System Landscape RFC User

Hi,
I have a simple question. I would like to be able to monitor my erp system(on another host) from solman. Using wizard, In the set-up system landscape-> create system step, under the main instance selection, what should I choose to add my erp system?
Plug Ins for Satellite Systems or Agents for Satellite Systems
Thank you.

Hi,
This info i took it from help library.
If you want the ATP check to be performed in SAP APO but triggered from SAP R/3, make sure when
defining the RFC connection of the SAP APO system in SAP R/3 that you use a user ID for the SAP APO
system that was created there as a dialog user.
Thanks,
nandha

Similar Messages

  • URGENT: Changing System Landscape in ChaRM

    Ok...here is our situation:
    We use ChaRM with a 3 tier system landscape (DEV > USER  >  PROD).
    Out USER system has been down for a month (maintenance) so we went live with ChaRM as follows:
    DEV > PREPROD >PROD
    Our USER system is now back up and running so we have replaced the Logical Component on the project to reflect this.  This has worked ok but the task list is still showing the old system landscape.  i.e. its showing PREPROD still instead of USER.  How do I resolve this?
    Do I have to complete the existing cycle and then create a new one?  This would be fine except I would lose all the jobs I have scheduled in the task list (schedule every 15min EVERY day....took me ages).
    Any suggestions?
    Thanks!!!!!!!!!!!!

    Hi,
    About this issue, there is a detail information about this in blog point 6  u201CChanges in the logical components of a project where Charm is already activatedu201D.
    This is the link:  http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/15116
    So, you have to change the transport route accordingly and then close current maintenance cycle and generate a new one.
    Following is the steps.
    1: please import all the transport requests which were associated in the current maintenance cycle task list by STMS manually import.
    1: change transport route from DEV > PREPROD >PROD to DEV > USER > PROD on the domain controller system.
    2: close current maintenance cycle.
    3: change the system landscape to DEV > USER > PROD in solar_project_admin.
    4: generate a new maintenance cycle.
    Thanks
    Regards,
    Vikram

  • Password inconsistancy issue with RFC users in ECC 6.0 System after upgrade

    Hi,
    We have upgraded the system from 4.7 to ECC 6.0, but facing the password inconsistancy problem for RFC users. We have set the parameters like "login/min_password_lng" as "8" and "login/password_downwards_compatibility" as "3" & RFC user Type is "system". Could you please suggest how to resolve the password inconsistancy issue.

    Hi Chandan,
    you need to run the txn. SECSTORE and there it will shows you all the RFCs that have inconsistent passwords. Please maintain the correct passwords there.
    In case the existing passwords are no longer acceptable due to new security policies as per the new SAP version, you will have to change the password from SU01.
    Regards,
    Shitij

  • Authorization Required for RFC user  in R/3-APO system.

    Could you please help regarding one authorization issue. I want to know the authorization required for one RFC user. Now this RFC user used for RFC connection of SAP R/3 - SAP APO system. user type is given dialog type and SAP_ALL profile has been given to this user  id. Now I have to remove SAP_ALL from this user id in R/3 and APO system and  provide the required the authorization in R/3 and APO system.
    Regard
    Auroshikha

    The RFC authorisation depends completely on what the user is doing (ALEREMOTE?).  We can't tell you what RFC auths your connection requires. 
    There is a guide to doing this here: https://wiki.sdn.sap.com/wiki/display/Security/BestPractice-HowtoanalyzeandsecureRFC+connections

  • First RFC call failed, config not loaded. Check the System landscape configuration.

    Dear Experts,
    We are getting below error on portal while using the BEX query in BI system.
    Error:
    BEx Web Application
    Error: First RFC call failed, config not loaded. Check the System landscape configuration.
    Exception occurred while processing the current request; this exception cannot be handled by the application or framework
    Failed to process request; contact your system administrator
    To facilitate analysis of the problem, keep a copy of this error page
    We are sorry for the inconvenience.
    As the ITS & WEB AS connection tests go successful on object created for BI system in portal.
    Kindly suggest me on this issue..
    Thanks,
    Bharath.

