Hello All,
I need your help with this one. Therefore thanks in Advace:
Is there a way to download and upload work center hierarchies?
The idea ist to download a complex hierarchy to a file and then upload it to another system/ client.
Thanx
Raf

Hi Daniele,
I just tried  the way you suggested:
- RCRAPDX1 downloaded a txt to presentation server with data.
- changed only the plant in file.
- run RCRAPDX2
unfortunately result is that ths system try to maintain the work centers within the file,
(which are already maintained).
The hierarchy structure won't be maintained.
So what I look for is a manner to transport the complete hierarchy structure...
regards
raf

Similar Messages

  • Capacity cumulation in work center hierarchy

    Hello
    Does anyone uses workcenter hierarchies to cumulate capacity requirements ?
    I've created a hierarchy but in the capacity evaluation transaction cm01,
    the capacity requirements are not cumulated from the underlying work center.
    Instead a capacity requirement of zero is shown on the hierarchy work center.
    Is there any specifics to cumulate the capacity requirement to work center hierarchy header
    Best regards
    Pascal

    Hi,
      In the transaction CM01, choose the pull-down menu Settings-> General. In the pop-up screen, under the "Herarchy" tab, select the check boxes "Cumulation of reqmts" and "Dyn. capacity cumulation", choose the "Hierarchy" and "Plant" and click on "Continue".
    Now the "Available Capacity" will be as per hierarchy setup and Rem. avail cap = Reqmts-Available capacity.
    Hope this solves the requirement.
    -Thaila Shree

  • Work center Hierarchy

    Dear Gurus,
    How can I use work center Hierarchy for Capacity Planning.
    I have 5 Lathe machines. How can I use Work Center Hierarchy?
    I also need  Work Center Wise confirmation.
    Please guide me. Also let me know how should I maintain data in work center as well as in routing.
    Thanks in advance
    RG

    Create a new WC (in CR01) as category 0004. This will be the top level WC in your hierarchy. <BR sab="44">Create a hierarchy (in CR21). <BR sab="46">Add your 5 lathes and the newly created top level WC to the hierarchy (in CR22). This can be tricky: the WC you just created must be the top level, the other 5 must be under it. <BR sab="50">Pull the capacity data (in CM01) for the hierarchy: go to settings, hierarchy, check the cumulation of requirements and capacities and type the hierarchy name. <BR sab="54">Route things as before, to the original 5 lathes.

  • Work Center Hierarchy and Routing

    Hi,
    I would like to know what exactly Work Center hierarchy mean?. Where is it used. In Routing, we maintain Sequence of operation along with workcenter where this operations are performed . Would like to know does work center hierarchy is linked to sequence maintained in Routing?. Thanks

    Hi,
    Any one can explain me the use of Workcenter Hierarchy?. In Routing, we maintain the sequence of operations. Does Routing and Workcenter Hierarchy has relation?. If Yes, what is the relation between these 2.
    Thanks in advance

  • Capacity planning at Work center Hierarchy level

    Hi,
    I have created Work center Hierarchy, now want to see the cumulative capacity of subordinate work centers at Superior Work center level, but using cm01- std overview, i can't see.
    Can anybody tell me , what-ever is missing?
    with thanks,
    Rasika
    9869028103

    HI Mangalraj,
    Thanks for your reply. I had tried that , even though there is no cummulation done.
    System is showing same error ,as 'There are no capacity requirements for the
    selection and settings'.
    what i have given input is Superior Work Center, Plant and Planner group.
    I didn't mentioned the capacity at superior WC.
    PLEASE HELP.
    Rasika.

  • Flat file upload against Cost Center Hierarchy nodes

    Hi,
    we would like to upload flat files into BIIP which need to contain values for cost center hierarchy nodes.
    Is there a way to add the cost center hierarchy node value into a flat file and upload it inot BIIP?
    Thanks and regadrs,
    Hans.

