Hi,
     We found the following two material at Customer(2811165) can't carry out the VAT for create sales order. But the Tax can carry out for the other customer. The customer(2811165) can carry out the VAT for other material sales order. I checked the customer and material the Contry code(KR) and Tax classification(1) is correct and normal. It is only the two material for the special customer can't get the VAT. I check the pricing analysis. The follwoing is the log. Pls help check it.Thanks.
The mateials:
      KTPJC001-02
      KF-8005-0XXXXXXXXX
The following is the log:
Access Message Description
08 010 Access not executed (Requirement 008 not fulfilled)
10 010 Access not executed (Requirement 007 not fulfilled)
20 010 Access not executed (Requirement 008 not fulfilled)
Best Regards
Park

Dear Park
It seems you have assigned Routine 008 for the table which has the combination of some description and applicable to domestic.  For the same combination, in VK13 / UTXJ, you have maintained a tax code for a domestic customer and you are trying to create a domestic sale order.  Actually routine 008 is meant for Exports and hence the problem.
If my understanding is correct, Go to V/07, select the condition type JIND and click on "Accesses".  There check whether any routine is maintained under the tab "Requirement".   If so,  just remove  those routines and retry your process.
thanks
G. Lakshmipathi

Similar Messages

  • Whether MRP can be carried out for work scheduling GR. 20 i.e. work to orde

    Dear Experts,
    Whether MRP can be carried out for work scheduling GR. 20 i.e. work to order.
    mahendra

    Hi MShirodkar,
    Yes, s and it specifies the time needed to process the material in the operations at the different work centers.
    The GR processing time depends on the order quantity.
    The GR processing time is required to calculate the lot size dependent in-house production time. The system then uses the in-house production time to determine the planned dates for planned orders in materials planning.
    You can define work scheduling times in the material master record in one of two ways.
    Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
    Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
    I hope it clears you doubt any queries please revert me back.
    Regards,
    Madhu.G

  • No audio (line-out) for some QT and all Real Player

    This is strange.
    This link, which uses Quicktime, will only play SOUND via my internal speakers: http://www.umeportal.com/player.aspx?fid=393&ftyp=3&pgid=7&hid=13728&fp=qt
    While this link will play SOUND via external speakers: http://www.apple.com/getamac/
    Same with all the HD trailers: http://www.apple.com/trailers/ The the SOUND plays externally ok.
    Here's another one that will ONLY play from internal speakers: http://www6.islandrecords.com/site/promo/quicktime/killersbonesquicktime.html
    Real player, will play SOME mov files externally, but most others mp3, mpg, mov, will ONLY play via internal speakers.
    Ok, what gives?

    Ugh....nevermind.
    I removed USB Overdrive and external audio started working for everything.
    This is strange becaues I have been using USB overdrive for about a week w/out any issues.
    At the time I noticed the problem...I had been using QT to convert mov files to h.264, mpeg4, Sorensen 3 files and for some reason, using the QT export features -- with USB Overdrive installed -- mucked up audio play back. Go figure.
    Mac Pro 3Ghz/2GB RAM/ATI Radeon X1900 XT   Mac OS X (10.4.3)  

  • No Availabilty Check can be carried out

    Dear All,
    While do the availablity check for material, I face an error :- "No Availability Check can be carried out for Material XYZ".
    As per my opinion,if this material is blocked with some sales transactions like Sales orders & Delivery,it will show the same.
    How to rectify this problem and why it is coming ? Kindly Elaborate.
    Best Regards,
    Ankur

    Hi
    First of all No Availability Check can be carried out for Material XYZ
    This is not a error message and it is a information message
    This comes while sales order creation because
    Say Material X plant 1000 and user A is entering a sales order and hes has not finished sales order creation still in VA01 transaction only
    Say the available qty for thar material is 25 units and user A has put 20 units and has not pressed enter
    Now user B creates another sales order for  same Material X and same plant 1000  say for 15 units
    Now for user B the system will throw this message No Availability Check can be carried out for Material for material X
    Because the system doesnot know at the time of user B craeting sales, what is going to the order of user A and it cannot do Availabilty Check for two sales orders simultaneously for the same material in same plant
    To control this only , define material block for users in we have  Availability Check in sd--basic fns in img
    Once the user A comes out VA01 t code and pressed enter for that material the system then can do Availability Check  for user B or otherwise settings are reqd define material block for users in we have  Availability Check in sd--basic fns in img
    Regards
    Raja

