A material has inspection type 01 active but the Post to insp stock is not checked in the QM view of material master. User did three GRs of quantity 10 each for a batch BAT1. So now the actual lot quantity becomes 30.
When the user did the 3rd GR, he noticed that the GR was not to be done. So he cancelled the material document and reversed the document via movement type 102.
After this he did 2 GRs of quantity 5 each. So now the actual lot quantity of the inspection lot should be 101010-10(for the reversed document)55 = 30.
After this, the user did result recording and UD. Now the inspection lot quantity shown in the system is 40 instead of 30. The goods reversal did not had any effect on the actual lot quantity. The stock is perfectly OK and in MMBE the system shows a quantity of 30 only. The problem is only with actual lot quantity.
I have two questions :
1. Why didnt the quantity 10 get subtracted from actual lot quantity ?
2. After the UD is done, is there any way to correct the actual lot quantity ?
Regards,
Manish.

HI Everybody,
Sorry for not giving clear information on this. The events took place in the following order :
1. Wrong GR done
2. Wrong GR reversed via movement 102
(As the batch is same, the quantity was updated in one single inspection lot)
3. Result recording and UD done
4. Copmplete stock issued to order
The GR was reversed before taking the UD but still the actual lot quantity didnt get corrected.
Regards,
Manish.

Similar Messages

  • In process Inspection  Lot Qty and Actual Lot quantity difference.

    Hi Experts,
    In case of  In process Inspection
    Scenario : 1. Production Order created, released but before saving the qty is changed.
                    2. Production Order created released and saved. Then qty is changed in Change Prod order txn.
    These scenarios are causing a discrepancy in  Inspection  Lot Qty and Actual Lot quantity. Is there any method to avoid this ?
    This can be made correct in  Inspection lot by resetting the sample calculation. But once confirmation has started for Prodn Order (not necessarily QC operation) or  RR has been done  resetting is not possible.
    Is this the std behavior ? Disallowing the resetting once RR done seems OK, but even if any of the operation in Prodn Order is confirmed it still give status error while resetting. Canceling all the confirmation all the way back  also does not solve the problem.
    Any suggestions ?
    Regards
    Joe

    Hi
    Although your suggestion is valid, it is not practical from user point of view.
    Moving this thread to QM forum.
    Rgds

  • Expired Lot quantity incorrect in MRP Planner Workbench

    Hello,
    We have an issue with Expired Lots in the planer workbench.
    - We have an Expired Lot of material in quantity 5000 pcs.
    - In MRP, the system should create an "Expired Lot" demand of 5000 pcs to net out the expired lot quantity from the beginning on hand.
    - But, MRP creates an "Expired Lot" demand for only 4988 pcs.
    Has anyone seen this behavior before?
    Can anyone explain the logic of why the "Expired Lot" demand is only 4988 when the actual lot quantity is 5000?
    Or, am I facing another bug?
    Appreciate an advice.
    Thanks,
    Mark

    Hello,
    We have an issue with Expired Lots in the planer workbench.
    - We have an Expired Lot of material in quantity 5000 pcs.
    - In MRP, the system should create an "Expired Lot" demand of 5000 pcs to net out the expired lot quantity from the beginning on hand.
    - But, MRP creates an "Expired Lot" demand for only 4988 pcs.
    Has anyone seen this behavior before?
    Can anyone explain the logic of why the "Expired Lot" demand is only 4988 when the actual lot quantity is 5000?
    Or, am I facing another bug?
    Appreciate an advice.
    Thanks,
    Mark

  • Inspection Lot quantity change (lot origin 03) when Prod. ord. qty changes?

    Hi,
    it seems that for an inspection lot, with lot origin 03:Production, its Inpsection Lot qty doesnt change when the Production order Total Quantity field changes. Only the Actual Inspection Lot changes.
    How can the Inspection lot quantity field of the Inspection Lot be changed accordingly?
    Should the enhancement PPCO0007 be used?and then LOSMENGE (table QALS) =GAMNG (table AFKO)
    Can it be done?
    Thanks in advance

    Hi,
    In that case, you can do it by :
    - Reread the master data of production order(From Menu Bar).
    - The status of production order will be converted from "Released" to "Created".
    - Release the production order again.
    Thanks
    SUMIT

  • Inspection Lot Qty Vs Actual Lot Qty

    Hi All;
    I am posting multiple GR's against a Process Order for Eg 1st GR 100 Qty, 2nd GR 200, 3rd GR 300 and after doing this in the Inspection Lot the Inspection Lot Qty shows as 100 and the Actual lot Qty of 600 (sum of GR's) hence the Inspection lot Qty is always less then the actual lot Qty.... is this standard,I was thinking the Inspection Lot Qty gets updated with the Actual Lot Qty and they should match.
    Thanks & Regards

