Hi All,
Recently we have refreshed our CRM 7.0 QAS system with PRD system.
Everything is working fine but we are facing some issue in connecting to TREX.
For TREX we have only changed RFC by program ESH_ADM_SET_TREX_DESTINATION to QAS TREX system and this RFC is working fine but still when user is trying to create new account or contact it is giving error:
" A Service of Trex Engine was called but connection could not be established for it"
" Check TCP/IP RFC communication"
Trex RFC is working fine, please suggest is there any more action required for TREX after system Copy.
Regards,
Shivam Mittal

Hi Nainesh,
Thanks for the message , yes system is up and running fine , the DB team did a restore of Production data  on Quality again , and i did the post refresh activities again , the issue what had happened last time was we were doing simultaneous refresh of two systems at a time , BI prod to BI qas and ECC prd to ECC qas , we had found a list of tables in BDLS which gets updated when we run BDLS and we run those tables only , unfortunately the files got exchanged , the ECC tables should have run on ECC machine and BI tables should have run on BI machine which didn't happen and it happened the other way round BI tables where run on ECC machine , due to which BDLS failed and the job got cancelled many times, which impacted the whole system conversion and logical update , which crashed the DB( i exactly don't know the reason what happened internally , still searching for it ) . At present the machine is up and running fine.
Regards
Mrigank Aditya

Similar Messages

  • Post System Refresh Activity

    Hi All,
    I did system refresh ( from PRD to QAS , platform Windows 2008 R2 and MSsql) the system was up and running fine. The system was absolutely fine  for one day and the day after the DB crashed , not sure what happened, is there a way i can find the logs through which i can come to know what exactly happened. Also post refresh when i was trying to run BDLS , the job was getting cancelled , the job log showed there is another conversion already running , when i checked the tables the conversion had already happened . Please tell me can running BDLS which cancelled many times could be the cause for the DB crash, if yes where can i find the logs for this , if not what else could have happened that the DB crashed . Thanks for your responses in advance.
    Regards
    Mrigank Aditya

    Hi Nainesh,
    Thanks for the message , yes system is up and running fine , the DB team did a restore of Production data  on Quality again , and i did the post refresh activities again , the issue what had happened last time was we were doing simultaneous refresh of two systems at a time , BI prod to BI qas and ECC prd to ECC qas , we had found a list of tables in BDLS which gets updated when we run BDLS and we run those tables only , unfortunately the files got exchanged , the ECC tables should have run on ECC machine and BI tables should have run on BI machine which didn't happen and it happened the other way round BI tables where run on ECC machine , due to which BDLS failed and the job got cancelled many times, which impacted the whole system conversion and logical update , which crashed the DB( i exactly don't know the reason what happened internally , still searching for it ) . At present the machine is up and running fine.
    Regards
    Mrigank Aditya

  • Post System Refresh Activity - BDLS run

    Hi,
    We have finished system refresh of a QA system from Production.  We need to run BDLS now to convert the original Production logical systems to QA relevant logical systems. 
    I am short of understanding of this process.  Can anyone please help me with the concept and process?
    Thanks in advance,
    Abdul

    Hi Abdul Rahim Shaik,
    BDLS will convert the logical system name for your PROD to QAS.
    For eg:
    Your source - PRDCLNT100
    Your target - QASCLNT100
    If you go to SCC4 in your QAS, u will see Prod logical system name for the client.
    Once you run BDLS after system copy, logical system name exist  in every table for PRDCLNT 100 will change to QASCLNT100.
    Refer to below link for more info:
    http://help.sap.com/saphelp_nw04/helpdata/en/33/c823dbaea911d6b29500508b6b8a93/frameset.htm
    Cheers,
    Nicholas Chang

  • Post system refresh, "Request IDoc : IDoc with errors added"

