Technical data for planned order dependent requirements .
Dear All,
I have to call the dependent requirements created by MRP run in my report. Can anyone please tell me that where these dependent requirements are stored in the database or is there any function module to get these values?
Thanks.
Dear,
RESB Reservation/Dependent Requirements Link with PBED for FG and SFG releation. Function module MD_STOCK_REQUIREMENTS_LIST_API
Also refer this link,
Dependent Requirements report required
Regards,
R.Brahmankar
Similar Messages
-
Table For Planned Order Details From PP Module
In our organisation we are taking Plan Vs Acheivement from Production. So, intialy we taken Plan details from "PLAF" Table and Acheivement details from "S225" Table. But After running MRP at month end. Previous month plan get deleted and new order create.
how to get history data for Planned order.
Please help us.
Regards
NagaI don't think that there is any history in regard to planned orders. PLAF will get rebuilt according to your MRP parameters and I don't believe that the data is stored.
Regards,
Rich Heilman -
When I choose leadtime scheduling in MRP RUN then system does forward scheduling always.
Then in planned order change mode when i do manually do scheduling then it does backward scheduling as per settings in OPU5.
How to get backward scheduling in MRP.??Dear,
MRP do the backwordscheduling but The system always determines the basic dates for planned orders using backward scheduling.
The system automatically switches to forward scheduling if the determined start date lies in the past.For this you have to maintain 2 settings.
1)In OPPQ - Plant parameters maintain the indicator for start date in the past allow. 2) In OPU3 for your plant & order type , maintain the no. of days for start date in the past.
Hope clear to you.
Regards,
R.Brahmankar -
MRP run - misalignment for planned order between Date and Production Date
Hi All,
We've just integrated SAP for a new plant.
The MRP runs based on Routing Lead Time for Make materials instead on Material Master Lead Time, for Capacity Assessment purpose.
When requirements dates lay in the past, MRP performs forward scheduling starting from current date and properly defines Production End Date according to Routing.
By checking MD04, for the proposed Planned Order, the basic date is same as Current Date (= same as Requirement Date) instead of being same as Production Date.
It works as it if checks stil the MAterial MAster LEad time instead of Routing. In fact if I updated the LT of MM the MD04 provides the right Date.
For future requirements, the MRP works properly, by having basic dates (both start and end date) aligned with Production Dates of Planned Order.
How can I do the alignment w/o updating In House Production LT?
Thanks,
DHi Caetano,
we have already done this configuration in OPU5 but it doesn't provide any benefit.
Below how we configured it:
Scheduling level: Via detailed scheduling
Adjust dates: adjust basic dates, adjust dep. reqmts to operation date
For capacity scheduling: Always basic dates, dep. reqmts to operation dates
Scheduling type: Backwards.
Regards,
D. -
Unable to get tha data for Residual Order Plan query-0PS_C04_Q0008
Hi Xperts,
i have activated standard query-0PS_C04_Q0008.
But when i am executing the query i am unable to get the data for "Residual order plan" in the report output..
As i checked the transformation and the queries for this, every thing seems ok.
Could please suggest me the best way to check further or How can i get the data for this field?
Regards,
SAPCheck whether you have data for "Residual order plan" in 0PS_C04.
-
User exit/ badi needed for planned order create/change,collective ATP check
Dear All,
I'm looking for a user exit/ badi which can be used for planned orders at the stage of
mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
I need after collective availability check to perform the following:
1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
then
2) to start a scheduling.
Very appreciate your help.
Best Regards,
Andrey
Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PMDear,
Use the BAPI : BAPI_PLANNEDORDER_CHANGE
Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
and the transaction MDAC Execute action for planned order
This function module includes the following actions:
Explode BOM
Explode BOM, check availability
Check availability, only explode BOM in the case of a requirement
Check availability, do not explode BOM
Reset availability
Change planned order data
Schedule planned order
Delete planned order
Assign the key for the respective action control to the materials in the material master (MRP 4 view).
Please refer this thread,
Re: MDVP for collective orders
Regards,
R.Brahmankar -
Release status for planned order
Hi All
I am running MRP weekly,system is generating the Planned order once MRP is completed.Here my requirement is i want release status for planned order, at the same time once planned order is released i dont want user to change any data in planned order.