    Hi Bharath,
    Please go through the below SAP Note and let me know if this helps.
    1903392 - Error: First RFC call failed, config not loaded
    BR,
    Anurag

  • Difference between RFC, SYSTEM and AUDIT users?

    Hi All,
    Can you highlight the main differences between the following users:
    RFC
    SYSTEM
    AUDIT
    how do their functions differenciate them ?
    Thanks in advance,
    Diwakar

    RFC User
    RFC user is basicly used to receive status messages. An RFC user has to be created in all the system clients where messages needs to be recieved. An RFC user can also be used for receiving messages using SMTP plug-in.
    The RFC User is an sap user of type System and that's why no person can logon with this user on SAP System.
    Following is thr procedure to create RFC User, remember the purpose is to recieve messages including status messages as well.
    Creation of RFC User
    Go to  Tools > Administration > User Maintenance > Users.
    Enter a name, for example MAIL_ADMIN.
    Select "New"
    On the Logon data tab page, select the user type System.
    Enter a password.
    On the Profiles tab page, enter the authorization profile S_A.SCON. This profile minimizes the risk of misuse, even if the communication system does not store the password is encoded form.
    Select "Save"
    Both RFC user and a System user are of type System only. Now the difference, depends upon the profile and authorization of the user.
    Audit users are of type dialog, and can be used by a person to logon to system. There might be many roles assigned to this user. My understanding is that an Audit User is not a standard sap type user but just a dialog user and can be created with a conventional method of creating any other dialog users with a specific profile and authorizations.
    Still to confirm, Can you please tell us, how many types of users does it shown in 4.6c at the time of user creation?
    Best Regards,
    Amol Bharti

  • RFC User for satellite systems

    Hello Gurus,
    I just wanted to ask about one issue. We are a SAP partner and using Solution Manager in VARs scenario. There are many systems of our customers connected to our Solution Manager..
    Now I want to ask about RFC user(s). As I see, in our Solution Manager there are many users(communications type C) with Synthax SOLMAN<system id> or something like that. It means basically, that we have for every particular customerS system one SOLMAN user for RFC(cust_scout) in our Solution Manager. My question is if we can replace all of these users with only one RFC user for all the systems and customers?
    Many thanks in advance for your help
    Miloslav Pudil
    IDS Scheer
    Prague
    Czech Republic

    >
    Miloslav Pudil wrote:
    > I just wanted to ask about one issue. We are a SAP partner and using Solution Manager in VARs scenario. There are many systems of our customers connected to our Solution Manager..
    > Now I want to ask about RFC user(s). As I see, in our Solution Manager there are many users(communications type C) with Synthax SOLMAN<system id> or something like that. It means basically, that we have for every particular customerS system one SOLMAN user for RFC(cust_scout) in our Solution Manager. My question is if we can replace all of these users with only one RFC user for all the systems and customers?
    Hi Miloslav,
    Technically, it will work that you define one common RFC user in your SolMan for communication (RFC BACK destination) from all connected managed systems.
    BUT, I would never recommend it.
    Once a managed system cause issues in your SolMan, you are not able (or at least it's much more difficult) to identify the managed system. Same happens, if a invalid password in the BACK destination leads to a locked user.
    My recommendation: Spend the extra effort in creating a user per managed system. Operation will be much easier later.
    See also this guide:
    [Activating EarlyWatch Alert [EWA] in End Customeru2019s System |http://service.sap.com/~form/sapnet?_SHORTKEY=00200797470000089947&_OBJECT=011000358700000567342009E]
    Best regards,
    Ruediger

  • Rename 600+ users in CUA implemented 3 system landscape

    Hello All,
    Task ahead :
    Rename around 600+ users in my Production system which is my CUA central system as well. I am having a simple 3 system landscape.
    Advice on :
    What can be the pitfalls for this activity ?
    Since CUA is ON, there would not be a Rename Option available any more...so How to proceed with this activity ?
    Is there any negative impact for such renaming actions in the system.
    Any inputs would be rewarded handsomely...
    Thanks for your time.
    Br,
    Sri

    Hi Happyman,
    How do i perfrom the Rename in my central system ? Its OK, i can delete child systems from the centrral CUA and perfrom a rename and then re add it back to CUA...bt my query is how to tackle this issue in central PRD system.
    does that means i need to delete the existing CUA altogether and recreate it again after utilising the rename option ?>
    Thx for the inputs...
    Br,
    Sri

  • RFC USER USER TYPE- SYSTEM/SERVICE?