    Hello All,
    Post system refresh, we are not able to execute the data loads.
    While loading the Infopackage, the overall status is still showing in YELLOW status. but in the Transfer (IDOCs & TRFC), it shows an Error message as "Request IDoc : IDoc with errors added"
    Yesterday immediately after the refresh, we were able to execute the master data loads (full loads)...
    However, transaction loads (delta) is facing issues.
    Today, we are facing the problem in both master and transaction data.
    Please help!!!! Its a very critical issue!!!
    Edited by: Siegfried Szameitat on Aug 9, 2011 10:17 AM

    Hi,
    While selecting the Infopackage to run the INIT load, it is taking me to the ECC login screen. Once i enter my credentials, its showing a dump with the message:
    Short text of error message:
    No RFC authorization for user XXXXX ( RSA8 ).
    Long text of error message:
    Technical information about the message:
    Message class....... "RSAR"
    Number.............. 051
    Variable 1.......... "No RFC authorization for user XXXXX ( RSA8 )."
    Variable 2.......... " "
    Variable 3.......... " "
    Variable 4.......... " "
    Please advice.
    Regards
    sneha

  • IDOC Tables with Errors Post System Refresh

    Hi Everyone,
    Is there any Report  or other way through which one can get List of  IDOC Tables with Errors Post System Refresh.
    Thanks,
    Regards,
    - Ishan

    Hi,
    While selecting the Infopackage to run the INIT load, it is taking me to the ECC login screen. Once i enter my credentials, its showing a dump with the message:
    Short text of error message:
    No RFC authorization for user XXXXX ( RSA8 ).
    Long text of error message:
    Technical information about the message:
    Message class....... "RSAR"
    Number.............. 051
    Variable 1.......... "No RFC authorization for user XXXXX ( RSA8 )."
    Variable 2.......... " "
    Variable 3.......... " "
    Variable 4.......... " "
    Please advice.
    Regards
    sneha

  • System refresh activity in Development Box

    Hi Guru's
    I have requirement for system refresh activity in development system and i would like to know what are pre-activity required for this other than when compared to normal system refresh and also please share me any link or snote related to this
    Regard
    Mohammed Sayeed

    Hi,
    This is SAP business one system administration forum. Please find correct forum and repost your question to get quick reply.
    Please close this thread here with helpful answer.
    Thanks & Regards,
    Nagarajan

  • System Refresh activity

    Does any body have a clear explanation for the system refresh activity.
    and is System copy and  refresh one and the same
    if some one has steps please send them to me
    thank u

    Pavan ,
    when you are performing the client copy you are coping the tables and indexes.
    if your system have different patch level i way cause inconsistancy while client copy.
    Please check this forun to clear the situation
    Re: Error in Remote Client Copy
    thanks
    Rishi Abrol

  • Retain background jobs and its variants before system refresh activity

    Hello All,
    I am going to perform system refresh activity on quaity system on monday. Customer wants to retain the background jobs and its variants in the quality system. Please guide me and let me know the steps to retain the background jobs and its variants before starting the system refresh activity.
    Regards
    Subbu