  • Microsoft Office 2004 (Word) unable to save files  I have been running Office 2004 on my Intel iMac with Snow Leopard for some time and all of a sudden I cannot save a document. Word just stopped responding and I have to force quit. I can open Word and cr

    Microsoft Office 2004 (Word) unable to save files
    I have been running Office 2004 on my Intel iMac with Snow Leopard for some time and all of a sudden I cannot save a document. Word just stopped responding and I have to force quit. I can open Word and create a new document but I cannot save it. I reinstalled Word but that didn’t help. Then went to the Internet and found at least one other Mac user having the same problem which it suggests is caused by a recent Mac Security Update:
    http://answers.microsoft.com/en-us/mac/forum/macoffice2004-macword/word-2004-wil l-not-open-or-save-documents/b04eb870-9b0d-4f3b-bb47-b122301e36f6
    So I check for a new Mac Security Update and sure enough there was one. I downloaded it and now Word seems to be working, as it should. I can both open and save files. The only problem remaining is that when I open Word I get the following error message “An unexpected error occurred while trying to load the Microsoft Framework library”. I contacted Apple but they were unable to help.
    How can I get rid of this error message?

    Look, I realize you might have to get your machine working, so this is how you revert back.
    Restore proceedure to pre-Security Update 2012-001 v 1.0 & v 1.1
    #1 Backup your personal data off the machine.
    Backup files off the computer (not to TimeMachine). If you don't have a external drive, get one and connect to the USB/Firewire port and simply drag and drop copy your User folder to the external drive, it will copy all your files. It's best to have two backups of your data off the machine when trying to restore.
    Disconnect all drives now to prevent any mistakes from occuring.
    #2 Reinstall OS X 10.6 from disk
    Get out your 10.6 install disk and make sure it's clean and polished (very soft cloth and a bit of rubbing alcohol, no scratches) If your disk is borked, you'll have to order a new one from Apple with your serial number.
    Hold c boot off the 10.6 disk (wired keyboard, internal optical drive), use Disk Utility First Aid to >Repair Disk  of your internal drive  (do not format or erase!!), Quit DU and simply re-install 10.6.
    Note: Simply reinstalling 10.6 version from disk (without erasing the drive) only replaces 10.6.8 with 10.6.x and bundled Apple programs, won't touch your files (backup anyway)  or most programs, unless they installed a kext file into OS X itself. (only a few on average do this)
    #3 Update to 10.6.8 without Security Update 2012-001 v1.0 or v1.1
    Reboot and log in, update to 10.6.8 via Software Update, but EXCLUDE THE Security Update 2012-001 by checkinig the details and unchecking the blue check box.
    #4 Reinstall any non-working third party programs
    When you reboot, make sure to reinstall any programs that require kext files installed into OS X, you'll know, they won't work when you launch them or hang for some reason as they are missing the part they installed into OS X.
    If for some freakish reason you get gray screen at any time when booting (possible it might occur when you reinstall older programs), hold the shift key down while booting (Safe Mode, disables kext files) and update your installed third party software so it's compatible with 10.6.8.
    https://support.apple.com/kb/TS2570
    That's it really.

  • Order can not carry out revenues

    Hi Experts ,
                      I was trying to release production order and got message no valuation variant is assigned . Even after assigning it in opn2 and reading PP master data it is showing same error .
    Also while doing goods receipt ( MB1A ) I am getting error : Order 600003045 can not carry out revenues .
    Please guide
    Thanks
    Neal

    Hi neal
    As per controlling config. Planed cost has to be calculated during release are create of prod order. For that you have to assign costing carriant in OPL8. both for Plan and actual . in standard SAP PPP! is costing variant for plan and PPP2 is costing variant for actual.
    For this costing cariant you have to assign costing type and valuation variant.
    Please do it SPRO-Production-SFC-Integration-Order costing
    Do these setting.
    Standard valuation variant for PPP1 is 006 and for PPP2 is 007.
    Regards
    J. Saravan

  • PO created using fm BAPI_PRODORD_CREATE...Fails to create for some material

    Hi,
    I am creating PO using BAPI_PRODORD_CREATE......
    I am passing order data  and afs data....
    For some material PO is not created....
    Before passing data to function mo. BAPI_PRODORD_CREATE all the data is correct....
    But after executing bapi PO is not created for some materials.....
    I debugged the bapi...not found any error......
    Can anybody help me with this issue........
    Regards,
    Jenifer

    Hi,
    Use BAPI_PRODORD_CHANG for this.
    Regards
    Susheel

  • Vendor information for some material's is missing in the report ?