    What is the process order quantity when Inspection lot was created? It should be 100.Usually the process order qty will be shown as the inspection lot qty and the GR qty will be shown as the actual lot qty. That's the reason the actual lot qty is equal to your GR qty. Most of the times, these two quantities are same.
    As said in the earlier response, for incoming goods the GR qty will be shown as the inspection lot qty and during inspection if you find the received qty is higher or lesser than the GR qty, using QAC1 the actual lot qty is corrected. So, always the actual lot qty is the qty received.
    Hope it helps.
    Thanks,
    Ram

  • Actual lot Qty and inspection stock

    Hi,
    We are using early inspection for 04 inspection lot. When I release my process order the inspection lot is created. As usual, the first inspection doesn't have Actual lot qty and Insp. stock is checked. Now, when I create new inspection lot for same process order, the inspection lot has Actual lot qty and Insp. stock is unchecked.
    In material master Post to insp. stock is checked.
    Thanks for your help in advance.
    Bhavesh Patel

    Dear
    U need to go for Order Change Management For doing This As u said ur Changing the Qty and it should reflect in the inspection lot
    Please Follow this Link :
    [http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/f0002c1c-f07c-2c10-3c93-b053715529b4?QuickLink=index&overridelayout=true]
    With Regards
    Pushpalas

  • Inspection lot quantity in manual inspection lot (T.Code-QA01)

    Dear Experts,
    I have activated inspection setup "89" with lot origin '89".I have activated this inspection set up to a material in QM view.
    When i want to create a manual inspection lot through T.Code QA01, the inspection lot quantity is a required field. But i do not want to enter a quantity here. I want to create manual inspection lot without quantity. Is it possible?
    If yes, please suggest how to proceed.
    Your help is highly appriciable.
    Regards
    Vivek

    hi
    Use User Exit :QPL10001
    Description
        You can use this enhancement to change all the fields when creating an
        inspection lot. The function module is only run once.
        You must be careful when using this enhancement since this can lead to
        inconsistencies in inventory management. For example, if you change the
        quantity fields.
    Logic:
    Logic will be when you are using a specific Material say MATNR : xyz .......then disable the Qty field LOSMENGE.
    I hope this will help you
    Regards
    Sujit

  • Confirmation of delivery via EDI (SHPCON) incl. actual pick quantity & GI

    My client makes use of a logistics service provider. Based on the delivery a dispatch order is sent (SHPORD) Idoc type DELVRY03. The logistics service provider receives the dispatch order, picks the materials and confirms the actual picked quantities to my client (SHPCON, Idoc type DELVRY03).
    The problem is this, for some reason the delivery is not being updated with the actual picked quantity. As a result, the system doesn't post GI because it thinks the delivery is not yet picked completely.
    In E1EDL20 (header) I added the sub segment E1EDL18 (qualifier-header) with the value 'PGI'. In E1EDL24 (item) I added the sub segment E1EDL19 (qualifier-item) with the value 'QUA'.
    Can anybody tell me what I did wrong??
    Thanks very much for your reply!!!
    Kind regards,
    Wander Jansen Venneboer

    I think you'll need 2 separate IDocs. First create an IDoc to update pick quantities (enter all quantities and E1EDL18 qualifier PIC). Then create second IDoc for PGI (no quantities are needed here) like you did. Quantities can also be updated in the PGI IDoc, but I think it only works if something was not picked and you need to change the delivery quantity to 0 (or actual pick quantity) to do PGI. We use this second option on the site that has WM but PGI data is being triggered from the third-party software. I was unable to use it to pick the deliveries for the site that doesn't have WM.
    You might need to post the PIC IDocs first and then go about the PGI IDocs. Also even if you don't use parallel processing, the next IDoc actually starts processing before the previous one is completely done. We ran into a big issue with locking errors when 2 consequent deliveries had the same material number. I complained to SAP but was told that this is standard. If this becomes an issue for you, try late locking feature and also you can schedule the error processing program RBDMANIN after the IDoc posting to take care of the remaining locking errors.
    Good luck!

  • Actual Activity Quantity

    Hi
    Somebody please explain how the actual activity quantity is confirmed on the production order ?

    Hi!
    Different activity types like labor, Machine, Factory Overhead etc.. are defined in the system for different resources (Sterilising, Mixing, Grinding, Packing.....) in the production line.
    Standard Activity rates are defined in KP26 with the combination of Activity type and Cost Center (generally different for each PP Resource - Work Center). Also the same are defined in Master Recipe with standard one.
    When you create production order, system will catch standard rates for machine hour and labor hour which are charged at a predetermined standard rate to be derived. Now when you confirm the PP Order through COR6N, you will put all activity type in actual...say 40  labor hours and 50 machine hours..so based on standard rate defined in KP26 and master recipe, system will calculate actual activity rates.
    Also for some of activity type like factiry overheads or others which are dependent on machine hours or labor hours, for that you have to define formula in your resource based on which system will calculate actual activity rates.
    Hope it will clear to you. Pls get back for further query.
    Thanks & Regards,
    Taral Patel

  • Po Quantity - Actaul Gr quantity  ---- Actual invoice quantity

    Dear Gurus,
    I want to know the report name which will show---
    Po Quantity - Actaul Gr quantity  -
    Actual invoice quantity
    (ME2M is not useful once we select delivery completed indicator)
    regards
    Sar

