Transfer of Production Version

Hi Gurus,
i am trying to transfer the Production Versions of a Material to an other System via IDoc. I am using BD10 for transfering.. The relevant Segment E1MKALM in MATMAS05 is filled with all data from the source. But in the Target Systen tge Production Version is not added (Material exists already in Target system, only addition is needed).
what am i am doing wrong? The Segment E1MKALM is directly for Production Version, but why this is not used in the target system? There are no errors in BD87 when i process the IDoc.
any Ideas?
Best Regards
Udo

no answered but i dont want this question to hang in ....

Similar Messages

  • Create production version

    Hi,
    we use ECC 5.0 and APO 4.1. For APO we need production versions. My problem is to create or change the production versions of a material, every time the appropriate routing or BOM is created or changed in ECC.
    There no suitable userexit in routing. Somebody told me to do with events and workflow. Can anybody tell me, how to do this on events routing-create/routing change and bom-create/bom-change.
    regards Joerg

    Function module CM_FV_PROD_VERS_MAINTAIN is used by transaction C223 to create/change production versions in dialog mode.  Are you looking for a function module or BAPI that will allow you to create/change production versions without screen dialog?  If so, I don't believe there is such a BAPI.  I thought maybe BAPI_PO_CHANGE might be useful, but according to <a href="https://websmp202.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=012003146900000252192005">Note 828538</a>, "For technical reasons, you cannot transfer the production version to the BAPI. However, as of SAP Release mySAP ERP 2005, you can influence the BOM components using the BAPI (complete recreation of the BOM or merging of the BOM components)."
    - James G.

  • ISSUE:regarding production version tab of MRP4 of  data transfer using BD10

    Hi all,
    This is regarding production version tab of MRP4 of  data transfer using ALE idoc (BD10).
    When i transfer the data using BD10 the production version is received at receiving end through segment
    but not created in MRP4 view tab.An error is coming as-
    "You wanted to maintain the master record of the material AB_06.04.09(2). However, it is already being processed by the user EBGABAP and is therefore locked."
    I logged in as-EBGABAP
    Please help me resolve the issue.
    Thanks
    Edited by: sanu debu on May 6, 2009 11:08 AM
    Edited by: sanu debu on May 6, 2009 11:09 AM
    Edited by: sanu debu on May 6, 2009 11:11 AM

    >
    sanu debu wrote:
    > Hi,
    > I have to upload production version tab data of  MRP4 view(MM01).Please suggest a function  moduleor bapi  for the same.
    >
    > Thanks.
    >
    > Edited by: sanu debu on May 6, 2009 3:24 PM
    BAPI_MATERIAL_SAVEDATA can be used, populate the respective fields in input parameter PLANTDATA

  • Receiver Determination when multiple Product Versions / identical namespace

    Hi,
    How would the receiver determination be done when we have multiple product versions with identical namespaces and interface names ?
    During development, when we do a release transfer to another product version, the namespaces and interface names remain same as the current objects.
    How would XI resolve the correct interface in this case ?
    thanks,
    Manish

    The XI does not care about the application systems. When a message is received by the application, it knows, what to do with the messages.
    The receiver could be an RFC call, an IDOC, an Abap Proxy, here the correlation between interface and Abap code is unique.
    The receiver could be a File, or JMS adapter, here the correlation  between interface and communication channel is unique as well.
    You might reuse IDOCs or RFCs or in rare situations other interfaces in different software components and install them for the same application system. But you can only generate proxies from one interface.
    Regards
    Stefan

  • Production version is not getting created using ALE-IDOC

    Hi all,
    Am using BD10 to transfer the material from sending to receving system.All the views are geting sent successfuly accept the production version tab data of MRP4 view.The segment is available in the standard IDOC.But prodction TAB  is not getting created at receving system .Please help to resolve this issue.
    Thank you.

    Hi Sanu,
    BD10 Send Material..
    the reason might be Production tab is not created is the segment is not a mandatory..
    and the data is not populating for that fields.
    if the segment is not madatorty and data is not available for the fields in the segment ..the prodction TAB  will not be created ..
    Regards,
    Prabhudas

  • Multiple Production Versions in Subcontracting Inforecord

    Hi Gurus - I have a question on how to assign multiple production versions in Sub-contracting Inforecord?
    I heard this functionality is available in ECC 6.0 is that true? If so how can I assign multiple production versions? What happens after we CIF across to APO? Any help is highly appreciated.
    Thanks and regards,
    Murali.

