Unit cost report required for project system

HI ALL
i have entered the  planned unit cost of wbs element with cost element  from cj40 buth the line item report  of that planned cost does not show any data please
tell me how it show the data.
or
but any body can tell me the report to display the unit cost value and their quanity. for wbs element + cost element. i know one report i.e. cji4 but it does not show the data
thanks

Hi Shabbir,
Please refer the below report :
S_ALR_87013619 Range: Assigned Orders/WBS Elements
S_ALR_87013014 List: Cost Elements
Pls assign points as way to say thanks

Similar Messages

  • Coustomization Documents required for Project Systems BP

    Hi All,
    We are implementing Project Systems 50.3 Business Package.For customization this Business Package, where we can find the documents.
    We have the PDF Business Package for Projects 50.3. But it doesn’t have the info regarding customization.
    If any one worked on this .. Please help me and send the documents for customization.
    Thanks in advance.
    Regards
    Ravi
    email: [email protected]

    Hi Ravi,
    check the following SAP notes:
    - 446426
    - 660410
    - 602158
    - 604918
    - 642775
    Hth,
    Michael

  • Report Painter Drilldown on Cost Element for Project Systems

    I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

  • Changing the data in DataSource in R/3 System for Project System

    Can we change the data of DataSource which is extracted from R/3 sYSTEM for Project System Module?

    Hello Rajesh,
    You can modify it in PSA. Or write the routines or rules logic as per your requirement.
    Could you please elaborate more on what kind of changes you are interested for.
    San.

  • Pricing Schema for Project System

    Dear Sappers,
    I'm configuring Pricing Schema for Project System(PS) module.
    The requirement is, the schema will be in such a way that it supports both excise, CST, VAT and service tax.
    In PS module the user raises a Purchase Order having procurement of material as well as taking service from Vendor.For this in PO he will maintain both material as well as service.
    I'm configuring the Pricing schema in MM - Purchasing - Condition.
    My question is for materials procurement, everything is working fine.But for service respect to activity number I want to maintain service tax and other cess in condition record.
    But to maintain service tax & other cess for activity number, I want the access sequence of sevice to be in Purchasing.I've taken the standard table for Plant, Vendor, Purchase Organinzation and activity number combination from External Service management and making a new access sequence in MM - Purchasing.All fields are coming but for Activity number, it not taking the document structure and showing error.
    How to overcome this??
    Any suggestions will be highly appreciated.
    Warm Regards
    PKB

    Hi Pankaj,
    Thanks for your suggestions.
    As per you reply, the access sequence is already maintain in External Service Management.But I want to bring the same combination Plant, Vendor, Purchase Organizartion and Activity number that is Table 97 to MM - Purchasing - Conditions- Access Sequence.
    I've tried to do it, but when I'm creating in MM - Purchasing, all document structure is copying except activity number.What I analyse the error is due to application area.Activity number is MS (External Service Management) area but i'm trying to do in M(Purchasing)
    Even though when I enter manually MS for the access sequence system is not taking.
    Suggest me.
    Warm Regards
    PKB
    Edited by: Pranaya Barik on Dec 11, 2009 12:09 PM

  • Planning Profile for Project System

    Dear All,
    In planning Profile (T Code OPSB) for Project System we can find  RElem.f.billing plan ..field, in this field which cost element we have to assign wheather it is sales revenue or secondary cost element cat.31 or else..plz adives me..
    Thanks and regards

    Mr. Sridhar,
    Thanks for ur reply, here my querry is, i have types of sales revenues like domestic, export, industrial etc.. there is only option is there to maintain revenue cost element, so which revenue cost element i have to maintain in planning profile.
    Regards
    Ramesh

  • Business packages for Project systems

    i,
    I wanted to know if there is a business package for Project systems which include transactions like CJ20N, CN33, CN41N, DP81,VA23, VA25. I checked in SDN Portal content portfolio and found there is a BP for Projects 5.3 and BP for Project self service. I checked out the content which is present but not sure whether it suits my requirements.
    Appreciate if any one can point to the right Business package.
    Regards
    PN

    Hi,
    Chk out this link, it points to Project Self Service.
    http://help.sap.com/erp2005_ehp_01/helpdata/en/3f/a197422836c76ae10000000a155106/content.htm
    You can find the prerequisites & the configuration required in the above link.
    For this Business Package you have to install the following software components:
    SAP PSS 600
    BP ERP05 PROJ SELF-SERV 1.0
    Regards,
    Abhishek

  • Which sharepoint service applications & services are required for Project server 2013 to work fine.