    Hello Hans,
    you can post the value agaist any node as long as it is a postable node (not a text node).
    Regards
    Marc
    SAP NetWeaver RIG

  • Work Center Hierarchy and Capacity

    Hello SAP friends,
    Can someone please help me with the following scenario?
    I have 3 Work Centers
    MAQ00 - (Capacity 10:00 x 2)
    MAQ01 - 8:00 -- 18:00 (Capacity 10:00)
    MAQ02 - 8:00 -- 18:00 (Capacity 10:00)
    I have a hierarchy
    HICY01
    MAQ00 - Root of hierarchy
    |_ MAQ01
    |_ MAQ02
    Then, I have a routing
    10 - PP01 - MAQ00 - 1H
    20 - PP01 - MAQ00 - 2H
    If I go to CM01 for Work Center MAQ00 I can see the capacity and requirement, where:
    Capacity: 10:00 x 2
    Requirement: 3:00
    But if I go to transaction CM21 for Work Center MAQ00 the capacity and requirement is not correct. Can someone please help me with this?
    Thanks in advance,
    Adelmo Silva

    Hi,
       CM01 will give the cumulative requirement as 3 hrs but CM21(Gradhical View) shows the individual spread of oprn. 10 and 20 as 1H and 2 H resp.
    Does the above help you?
    -Thaila Shree

  • Regarding work center hierarchy

    Hi all,
    I have 2 work centers liked to a superior work center in a hirarchy.
    Is it possible to do capacity planning at the superior work center level.
    The scenario is like this - I will get planned order at a superior work center level. I will  convert the planned order into 2 production orders with child work centers in respective order.
    Now I want that, when I see the capacity overview for the superior work center, it should be full. That means I want to link the capacities of the child work centers to the parent work center. 
    Please let me know if it is possible ?
    Regards,
    Yogesh

    Hi,
    Work center hierarchies are used in capacity planning to cumulate available capacity and capacity requirements. You can cumulate available capacities from subordinate work centers to a superior work center level in order to determine the total available capacity for the superior work center.
    In your situation, I think you need to create two planned orders with the two work centers and after this you will be able to see the capacity requirements cumulated at the superior WC.
    Regards
    Datta

  • How to construct Work center Hirerchy in Production Planning.

    Hi Experts,
    How to construct Work center Hirerchy in Production Planning.
    Thanks in advance.

    Amit,
    I guess you must have overlooked the rules of engagement for this forum. It is customary for questioners to first perform basic research before posting any questions.
    First, search in the forums (search box in the upper right of this page). FYI The question you raised has been covered dozens of times.
    Next, check online help. This help is generic, and not generally specific to a particular industry:
    http://help.sap.com
    Work Center Hierarchy:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/b1/c037ae439a11d189410000e829fbbd/frameset.htm
    Next, look for generic solutions solutions in Best Practices. Basic index at
    http://help.sap.com/saap/sap_bp/BL_IN/html/Content_Library_BL_EN_IN.htm
    Next look for industry specific solutions in Best Practices:
    http://help.sap.com/content/bestpractices/industry/index.htm
    If you are experiencing a problem, or you believe that SAP is not working per the online help, you can then search OSS notes.
    http://service.sap.com/notes
    Next search in one of the standard online search engines (such as Google).
    Only after you have performed all of these tasks, and studied all of the online help that is supplied for free by SAP, should you then consider posting a question to these forums.
    If you are unwilling or unable to perform such research, then you should probably engage a consultant to assist you. All consultants use searches to assist them in designing and executing solutions. If you intend to one day become a consultant, you would be wise to cultivate this skill.
    Best Regards & Good luck,
    DB49