    Hi,
    We are using CTP method of GATP.
    Currently our user type for RFCUSER (Usermentioned in rfc destination) is service? It allows dialog mode this is security concern for us as RFC USER as all authorisations.
    When we changed it to system user it is giving error while triggering GATP. Also there is dump in SCM system with message
    "DYNPRO_SEND_IN_BACKGROUND"
    "/SAPAPO/SAPLATP4" or " "
    "SYSTEM-EXIT".
    pls. suggest solution
    Regards,
    Santosh

    Hi,
    This info i took it from help library.
    If you want the ATP check to be performed in SAP APO but triggered from SAP R/3, make sure when
    defining the RFC connection of the SAP APO system in SAP R/3 that you use a user ID for the SAP APO
    system that was created there as a dialog user.
    Thanks,
    nandha

  • RFC users locked after system copy in production system

    Hi,
    BW_User,MDBTC(RFC users) system users were locked in our BI Production system at the same time system copy activity was running in the Quality system(production to quality) so as per our colleagues concern after system copy they started Quality system with out changing background work-process 0 so some jobs were triggered which were copied from production system.
    Is there any cause to lock RFC users in production system for system copy? If there is any other reason where we can check logs
    Thanks
    Jalandhar Reddy

    Hi,
    Well maybe i am wrong to analyze your problem .
    Anyway I faced this issue to in our system before and we found that one background job was running  in a system that has basically  prompting an RFC connection to another system. In the t.code SM59 and there was wrong password was put in.We just reset the password and it was worked fine.
    You can try for this..
    Regards
    Bhuban
    RKFL

  • Unable to read software component version from System Landscape Directory "

    I've worked in past creating/importing SWCV, but this is new system PI7.0 and stuck.
    A) Is my understanding on resolution correct?
    Should I go and apply notes 940309 and create client copy of existing client 001
                                        OR
    change role of client 001; SXMB_ADMIN -> 'Integration Engine Configuration' to 'Integration Server'
    I have no problem in using client 001 as Integration server, all I want is import of SWCV to work. Thanks. Appreciate the help.
    B) Here is what I have done and the error:
    1) Followed weblog below and created product, software component, technical system, business sytem in SLD.
    /people/srinivas.vanamala2/blog/2007/02/05/step-by-step-guide-xml-file-2-xml-file-scenario-part-i
    2) When I import the SWC from integration repository getting error
    (Unable to read software component version from System Landscape Directory "server:5<system number>00").
    C) Pointers used from the forum to debug the issue, but still no luck
    Below are the points checked from the forum and all steps are correct, but still have issues with the import
    1) check the RFCs SAPSLDAPI, LCRSAPRFC, connection test pass as the program ID registered with Jco
    2) T-code SLDCHECK no errors (followed http://help.sap.com/saphelp_nw04/helpdata/de/78/20244134a56532e10000000a1550b0/content.htm)
    3) T-code SLDAPICUST got user PIAPPLUSER, pwd is correct (reset the pwd)
    4) logged using PIAPPLUSER http://server:port/sld and it works
    5) One of the weblog SLD Check Failed (LCR_LIST_BUSINESS_SYSTEMS function doesn't work) referred to apply notes 940309
    Notes: 940309
    You are installing 'SAP NetWeaver 2004s SR1 ABAP+Java' Usage Type 'NetWeaver Process Integration (PI)'.
    You don't want to use the default client 001, but another client as Integration Server.