    Murali - Its possible to use multiple PV in sub contracting.
    Settings in ERP :
    1. In CFC9 activate the - Transfer multiple selection of PDS indicator. When you select this indicator, the system allows you to select several productions versions in the integration model; it also creates a Production Process Model (PPM) or Production Data Structure (PDS) for each production version in SAP SCM
    2. Assign the PV's to the subcontracting info record through -  Logistics  - Central Functions  - Supply Chain Planning Interface - Core Interface - Advanced Planner and Optimizer - Environment  - Data Transfer  -Assign Multiple Production Versions
    3. When you select the integration model parameters for PDS, you have selected PP/DS Subcontracting as the PDS Type value. Similarly, for PPM, you have selected Subcontracting PPM as the Type of PPM value.
    Subcontracting with multiple production versions is supported. However, the integration with an SAP ERP system requires at least SAP ERP 2005 with Enhancement Pack 03.
    Rgds
    Valavan

  • Costing - Multiple Production Versions and Recursive BoMs

    Hi All,
    We have a production and product costing scenario as follows:
    Production versions 10, 20 and 30. It takes all three versions to manufacture the finished material and there are no intermediate products in this scenario. 10 and 30 are to be costed and 30 is a recursive BoM with the input from version 10 also being the output. 10 is the main production step with components but 30 is a recursive BoM sometimes only with the output material as the input and sometimes with a more complete BoM but which includes the output material as an input component.
    The quantity input appears to be the same as quantity output for the recursive element.
    If anyone has come across this scenario and you can let me know what design principles you followed I would appreciate it.
    We are getting iteration error messages when costing production version 30 and even reducing the input quantity below 95% of the input as per the SAP documentation does not fix the error message.
    Any help you can give will be greatefully received.
    Thanks.
    Regards,
    Tim

    Murali - Its possible to use multiple PV in sub contracting.
    Settings in ERP :
    1. In CFC9 activate the - Transfer multiple selection of PDS indicator. When you select this indicator, the system allows you to select several productions versions in the integration model; it also creates a Production Process Model (PPM) or Production Data Structure (PDS) for each production version in SAP SCM
    2. Assign the PV's to the subcontracting info record through -  Logistics  - Central Functions  - Supply Chain Planning Interface - Core Interface - Advanced Planner and Optimizer - Environment  - Data Transfer  -Assign Multiple Production Versions
    3. When you select the integration model parameters for PDS, you have selected PP/DS Subcontracting as the PDS Type value. Similarly, for PPM, you have selected Subcontracting PPM as the Type of PPM value.
    Subcontracting with multiple production versions is supported. However, the integration with an SAP ERP system requires at least SAP ERP 2005 with Enhancement Pack 03.
    Rgds
    Valavan

  • PPM not getting created when ECC Production version is changed

    Hi,
    We are facing a problem with PPMs.
    We changed the Production version in ECC for the corresponding Material in ECC from 5000 to 6000.
    We then ran the RSPPMCHG and then generated and activated the PPM Integration Model.
    No queues inbound (APO) or Outbound (APO) were blocked. \
    The result was that the 5000 PPM was deactivated in APO but we could not find the 6000 PPM version anywhere.
    Can anyone please help??
    Regards
    Abhishek Sahi

    Hi,
    Refer notes 448085 PPM Transfer: Tips and Tricks
    Aslo after generating and Activating the IM, run the report  RSPPMCHG ( Tcode - CFP3)
    Thanks,
    nandha
    Edited by: S.Nandakumar on Oct 8, 2010 10:05 AM

  • Linking SNP PPM to desired ECC production version

    Hi
    We have a need where we manually create SNP PPMs and so the APO and ECC have no connection in terms of the PPM or production version.
    I have two SNP PPM1, PPM2 in APO and I have two production versions in SAP ECC, VA and VB.
    The requirement is to some how maintain a table in APO where we can choose to map the SNP PPM to ECC production version.
    something like
    SNP PPM1 and PPM2 both need to refer to version VB so that an SNP planned order pushed into ECC would automatically pick up production version VB.
    Appreciate if any one can throw some light on how we can create a user maintained table or Z transaction  in APO to achieve this.

    Hello KA,
    Could you please let me know why you want to change the source of supply in ECC only?
    Do you have PPDS? If yes then you can have one source of supply for that production version VB and transfer these orders to ECC system.
    Apart from that if you want to do the development then check FM /SAPAPO/DM_PROD_ORDER_CHG_OLTP inside that with your own custom logic you can update the production version.
    Best Regards,
    R.Brahmankar

  • Production Version naming convention

    Hi all,
    We are using PDS and it is being transferred from R/3.
    The problem is in R/3, in many cases different materials are having the same production version numbers.
    If we have the same production version number will it cause any problem / confusion while transfer to APO and in further planning process in APO ?
    Current situation in R/3 :
    Product A : Production Versions 0011,0012,0013....
    Product B : Production Versions 0012,0013,Z014..... Is this ok ?
    Or is it better to delete and create with unique production version number in R/3 before transferring ?
    Kindly guide.
    Durai

    Hi Durai,
    The PDS will get the combo structure of product-location-version no only.
    So, there is no harm in having different products having same production version numbers.
    Regards
    R. Senthil Mareeswaran.