  • LSMW for Work center text

    Hi Experts,
    Im developing LSMW to upload the Work center text(TCode CA10).
    I did tried on Direct input -> program /SAPDMC/SAP_LSMW_IMPORT_TEXTS in LSMW. The uploading process was done successfully but it <u>can not</u> be used in Master Recipe assignment(TCode C202). Reason due to the direct input program doesn't has <u>Work center short text</u>. FYI, the Work center short text is entered during the Work center text creation via CA10 first screen.
    And i did tried on CA10 manually, work center text only <u>can be used</u> in TCode C202 when it is created <u>with short text key in at CA10 first screen</u>. While for the Work center text that created <u>without</u> short text key in, system will prompt <u>error</u> when i try to assign the Work center text into C202.
    Thus, i may need you advice. In LSMW other that direct input,is there any BAPI or IDOC available for the Work center text upload?
    Please comment.
    Thanks in advance.

    Hi SKK,
    Thanks for you reply.
    I did tried on FM SUBMISSION_PROCESSING, and found:
    It is being trigger online, whereby i need to key in the text manually.
    Since my requirement is mass upload, hence that is impossible for me to execute the FM to key in the text manually.
    Do you know there is any other FM/BAPI/IDOC that can perform the <u>Work center Short and Long text</u> in background mode?
    Please comment.

  • Work center hierarch cumulation problem

    hi
      I am trying to cumulate capacity requirement from 3 work centers...I created a work center hierarchy as below steps but I cann't see the cumulate result..it prompt no available capacity requirement or work center exist..anyone knows what I should do next?I can do capacity leveling/evaluation,so I think my IMG setting is good..i searched the SDN forum but no workable solution for me..
    thanks.
    Create a new WC (in CR01) as category 0004. This will be the top level WC in your hierarchy.
    Create a hierarchy (in CR21).
    Add your 5 lathes and the newly created top level WC to the hierarchy (in CR22). This can be tricky: the WC you just created must be the top level, the other 5 must be under it.
    Pull the capacity data (in CM01) for the hierarchy: go to settings, hierarchy, check the cumulation of requirements and capacities and type the hierarchy name.
    Route things as before, to the original 5 lathes.

    Hi ,
    Dispatching is used to allocate or schedule the planned orders in the work center/resource.
    We can use CM25 transaction-Graphical planning board for dispatching.
    Planner can assign /dispatch the planned orders manually here. He can see graphically the planned orders overload work center which are dispatched with other.
    Using cm21 you can do capacity levelling graphically or using cm22 can do cap levelling using tabular column.I feel using this would be easy.
    Regards,
    R.Brahmankar

  • Main Work center ?

    Dear All,
    Can you please explain,
    How to create main work centre & work center.
    How can we differentiate the two after creation.
    What is the use of work center hierarchy.
    AR

    Hi Amit,
    About Work Center : Work Center is a person, a group of persons, a machine or a group of machines.
    Just understand the above lines. this is the basic defination of work center independent from any PP or PM work center.
    Now, if work center is created to perform Maintenance tasks with * work center category 0005 * those work centers are called maintenance work centers.
    ( Generally persons or group of persons are created as work center in PM)
    If work center is created to perform Production tasks with * work center category 0002 * those work centers are called PP work centers.
    (Generally Machines or group of machines are created as work centers in PP)
    In Plant maintenance, work centers can be defined in Hierarchy i.e. work center heirarchy is possible.
    take an example: you have created a work center with a group of people. you need to define who would be person responsible for this group & also you can define the persons heirarchy with the integration of HR.( e.g. Manager-Senior Engineer- Engineer-Associate Engineer- Senior Fitter- Fitter)
    The difference in one word is : Both are work centers but having different category & being used to perform different kind of tasks.
    For the trasaction : i would only like to say that while creating from PM nodes by t-code IR01, system give you default work center category 0005.
    I hope i am able to solve ur query for some extent.
    Thanks,
    PMGURU

  • Request for detailed acts to upload Work center,  BOM, Routing data in LSMW

    Hello PP ANgels,
    Request for detailed actions to upload Work center/Resource,  BOM, Routing/Recipe data in LSMW.
    Thanks in advance

