Transformation pointing to Quality Client in Production System Repeatedly

Hi,
I need to understand one issue which is explained in detail below step by step.
1. I created one Customized Data Source(Full Load) and replicated in BW.
2. Also created Info Objects, DSO, Info Package, Transformation, DTP.
3. While transporting this modelling to Production(first time), i unknowingly/mistakenly missed capturing the datasource in Transport Request.Sequence of transport was -
Data Source
Info Area
Info Object Catalogue
Info Object
DSO
Cube & MP
Data Source
Transformation
Info Package & DTP
     Now, the moment TR for transformation was transported it threw an error - "Data Source does not exist in Quality client". Then I transported the Data Source TR and after that re-transported the transformation TR production and this error was removed.
But, there were 2 transformations in production - 1) Pointing to Production, 2) Pointing to quality.
4. I request the basis team to delete the second transformation(pointing to quality) from BW production system.
5. After that we captured Data Source and transformation in same TR and transport was successful.
6. Now, after few days we transported a change to production for same object and the system again threw the same error mentioned in point no.3 above and created two transformations again.
How to resolve this issue permanently and I also want to know the reason of this type of system behavior.

Mohammed,
I did that also - please read my step no.4.
We are able to delete the transformation which was referring to quality client and then captured D.S & transformation in a single TR and transport as successful.
Now, after few days I did one change in the same transformation and transported to production.
System Behavior:
Error - " No source exist (i.e.,system referred to quality in production)".
Also again transformation was visible in production which was referring to quality client(which we already deleted with the help of BASIS).
Now since again the transformation needs to be deleted from production, our basis team is telling us to they cannot delete objects every time in production.Thus,
1. Is there any option to solve this issue permanently?
2. Also is it necessary to transport data source along with the transformation which is directly linked to data source?
Please Note: We have Dev+Quality as one client and Production.

Similar Messages

  • Fresh source system clients in production BW system

    Hi,
    In my production BW system,all transfer rules currently point to 400 clients of source systems.
    Now requirement has changed and test data is being created in 310 clients of source systems,and not the 400 clients.
    I know about new source system creation and RFC connections in sm59,but how to (in a simple way) make all transfer rules to point to the 310 clients,instead of the 400 clients.
    Thanks,
    Vishvesh

    Hello,
    This issue got resolved by using below steps..
    The requirement is that Clients 400 connection should no longer exists in BW and  replaced by clients  310
    Below steps would hold good if the datasources of
    CLNT310 & CLNT400 are identical.
    1) Delete CLNT310 in BW (no Datasources of this system is  used  in BW)
    2) run BDLS in BW change CLNT400 to CLNT310
    3) Run RSAP_BIW_DISCONNECT in 310 clients ..
    f) Restore connection CLNT310
    Cheers,
    Vishvesh

  • Replicate data from one client to another in a production system

    Hello,
    I have two client in production system. Whenever a equipment is created in one client it should be replicated in another client and whenever a equipment is changed in one client the changes should be replicated to another client.
    Data should be immediatly replicated to the another client.
    Can basis do some setting so that the two client will always have the same data for equipments.
    or i have to get the data from one system and send it to another system through idoc and update that data in another system. This will take a lot of time.
    or is there any easy way

    Hi Sachin,
    You need custom program to achieve this requirement. Either you can use ALE+IDoc or direct BAPI function module call.
    This should happen within seconds if designed properly.
    Regards,
    Avinash

  • Error while transporting ADDRESS to production system

    Hi all,
    We are in the process of a new rollout and we have created new plants and company codes. the same have been transported to quality and pre-production systems without any issues. however when we transport the same to Production, we face an error
    The object TDAT ADDRESS_4.6 has not yet been imported successfully into client 100
    The object
      R3TR TDAT ADDRESS_4.6*
    has not yet been imported into client 100 without error.
    the objects are getting transported with same address number as in development which in production points to a different address.
    as far as i know the system should generate a new address number and assign it to the object during transport.
    Any suggestion wud be great

    the log is
       Post-import methods for change/transport request: MEDK909182
          on the application server: ITMISAPGW2
       Post-import method AFTER_IMP_CUST_ADDRESS started for ADDRESS_4.6 T, date and time: 20090714144548
       Post-processing taking place in client 100
       The object TDAT ADDRESS_4.6 has not yet been imported successfully into client 100
       The object TDAT ADDRESS_4.6 has not yet been imported successfully into client 100
       The object TDAT ADDRESS_4.6 has not yet been imported successfully into client 100
       Post-import method AFTER_IMP_CUST_ADDRESS completed for ADDRESS_4.6 T, date and time: 20090714144548
       Post-import methods of change/transport request MEDK909182 completed
            Start of subsequent processing ... 20090714144547
            End of subsequent processing... 20090714144548
       Execute reports for change/transport request: MEDK909182
          on the application server: ITMISAPGW2
       Reports for change/transport request MEDK909182 have been executed
            Start of................ 20090714144548
            End of.................. 20090714144548
       Execution of programs after import (XPRA)
       End date and time : 20090714144548
       Ended with return code:  ===> 8 <===
    regards,
    Tarun
    Edited by: Tarun Bahal on Jul 16, 2009 9:41 PM