Somebody explain me about the settings of action control of planned order.
Regards
Srinivasan.PHi,
Sorry to say but there is nothing like system status for Planned orders.
Check below thread,
[Release of Plan orders|Planned Order Release]
Regards,
Dhaval -
Where we enter raw material reservation qnty for planned order in monthwise
sir,
as per client requirement in every month raw material reservation quantity fixed for planned order in monthwise.
in sap Where we entere raw material reservation for planned order in month wise nov, dec, jan and whre its show.
is it possible after mrp run.can we check that raw material reserve stock in mmbe for planned order.
pl guide me step by stepDear Prakash,
1) in MMBE, you cannot see Reserved qty against plan order ( it is not a confirmed receipt )
2) the reserved qty which is shown in MMBE is against production order
3) only after converting plan order to production order ( Header material )
4) dependent requirements will convert into reservations
Regards
kumar -
Creation of Reservation for planned order
Hi Team,
Is it possible to create reservation for planned orders after MRP run?
My opinion was the reservation can only be created with reference to production order after MRP. The reservation can not be created with reference to planne dorders after MRP run because planned orders are intermident document which will not exist in the system always. The planned order details will not be available in the system once it get converted into production order.
How the reservation will be processed which was created with reference to planned order after converting the planned order to production order?
Kindly need ur guidance.
Thanks
pskDear PSK,
In a typical discrete manufacturing setup production orders are the promised receipt for which reservations gets generated as
soon a production order is created.But only if the order is released goods movements can be posted against the reservation
details through MIGO/MB1A for 261 movement.
It's not required to create any reservation at the planned order level or which may not help you in any means to your business.
But however in a REM scenario MF60 is used to create stock transfer reservations for 311 movement where planned orders
are used for production backflush.To explain in detail even without any planned orders you can do a stock transfer reservation
for a production quantity.
Check and revert back.
Regards
Mangalraj.S -
How to connect MAPL and PLPO to derive work center for planned order
Hi,
Anybody know how to derive work center using MAPL and PLPO for planned order (PLAF). Is there any connecting table between MAPL and PLPO.
Please help asap.
Regards,
MitaliI guess u r trying to view the detail scheduling info (tab in MD13) for a planned order . In that case -
1. Go to PLAF and enter the planned order number. (PLAF-PLNUM) and get the ID of the capacity requirements record (PLAF-BEDID).
2. With this PLAF-BEDID go to KBED. pass the value here. KBED-BEDID. The KBED-ARBID values are your work center ID.
3. To get the work center texts ( the way is appears in the screen) - Pass this value to CRHD . CRHD-OBJTY = 'A' ( i.e Type work center) and CRHD-OBJID = KBED-ARBID.
Hope it solves ur prob.
Cheers
SKC -
Updating Scheduling data for Purchase Order
Hi,
I need a function module which can update the scheduling data for purchase order in EKET table. Normally we create Purchase Order as a reference from purchase requisition through BAPI_PO_CREATE1. That time it takes care of all the scenarios. But as per the requirement I want to create a PO which is created from more than one Purchase Requistions so I can't use the said BAPI. But still I am using this BAPI and after creation is completed I am updating the Requistions. The same scenario is taken care in ME59N, but I can't copy that code because of some requirements. So could any one please give me the idea to replicate the same functionality with any function module or other ways.
Thanks
Somnath paultry to pass all u sheduling related fields to POSCHEDULE and make sure u have enabled POSCHEDULEX along with sheduling related fields .....also (if no changes are there leave it with space )...
