Stock transfer between stor loc. of same plant triggered by Sales Order

Hello everyone
I need some input regarding triggerring Stock Transfer between 2 storage locations of the plant from a Sales Order.
Sales Org: ABCD
Plant: WXYZ
Stor Location: 0001 & 0002
Now here 0001 is the Picking location for the Delivery Document.
However 0002 is where all the stock is stacked.
Physically they both are different buildings in the same vicinity.
The Business wants the Sales Order to trigger the stock movement from 0002 to 0001 on a daily basis.
So from a end user prospective, they will move the stock from 0002 to 0001 for all the items needed to fulfill the Orders due for Shipment for that day.
What options do I have for this ?
Thanks
Vin

Well actually the Selling Org ABCD is of a different Company code .. it is a typical case of Intercompany Sales .. where the Plant WXYZ is belonging to another company code.
I have setup the Intercompany Sales Process .. and want to trigger the Stock movement as mentioned above.
I have configured the STO for storage location - stor. location in a Plant. ...
However I am struggling to trigger a STO from a Sales Order.
I tried using the Schedule Lines to trigger a Pur. Req ... however the Supplying Plant field remains blank (which is the same in this case as it is a stock movement between 2 locations of the same plant).
The flow looks somewhat like this
Sales Order -
> Stock Transfer PR in Plant WXYZ -
> Delivery Doc for the STO --- > MIGO to receipt the inventory in 0001 -
> Delivery DOc for Sales Order -
> Invoice for end customer --- > Intercompany Invoice
If anyone has automated creation of a STO from a Sales Order .. please advice
Thanks
Vin

Similar Messages

  • STO ( stor. loc. to stor. loc of same plant ) creation frm Sales Order

    Hello guys
    I am facing a unique scenario in our current environment. Need you input ASAP
    environment:
    Org 1 - Plant 1 - division 1
    Org 2 - Plant 2 - division 2
    Org 1 wants to take over the sales of all the items belonging to division 2 which are currently being sold by Org 2.
    These items are HAWA and their procurement is currently done outside ECC.
    Now the procurement of these items will continue to be done by Org 2 & even its inventory will be owned by Org 2.
    Proposed Sales Flow:
    1) Org 1 accepts Order for the item with Plant as Plant 2
    2) Plant 2 Delivers the goods to customer
    3) Org 1 invoices the customer
    4) Org 2 invoices Org 1 using Intercompany billing.
    Now the challenge is wrt step 2.
    The Items are shipped from Plant 2 with their Issuing storage location as ABC.
    However these items are initially stocked in a different building outside the Plant 2 .. say stor. location = XYZ
    Now based on the Sales Requirements due for shipment today .. the users will move the Inventory of the items from Stor. Location XYZ to ABC for which they want some reference document for the move (which I have recommended as STO)
    I have come across some threads which give input regarding triggerring STO from Sales Order.
    However my challenge is the STO in this case is between 2 storage locations ABC & XYZ  of the same plant.
    Do you think Sales Order triggering a PR (similar to 3rd Party scenario) & then this PR converts to a STO work ?
    Please let me know the steps if possible.
    THanks
    Vin

    Well actually the Selling Org ABCD is of a different Company code .. it is a typical case of Intercompany Sales .. where the Plant WXYZ is belonging to another company code.
    I have setup the Intercompany Sales Process .. and want to trigger the Stock movement as mentioned above.
    I have configured the STO for storage location - stor. location in a Plant. ...
    However I am struggling to trigger a STO from a Sales Order.
    I tried using the Schedule Lines to trigger a Pur. Req ... however the Supplying Plant field remains blank (which is the same in this case as it is a stock movement between 2 locations of the same plant).
    The flow looks somewhat like this
    Sales Order -
    > Stock Transfer PR in Plant WXYZ -
    > Delivery Doc for the STO --- > MIGO to receipt the inventory in 0001 -
    > Delivery DOc for Sales Order -
    > Invoice for end customer --- > Intercompany Invoice
    If anyone has automated creation of a STO from a Sales Order .. please advice
    Thanks
    Vin