    HI,
    Can any one help me,
    I am planning to install project server 2013,  what are the service applications and Services ( Manage services on server in central admin ) in sharepoint  are required for project server 2013 to work fine, so that i will run only  service
    application and services to increase server performance..i don't want to configure all service applications  when i  am configuring.
    Thanks in Advance..
    vijay kommireddi

    Hi Vijay,
    If you are installing Project Server on SharePoint farm, You need to start the service Project Application Service which would be available after you install project Server 2013.
    For Project Server Reporting you need to start Excel service and Secure Store service.
    http://technet.microsoft.com/en-us/library/ee662106(v=office.15).aspx
    Thanks,
    Phani

  • BTE's used for project systems master data.

    Hi ,
    Can anyone tell me what are the BTE's used for project systems master data.
    Tcode used are CJ01,  Cj02,  CJ20N,  CJ12,  CNMASS
    When master data is changed or created BTE should trigger.
    Regards
    Subin

    I don't think there are any open_fi BTE available for PS master data.
    you can use classic subs/vals using GGB0 and GGB1 transaction codes.

  • Result Analysis for Project Systems

    Hi all
    Does any1 have any documentation relating to Resut Analysis for Project Systems incl POC calculation and other basic concepts. Any help would be highly appreciated.
    Regards
    Hrishi

    Hi,
    Please follow the link below: it has all the details for the POC methods:
    http://help.sap.com/saphelp_46c/helpdata/en/90/ba6f37446711d189420000e829fbbd/content.htm
    Hope its useful.
    Reward points if found useful.
    thanks..

  • How to identify Sale Order costing is required for Items in Sales Order

    Howstandard cos estimate*w to identify Sale Order costing is required for Items in Sales Order?
    On which criteria we can conclude Sale Order Costing is reqd ?
    ? * means what and wat is the purpose and how to chk for the Item in Sales Order, either it is required or not**.

    Hi Dharamveer,
    The best way is to make the order qty is equal to the quantity delivered. This way, when some one looks at this order in future - they think that the order was for X and the delivery was for X qty is completed. They will not know the background of the issue unless they go through change log. Even in change log, they see that the Ord qty was adjusted, but may not understand why?
    The good practice is to make order qty equal to already delivered qty.
    Create a new line for the remaining qty and reject the same with appropriate reason for rejection. This way, any one can understand the background , the reason for rejection easily. Hope it helps !

  • Combined debt reports required for 'associated' customers showing amountof

    Combined debt reports required for 'associated' customers showing amountof debt and aged by month

    Mugunthan
    Yes we have applied 11i.AZ.H.2. I am getting several errors still that we trying to resolve
    One of them is
    ===========>>>
    Uploading snapshot to central instance failed, with 3 different messages
    Error: An invalid status '-1' was passed to fnd_concurrent.set_completion_status. The valid statuses are: 'NORMAL', 'WARNING', 'ERROR'FND     at oracle.apps.az.r12.util.XmlTransmorpher.<init>(XmlTransmorpher.java:301)
         at oracle.apps.az.r12.extractor.cpserver.APIExtractor.insertGenericSelectionSet(APIExtractor.java:231)
    please assist.
    regards
    girish

  • Technical spec for Project systems report

    Hi all,
    My requirement is to create technical spec's on this Project Systems monthly and yearly budget and actual tracking with drill down capability
    And the char and KF are:-
    Char
    Project Definition
    WBS Element
    Cost Element
    Vendor
    Purchase Order No.
    Purchase Order Item
    Requester
    Created On
    PO Description
    Final Delivery
    KF
    PO Value
    Value - Quantity Delivered
    Amount Invoiced
    To be invoiced - Value
    To be Delivered - Value
    Can anyone help me that which standard query is suitable for this requirement.