    applied portion (PIPostInstallProcess) of OSS notes 940309 and it resolved.
    Note:
    I still retained client 001 and didn't do client copy as mentioned in the notes. The wizard based CTC tool helped. Here are the details if someone has similar issue and want to know further details:
    A NetWeaver Process Integration (PI) Installation (ABAP+Java) has two parts: Installation and configuration. The former is done by the Installer, the latter by the 'Central Template Configuration' (CTC) Tool.
    http://help.sap.com/saphelp_nw04s/helpdata/en/14/39084136b5f423e10000000a155106/frameset.htm
    1.      Call the wizard-based configuration tool as described in Configuration Wizard.
           2.      Select the scenario PI and the task PIPostInstallProcess.
           3.      Choose Execute.
    A list of the steps to be executed by the wizard is displayed.
           4.      Choose Install.

  • 403 Error during communication with System Landscape Directory from RWB

    Hi,
    I've got a new install of PI (XI 7.0) SPS 10 and am getting an error whenever I try to access the SLD from RWB or Integration Builder.  The SLD is running on the same server as XI.
    I've been through the various config guides (strangely there doesnt seem to be one specifically for PI/XI 7.0),  to configure RFC destinations, checked users are not locked etc.
    I'm thinking it's probably a VA / Authorisations issue, but could use some ideas!
    Here's a few errors just for reference (and future people searching!)
    <i>
    Error during communication with System Landscape Directory: HTTP response code: 403 (Forbidden)
    Unable to read XI domain from the SLD. Monitoring cannot therefore be configured. Error message: com.sap.aii.rwb.exceptions.BuildLandscapeException: Error during communication with System Landscape Directory: HTTP response code: 403 (Forbidden)
    No System Landscape Directory exists. Unable to generate the landscape
    Unable to read software component versions from System Landscape Directory "my.server:51400" (have tried 8014 also)
    </i>
    Thanks,
    James.

    Hi,
    1) Activated all services
    2)Go to SU01 > type PIISUSER and reset the user's pw
    Check out this might be helpful
    http://help.sap.com/saphelp_nw04/helpdata/en/89/05793c05f0807be10000000a11405a/content.htm
    403 ERROR
    Check this note might help you 961880
    Regards
    Agasthuri Doss

  • 4 System Landscape // ChaRM // No Export System found

    Hi Folks,
    I got some problems with a 4 system landscape in ChaRM.
    The error message I get when doing a consistency check within my SMI project is:
    Message from function module /TMWFLOW/CHECK_PRJ_CONS: No export system for NWA-303
    Message no. /TMWFLOW/TRACK_N159
    Transport route should be as follows:
    DEV -> QAS -> INT -> PRD
    Since I am still in testing phase I used clients instead of real systems in my configuration (TMS, Logical component,....)
    My configuration looks like this:
    NWA client 300 -> 301, transport layer ZCHM, transport layer SAP, consolidation
    NWA client 301 -> 302, delivery
    NWA client 302 -> 303, delivery
    Logical Component defined as follows:
    Developement System (Source: SAP): NWA:300
    Type of Role: D Source System
    Quality Assurance System (Source: SAP): NWA:301
    Type of Role:  O Target System
    Integration System (Source: User): NWA:302
    Type of Role:  O Target System
    Production System (Source: SAP): NWA:303
    Type of Role:  P Production System
    Anyone got an idea what is wrong? did I miss anything?
    The same configuration works for a 3-tier Landscape (without Integration System).
    Any help is appreciated.
    Thanks.

