Stock Transport Order with Delivery and Billing
Dear all,
I've manage to perform STO process for supplying plant -> delivery (VL10B) until post goods issue (VL02N).
Now, when I attempt to perform standard SD billing (VF01) using the delivery number, the system proposes "IV" billing type (Interco Billing).
My problem is there no net price for the billing document (VF01). Question: normally the pricing is carried over from Sales Order in a normal SD process. Since this is STO crossover from MM process into SD process, do I need to maintain the pricing condition manually in the billing document before saving?
Thanks.
Steven
In the copy control (delivery --> billing document) you can define what the source of the price is, from where system should copy, determine it.
Basically you have two options: determine the price based on sales condition records or copy the price from purchase order (see pasted link). If you use shipment, you can set that shipment cost should be copied as well (see OSS note 574850).
You can find copy control settings under:
SPRO > Sales and Distribution > Billing > Billing Documents > Maintain Copying Control For Billing Documents
As for details please have a look at:
Intercompany Billing Process
(see Raghavendra's answer)
if you are not familiar with SD, please contact your SD consultant to carry out the settings.
Edited by: Csaba Szommer on Jan 14, 2011 12:38 PM
Similar Messages
-
Stock Transport Order with Delivery and Billing Document/Invoice
Dear Experts,
We have implement the process in our system as required on SAP document:
http://help.sap.com/saphelp_47x200/HELPDATA/EN/4d/2b911d43ad11d189410000e829fbbd/frameset.htm
The problem is that when creation the PO the Shipping tab does not exist in the PO , and no delivery can be created .
We are using NB PO doc type,
Delivery type implemented as NLCC
Please advise where is the problem ?
Regards,
Moshe>
Moshe Stein wrote:
> Hi Afshad Irani
> Thanks for your prompt reply,
> I have looked to all your pages , but could not find the problem why there is no Shipping Tab?
>
> Moshe
Shipping tab is related to shipping points. You need to maintain shipping points, then shipping points are linked to storage location, and once you enter storage location your shipping point is picked. One of the above links tell you how its done.
T-code OVL2
Path logisitc excution-->shipping>basic shipping function--->assing shipingpoint s
Shipping point
Edited by: Afshad Irani on May 30, 2010 7:44 PM -
Stock Transport Order with Delivery via Shipping
Hai
I created stock transport order Intra process. within company two plants .. i configured supplying plant i assigned sal.org,dis.channel,division and receiving plant i assigned customer number also. in po its automatically picked the shipping data details. but in delivery VL10B with ref po , it show the error log error message as: An item with no delievery quantity is not permitted.Item will be deleted. but i checked all the setting in STO.. how to solve the error message in delivery?Is committed qty showing in the delivery schedule tab of item details(STO)?
And also check the delivery creation date in the shipping tab.While creating the O/b delivery you should give the date as it's given in the Shipping tab.
And Also maintain the Stock in the Supplying plant.
Otherwise Give the Message no.
Edited by: John Boeckle on May 23, 2008 2:24 PM -
Intra company stock transport order with delivery to subcontracting vendor
Hi Friends,
We have an issue with Intra company stock transport scheduling agreement with delivery to subcontracting vendor.
We have a scenario where the component is provided by another plant (Plant A -Intra company) directly to subcontracting vendor and the subcontracting vendor processes the component and sends us(
Plant B) the finished good.
We have a subcontracting scheduling agreement created with the subcontracting vendor with Item category u201CLu201D for plant B .(Document type LPA)
And we created the stock transport scheduling agreement with document type LU (Between Plant A to Plant B) by entering the subcontracting vendor number to the "EMLIF- Vendor to be supplied/who is to receive delivery" field but the check box "LBLKZ-Subcontracting vendor" is hidden in the delivery address tab.
Field selection with document type (LU) and Field selection with transaction code (ME37) did not help to bring the field to the delivery address tab.