    Hi,
    One of my user has raised a request that the vendor information for some material is not displayed in report where as its available in ECC, now i have checked in BI that information for 20 material numbers is missing even in BI that is the reason not showing in the report. Now what do I do ? Can you please suggest.

    Kindly update the master data table for material and vendor.....

  • "No Availability Check Can Be Carried Out"

    Q.- In which all business situations we can get an error message - "No Availability Check Can Be Carried Out" except Material is blocked by another user?
    Please replay as early as possible.
    Thanks and Best Regards,
    Amol
    Edited by: amwsapsd on Aug 25, 2010 8:06 AM

    It will Pop -up the same Message in case if the Order , Delivery note & Reservation of Material is Processing.
    You can then block the relevant Transaction as per the requirements.
    Best Regards,
    Ankur

  • Output type in Purchase Orders, erroring out for some users

    Hi All,
    We have a custom ouput type for PO, say 'ZZZ'. The problem is we do not get this out put type in the message screen of PO for some users and some time it gets populated for the same users. Please help me in understanding this issue as we are unable to track the things.
    Thanks,
    Amit

    Hi
    Please check the maintenace of the condition record, Check the key combination used. The conditon records are mainatined based on the organisational parmeters & the Vendor data.
    Please check the PO's in whcih the message are not coming automatically & check the combination exist or not as condition records.
    You can check the condition records using MN05, MN06
    Award points if useful
    Thanks & Regards
    Kishore

  • Inconsistent for some material in Material master

    During creation for some material I am facing an error "The material type  does not exist" Message no. M3104. It happens with all material type.
    However, I have already found the reason for that. The material was already created before (year 2011) with ZMAK material type (but no transaction yet) and now the material type is deleted from production server. I can see the material in MARA table. It shows the material type which already has been deleted.
    Also I can see the material into all table MARC, MARD, MBEW, MAKT, MARM.
    But the interesting thing is that, I can't see the material in MM60.
    I can realize there are some inconsistent. But the data is available in all tables, so why I can't see the material in MM60 ?
    I have an option to re-create the material type. But it is my last option. Is there any other option to make the material visible in MM60 (without creating the material type).

    Hi,
    For workaround, you can create new material type FERT and transfer to production system, create material code FESEN045* or FESEN045. Or FESEN045’ not same material code FESEN045 (which is not possible) with material type FERT. Once done, you can do material to material transfer with MB1B with 309 movement type. If quantum of materials is more, you can go for BDC with MB1B with 309 movement type.
    Later you can delete material number FESEN045 with material type ZMAK and once all done, change material code to FESEN045 from material code FESEN045* for material type FERT.
    Or else you can have a mini project; keep all material stock created with material type ZMAK.
    You can create new material type FERT and then transfer to production system. Create new material code with new material type FERT and then go for MMAM. Finally add stock to new material code.
    Regards,
    Biju K

  • Open in Camera raw grayed out for some tifs not others, bridge

    I searched but could not find a solution. CSR. PC. Windows xp. In CS4 Bridge the option to open with Camera raw is grayed out in the file menu for some tifs and not others - It shows up grayed out on the file menu, but doesn't show at all when right clicking,  even with the files where open with camera raw is not grayed out in the file menu. I have purged the cache, deleted all temp files, closed both bridge and photoshop and still I cannot open the tif in camera raw. It is grayed out. If I go to the pic I touched up yesterday the option is not grayed out. Does anyone know how I can fix this?