    Hi Raquel,
    Ours problems with RFC and with connections had be corrected with the note below:
    1833778 - Activate Change Request management - Check error
    Thank you very much!!
    Adriana

  • System landscape directory configuration

    Hi ,
    I have problem related to System Landscape directory.
    Actually my intention is to consume webservice from abap system.So i heard that we have to configure
    setting in system land scape directory.
    So if i go to system landscape directory i.e.
    visualadministrator->services-slddatasupplier-CIM client generation setting
    then at this point it ask for
    HTTP connection parameter :
    Host:
    Port:
    User:
    password:
    so i just want to know what detail we hav to mention here.
    Please help me on this issue.
    Thanks,
    sudhanshu

    I do not think you need SLD configuration for comsuing webservice.
    Once you have downloaded the WSDL file you can consume the same using Webdynpro
    Check in wedynpro forum with the search string "Consuming Webservice in webdynpro",
    you shud get lot of help.
    Check this link
    Using RFC as WebService in WebDynpro
    Few more
    http://www.riyaz.net/blog/xipi-consuming-xi-web-services-using-web-dynpro-part-ii/
    http://www.riyaz.net/blog/xipi-consuming-xi-web-services-using-web-dynpro-ui-design-part-iii/
    Edited by: Santhosh Edla on Jun 12, 2009 10:12 AM

  • You do not have permission to view the System Landscape Directory.

    Hello there,
    When I accessed my SLD from portal, it took me to the page but kept saying:
    - You do not have permission to view the System Landscape Directory. Minimum required: UME role with permission com.sap.lcr.LcrUser and J2EE role LcrUser. See the SLD Post-Installation Guide for details
    - SLD not configured; configure the SLD in Administration first.
    I searched on these forums for the above error. Got some results, but nothing really substantial that has helped/fixed my problem.
    I also read a bit on SLD from the pdf file named: System Landscape
    Directory of SAP NetWeaver 2004s
    I also worked on the security roles and actions to individual
    users or user groups like for ex: the above pdf file advised I map the security roles from Visual Administrator, to the created roles in the portal. I've done that too. Like create a user group: 'SAP_SLD_ADMINISTRATOR'  and create a user role corresponding to it, which would be: 'LcrAdministrator'
    Then, I went to visual administrator, and clicked on 'Assign User Groups to Roles'
    Even after this, I tried to access the SLD from portal: It is still giving me the same error I mentioned above in bold italics.
    Can somebody please help me how to fix this issue?
    Thanks
    Dino.

    Graham:
    Thank you very much for making the effort to reply to my query.
    But, it still hasnt solved my problem yet.. for some reason even though I followed your instructions and did what you advised. 
    I have attached a screenshot of my Visual Administrator screen that you advised me to modify/change.
    Here it is: http://img166.imageshack.us/img166/2259/screenshot002co1.jpg
    After I made the changes, I restarted the J2EE server and went to my portal SLD page: [http://org-x:50000/sld]
    Tried authenticating usernames: LcrAdministrator and Administrator.
    Both attempts resulted in the same error show below:
    - You do not have permission to view the System Landscape Directory. Minimum required: UME role with permission com.sap.lcr.LcrUser and J2EE role LcrUser. See the SLD Post-Installation Guide for details
    - SLD not configured; configure the SLD in Administration first.
    I am wondering, if you would have another workaround regarding this issue, can you please let me know?
    Thanks
    Dino.

Maybe you are looking for

  • Thunderbolt to HDMI does not detect TV on Yosemite

    I am having the same problem as a lot of people with Yosemite and and connecting to a TV/external monitor via thunderbolt to HDMI but have found a sort of a solution or at least a bit more info that might lead to someone having a eureka moment. I hav

  • PDF washed out

    I'm creating a pdf in Bridge and it becomes washed out once saved.  I've tried sRGB color space as well as Adobe 1998.  Both are washed out.  Does anybody have a solution to this issue? 

  • HowTo; Embedd all linked images

    I'm looking for a quick and easy way to tell Illustrator to embed all linked images.

  • Check for Clause Updates ....

    Hello: In PO - Buyer Work Center (R12.0.6), When I do a check for clause updates, the system displays all the latest clauses from the library. On selecting a clause and applying it, I get the latest clauses. However, I want to revert it and get the o

  • Switching computers i sync with..will i lose everything?

    currently, my iphone 3gs is synced with a windows computer, and id like to switch to sync it with my mac. will i lose all my text messages, apps, ect? i know i can save my contacts in google, but what about everything else? if i back it up on the mac