    Dear Subbu,
    You have to export the TBT* Tables to retain the jobs. You can do this with R3trans:
    1. Make Export file
    2. Make Import file
    3. Make Export in Q System before Systemcopy
    4. Start Database and not SAP
    5. Make Import in Q after Systemcopy
    6. Start sap
    1. Make Export file /tmp/export_cmd
    export
    file='/tmp/export_Q.dmp'
    client=<your client>
    delete from TBTCA               
    delete from TBTCB               
    delete from TBTCCNTXT           
    delete from TBTCCTXTT           
    delete from TBTCCTXTTP          
    delete from TBTCI               
    delete from TBTCJCNTXT          
    delete from TBTCJSTEP           
    delete from TBTCO               
    delete from TBTCO_V01           
    delete from TBTCP               
    delete from TBTCPV              
    delete from TBTCR               
    delete from TBTCS               
    delete from TBTC_SPOOLID        
    delete from BTCEVTJOB
    select * from TBTCA             
    select * from TBTCB             
    select * from TBTCCNTXT         
    select * from TBTCCTXTT         
    select * from TBTCCTXTTP        
    select * from TBTCI             
    select * from TBTCJCNTXT        
    select * from TBTCJSTEP         
    select * from TBTCO             
    select * from TBTCO_V01         
    select * from TBTCP             
    select * from TBTCPV            
    select * from TBTCR             
    select * from TBTCS             
    select * from TBTC_SPOOLID 
    select * from BTCEVTJOB
    2. Make Import file /tmp/import_cmd
    import
    file='/tmp/export_Q.dmp'
    3. Make Export in Q System before Systemcopy
    R3trans -w /tmp/Q_export.log  /tmp/export_cmd
    4. Start Database and not SAP
    sqlplus "/as sysdba"
    SQL> startup
    or
    startsap
    stopsap r3
    5. Make Import in Q after Systemcopy
    R3trans -w /tmp/Q_import.log  /tmp/import_cmd
    If you want to undo this, start the export script in P system and the Import script in Q system.
    Don't be afraid of the delete statement but without delete it doesn't work!
    6. Start sap
    startsap
    Best regards
    Willi Eimler

  • How can we automate the Post system refresh activities

    All,
    Just want to know if there is a way to automate most of the post system refresh activities that were done by Basis.
    Please note that i am talking about Post System refresh activities.
    Appreciate your responses.
    Thanks,
    Giri

    It all depends on what you would like to do: you keep the same SID or is it a rename?
    - you could plan 1 jobs on production after event 'Zafterrefresh" with following steps:
    that runs a BDLS
    that does a cleanup of the spools
    cleanup application logs
    Trigger the event after the refresh and that starts.
    Depending on your system you can run multiple jobs in //
    some actions will have to be done manually:
    user import
    TMS config
    etc

  • Post System Refresh

    Hi Guru's,
    I needed to know what are important BI steps to go through (for system check up) after the system refresh.
    In this case, the testing box has been refreshed from the production.
    Thanks, Akash

    hello,
    After the refresh, the connection with the source system gets lost.You need to:
    1.restore source system connection
    2.activate and replicate datasources
    3.Run program RS_TRANSTRU_ACTIVATE_ALL to activate the transfer struture
    4.If you had not transported certain objects from QA to prod. You will need to retransport them.
    have a look at 4 possible scenarios and check the strategy at:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/bff13df2-0c01-0010-6ba7-bc50346a6fd8
    Check these notes: 140276 and 325470
    to know the other possible notes for this,have a look at:
    /message/3030702#3030702 [original link is broken]
    Reg,
    Dhanya

  • SRM - System Refresh (Post Refresh steps)

    Hi,
    Can anyone tell me the steps to execute after SRM system refresh using file copy method ?
    Thanks & Regards,
    Jag

    I have seen this somewhere in the forum: See if this helps you
    BDLS: Convertion of logical system (SRM).
    Check entry in table TWPURLSVR.
    Check RFC connections (R/3 and SRM)
    SPRO, check or set the following points:
    Set up Distribution Model and distribute it
    Define backend system
    Define backend sytem per product category
    Setting for vendor synchronization
    Numbe ranges
    Define object in backend sytem
    Define external services (catalogs)
    Check WF customizing: SWU3, settings for tasks
    SICF: maintain the service BBPSTART, SAPCONNECT
    SE38:
    Run SIAC_PUBLISH_ALL_INTERNAL
    Run BBP_LOCATIONS_GET_ALL
    Update vendor BBPUPDVD
    Check Middleware if used.
    Run BBP_GET_EXRATE.
    Schedule jobs (bbp_get_status2, clean_reqreq_up)
    Convert attributes with RHOM_ATTRIBUTE_REPLACE
    BR
    Muthu

  • Windows 8.1 will not activate on HP19-2113w after system refresh.