  • R3 Product Versions to be Mapped as Modes in APO

    Hi,
    I have several product versions in R3 (generally based on differen work centers)
    I would like to transfer these versions in 1 PPM but with different alternate MODES.
    How can I do that, bu using a user-exit etc. ?
    Thanks all..

    No comment

  • Creation of inspection lot 04 depending on production version

    Hi Experts,
    could you tell me if it is possible to create a Good Receipt inspection (lot origin 04) depending on the production version used ?
    My material has 2 production versions:
    0001 - production with process order
    0002 - production with repetitve manufacturing
    When I do a GR on process order, I do not want to create an inspection lot 04.
    When I do a GR on product cost collector, I want to create an inspection lot 04.
    As I have entered inspection types in material master data, I do not know how to do the distinction ?
    Thanks in advance for your help
    Best regards
    Amaury

    Hi
    Check user exit
    QBCK0003 |Extended QM check for goods receipt
    Regards
    Sujit

  • There is already a transaction for the systems of this product version(MOPZ)

    Hello All,
    I am trying to configure maintenance optimizer in Solution Manager 7.0
    on Windows 2003 server and SQL 2005 server.
    I am configuring this for SAP CRM 2007 server.
    Created the server, database and system in SMSY
    Created Logical Component in TA code SMSY
    SM59 connection for SAP-OSS is OK.
    S-User is assigned to a User.
    Created a solution using TA code solution_manager.
    Defined the product version for the solution created in the TA code
    solution_manager.
    When creating a Maintenance Optimizer transaction, I select the
    product version and its logical component in the Plan Maintenance
    (Phase) and click on Continue to go to Select Files Phase, I get below
    warning:
    Information Procedure 8000000130 Saved
    Warning: Status was reset by system
    Warning: There is already a transaction for the systems of this
    product version
    I cannot get pass this phase.
    I have deleted and recreated the solution, carried out the same
    activity again but its giving the same Warning
    Warning: Status was reset by system
    Warning: There is already a transaction for the systems of this
    product version
    Any help will be appreciated???
    Regards,
    Satish.

    Hello Ragu,
    Thanks for your response.
    As of now, we do not have ChaRM in place. Secondly, we use a single customer number.
    I would like to let you know that in our landscape we have two CRM server, one ECC sever, one SOLMAN7.0 server.
    I tried to configure MOPZ for CRM, ECC, SOLMAN server to download the respective STACKS.
    I was successful in configuring CRM and SOLMAN.
    But  when I tried to configure in ECC, it failed due to RFC erros.
    So I deleted the transaction for the ECC system and deleted the system itself in Solution Manager.
    Reconfigured the Systems in "SMSY", RFC connections are correctly defined to configure MOPZ between SOLMAN7.0 and ECC6.0.
    When I start configuring the MOPZ, I cannot get pass the first phase and this is when I get an error: There is already a transaction for the systems of this product version.
    Please let me know if you need further information.
    Regards,
    Satish.

  • Costing variant and production version

    We have two costing variants "C" (used to create current cost estimates) and "F" (Used to create Future cost estimate). All of the production versions in the system have a validity date of 9999. Is there a way to tell the system to use one production version when costing using Variant C and another version when costing is done using variant F.
    Or if that is not possibel than how do we use one production version in 2011 while recosting current standards and another production version in 2012. (Remember the production version that we are using currently in 2011 has a validity date of 9999)
    Regards

    Hi
    In your Costing Variant - You have a tab callled "Qty Structure Control".... Here you can specify BOM Determination and Routing Selection id.... i.e. If the BOM / Routing attached to the prod version can be assigned a specific BOM Determination Class and Routing Selection id, it can work
    OR ELSE
    While doing CK11N, you can manually specify the Prod Version in the "Qty Struct" Tab..... Create an LSMW for CK11N and you can do a mass costing like CK40N.... CK40N does not have this option of specifying Prod Version
    I would prefer 2nd option
    Br, Ajay M

  • QC Activity based on Material Production Version

    Hi,
    Normally, we perform QC activity based on Material Code, i.e. in Material Master we maintain inspection type in QM View for material which needs QC activation during Good Receipt from Production
    Is it possible to perform QC Activity based on Production Version of a material i.e.
    For Example
    Product A having 2 Production Versions
    IF Product A with Production Version 1 then No QC required during goods receipt from production
    IF Product A with Production Version 2 then QC required during goods receipt from production
    So please tell me what feasible solution possible from your side
    With Regards,
    Kunal Sheth

    Dear Sap User,
    Production version is nothing just a combination of Master recipe/Routing and BOM used for particular production or process.
    If you are having so many production version then you have to choose which you want to choose but if you are having a single production version then it will be chosen automatically.
    Do it once and revert in case of any query.
    Rgrds,
    Dheeraj Rawal
    Edited by: Dheeraj89 on Feb 9, 2012 6:13 AM

Maybe you are looking for