    Hi,
    Try with t.codes
    1.MB5S,
    2.ME80FN,
    Regards,
    Biju K

  • QM Inspection Lot Qty vs Actual Lot Qty

    Gang,
    What is the difference between Inspection Lot Qty vs Actual Lot Qty. And which one of these should get updated when more than one receipt is against the same Material/Batch/SLoc?
    Thanks
    Bruce

    Inspection lot Qty & actual lot qty as I remind are most of the time same but when you do the QTy correction through QAC1 ,they come into picture...or may be when you have inspection control defined in the QM view
    Inspection lot qty has significance for inspection & calculation of sample size.
    When more than one receipt is against the same Material/Batch/SLoc the inspection lot QTy will be Qty for which he material document is created,

  • How to adjust order quantity to match lot quantity

    Hello everyone.
    Is there any feature that adjust the ordered quantity to match sales/purchasing lot quantity automatically?
    (OM or PO)
    For example,
    Item A's sales lot quantity is 10.
    When customer ordered 3 Item A ( or User is ordering 3 Item A to the supplier )
    I expect the sales/purchasing order quantity will be adjust 10 automatically.
    Regards
    Kei Machida

    Hi Venkat,
    You can up date the price or quantity in the billing document based on the delivered material batch quality parameters.
    But for this you need to take ABAPer help.
    I hope this will help you,
    Regards,
    Murali.

  • Inspection Lot  quantity unit is changing to Basic UOM.

    Dear All,
    In material master, material unit is in MTR(M),for that material i created Production order in NOS
    I am confirming that order (TCODE -CO11N) in nos only ,up to last stage of confirmation it is in NOS only
    but after confirmation the lot is generating in qa32 that lot quantity unit is basic unit of measure i.e MTR(M).
    But i want that lot in confirmation unit i.e 'NOS' .
    So,please suggest me to solve this problem.
    Is there is any user exit to overcome on this problem.??
    Regards,
    Sanket.

    Hi,
    the UOM of QA32(inspection lot) is always similar to the UOM of MM03(material master).
    Arunima

  • Ud only when Actual Lot Qty is Zero

    Dear all,
    Our requirement is to give usage decision code only when Actual Lot Qty is Zero.
    if there is open qty ud should not to be possible
    regards,
    lingan

    Hi,
    Use User status profile as per below screen shots for your requirement.
    T.code: BS02
    After creation of status profile assign it in to inspection type and check ur scenario again.

  • Lot quantity to order for a material set as reorder point planning

    Dear All,
    Suppose the requirements of a material are as follows:
    Week1 Required quantity - 100
    Week2 required quantity - 150
    Week3 required quantity - 300
    Week4 required quantity - 500
    This material is set as "VB" (Reorder point planning in the material master)
    My questions is:
    Can we use periodic lot sizing procedure for a material planned based on reorder point planning , so that MRP run will consider the requirements of a month (1050) and use that as the lot size to order material.
    We want to plan the material if it falls below the reorder level, but we want the system to dynamically calculate the quantity to order based on the actual demand (and not on either fixed lot size or maxmimum stock level).
    with regrds
    Laxmipathi.G.V

    Hi
         Use Anyone of the following
    1. Use automatic reorder point with forecast planning requirment.Where ssytem will calculate reorder point automatically based on weekly /monthly Forecast req.In this case Lot size you can use EX itself.
    2. Use Planning type PD and lot size EX and Instaed of ROL use safety stock so that system will consider weekly sale req. and  also safety stock according to that procerement proposal will be created.
    Regards,
    Velmurugan S

Maybe you are looking for

  • RH8 HTML suddently generating truncated CHMs

    I typically compile a new.chm file for my project once or twice a week. Yesterday, the chm I generated  came in at 1975 kb. The previous one, created three days earlier for the same project, was 47,489 KB. RH displays no error messages and does not c

  • How do I get rid of MY Start by Incredibar

    When I open new window I get a My Start page and junk advertising. I have tried to delete through remove program and deleted a strange "user" file. Search search.does not find an other files with search. I did search with "ib" as suggested on some fo

  • [b]FRM-92060 Oracle Developer 9i Error Message[/b]

    Dear Sir, when I have run the module that builds with Oracle 9i form developer the following error happened: Frm-92060: Filed to connect to the Server. Bad machine Specification: /forms90/l90serverlet:-1 Also when I try to run address with L90servlet

  • Cannot connect - invalid response !

    When I tried to connect my iPod to my PC today, I got a message  saying it could not connect beacuse an invalid response was received from the device ? I have not had this problem before. I tried to connect my iPod on my friend's laptop and it connec

  • Firefox: Change toolbar text color

    Hello guys, I saw some very awesome threads in the artwork section and I thought someone here might be able help me make firefox sexier (sorry if I posted in the wrong section! should this be on artwork? newbie?). Could anyone supply the CSS code/ele