As a result, when we do PGI from the supplying plant, the stock is posted to "in transit" (Movement type 641) instead of "Component provided to vendor" (Movement type 641 u2013 O)
The same behavior for purchase order with document type UB as well/
Is the movement type u201C641-O u201C supported by standard SAP or do we have any other workaround to address the requirement. ?
Now we are in ECC 6.0 EHP3.
Your inputs will be highly appreciated.
Regards
Gobinathan GHello,
This EhP4 feature addresses only the one step Stock Transport Order to subcontracting vendor for intra company.
Does anybody know how to do a two steps Stock Transport Order to subcontracting vendor for intra company?
By "two steps" I mean:
1- Goods Issue from supplying plant A to in-transit stock of the subcontracting vendor at receiving plant B.
2- Inbound Delivery Notification (IDN) at receiving plant B + Goods receipt against this IDN into the subcontracting stock at receiving plant B.
Thanks and regards,
Stéphane -
Creating Stock Transport Order with Delivery
Hi All,
I am trying to create an STO with delivery option.
I have been able to complete STO cycle without Delivery - both one step and two step.
However, after choosing Delivery Type NL in SPRO, the ME21n for STO creation gives error - Unable to determine shipping data for Material 427.
Sales org structure has been defined and assignments are complete.
Shipping Point has been defined & assigned to the Supplying Plant.
Recivering Plant has been given a Customer Number and both Receving & Supplying Plants are assigned sales area data. (MM->Purchase Order->Set Up STO)
In Material Master, Loading & Transport groups have been assigned, and all views have been maintained.
Any ideas on the possible cause of error??
Thanks.Hi,
Please check these links:
ERROR"Not possible to determine shipping data for material XXX"
Not possible to determine shipping data for material -
Cross-Company Stock Transfer with Delivery and Billing
Hello Fellow Experts and Friends,
I have a situation at a client in California. The client does Make-to-Order sales. The only materials kept in inventory are raw materials and NREs. This client has plants in several countries around the world but only two are on SAP. The current version is 4.6C.
The scenario goes like this. The plant in China (CC: 2020, Plnt: 0020) wants to order raw materials from the US plant (CC: 1010, Plnt: 0010). If the US plant does not have enough stock in inventory, an order needs to be placed with a local vendor. When all materials a re available to ship,we need to deliver to and invoice the China plant. Additionally, shipment notification needs to be sent to the plant in China.
IWould someone please be so kind as to helpme with a "Best Practice" process flow for Cross-Company STO with Delivery and Billing? I also need guidlines for customizing the process in the IMG. This process must include issuing a PO to a local vendor for ordering additional inventory. For the shipment notification, I was thinking of an EDI Advance Shipment Notice if the receiving plant uses EDI. I need a different option, If the receiving palnt does not use EDI.
I am open to your suggestions.
Thanks,
AJ
Edited by: Arthur Hawley on Sep 8, 2009 10:56 PM
Edited by: Arthur Hawley on Sep 11, 2009 4:46 PMArthur,
Once this is correctly set up it works very, very well. And the cross-company supply scenario is actually fairly simple, streamlined and automated. However, this is NOT such a simple process to set up.
True cross-company supply, all the way through, requires a LOT of configuration which ties in SD, MM, FI, and EDI. It uses "wrap-around" IDocs to do some of the cross-posting in other company codes. There is also the issue of Intercompany markups, as well as Intercompany eliminations.
There are LOTS of folks who do the painful process of the FULL Order to Cash in one company code, and the full Purchase to Pay in the other. But this is NOT the right solution and requires almost twice as much transaction processing.
Just for the Intercompany setup, start to finish, I've been working on a "cookbook" to set up all of the modules for almost 10 years now. I've done it several times, at several companies and it works very well once it is all in place. However, that cookbook document is about 100 pages long (config settings, IMG settings, master data requirements, EDI settings, etc.).
Also, in your scenario you are talking about multi-sourcing parts from other locations. All of the related MRP settings are a separate setup issue.
What you are asking is WAYYYYyyy beyond the scope of forum posting. So if your company or client could use some help, please feel free to contact me.