this will definetly update not only eket table ....it will update every table regarding to purchase order,ekpo,ekko,eket ...etc
Example of population of BAPI interface in the Function
Parameter: POHEADER
COMP_CODE = 1000
DOC_TYPE = NB
ITEM_INTVL = 00001
VENDOR = 0000001000
PMNTTRMS = 0001
PURCH_ORG = 1000
PUR_GROUP = 001
CURRENCY = EUR
Parameter: POHEADERX
COMP_CODE = X
DOC_TYPE = X
ITEM_INTVL = X
VENDOR = X
PMNTTRMS = X
PURCH_ORG = X
PUR_GROUP = X
Parameter: POITEM
PO_ITEM = 00001
MATERIAL = 100-100
PLANT = 1000
STGE_LOC = 0001
QUANTITY = 15.000
TAX_CODE = V0
ITEM_CAT = 0
ACCTASSCAT = K
Parameter: POITEMX
PO_ITEM = 00001
MATERIAL = X
PLANT = X
STGE_LOC = X
QUANTITY = X
TAX_CODE = X
ITEM_CAT = X
ACCTASSCAT = X
Parameter: POSCHEDULE
PO_ITEM = 00001
SCHED_LINE = 0001
DELIVERY_DATE = 02.12.2002
QUANTITY = 6.000
PO_ITEM = 00001
SCHED_LINE = 0002
DELIVERY_DATE = 03.12.2002
QUANTITY = 5.000
PO_ITEM = 00001
SCHED_LINE = 0003
DELIVERY_DATE = 04.12.2002
QUANTITY = 4.000
Parameter: POSCHEDULEX
PO_ITEM = 00001
SCHED_LINE = 0001
PO_ITEMX = X
SCHED_LINEX = X
DELIVERY_DATE = X
QUANTITY = X
PO_ITEM = 00001
SCHED_LINE = 0002
Parameter: POACCOUNT
PO_ITEM = 00001
SERIAL_NO = 01
QUANTITY = 15.000
GL_ACCOUNT = 0000400000
COSTCENTER = 0000001000
CO_AREA = 1000
Parameter: POACCOUNTX
PO_ITEM = 00001
SERIAL_NO = 01
QUANTITY = X
GL_ACCOUNT = X
COSTCENTER = X
CO_AREA = X
Parameter: POCOND
ITM_NUMBER = 000001
COND_ST_NO = 001
COND_TYPE = PB00
COND_VALUE = 79.900000000
CURRENCY = EUR
CURRENCY_ISO = EUR
COND_UNIT = KG
COND_P_UNT = 1
CHANGE_ID = U
Parameter: POCONDX
ITM_NUMBER = 000001
COND_ST_NO = 000
ITM_NUMBERX = X
COND_TYPE = X
COND_VALUE = X
CURRENCY = X
CHANGE_ID = X
Parameter: POPARTNER
PARTNERDESC = OA
LANGU = EN
BUSPARTNO = 0000001100
PARTNERDESC = GS
LANGU = EN
BUSPARTNO = 0000001200
PARTNERDESC = PI
LANGU = EN
BUSPARTNO = 0000001000
reward points if helpful.... -
How to get the pricing hierarchy based on the delivery date for sales order
Hi,
How to get the pricing hierarchy based on the delivery date for sales order other than system date.
My requirement is to get the Pricing hierarchy based on the delivery date other than system date.
Waiting for kind response.
Best Regards,
BDPHI Sai,
please refer teh document already how to write FM based extration on generic extractors.
and here the logic to find the latest records values:-
-> get the data in an internal table
->Sort the internal table data based from date descending
-> Using READ statement , we can read the first record of the table which is nothign but your latest record.
Regards.
Sakthi -
Changing MRP controller for planned order
Hello experts,
Is there any way the planner could change the MRP controller of a planned order within MD12 ? We are using ver 4.7 and this field is not enabled. Currently the planners are creating prod orders much in advance and are looking to move to a process where they firm planned order. We are using project stock planning structure so more that one planner may create orders for the same material. So when one planner review the material planning for one project he would firm the planned order and assign it to him for leater conversion.
Note: I the config I didn't saw any field selection control for planned orders.
Thank you in advance for sharing your wisdom.
Francois Paquet BPA
aeronautive industrieFrancois,
Very interesting question. However I never had to change those fields in either planned or prodcution orders.
Both orders master data fileds are disabled.
However since your are working with project orders ( or netwrok orders ) system would be giving you specific planner order hard tied to the project order ( similar to Made to order scenario).
Planner could use MD51 ( project planning ) & MD4C ( option for Netwrok or WBS element ) for monitoring progress of his /her order.
This way planners do not have to go by MRP controller data.
Hope this provides some new thoughts.
Thanks,
Ram -
Hi Experts,
I have configured the ATP rule for Planned Orders. So I only want to check the component stock and Production Orders when running ATP check for the Parent Material.