    Everything was working fine on my PC.  Then the other day it crashed and said there was a disk error and that it had to scan the whole drive to find the error. It finished scanning, but windows 8.1 would not load sucessfully.  Therefore I did a system refresh thru HP recovery.  After doing that windows would start up normally, but I lost my activation.  When I tried to activate the response was "Key doesn't work try again later" or something like that.  Kept trying, no luck.  I thought it may have been an error with the system refresh, so I did the total system reset (after saving personal data).  Now I am having the same problem with activation, and If I try to navigate the normal way to the activation screen, the screen disapears.  I can get to activation using command prompt.   but key still does not work.  The key I am using I retrived from my BIOS data.  Also, I ran the refresh and reset from the origional hard drive partition.  I hope someone has a solution to this.  Thanks is advance Bill   

    Hello , Welcome to the HP Forums, I hope you enjoy your experience! To help you get the most out of the HP Forums I would like to direct your attention to the HP Forums Guide First Time Here? Learn How to Post and More. I have read your post on how your desktop computer will not activate after performing a system refresh, and I would be happy to assist you in this matter! In order to correct this issue, I suggest following the steps in this resource on Windows 8 product activation, which should help to activate Windows 8.1 on your system. Please re-post with the results of your troubleshooting, and I look forward to your reply!
    Regards

  • System Refresh Precautions?

    Hi,
    During system refresh, are all types of data - master data, transaction data as well as <b>customising data</b> get refreshed from prouduction environment?
    Could you please suggest what is best way to get back project specific new customising data on a refreshed environment? Is there some sap recommended best practice on this.
    regards,
    Karthik