Bill Wood - President
R3Now Consulting
http://www.r3now.com SAP thought leadership!
Platinum SAP Solutions
(704) 905 - 5175
http://www.linkedin.com/in/billwood -
Issue in Intracompany STO with Delivery and Billing
Dear Experts,
In Intra Company STO with Delivery and Billing, pls help to map this scenario:
During PGI Supplying plant stock a/c credited. and debited to some interim a/c.
During GR at receiving plant this interim a/c credited against the receiving plant stock a/c.
This issue mainly arose b'cause in ordinary cases during PGI itself the stock a/c value updated, even when the goods r in Stock in transit.
Thanks and regards
sBkHi,
During Intra company Stock trasfer below acc. entries happen:
at the time of PGI
movement type (641)
Stock A/c receiving plant : debit (BSX +)
Stock A/c issuing plant : credit (BSX -)
But at the time of receiving goods (GR) at receing plant:
only impact the inventory entries. No accounting entries.
SAM -
HI,
STO with delivery and Billing
Material is valuated in MAP
When doing PGI system picks the MAP of the issuing batch and this is what SAP provided
Nw we need to transfer(PGI) @ the purchase price of the material in the supplying plant
How to configure that
Do we have any control on the price during PGI
How can i use the help of ABAP ers for this
sapmmlearnerHi,
If material is not maintained for batch, then system picks MAP during PGI as it is having price control 'V'.
To get desired result, you have to go for batch valuation. ACtivate valuation category for your plant.
Maintain 'X' in accounting 1 view in material master.
Valuation type is nothing but your batch number. During PGI, you can select batch as per valuation.
Regards,
Piyush -
Stock Transport Order Without Delivery
I m trying to transfer stock from one plant to another (within same company) without delivery.
what all configuration do i need to do.
pls. guide.
I m little bit confused over stock transfer,
Regards,
Pramod KumarOh no, not at all! This forum is meant to answer all your problems!
Configure Inter company Stock Transport Order
Material should exist in both the plants (Delivering & Ordering),
Internal customer should be assigned to the ordering plant ( MM -> Purchasing ->
Purchase Order -> Setup stock transport order -> assign the internal customer to the
ordering plant and assign the Sales area of the internal customer.
Assign its Sales area to the delivering plant
Assign the document type and Delivery type NB and NLCC
Assign the Supplying plant --> Receiving Plant --> NB
Take the delivering plant and assign the sales area.
Vendor master has to be created and assign the supply source (Delivering Plant).
Create a purchase order ME21N ---> Save
Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order
number here and execute.
Select the Delivery creation line and do the back ground process.
Start the log display and see the delivery document number by the documents button
Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery
document.
Billing (Intercompany pricing conditions should be set).
AND
1. Customer No. for the Goods Receiving Plant - OMGN
2. Availability Check- Checking Rule (if necessary) - OMGN
3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders,
NLCC)
4. PO type (which i believe you have done) - OMGN
5. Assign Vendor No. to the Supplying Plant (done) - VK02
6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you
need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
***and by the way for the Invoice to work between Cross-Company Plants, you need
also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
STO:
STO CONFIG:
The following steps have to be followed in order to configure stock transport order
between two plants.
1. Create a vendor for the Company code of the receiving plant using account group 0007
via T-Code XK01.
2. In the purchasing data view assign the supplying plant and the schema group
3. Create customer with the sales area of the vendor.
4. The shipping conditions, the delivering plant and the transportation zone determine the
route in the STO.
5. In the pricing procedure determination relevant to the STO assign document pricing
procedure and customer pricing procedure to get the pricing in the invoice.
6. Maintain condition records for pricing condition.
7. Maintain carrier as a partner in the customer master.
8. In OMGN select the supplying plant and assign the company code and sales area.
Similarly select the receiving plant and assign the company code and sales area (The
company code to which the plant is assigned to).