  • Is there a way to find all config changes between clients and sap system

    We have our Dev system with clients
    310 - Developer make changes and create transport
    400 - Test client
    410 - a copy of our Production system (over 1 year ago0
    TST - this is our quality system with one client
    101
    Production system one client
    101
    I know if i do a database copy from Production to our TST system, both systems would be exact.
    Abaper Director wants to know all the configuration changes that are different between Devopment client 310 - Test and production.
    I told him that in development client 310 the abaper or functional users make most of the changes if they do  not get transported they would be missing.
    I cannot copy to client 310 otherwise we would loose all of our version management.
    Is there another way that I can see the config changes between all these clients.
    Thanks
    Joe

    You should be able to use tcode SCU0 
    Regards,
    Brian

  • Client on Production

    Hi All SAP Gurus,
    Can anyone tell me how many production client we can start on production server.
    Thanks and Regards,
    Pravin

    Hi Pravin,
    You can have any number of clients in Production system but its strongly recommended that you should have only one client in production system otherwise in development & quality you can have any no of clients.
    Thanks,
    Nitesh Jain

  • Two clients in XI system

    Hi all,
    Actually client 100 is created in Production .while installation in java engine its through some error, we are not able to continue the installation & we are not able to connect the jave engine with client 100.So that we created the new client 101 and we made the client copy again and started installation its completed succesfully.So there is any issue that of two client in production system & Can we will delete the 100 client in the production system is there is any issue.
    pls help me in this ASAP.
    Kind Regards,
    Gopinath.

    hi,
    if you don't have any messages yet
    delete it and start the installtion once more
    it may help to prevent many problems <b>in the future</b>
    Regards,
    michal
    <a href="/people/michal.krawczyk2/blog/2005/06/28/xipi-faq-frequently-asked-questions"><b>XI / PI FAQ - Frequently Asked Questions</b></a>

  • Inactive Transformations and DataSources in Production System.

    Hi Experts
    We are working on BI 7.0 engine within Solution Manager.
    We had some issues with DataSources initially while transporting BI Objects from Devp to Prod. We logged it into OSS and followed their procedure to redo the transports.
    In the process, the issue was resolved but 2 New Transformations are created one for each Data Model (since I have only 2 InfoCubes) automatically and is the working model now.
    Actual Transformations from Devp became Inactive in Prod and also there are 2 Inactive DataSources which are also from Devp. 2 New DataSources are again from Devp.
    When I tried to Delete these unwanted Objects from Prod (I asked the Basis to Open Prod for me though this is not the best practice), it is asking for a Request ID. Also, since the Project has Gone Live already, I am scared if I might disturb the Production System.
    Kindly, advise what best could and needs to be done.
    Thanks,
    Chandu

    Initially, we implemented BI-HR module with standard content, which 3.x content (transfer / update rules)... in parallel we also did transformations & DTPs (BI 7.0 model).
    Since, client wasn't sure with conversation of transfer rules (has lots of routines) to transformations & DTPs . So we transported both the models to prod sys... We created daily load process chains with transformations & DTPs... The actual plan was, if PC loads fails, then to go for manual loads of 3.x model...Fortunately 7.0 models was successful...
    Then one month later, we deleted those transfer / update rules and 3.x datasources from prod sys, on the weekend (process chains runs only week days) without any issues...
    We captured those deletion requests and deleted them from SE09 by unlocking them in SE03.

  • Setting up a Quality/Production System-- Pl suggest

    Dera All,
    We are on SRM 7.0 and ERP-EHP4. We have a development Server and have configured the  SRM and ECC for the Extended Classic. What is the best approach to create a Quality/Production System?. I Have gone through the document System Transport and Copy too and have a couple of questions.
    1.  Do We need to perform a client copy with SAP_Cust from Development  to Quality and Quality to Production? and then do the necessary settings for Product Categories/Products/Business Partners and Org Model Transport etc...?
    2. Is System copy a good option?. ( The document suggests not to go for System Copy for setting up Quality/Production Systems from Development Server)
    Pl suggest.
    Thanks and Regards
    velu

    Dear All,
    Any suggestions. Can you pl share how this is being handled in your current projects?.
    Thanks in advance
    regds
    velu

  • Setting up of TMS from Quality to Production systems

    Hi ALL,
    I have a query:
    I have to setup the TMS in such a way that the transports from Client 110 of Quality server should ONLY go to Client 110 of Production server.
    Similarly for client 120 of quality -> client 120 of Production.
    Please be so kind to advice and help with detailed steps.
    Rgs
    Ipsita.