  • Stock transfer between stor locations - copy in reference data

    Dear all,
    We would like to implement a process in SAP MM that is as follows.
    However so far we have not been able to find a suitable/good solution for the below step number 5 below
    Proces in general: A number of Materials are to be received in storage location 1 but to be stocked in storage location 2 of the same plant.
    We configured it like this so far:
    1                    MM01 - Material master created in both storage locations. In the field MARC-LGFSB ( external procurement stor.location) we have filled in storage location 1
    2                    MD01 - mrp runs are executed ; results in Purchasing Requisitions created for storage location 1
    3                    Purchase requisitions are converted to Purchase orders
    4                    MIGO u2013 goods receipt for the purchasing order , hence receipt into stock of storage location 1
    5                    MIGO_TR u2013 stock transfer posting stor.loc 1 to stor.loc. 2 . At this point we would like to be able to reference/copy the data of the step 1 into this transaction in order that the data does not have to be re-entered manually. We canu2019t find a way how to do this. Should we use other functionality to enable this? In the end what we are after is to avoid typing in data twice.
    Your help would be much appreciated.
    Cheers,
    Arjan
    Edited by: A. de Vries on Oct 27, 2010 5:41 PM

    Why don't you receive the goods directly in the storage location where it is "stocked"?
    If you still adhere to your idea you maybe could trigger an output (via message determination) when posting the GR in MIGO. The output would create an IDOC which posts the goods movement (check IDOC "MBGMCR02"??? --> this IDOC uses function modul "MB_CREATE_GOODS_MOVEMENT" )
    This needs some development...

  • Stock transfer between 2 projects of different plants.

    Hi All,
    We have two plants and each plant as multiple projects. Some time it is required to transfer stock between two project which are of different plants. Currently we are using MOVEMENT TYPE 415Q , where stock transfer is done using 4 steps. Our client is insisting to do it in SINGLE step.
    Please advice whether it is possible.
    Thanks,
    Vengal Rao.

    Thanks Venkat,
    For the quick reply, but here I think using 415Q in MB1B  it has more than one step, and our projects are in different plants, I mean both project are of different plants.
    Please clarify.
    Vengal Rao.

  • Stock transfer Between Str Loc--Str Loc

    Dear All,
    Initially Storage "X" has been maintained under plant "P1".And few material's has been created with above combination and even GRN also done.
    Now,the requirement is that.Under the same plant"P1" one more storage location"Y" has to be maintained.And all the material stocks under storage location "X" has to be transfer to storage location"Y".
    Please guide me how to transfer stock from storage location "X" to "Y" under the same plant"P1".

    Hi,
    1. OX09 - Create Storage Location Y
    2. MMSC - Extend Materials to the new Storage Location Y
    OR use MMSC_MASS for Mass extension of Storage Location Y for the materials
    3. Now go to MB1B - Here in initial screen, enter Movement Type - 311, Plant - P1 and Issuing Storage Location - X and Press Enter
    Now in this screen, enter Receiving Storage Location - Y and materials with quantity and Post the material document.
    Now check stock in MMBE, it will show under Storage Location - Y
    Note: - It does not require any configuration. It is a standard process in SAP.

  • Stock Transfer between Store (IS-RETAIL)

    Hi,
    I want to transfer the article from one store to another store which is belong to same company code in IS-RETAIL.
    So what is the procedure and configuration to do.
    In retail senario store is having only customer master.How the supply store is treated as vendor.
    Regards
    Abdul

    Hi Abdul,
    Goto IMG>Logistics General>Plant Master>Control Data>site profile
    choose your site profile on which your store have been created for Eg: Site profile "0110", enter Vendor account group 0001.
    Now you check your site where u can find Vendor Master.
    Then create STO with Store as a Supplying site.
    Regards
    Mohanavel

  • Stock Transfer Between Excise and Non Excisable plants

    Hi Friends,
                                 I have created STO for excisable plant from non excisable plant. delivery created in excisable plant. But in non excisable plant, I am unable to capture excise invoice.I want the price in non excisable plant as Price+ excise. How to do this? please reply...
    Regards

    Non exciseable plant will create a STO and give it to Exciseanle plant.
    The Exciseable plant will transfer post the stock
    Along with Excise , J1IS created.
    The receipt plant,The Non Excise plant will do the GR . the stock + excise will get added up in the non exciseable plant .
    Rewgads