    RJ Dougall wrote:
    My intent is to batch process in Camera Raw -- my preferences have always been set to use camera raw for TIF and JPG files, and I have never had a problem accessing Camera Raw either directly in PhotoShop itself, or Bridge.
    Please e-mail me a copy of your response to [email protected]
    Uh, this is a forum...not an email tech support organization...
    As for your issue, it's simply not clear what you are doing or what issue you have. Can you not open the scanned images via Camera Raw from within Bridge? If you can then you will need to go through each image and adjust the ACR settings before you would be able to process them. Depending on how you set up your actions, Photoshop's Batch may or may not catch settings...that part is pretty complicated.
    Also, I would question your use of JPEGs vs TIFFs. I would suggest scanning as 16 bit TIFF and running those through Camera Raw...you will be loosing a lot to scan into 8 bit JPEG and then re-running through Camera Raw. You really want to be sending ACR 16 bit images...

  • Allocate CO-PA  message Scalling carried out for segment SVVC1

    Hello
    i need some help
    when my user want to allocate COPA by transaction code KEU5
    she got message warning "Scalling carried out for segment SVVC1"
    Diagnosis
    the standardization of negative tracing factors was carried out in segment SVVC1.
    System response
    The tracing factors of the receiver are changed . this change the value for the receivers.
    Procedure.
    Standardization 4 was carried out.
    and I also found warning message.
    "Sendor base in period 8 is 0 therefore no allocation is possible"
    Diagnosis
    the total base value for sendor   Costcenter nameXXXXXX  in period 8 is 0. this value is derived from total of all receiver allocation bases.
    System response
    it is not possible to distribute the sender value because calculating the receiver values according to the formula.
    sender value X receiver allocation base / sender base would terminate the program . the sender is therefore not credited for period.
    Segment for allocate have segment for allocate from costcenter AAA costelement group BBB
    I check in Cost center report. using selection screen input cost center AAA and cost element group BBB for period 8
    and i found that value is -70,000
    and why doesnot -70,000 cannot allocate ?
    and does have way to solve it or not ?
    please help
    Edited by: dittaporn nanasilp on Sep 4, 2010 11:12 AM

    OK

  • No inspection lot can be opened for this material and vendor

    dear sir
    i m facing this error while  doing gr. also how to confirm certificate
    plz guide me
    No inspection lot can be opened for this material and vendor

    Sujit/Raj
    I got th similar error. I closed the issue as Raj said because there was an open inspection lot. Im still nto able to figure out the background or root cause for thi.
    The QIno record doe not have release Qty active and release date is 12/31/9999. Then why we have to close the previous inspection lot before recieving another. It seems like there is a condition or something that tells Inspection are to be done in stages and hence previous or pending inspection lot needs to be closed. But where i this condition coming from, where should i check.
    I created PO and performed GR. I noticed if i perform GR and if the Inpection lot has status REL SPCO SPRQ IRCH then this happens. If the status is just REL SPCO SPRQ  then I'm able to do multiple reciepts and this error does not show up.
    Any idea or suggestions?

  • Can I carry out the persistence and ORM tasks using EclipseLink?

    Can I carry out the persistence and ORM tasks using EclipseLink (without TopLink or Hibernate) ?
    Is the EclipseLink a free tool and no license fee?
    How about TopLink Essentials?
    Edited by: junez on 18-Nov-2009 05:51

    junez wrote:
    Can I carry out the persistence and ORM tasks using EclipseLink (without TopLink or Hibernate) ?
    Is the EclipseLink a free tool and no license fee?And yes, EclipseLink is an open source project so there are no license fees. However, Oracle does redistribute EclipseLink as part of the Oracle TopLink product and therefore customers are able to access support for EclipseLink through Oracle support.
    --Shaun                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

Maybe you are looking for

  • Silent Installation Of Oracle 10g Expression Edition

    Plz i need information about how to install Oracle 10g Expression Edition silently on multiple computer.....i get this script from Oracle site: ** Response file to perform silent install of Oracle Database 10g Express Edition ** ** Values for the fol

  • How can to connect 3 displays with resolution 2560x1600 to MAC Pro?

    How can I connect 3 Dell U3014 displays (resolution 2560x1600) to MAC Pro?

  • Possible to update report instances in publications?

    Product: Crystal Reports Server 2008 Version: 12.1.0.882 I haven't been using the server for very long, so excuse me if the answer to this question is more obvious than it seems... We have built a variety of report publications using individual Cryst

  • Hp dv 2700 sound driver for windows 7 64 bit

    hi kindly guide me how to download and install sound drivers for windows 7 64 bit  i have instaled it but it doesnt work properly 

  • Prod order quantity change