In OPJJ, I only selected the following options.
Include Safety Stock : Ticked
Check without RLT : Ticked
Incl.production orders : X (Take all production Orders into account)
No other options or boxes have been selected
Also I have included the relevant Checking group in MRP 3 for the Parent Material (Checking Rule has been assigned to that Checking Group in Config) and also maintain the Plant Parameters for MRP (assign the checking rule to the plant)
So, For an example :
Parent : A
Components : B and C
Parent Material A has only 5 Planned Orders starting on same day 20.05.2014 each qty 5
Components B got stock 300
Components C got stock 1
When I ran ATP Check for the Parent material A using COHV, qty 1 has been allocated to all the planned orders as committed. Why is this happening ?
I also checked in CO09 for the Component Material C, and it says ATP Qty is only 1. I expected the system would allocate that stock 1 to one of the Orders but it seems to be not working as I expect.
Any explanations will be much appreciated and will not hesitate to avoid the points.
Kind regards,
IsharaHi DB49,
Appreciate your reply. Please see the following comments.
Right now I have been assuming that you have performed an availability check manually for one of the planned orders, and you got the same results (overconfirmation). Please confirm.
Yeah I have performed for one order and it gave me the same result. Also, when I perform for the 2nd Order, it allocates the quantity.
OK, basic things you should already have checked:
You have maintained the checking rule for planned orders (OPPQ or OPPR)
You have maintained the ATP group for the materials (OVZ2)
You have assigned the ATP group to the Material Master of the components (MM02)
You have maintained the scope of check according to the rules you mentioned earlier (OPPJ).
You have no planning strategy in the component material that would have invoked a special ATP.
I checked everything apart from point 2 (OVZ2). I have maintained that via MRP Group and that MRP Group has been linked to Master Data (MRP 3)
Really appreciate your support in this.
Kind regards,
Ishara -
How do I maintain storage location for Planned Orders in APO
Dear all,
Can you help us in maintaining storage location for planned orders in APO. The storage location from material master need to be updated in product master of APO and the same shall be automatically picked from product master during Supply Network Planning run.
Material master CIF is live.
We have got the following content error in CIF consistency check. How ever this is nt goging to harm any thing, but we would like to maintain in both R/3 and APO.
Error:
Plant and storage location in SAP APO: 2004
Plant and storage location in SAP R/3: 2004 FGPA
Thanks in advance
Ram Mohan Rao KolanupakaInstead of maintaining additional master data, i would rather use CCR user exits to switch off comparison of planned order at storage location level if the APO storage location is blank. This way you would not have to make changes to PPMs everytime a new scale out of the solution happens.
In SE18 check the user exit /SAPAPO/CIF_DELTA3 (interface RELEVANT_FOR_COMPARE_ORDHEAD)
If it is not possible to switch off this comparison then I guess changing master data is the next step. Do explore with a developer though about the first option.
Maybe you are looking for
-
Safari crashes at startup now for no reason
Tonight all of a sudden after a reboot safari (and chrome and Firefox) all crash on starting the app. Network is functioning, I can use outlook, Skype etc. just all browsers crash. Help! Process: Safari [415] Path: /Applications/S
-
Hi All, Request you to share your views on Internal forex trading (Mirror Transaction) I am working on Internal forex trading , when i enter the details of the transaction in the Tcode TX31 for transaction close and give in the required details, syst
-
Authentication error with Yammer Data Source
Hi, I want to show Yammer post in my Siena application (Beta 3). I have added Yammer data source by providing Client id (by registering app) and provided redirect URL as my organization Yammer page (https://www.yammer.com/******.com). However when I
-
Installing Windows XP sp2 on SATA - KM4M-V
Hi, Hope some one can help me: My Set Up: MSI KM4M-v Amd Atholon XP 2800+ 333mhz FSB 1.5 gb Memory (Matrix PC3200) [1 x 1gb and 1 x 512mb] 200gb Matrox DiamondMax +10 (SATA150/7200/8M) 80gb Ibm Desktar IDE NEC DVD-RW Drive IDE Samsung DVD DRIVE IDE F
-
Well I get into msn hotmail can look who is sending me messages bit can not open the message?