  • Stock Transfer Between two plants within same company code

    Hello,
    We are using scenario-'Stock transfer between two plants within same company code. Scenaro is like Plant A is receving plant and Plant B is delivering Plant.
    Plant A release PO for 100 nos to Plant B
    Plant B issues 100 nos (via delivery) to Plant A
    But Plant A receives only 50 nos physically so they do Goods receipt for 50 nos , but document got generated for 100 nos (when plant B issues material).
    Now Plant A do not want to receive remaining 50 nos physically, but wants to reduce material document which got created when goods issue posted by plant B
    Now stock in transis (mb5t) is 50 nos.
    How to reduce this material document. or any another alternative solution for this?
    Thanks,
    Shailesh

    Hi There
    Reversal of partial is not possible ,
    But you can use the Mov Type 557 and 558 to do the adjustments in Stock in transit qty
    Few more details on STO adjustments
    Hi There
    it can be settle in many ways,,,
    1. Receive the goods as 100 and Scrap the 50 nos from the received plant,,- If the receiving plant is responsible
    2.Revert the PGI/Transfer movement(Vl09) and send the 50 nos again from the supplying plant- of the Supplying plant is responsible,
    3.Also we have the movement type 557 and 558 without doing the above two steps you can correct the qty from stock in transit itself,,
    4. also you can check the below similar thread
    STO - material lost during tranfer from plant A to plant B
    5. If above are not ok, then receive the goods as 100, And raise the STO as your plant as supplying plant and receiving plant is (Supplied 50 nos less) plant,, Do the process without sending the material.. in this way that 50 nos can be adjusted,,
    6.Here is some more details
    557 Issue from stock in transit (adjustment posting)
    Only use this movement type (also the reversal movement type) under the following circumstances:
    Using movement type 557, you can correct purchase-order-independent stock in transit if
    - a good receipt cannot be posted to a purchase order without stock in transit, even though there is still stock in transit according to the purchase order history
    - stock in transit still exists, even though there are no open stock transfer orders for the particular material
    This movement type may ONLY be used in the cases mentioned above after careful analysis, to correct stock in transit that has rounding errors.
    This movement type may not be copied.
    Note!
    Before using this movement type, note the following:
    - 392205 Analysis stock in transit / Correction if split valuation
    Possible special stock indicators:
    E, Q
    7. As previous post says if you have the note for this issue you can use that also
    You can use any one of the way to solve the issue, Hope it helps
    Cheers
    Senthil P

  • Stock transfer between two plants within same company code at price

    Hello,
    Hello
    I have a scenarios. One plant is selling a part to other plant at a margin. Both plants belongs to the same legal entity.
    How can I map this scenario in SAP?
    What will be the cost of my part in these two plants?
    What mechanism I would use to transfer the stock from supplying plant to the buying plant?
    Your urgent reply is appreciated.
    Thanks,

    Hi Pream
    You can do it through Intra Company STO, but in this scnerio the libility never gets generated to the receiving plant because it is transfer from one pocket to other. but you can always transfer the goods on the assessable valu. you have to maintain the ***. value in J1ID, then while bill system picks the same ***. value in UTXJ condition.
    But if you want to salel at a margin then use SO-PO i.e. create PO from receiving plant and against sale order, do the delivery of the material to the respective plant.
    I think this will help you.
    In case of any qurty feel free to contact
    Girish

  • Stock transfer between Plant/Storage location to Plant/Storage location

    Dear Experts,
    This is a MM component of SAP Retail.
    We have 4 brands ( Plants of type B, Plants of type C etc) that needs inventory from the same Distribution center (Plant A) for some common products. Here the direction is to prioritize the inventory per brand. The requirement is one brand should not take the inventory of the other brand.
    To overcome this problem , the solution proposed is to have different storage location for different brands in the same DC.
    When we run replenishment  planning for the brands and do a ATP check, the availability check should consider only the one issuing storage location in the DC which we allocated for the brand.
    I do see the following set up in SPRO and I have done the following.
    Step1: Activate Stock Transfer between Storage Locations
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> u2018Activate Stock transfer between storage locationsu2019
    Step2: Assign Delivery Type and checking rule according to storage
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations->Assign Delivery Type and Checking Rule According to Storage
    Step3: Define Shipping Data for Stock Transfer between Storage Locations
    SPRO ->Material Management ->Purchasing ->Purchase Order ->set up stock transport order ->set up stock transport order between storage locations -> Define Shipping Data for Stock Transfers between Storage Locations