9. Assign the delivery type and checking rule to the document type.
10. And finally, assign the purchasing document type to the supplying plant and the
receiving plant.
11. Create the STO using T-Code ME 21N and save.
12. Check for release strategy if any and release using T-Code ME 28.
13. Create delivery in background using VL10G.
14. If delivery is created, it is an indication of correct configuration and master data
creation.
Stock transfer between two plants in deffernet company codes is known as inter company
stock transfer.
Material shoud be maintained in both supplying and receiving plant MM01
Sotck should maintain only in supplying plant MB1C
Create receving plant as a customer in suplying plants company code and sales area
XD01
Assign this customer number in receving plant detials OMGN
Assign supplying sales area in supplying plant details OMGN
Assign delivery tupe NB for in combination of supplying/ receving plants.
Create STO ME21N
As it is normal there in the item details wer should get shipping date i.e customer number
Go for Deliveryy VL10B
Shipping point *****
Select PO go for execute
then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
Goods Issue VL02
Delvy doc **********
Click on picking
enter the picking qty
Click on PGI
in the mean time check in the PO history you will get the details
Goods receipt MIGO
Stock overview the stock will be updated.... -
STOCK TRANSPORT ORDER With in One company code
Dear Laksmipathi,
While RP delivery in stock transfer order With in One company code, the sym will pick movement tyoe 641 and which ic configrued in SL .But in STO there is no sale order creation that i mean SL will pick only in sale order.
Here order type UB and plant combination sym will pick the Delivery type NL
NL -NORM -V sym will pick Item category NLN of Delivery not of sale order.
NLN-NN(Schedule line)
Generally we know the SL which is determined by item category and MRP type , here item category is coming only in RP delivery document.
So my question is
Question 1.how this 641 which has determined while RP Delivery document?
if it is determining from schedule line NN , how it can be consider since sale order is not in the picture?
Question 2. In 641 the cost has been updating /Accounting document is getting generatiing where as in VF01 billing doc not relevent for Accounting doc .so how we can settle or balance the cost of this material while occured in 641 or PGI?
Question 3.What are the business benifits while doing STO?
i am new in this and Pls advice how to give the point to you .
Regards
ISHIDear Thakkar,
Pls compare my question and ur answer
Question 1.how this 641 which has determined while RP Delivery document?
if it is determining from schedule line NN , how it can be consider since sale order is not in the picture?
What is I am not clearu2014that if i641 is determining from schedule line NN , how it can be consider since sale order is not in the picture?
Ur Ans:
A1. In case if STO the item category is assign to Delivery typeitem category groupusages+ Item category of the higher-level item Tocde (ZERO)0VLK Taking the item category and and checking the schdeline assign to the same. In schedule line you will find 641.
Query
OVLK which is delivery header and taking the item category of Delivery through Delivery typeitem category groupusages+ Item category of the higher-leveL.
Can we determine the SL with delivery type and delivery item category since sale order is not in the picture?
How we can take the sale order item category for find SL since sale order is not in the picture?
Question 2. In 641 the cost has been updating /Accounting document is getting generating where as in VF01 billing doc not relevant for Accounting doc .so how we can settle or balance the cost of this material while occured in 641 or PGI?
What is I am not clear-How settle cost of this material ?
Ur Ans : The accounting is happening for material value.
Are you think Is it correct this answer yourself?
Question 3.What are the business benifits while doing STO?
I am cleared in third answer which you given and I am appreciating to you ur response, but the answer should be according to my question.
Thanks
Ishi -
HELP for all 5 TYPES of STO Stock Transport Orders with detailed scenario
PLEASE help me understanding the detailed scenarios for all 5 TYPES of STO s
as in my day to day job activities , i frequently handles issues related to STO s
PLEASE HELP WITH DETAILED STEP BY STEP SCENARIOSHi Jagatram,
Standard SAP has the following methods For Stock transport order:
1) One Step Transfer stock without using purchasing documents; Use movement type 301.
2) Two Step Transfer stock without using purchasing documents; Use movement type 303 in Supplying plant and movement type 305 in receiving plant.