    Sanjay,
    In the forum I found that you had used some "drops", that require a password to view.
    In these forums, the only links I post are public (help.sap.com) and from SAP support (service.sap.com/support).  SAP Support is mostly available only to customers and partners of SAP.  If you meet these criteria, and need a login for the SAP support site, contact the license administrator for your company's SAP licence (this is usually a Basis person).  If you cannot locate this person in your company, contact Service Marketplace directly (service.sap.com/mp).  Alternatively you can contact your local SAP Sales office and speak to your account administrator.
    Maybe it would be a better idea to group all standard solutions in one place.
    I expect it will be so...in Nirvana.  Here, life still entails suffering.
    With respect to your detailed questions, I would have a hard time answering, I have never used recordings in LSMW to create work centers, I always use standard batch/direct input.  I suspect that the VGEXX items are the units of measure from CRHD, I suspect LARXX items are activities from CSSL, and I couldn't comment on FORXX items without doing some research.
    This is the SCM PP forum.  You might get more answers posting this in the ERP PP forum SAP ERP Manufacturing - Production Planning (SAP PP) , since work centers/routings/recipes/BOMs are more or less irrelevant in SCM.
    Sorry I couldn't be of more assistance.
    Best Regards,
    DB49

  • Why time-dependent not work for cost center and profit center hierarchy

    Has anybody been able to successfully turn on time-dependent for cost center hierarchy? Looks like the R/3 datasource 0COSTCENTER_0101_HIER is defaulted to be NOT time-dependent, and I don’t know how to change the R/3 configuration to enable time-dependent for this datasource.
    Here is what I found. If you go to RSA2 in R/3 and enter datasource 0COSTCENTER_0101_HIER, and then select "Hierarchy Info", you will see that all the time-dependent properties are unchecked by default. By comparison, Cons Unit datasource 0CS_UNIT_CSCU_HIER has “Version Dependent Hierarchy” as selected, and we are able to load Cons Unit hierarchy as time-dependent, but have no luck so far with the Cost Center hierarchy.
    Can any BI guru tell me how I can make time-dependent work for the cost center hierarchy?
    Thanks a bunch!

    Check SETLEAF and SETNODE.
    Basically CO Master data groups dont have seperate tables. They will be available in above tables. Choose proper Set class to filter the results

  • Download  for the cost center hierarchy

    I would like to help me I need to do is download a program for the cost center hierarchy, but not if there is a function that you do this?

    Go to transaction KSH3 (Cost Center Group) and enter your top node and press enter.
    Place your cursor on the top node in the list and take the menu path:
    Extras -> Export
    Click on Presentation server, enter a file name and press the enter button.
    Rob

Maybe you are looking for

  • Billing in third party

    hi, in third party sales my client want to make a bilingl for bill to party after recieving the incoming invoice from vendor, before of that he want to restrict the billing process that order related billing. here he dont want to do the billing befor

  • Why are my tabs being re-directed to google-analytics?

    It seems when I open a tab, in the lower left of my screen is a message "waiting on google-analytics" and the page never opens == URL of affected sites == http://www.fool.com

  • Internal table logic - help required

    Hi, I am working on BSEG table to determine offsetting line count and amount total for a posting line item and need a small logic . I have a table of currency fields like below and the table is such ( like BSEG ) that each line item will balance itse

  • How to register a new list of JDBC driver to ODI?

    Hi Guys, How to register a new list of JDBC driver to appear on ODI? exam : When I defined a new master repository that resides on MSSQL 2005 I already had sqljdbc.jar (This is mssql2005 jdbc driver) on the ..\oracledi\drivers But when I browsed jdbc

  • How to use third party components?

    I have downloaded a third party component. Please tell me how to use it. Which file/folder am I suppose to place in the libs folder. Where can I find this .svc file in the component folder. Thanks in advance. Regards, Pooja