    Step4: Define Rule for Determination off Shipping Point
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations -> Set-up Storage-Location u2013dependent shipping point determination->Define rule for determination of shipping point
    Step5: Shipping Point Assignment According to Storage Location
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> Set-up Storage-Location u2013dependent shipping point determination-> Assign Shipping Points According to Storage Location
    Question.No:1- After completing the above set up  in me21n, the issuing storage location field is greyed out. I am not able to enter any value here. Can you please help.
    Question.No:2
    I do see the following setting.
    Under IMG ---> Material Management ---> Purchasing --> Purchase Order --> Set up Stock Transport Order -->Business Add-In for Determination of Issuing Storage Location
    Display the IMPLEMENTATION
    Double click on the method GET_SUPPLYING_SL
    Click the Execute button
    Click the detail button on IF_EX_MD_EXT_SUP
    Execute GET_SUPPLYING_SL
    There is a prerequisite for this BADI .I have done those things.What i dont understand is where to force the combination of supplying site/issuing stor.loc/receiving site/receiving stor.loc
    Kindly provide your inputs.
    Thanks,
    Vasanthan

    Dear,
    Have You configure MRP in second plant (where you want to transport the Material).
    Please try with this and do again Po for stock transport.
    Regards
    Piyush Patel

  • Stock transfer between the two manufacturing plants

    Dear Experts,
       I am doing the stock transfer between the 2 excisable plants
      1.First we will transfer the Semi finished material from one manufacturing plant to another manufacturing plants.
      2.After receiving the material in the receiving plant, they will convert SFG to FG.
      3.FG material will transfer to another non excisable plant.
    Is we need to pay the excise 2 times (1st time as a SFG material, 2nd time as a FG material)
    What is the exact procedure for this scenario.
    Regards,
    Narendra

    Respected Lakshmipathiji,
    i was little confused here...
    """Coming to your query, you need to levy tax on the selling price / assessabale value when sending the FG to non-excisable plant""""
    Tax means are you talking about sales tax?
    when we transfer the Finished goods from manufacturing plant to Non-manufacturing plant---Will it attracts Sales tax?
    Please throw some light here sir..
    Note to Narendra: this will be completely depends on your client--currently at my client they will transfer semi finished/Finished goods from one plant to another as sales cycle(attracts only excise values)--once after receival of stock--the receiving plant will raise PO to supply plant followed by MIGO and MIRO--there by the same excise values will be settled in MIRO settings(user will enter excise values manually in MIGO/MIRO to match the origin of stock transfer sales invoice)( i was not completely aware why they do so--may be need to get more clarity from my MM counterpart)
    Phanikumar

  • Stock transfer between plants for split valuated materials

    Hi,
    I'm doing a stock transfer between plants without STO.
    The FG's are split valuated,which are transferred from central warehouse to other warehouse at different states.
    I'm trying to use mvt type 303 and 305 to transfer the FG.
    But getting error "Use one-step procedure for transfer posting to mat. subj. to valuation".
    Please suggest how to achieve the requirement.
    Is it possible to make 303 mvt type document to be parked and posted.
    Regards,
    Venkatesh

    << Moderator message - Cut and paste response from Error when doing two step transfer between Plants with split valuation removed and points unassigned. Plagiarism is not allowed in SCN >>
    Refer below link with same issue discussed,
    [two step transfer with split valuation |Canu00B4t use two step transfer with split valuation ?]
    Edited by: Rob Burbank on Feb 3, 2012 11:30 AM

  • Stock transfer between Excise Plant and Non Excise Plant

    Scenario : Stock is imported from say Singapore. One of the import duties can be claimed back as CVD and pass the benefit to customer.
    Requirement : Stock transfer between Excise Plant and Non Excise Plant
    Question : i) If I do stock transfer from Excise plant to non-excise plant, can I transfer the CVD amount which I captured in RG23A - Part1/Part 2?
    ii) If I do stock transfer from Non- Excise plant to Excise plant, can I get the benefit of CVD and pass on that benefit to customer?
    Pls let me know the possiblity of above two in SAP and Legally?
    thanks in advance
    Sridevi