3) Using Standard Transport Order (STO) without delivery in two steps. STO created in T-Code ME27, receiving plant posts goods issue (for returns), movement type 351 and supplying plant post goods receipt from using movement type 101.
4) Using Standard Transport Order (STO) with delivery in one step. STO created in T-Code ME27, Receiving plant creates shipment and Goods issue document (for materials to be returned) with movement type 647 and goods receipt document with movement type 101 both created in one step.
5) Using Standard Transport Order (STO) with delivery in two steps. STO created in T-Code ME27, Receiving plant creates shipment and Goods issue posted (for materials to be returned) with movement type 641.Goods receipt is posted in the supplying plant, movement type 101.
6) Using Transportation scheduling agreement (TSA) with delivery in two steps. TSA created in T-Code ME37. Receiving plant creates shipment and Goods issue document (for materials to be returned) with movement type 641. Goods receipt is posted in the supplying plant, movement type 101.
To achieve it, necessary configurations has to be done in Tcode- OMGN.
SPRO>> Materials management>> Purchasing>> Purchase Order>> Set up Stock transport Order:
1. Plant: For the receiving plant, maintain customer No-Plant (If using STO with delivery), for the Sales Org, Dist channel and Division.
2. Checking Rule: Create checking rule.
3. Define checking rule : Usually no change required here.
4. Assign delivery type/checking rule: Assign the document type(UB) - Supplying plant- Delivery type(NL).
5. Purchasing document type: Maintain the supplying plant- Receiving plant relationships for the doc type-UB, either 1-step or 2-step, as per business.
Hope this helps!
Regards,
Shilpa -
Auto Batch Determination For Stock Transport Order/Replenishment Delivery
All,
I have an issue with my stock replenishment deliveries (STPO, Stock Transfer Plant to Plant via standard MRP/Procurement process with a Purchase Order that is a Stock Transport Order).
One question I have is what module should the configuration be for Auto Batch Determination on deliveries from STPO's, is it SD or MM? The reason I ask is because I have the SD side working just fine for example if I enter a customer order for this material and issue a delivery against it I get a batch automatically assigned according to your search/sort criteria. I know with a Stock Transport you have different item categories etc. and I have flagged them as relevant for ABD.
I have been racking my brain regarding this and I have went through the configuration for both Inventory Management and Sales and Distribution. I have went through the steps several times. I am not seeing what I am missing any help in this arena would be helpful I am getting the following error message when I go to the batch tab on the replenishment delivery "Batch determination is not possible because there is no search procedure". I am at a loss to what configuration is needed. I keep going through the steps and I am not finding whats missing. Any help in this area would be most grateful.
Thanks,
JeremyHi Jeremy,
you need to configure batch determination in SD and maintain enteries in the trasaction code V/C5 as below
Sales org + Distribution channel + Division + DL (in salesDoc Ty) + Search procedure + tick check batch
Sales org + Distribution channel + Division + NL (in salesDoc Ty) + Search procedure + tick check batch
also check whether the delivery item category is active for auto. batch determination and maintain the batch condition record in transaction code VCH1
regards,
Santosh -
Stock Transport order with Freight Charges- Payable to an external vendor
Hello
we are implementing the stock transport order between two plants in SAP 4.7. The document type is UB and it has to be a two step process. We need to post the Freight Charges as well. The freight Provider is external vendor.
What is the best way of configuring this scenario for freight cost?
I did put the freight forearder vendor code on the conditiond tab detail of condition tyep FRA1 but can't do the invoice verification for the same.
Any tips are appreciated.Hello,
This EhP4 feature addresses only the one step Stock Transport Order to subcontracting vendor for intra company.
Does anybody know how to do a two steps Stock Transport Order to subcontracting vendor for intra company?
By "two steps" I mean:
1- Goods Issue from supplying plant A to in-transit stock of the subcontracting vendor at receiving plant B.
