, even though there are no open stock transfer orders for the particular material
    This movement type may ONLY be used in the cases mentioned above after careful analysis, to correct stock in transit that has rounding errors.
    This movement type may not be copied.
    Note!
    Before using this movement type, note the following:
    - 392205 Analysis stock in transit / Correction if split valuation
    Possible special stock indicators:
    E, Q
    7. As previous post says if you have the note for this issue you can use that also
    You can use any one of the way to solve the issue, Hope it helps
    Cheers
    Senthil P

  • What is Cycle or steps to create Stock transfer between plants.

    What is Cycle or steps to create Stock transfer between plants.
    Reply with T Codes & Justify

    Hello RM
    We can transfer stocks within a company code between 2 plants using 3 methods:
    1) Using single step simple stock transfer (Mvt Type 301).
    2) Using two step stock transfer (Mvt Types 303 and then 305).
    3) Using a stock transport order(STO) again it is based on 2 things:
    a) r u using STO with delivery or
    b) without delivery.
    Though the first two steps are very simple to process but using STO has its own advantages: 1) Quantity in transit can be monitored 2) delivery costs can be entered in the STO.
    First 2 steps (single step and 2 step plant to plant transfer) can be done using MIGO tcode , selecting stock transfer and entering the relevant mvt types.
    would like to tell you about STO as it is an important process.
    STO without delivery, the following functions are provided to support the Internal Stock Transfer without Delivery :
    #Create Stock Transport Order
    #Post goods issue for stock transport order
    #Post goods receipt for stock transport order
    Config Step required before processing above steps:
    Setting Up Stock Transport Order: Purchasing Document Type, the purpose of this activity is to specify which document type is to be used for a certain combination of supplying (issuing) plant and receiving plant.
    Path go to SPRO--MM-Purchasing---PO-Set up STO-----assign doc type, one step procedure, underdelivery tolerances.
    There you have to enter your supplying and receving plant with the Purchasing doc type( UB).
    Now the process:
    1) Receiving plant will create a STO towards issuing plant.
    2) Issuing plant will transfer material from their unrestricted use stock to stokc in transit using mvt type 351.
    3) Receiving plant receives the goods using MIGO mvt type 101.
    Regards
    Yogesh

  • Stock transfer between plants for split valuated materials

    Hi,
    I'm doing a stock transfer between plants without STO.
    The FG's are split valuated,which are transferred from central warehouse to other warehouse at different states.
    I'm trying to use mvt type 303 and 305 to transfer the FG.
    But getting error "Use one-step procedure for transfer posting to mat. subj. to valuation".
    Please suggest how to achieve the requirement.
    Is it possible to make 303 mvt type document to be parked and posted.
    Regards,
    Venkatesh

    << Moderator message - Cut and paste response from Error when doing two step transfer between Plants with split valuation removed and points unassigned. Plagiarism is not allowed in SCN >>
    Refer below link with same issue discussed,
    [two step transfer with split valuation |Canu00B4t use two step transfer with split valuation ?]
    Edited by: Rob Burbank on Feb 3, 2012 11:30 AM

Maybe you are looking for

  • Safari 5.1.2 and Juniper Infranet Controller

    My work place provides wireless with Juniper Infranet Controller but Safari 5.1.2 doesn't work with it.  Safari is initially redirected to the proxy web site address on the controller but never shows a web page.  I managed to work around this by usin

  • Still frame stuck in canvas

    Hello, I'm working on new project and I've got a still frame showing in my canvas on playback. I've deleted the track and drag something new in its place and am still getting the still. Any suggestions? Thanx, John

  • What's up with "Downloading, Installing, Setting Up"?

    Hello, what's up with "Downloading, Installing, Setting Up"? It is striking how often this problem confronts us again and again in recent times. How is it possible that Adobe does not notice that. I wish that they would take action and forward it to

  • R12: How to Restrict Custom Responsibility to a particular Organization

    Hi, I have created a new responsibility say xx_resp. I want it to restrict it to paraticualr one organization say ORG1. whenver any user access any function under this responsibility he/she cannot query any other organization data except ORG1. Please

  • Info window Permission limits in Leopard?

    In the Sharing & Permissions sections of Info windows in Tiger -- you could select almost any group (such as wheel or staff) or a user (such as System) and assign that group as the Group ID or that user as the owner ID. This ability appears lost in L