    Ok! Thanks for the replies. Pls let me allow to elaborate the earlier requirement.
    Trading Goods say A gets imported to India. Issue was :
    1) We need to issue Excise invoice only to few customers. So, we thought of treating one batch as excise batch and remaining as non excise batch per day.
    2) Stock price varies every day being batch wise produced in say Singapore.
    Means Mateiral is A but price varies evey day and because of the duty payment also gets varied. For a single material master we do have different prices for each batch and also excise/non excise scenario. So, how can I get material value for each of this combinations in the system and how to identify the same.
    Because of the above reasons, we thought of having two plants. I can not configure depot here because cleint requires single plant for each state as of now.
    Am I clear? If not, pls let me know,
    regards
    Sridevi

  • Billing in Stock Transfer between two plants of two different company codes

    Hi Friends,
    I am doing the scenario of stock transfer between two plants of different  company codes.
    I have some issues in Billing for this..
    What are the settings do i need to to for Pricing in SD point of view.
    Ex:
    Supplying         /         Receiving
    Com.Code:2000     /        CompanyCode:1000
    Plant:2100              /         Plant:1100
    SA:2000/10/00      /          SA:1000/10/00
    I created Customer 5555 w.r.t sales area of supplying company code (2000/10/00)
    I created Vendor  7777 and assigned Supplying Plant 2100 in add purchasing data.
    In IMG Settings:
    Define Shipping Data for Plants: In Receving Plant i assigned customer 5555 and sales area blank
                                                        In Supplying Plant i assigned customer blank and sales area as 2000/10/00
    Create Checking Rule: Standard(B SD Delivery)
    Define Checking Rule: Standard(Avallability-01assigned to checking rule B)
    Assign Delivery Type and Checking rule: Document type(NB)-Supplying Plant(2100)-Delivery Type(NLCC)-Checking Rule-(B)
    Assign Doc Type:Supplying Plant(2100)-Receving Plant(1100)-Doc type(NB)
    What are Pricing settings in SD i have to do?????????
    Process:
    ME21N->VL10B->VL02N(PGI)->VF01(IV)->MIGO->MIRO
    I have gone through many threads in Forum but confusion in Pricing Part..
    Some are mixing with the inter company sales proces..
    Pls guide me..
    With Regards

    Do the following steps for STO Customizing:-
    1. Create a customer master record for the issuing plant.
    2. Create a vendor master record for the issuing plant, and enter customer account number in the Customer field on the Control screen.
    3. Repeat steps 1 and 2 for the receiving plant.
    4. Assign the plants to the customer master record in Customizing for Materials Management (MM), by choosing Purchasing <Purchase Order < Set Up Stock Transport Order< Plants.
    The Process Flow would be as follows :-
    Create a stock transport order, following the standard procedure, and send the order to the issuing plant.
    Issuing plant has processes your order, and when it is ready to ship,the storeperson at the issuing plant issues the goods using a transfer posting. The excise clerk there creates an excise invoice.The excise supervisor verifies and posts the excise invoice.It then sends the goods to you, together with the excise invoice.
    Once the goods arrive, you follow the standard procedure for incoming excise invoices:
    The excise clerk captures the excise invoice, using the stock transport order as the reference document. The storeperson enters the goods receipt, again using the stock transport order as the reference document.Alternatively, you can first enter the goods receipt and then capture the excise invoice.
    The excise supervisor then posts the excise invoice.
    Best Regards,
    Ankur

  • Stock Transfer between plants two steps.

    DearAll,
                 We are using the scenario stock transfer between plants two steps.in the source plant we are issueing the goods  with on 303 movement in MIGO with Remove from storage option. in the receiving plant we are receiving the goods with refernce to 303 material document in MIGO with place in storage option.
              we are using the version SAP 4.7.
    my problem is at the time of goods receipt SAP is allowing to the posting date less than the source plant 303 document date. it should allow the posting date as Greater than equal to source plant document date at the time of GR.
    Any standard pracktise is there.
    for example  source plant 303 document date is 08.06.2009 wrongly i have entered the receiving plant 305 document posting date as 06.06.2009 it is allowing to post it is not throw any information. it should not allow to know.
    i want to control this. any standard controls is there. kindly help.
    Regards
    P.Anandhakumar
    Edited by: Anandhakumar Palanisamy on Jun 9, 2009 10:46 AM

    Except user exit , Is it possible any standard functionality.?
    why SAP not controlled this?.
    this is SAP bug or not?. kindly clarify..
    Regards
    P.Anandhakumar....