2- Inbound Delivery Notification (IDN) at receiving plant B + Goods receipt against this IDN into the subcontracting stock at receiving plant B.
Thanks and regards,
Stéphane -
Stock transport order with BAPI_PO_CREATE1
Hi,
can anybody give me an advice how to use the function BAPI_PO_CREATE1
to create stock transport orders?
I´m getting some errors when I run it. Here is my test data I have used:
poheader-comp_code: NO10
poheader-doc_type: UB
poheader-langu: EN
poheader-purch_org: NO10
poheader-pur_group: 999
poheader-suppl_plnt: 2041
in poheaderx I have set a flag for the filled fields.
poitem-po_item: 00010
poitem-short_text: test
poitem-material: 100230
poitem-plant: 2001
poitem-quantity: 1
poitem-po_unit: CYL
poitem-conv_num1: 1
poitem-conv_den1: 1
poitem-prnt_price: X
poitem-unlimited_dlv: X
poitem-item_cat: U
poitem-acctasscat: K
poitem-gr_ind: X
poitem-ir_ind: X
poitem-gr_basediv: X
poitem-preq_name: TEST
I´m getting the following errors in the return table:
ID Num: 000 PO could not be creating using Enjoy-BAPI
E ID MEPO Num: 002 PO header still faulty
E ID 06 Num: 098 Please enter supplying plant
E ID ME Num: 018 Item category U can only be used with material
W ID ME Num: 040 Can delivery date be met?
E ID ME Num: 083 Please enter G/L account no.
Any ideas how I can create one successfully?
CheersHi,
poitem-po_item: 00010
poitem-short_text: test
poitem-material: 100230
poitem-plant: 2001
poitem-quantity: 1
poitem-po_unit: CYL
poitem-conv_num1: 1
poitem-conv_den1: 1
poitem-prnt_price: X
poitem-unlimited_dlv: X
poitem-item_cat: U
poitem-acctasscat: K
poitem-gr_ind: X
poitem-ir_ind: X
poitem-gr_basediv: X
poitem-preq_name: TEST
fill the corresponding fields in POITEMX table also with 'X'!
Regards,
Sooness. -
Stock transport order with movement type 643 - post to COPA
Hello SAP gurus,
We use movement type 643 to post good issues for stock transport order (intercompany process). The delivery type is NLCC. We recently implemented account-based COPA. At the time of post goods issue, cost of goods sold should be posted to COPA, but it didn't. Could someone help me figuring out how to push PGI to COPA for stock transport order? Thanks in advance.
Regards,
Cassandra WongThe reason that PA segment is not populated in the good issue for STO is because the cost element of the COGS account was set to "01" instead of "12". I changed the cost element category and the PA segment is populated correctly.
Maybe you are looking for
-
How to get a reference for custom controller
Hi All, I am working with the custom controller but i dont know how to call the functionality of custom controller into a view controller.For accessing component controller functionality we have a attribute wd_comp_controller in view controller.
-
Office 2010 : PDF Maker Pane is missing in ribbon
Hi, After upgrading from MICROSOFT Office 2007 to 2010, I notice that PDF Maker is missing in Office Ribbon. I tried Repairing & Reinstalling ADOBE Acrobat 9.0 (+ Update to 9.3.2) but still the same problem. Another try : Fresh install of Windows XP
-
How to copy the data of one node to another of the same context
hi experts, i need to copy the data of one node to the other node of the same context. the source node is a model node ( i.e comming from <b>RFC</b> ) and the destination node is a value node which i have creted. what i have done is. i have rea
-
Sound is unstable. Volume up and down?
&Sound is unstable. Volume up and down?y Hi guys. I'm completely at a loss with my PCI Express X-Fi Titanium Fatalty Champion Series. Recently I formatted my computer and installed all of the latest drivers for my card with WinXP Pro 32, problem now
-
I had my phone replaced by Verizon because the volume was ringing too low with disregard to the level it was set on... this happened immediately after the update and continued even with factory reset. Verizon sent me another one which is doing the s