    Hi Please go through. This will give you exhaustive information. After refresh we used this to get back the required system specific customizations.
         Refresh from PR1 to QA1
    1.     Before the copy 
    &#61558;     Note down customer key, Installation number and license key - Done
    •     LICENSE system: QA1
    •     Customer key: L1985917776
    •     Expiration_date: 99991231
    •     Installation no: 0020065063
    •     Key: GKRZ25H353129JYX8HCJRS13
    •     Productid: R3_ORA             
    license useable ***
    (directory: \usr\sap\QA1\SYS\exe\run)
    (run command: saplicense – show)
    Team Involved: SAPDBA
    &#61558;     Download RFC tables  - To be done
    Tables rfcattrib, rfcdes and rfcdoc have been exported using sapdba on QA1 and the corresponding files are kept in a new temporary directory: /oracle/QA1/rfc_dest. After the system copy, these files have to be moved from /oracle/QA1/rfc_dest to /oracle/QA1/sapreorg and then the tables can be imported into QA1, to revert back to the RFC destination information as it is now.
    Steps : 1)login with oraqa1
               2) type sapdba
               3) select e - Export/import
    Perform this step two days before the scheduled refresh.
    Team Involved: SAPDBA
    &#61558;     Backup user master records in QA1 - To be done
    Procedure : login to QA1 400.
    Execute Transaction code: SCC8 (CLIENT EXPORT)
    Selected profile: SAP_USER
    Target system: QA1/DV1(safety backup)
    Perform this step two days before the scheduled refresh.
    Team Involved: SAPDBA
    &#61558;     Compare filesystem spaces -  Done
    Team Involved: SAPDBA
    &#61558;     Compare transports To be done
    Team Involved: SAPDBA
    &#61558;     OPERATION MODES(RZ04) Done
    Existing QA1 operation modes.
    Team Involved: SAPDBA
    &#61558;     Successful backup of PR1 To be done
    A successful offline backup has been scheduled on *** and that backup will be restored on to QA1 by the Unix team.
    Team Involved: USTO
    &#61558;     System messages/E-mails To be done
    SM02- CREATE A TEST MESSAGE IN PR1
    Two days before the scheduled refresh perform this step.
    Team Involved: SAPDBA
    &#61558;     Delete the existing datafiles on QA1  To be done
    Login as qa1adm and execute stopsap
    Login as oraqa1 and execute:
    lsnrctl stop
    rm –rf sapdata?/*
    Team Involved: SAPDBA
    2.     The copy To be done
    Copy all the datafiles from /oracle/PR1/sapdata? To /oracle/QA1/sapdata?
    Owner, group and permissions of the new files/directories to be maintained as before
    Copy Command: rcp –p  /oracle/PR1/sapdata*   Sierra: /oracle/QA1/sapdata*
    (NOTE: If errors occur when restoring/copying the sapdata on the target system, the complete restore/copying has to be repeated.)
    Team Involved: UNIX FOF/USTO
    3.     After the copy To be done
    &#61558;     Creating the control file on PR1 – To be Done
    Login as pr1adm and execute the following in svrmgrl
    connect internal
    alter database backup controlfile to trace;
    exit
    FILE created under the following Location: \ORACLE\PR1\saptrace\usertrace\ <pr1_ora_xxxx>.trc chose the latest run
    ftp the file onto desktop
    Team Involved: SAPDBA
    &#61558;     Edit the control file – To be done
    Here is the edited control file:
    Team Involved: SAPDBA
    &#61558;     Creating the control file on QA1  -  To be done
    Login as oraqa1 ftp the file to /oracle/QA1 and execute the following in svrmgrl
    connect internal
    @control.sql
    alter database open resetlogs;
    lsnrctl start
    exit
    Login as qa1adm and execute startsap
    Team Involved: SAPDBA
    &#61558;     Post system copy activities
    •     License installation  - to be done
    Login with user qa1adm
    Goto /usr/sap/QA1/SYS/exe/run  
    command: saplicense –install
    •     Installation check (Transaction SICK)
    •     SE06 > Database Copy or Migration > Post Installation Processing
    •     Delete entries from tables: DBSTATHORA, DBSTAIHORA, DBSTATIORA, DBSTATTORA, MONI, PAHI, OSMON, DBSNP, SDBAH, SDBAD, SDBAP, SDBAR, DDLOG, TPFET, TLOCK and TPFHT
    •     Initial SAP consistency check (Transaction SM28)
    •     Database consistency check (Transaction DB02)
    •     Server check (Transaction SM51)
    •     TMS configuration
          Logon to the SAP R/3 System and goto TCODE SE06. Select "Database Copy or Migration" and execute "Post Installation Processing".
          Delete old TMS configuration and make new configuration for TMS via STMS TCODE.
    •     Logical system set-up and BDLS
    Delete logical system for client 400 after system refresh and create new logicalsystem and assigned to client 400.
    After refresh: LOGSYS400(logical system for client 400)
    Delete this logical system and create new logical system
    New logical system: QA1CLNT400 (logical system same before refresh in QA1)
    •     ITS and Bugseye settings
    •     RFC destinations as per Appendix (import the exported tables and then delete the temporary directory /oracle/QA1/rfc_dest)
    •     Logon load balancing(Transaction SMLG)
    •     Instance profiles
    Import profiles from active servers using RZ10
    Save and Activate instance profile. And restart the sap services.
    •     CCMS configuration
    •     Housekeeping jobs
         Background jobs(daily jobs)
    •     Application jobs
    •     Printer/spool/TemSe set-up
    •     User administration
        The transports are imported implicitly in post processing with transaction     
    SCC7.                                                                    
    •     Transport sequence number set-up
    •     Mass transport and Support package/patch application.
    Re-import transports to QA1 from DV1 which are not available in PR1.
    •     Manual configuration
    •     Create the rest of the clients:
    o     400     UAT/OAT Live Copy
    New client 340 to be created with the following settings.
    Source client: 400
    Target client :340
    Profile: SAP_UCSV
    COPY MODE: local copy
    Team Involved: SAPDBA