    Hi,
    Check the below business content queries:
    0PM_MC01_Q0001     Budget Comparison (Actual Costs) 
    0PM_MC01_Q0002     Budget Comparison (Planned Costs)
    0PM_C06_Q0002       Budget Proposal (Periodic)
    0PM_C06_Q0003       Budget Proposal (Objects)
    Check this might be useful:
    http://help.sap.com/saphelp_nw2004s/helpdata/en/e8/858f40f5767d17e10000000a1550b0/frameset.htm
    Hope this helps.......
    Rgs,
    Ravikanth

  • Reports available for Project

    What are the seeded reports available for Reporting.Consolidation Purpose in Projects.
    I need following details --
    1. Report for Monthly expenses for the Projects
    2. Report for Project status like whether they are closed , Approved etc and the cost associated with these Projects along with Supplier Invoice info ,Associated Purchase Order etc .
    3. Reports related to reconciliation
    Any report which match some of the requirement will also serve my purpose .
    Please help

    Hi,
    Below are some of the reports that may help in your requirement.
    1. Report for Monthly expenses for the Projects:
    You can look at the reports MGT: Expenditures Summary and MGT: Expenditures Detail
    2. Report for Project status like whether they are closed , Approved etc and the cost associated with these Projects along with Supplier Invoice info ,Associated Purchase Order etc .
    For the Supplier invoice info and PO : use the same MGT: Expenditures Detail report with the Expenditure Class as Supplier invoice
    For Project Status: AUD: Project Configuration
    3. Reports related to reconciliation
    AUD: Cost Audit Report
    AUD: Project Subledger Summary
    AUD: Project Subledger: Detail by Expenditure Type
    AUD: Project Subledger: Detail by Project
    AUD: Revenue Audit Report
    AUD: Supplier Invoice Audit Report
    Hope this helps!
    Thanks,
    Sathish Raju
    www.projectsaccounting.com

  • Release strategy & EBAN for project systems, purchasing

    Hi
    We have 2 different scenarios for which we use same account assignment category "Z".
    1) Purchase Requisitions for capital expenses (Account assignment category "Z") - this is part of project systems requisition attached to WBS elements
    2) Purchase Requisitions for expensed items (Account assignment category "Z")
    I have configured release strategy with classification with following characteristics
    1) plant
    2) cost centers
    3) total amount in PR
    4) account assignment category
    all 4 characteristics are same in both areas (capital and expensed)of purchase requisitions, account assignment category Z decides whether it is capital purchase or expense related purchases. Z uses order number that is internally tied to WBS element.
    my question is - if some one has similar scenario then what is the best solution to handle invocation of release strategy.
    how release strategy can be determine, do I need to use user exit and if yes what best user exit is available.
    EBAN fields, I have researched and I cant use fields like "requisitioner" for determining release strategy.
    I would like to invoke different release strategy for capital projects and different release strategy for expensed items in PR. there is a workflow attached to this later.
    Please reply
    Thanks and regards
    Umesh

    Umesh,
    Well, there needs to be some way to differentiate the 2 types of purchase requisitions for you to use 2 different release strategies.
    I am not sure if you have the option of using a different document type to differentiate the 2 requisitions. I would definitely look at this possibility and include the document type (CEBAN-BSART) as a characteristic in the release strategy.
    Other options would be to look at using the purchasing group (CEBAN-EKGRP) or the requirements tracking number (CEBAN-BEDNR) as characteristics in your release strategy.
    Hope this helps.
    H Narayan

Maybe you are looking for

  • How to delete the error stack in process chain?

    Hi all, we just want to do the following: - we are loading in FULL daily to our datatarget (data is versionized by 0calday) - we want to use the error-stack in order to analyze wrong data --> but we now encounter the problem that, if data has once be

  • Set English language in other regions

    When I first installed Snow Leopard, I selected Italy as region but with english language. As a result, under Language & Text in System Preferences, my region in the Formats was set to "Italy (English)", that is the italian format but with months and

  • HT4623 My email acct keeps saying my use rid or password is incorrect when I try to send an email - help?

    I have updated my password and it works on my iPhone but not my iPad.  Btw I have not installed iOS 7.0.2 on my phone.

  • DMU at Openworld '12

    Folks, If you're attending Oracle OpenWorld in SF next month, you may be interested in the DMU session below. Come and learn how you can leverage DMU and the latest generation of database technology to lower the cost of Unicode migration while boosti

  • IPod will not take movies

    I have a 60gb 5th gen ipod and am using Handbrake to add movies to iTunes for transfer to my iPod. After about the 3rd movie having been added it will no longer upload my movies. I have "selected movies" chosen and have checked the movies I want, but