    Hi Ipsita Guin
    you create a route via Tcode STMS_PATH and create route Quality to Production.Logon Client 000 configure transport route.Now u can u define u r server
    name.
    http://help.sap.com/saphelp_nw2004s/helpdata/en/14/94fc3f8fc2c542e10000000a1550b0/frameset.htm
    Thanks & Regards
    Pankaj Kumar

  • How to active the transformations in production system

    HI
    How to active the transformations in production system when Time stamp error occured in SAP BI.
    In SAP BW we use RS_TRANSTRU_ACTIVATE_ALL for tranfer rules activation.Is there any chance Activation allowes in production system witout any ABAP programme running.

    Hi Gkreddy,
    There is a specific program for that: RSDG_TRFN_ACTIVATE. It will also re-activate the related DTPs.
    Please check the following SAP Notes:
    #1408161 - Program for transformation activation.
    #1471117 - SP25:RSDG_TRFN_ACTIVATE skips if M version has OBJSTAT 'INA'.
    BR

  • Functionality to copy SO working in quality but not in Production system -

    HI Friends
    I have created a ztcode which uses bapi BAPI_SALESORDER_CREATEFROMDAT2 to create copies of a manually created sales order
    this function was working perfectly fine as till now we only had one line item per sales order
    last week we added a material which has 2 BOM items (both non stock)
    We passed only the parent item into the bapi so the orders created thru the bapi had only the parent item and the child items exploded on to the order because of the BOM config already in place.
    This works perfectly fine in Quality systems but failed in production
    Both the systems are identical in nature in all respects visa vis transports config and system patch as well.
    The BOM is maintained in CS01
    both the child items are marked as Relevant for sales and BOM usage is marked as 5
    I am failing to understand why it doesnt work in production
    And as we have used std bapi my tech consultant has been debugging without any sucess as well
    Would appreciate any thoughts on how to find a lead in solving this mystery.
    Regards
    Supreet Upadhyay

    HI Shiva
    Thanks for the answer ,we have reimported all the relevant transports thrice but in vain
    Also the config is in place,I forgot to mention earlier that the manual order that we create which is used as a reference to create copy orders explodes the child items
    So config doesnt seem to be an issue here.
    The code should also be ok coz it works in quality
    so we think somehow it has to do with the production system
    we are clueless in what direction should we investigate
    Supreet

  • Tcode in production client but not in development & quality client

    I am facing this particular situation, I am seeing a particular Ztode which is in production client but not in development & quality client
    Is it possible to have a tcode in production client but not in development & quality client, If yes what would be the reasons for maining in production client but not in development & quality client

    It could be a local object that a person who has developer access in production created. This is unusual, but not unheard of.
    Or the transaction could have been deleted in DEV and the deletion transported to QA but not PRD.
    Rob

  • Setting client role in non-production systems

    In our QA test systems of R/3 and BW, the client role  in SCC4 was set to 'Production'. The reason I was given is that  by setting the client role to 'Production', will enable some settings in FI such as period closing,and customizing settings remain open  without transportable requests. I totally disagree with this. I worked on numerous projects, but this is first time I am hearing this. I always set client role to Test in non-production systems, without any problems. Do any one have  any idea about this?
    Thanks
    Santosh

    SAP have a concept of "current settings".  These include things like exchange rates and other items which really appear to be configuration settings.  In a non-modifiable system these cannot be changed because the transport management system tries to get involved.  If the client is set to productive, this restriction is overridden.
    I would always suggest that the QA system should be set to productive and non-modifiable to ensure that the behaviour of the transactions affecting such objects can be tested in a production-like environment.  If you need to have your QA system open for any sort of changes you are exposed to having changes introduced in QA to leading to the impression that new/modified functionality or config works but when the transport takes the unmodified version to production you'll be in trouble.

  • Process chain (RSPC) modifcation in Quality and production system

    Hi,
    In our landscape quality and production system is set as non modifiable. But we want to modify the process chain (RSPC) in Quality and production system.
    As per the thread Need input: do process chain/InfoPackages changeable on PROD in your compa?  in RSA1 -> Transport connection we made   RSPC ( Process Chain) ,  RSPT (process chain starter) and RSPV (process variants) are changeable.
    With this setting we are able to create/ edit new process chain in Quality and Production system. But we canu2019t edit the transported Process chain. i.e. process chain transported from Dev to Quality system.
    We donu2019t want to open Business Information Warehouse: Customer Namespace (/BIC/ ) in Quality and production system (Se06). Please let me know is there any other settings needs to be.
    We are on BI 7.0
    Regards
    Preethish

    Hi ,
    In RSA1 -> Transport Connection --> Object Changeability
    Object has 3 state
    Not Changable
    Changable Original
    Every thing changable
    What is the difference b/w Changable Original and Every thing changable
    Thanks..
    Preethish

Maybe you are looking for