  • System refresh PRD-QUA

    Experts,
    We have completed the system refresh using PRD system data.
    part of post processing activity using t-code BDLS and and completed the  Logical system conversion.
    But still we observed that in BI system still prd system logical system (as below) name available on the infoobjects, because of the some of the jobs failed at BI system.
    RSA1->
    Data Transfer Processes
      8PB1CH0338T / PPXCLNT100 -> ZDINXXX
    Please let us know how to change the all the logical system from production system to quality system.
    Thanks
    Malai

    Hi Nick,
    Thank you for the response..
    Yes we have activated and ran the replication also.
    its seems looks good  When I check the check the datasources,
    Version : active
    and  datasoruce as below
    Datasouce for QX1CLNT100 QX1 client 100
    8PB1CH0338T
    ZDINCOMP_TEXT
    RSDS 8PX1CH0338T
    QX1CLNT100
    -> IOBJ ZDINCOMP
    C Din Company (Texts)  TEXTS ZDINCOMP    TEXTS ZDINCOMPTEXTS ZDINCOMP
    But click the inforprovider it shows around 30 of them shows PX1CLNT100 logical system.
    How Can i change those PX1 logical system name
    Thanks
    Elumalai

  • Adding transports to import queue after System Refresh

    Hello All,
    Every time we do system refresh from PRD to Sandbox as a part of post refresh activity we need to import all the transports which are in the import queue of PRD(which are not yet imported to PRD) to our Sandbox.
    But its a tedious job, as in the import queue many old transports which are still not yet imported to PRD will b there.
    So may b around 150+ transport requests in the import queue of PRD, which we need to add those manually from path
    Extras---->other requests -
    > Add. doing same for 150 times. cant even imagine dat work.
    So my question is, Is there any way to get the replica of import queue of PRD to Sandbox.
    Some where i read like transport buffer in the path  /usr/sap/trans/buffer/<SID> of the system will have list of all transports in the import queue.
    So can i copy dat file and replace SID with Sandbox SID and place it in the Sandbox under same path.
    Please suggest or give me a correct solution.
    Regards,
    Ravi

    Thanks a lot for your reply.
    I had read about using script like tp addtobuffer inorder to add the transports to the import queue some time back.
    But forwarding transports is a new method i got to know here which even looks easy too. It would be great if any 1 tell me how forwarding works.
    Also it would b fine if who all uses this method of forwarding to add transports to import queue do reply about any  problems faced while forwarding requests.
    Bcoz in our landscape , transport route is as below
    Dev to QA and Sandbox then from QA transports will move to Production.
    So after refresh forwarding Transports from PRD to Sandbox, how does this work. Please share your suggestions.
    Regards,
    Ravi

Maybe you are looking for

  • MBP - screen is grey-shaded and it is not possible to click on any link. Any ideas why and how to solve this problem?

    So, only on certain web pages, eg newspapers on-line, the screen appears grey-shaded. It is just possible to read the content. But I cannot click on any links. And sometimes the screen opens at the bottom of the page.

  • Line Item 0BATCH is used In Aggregate

    Dear Masters       I have used aggregate on cube. When I excuting query in query designer, it's taking much time to display the data. When I checked aggregate, it's giving warning message below Line item 'Batch number' is used in aggregate System Res

  • Needed to create a new cost element hierarchy to come in line

    needed to create a new cost element hierarchy to come in line with Victory reporting.  I went into create new group and referenced NETEXPS2.RD so that I could then edit it. I made all the changes required for the new hierarchy NETEXPS3.RD.  Unfortuna

  • What's up with Panera?

    I love my new MacBook Pro, but it will not work with Panera's Internet.  I have tried four separate Panera locations and I have had no luck at any of them.  I have tried using multiple browsers and tinkering with wifi settings and running the diagnos

  • Adding JcheckBox in JTable

    Hi there, I have a JcheckBox in a JTable. Whenever I click the Checkbox , on that particular cell it display true , when Clicked and false when I click again. Is there any way that I could disable that ?, I also wanted to center the Jcheckbox ? Thank