Upload single level variable cost in SNP PPM in mass by MASSD

Hi experts,
I am trying to upload single level variable cost in SNP PPM in mass by MASSD by following selections:-
Selection
Object Type:- PPM
Selction Criteria:-
Component:- Plan        Attrib:- Use of Plan
Component:- Plan        Attrib:- Plan
Components & Attributes to be Maintained
Component:- Plan        Attrib:- Var.Sing.Lvl Costs
While maintaining the cost, under selection criteria, compoment: PLAN and attribute: PLAN I am unable to maintain multiple plan names.
The single level variable cost that I have to maintain for all these plans is the same and therefore was trying to use transaction MASSD
Can you please throw some light on how multiple PLAN selections can be done?
Regards
Chetan

DEAR GURUS,
*There is a question regarding the resoucre  consumptions  relevant to PDS in SNP,*
****The inputs are:****
****1) Base Qty= 7700 TH****
****2) Set Up =45 MIN****
****Resource consumed by operation activity is 112 207 seconds = 31,17 hours.****
****Unfortunately we didnu2019t understand how this figure is calculated.****
****Can you please help us in this****

Similar Messages

  • Mass Upload of Define Mode Combinations_PPDS to SNP PPM

    Dear All ,
    I am converting huge numbers of PPDS PPMs to SNP PPMs , I would need your support in telling me a mass upload ( program ) for defining Mode Combinations transaction .
    As such a BDC has been prepared but that takes a very long time for pushing data in this transaction .
    Thanks and Regards ,
    Prashant Kumar

    Dear Murali ,
    I have specific field values e.g. variable lot size , without PPDS Campaign , Blank Mode Combination to be selected .
    When we select the PPDS PPM no. or Product Location Combination inserting all these values in the table after execute done on the selection screen needs manual entry of all the field values .
    Data is really very huge and was wondering if there could be a quicker way out . There is more SNP PPM converted from PPDS PPM due to alternate modes of 10-15 in many of the PPDS PPMs .
    Would appreciate any further help .
    Thanks and Best Regards ,
    Prashant Kumar

  • Cost profile/function in SNP PPM

    Dear colleague,
             i have created a cost function for a material with values
    0-10 -- variable cost as 10
    10-100 -- variable cost as 9.
    and i have attached this cost function to the PPM under cost profile but while running the SNP optimizer the cost is never considered.
    Not sure what could be the issue in this. Request if any body can help me on this topic.
    Thanks
    Sandeep

    Hi Sandeep,
    Among the two optimzation options of Linear Optimzation and Discrere Optimzation,  If you choose  Discrete optimization ,  you can specify that you want the optimizer to consider the piecewise linear cost function (defined in the production process model (PPM)), for the PPM.
    u2022 You  need to  activate Discrete Optimization in the optimizer profile header data.
    u2022 You  need to  define the piecewise linear cost function (cost profile) in the PPM.
    Regards
    Datta

  • DIFFERENCE BETWEEN SINGLE LEVEL AND MULTI LEVEL COSTING

    Sir,'
    Please explain the difference between Single Level and Multi Level Costing in Detail
    thanking You

    While using material ledger, we can use the single level or multi-level price determination for valuation of inventory.
    Procurement processes are used in Product Cost Controlling to determine procurement costs and to present those costs. Purchase Order, for example, is single-level procurement and Production is multilevel procurement.
    Single-level material price determination calculates the periodic unit price for a material. The standard price and the cumulative single-level differences of the period are taken into account. Single-level material price determination takes into account the differences that arise directly when a material is procured.
    Multilevel price determination calculates the periodic unit price for a material. The standard price, the single-level differences cumulated in the period, the differences between planned and actual prices, as well as input material differences (multilevel differences) are all taken into account.
    Single-level material price determination  is a prerequisite for Multi-level price determination.

  • Fixed and variable cost component break up in PCA

    Hi,
    Is it possible to get fixed and variable cost component break up and contribution report in PCA at each product group level and lower level of node. I think this requires development. As my client requires the report to have cost break up into fixed and variable in PCA at each line item level. Can anyone solve this

    Hello
    You can get the report by using the  report painter, no development will be required.
    Regards
    Madhav

  • Crystal Reports prompt single value variable from BEX

    Hi,
    after upgrade to BO 4.1 SP2 Patch 3 the prompt from BEX variable in CR doesn't work.
    After investigation the issue is happened for variables containing more than 9 values.
    Bex Setting: Variable -> Details -> Variable Represents -> Single value
    Variable which shows Jan-Dec
    The issue happens only on CR file stored in BO server in Cr design time it works fine.
    Is the bug known? Is there any solution?
    Harald

    Yep.
    Now tell me how you want to show that Prompt @ WebI report level.
    My problem is that in WebI selection screen we get list of date values from the info provider instead of Calendar prompt
    where user can enter the values directly. Exactly, i didn't get this??
    @Prompt:
    You have flexibility to show options like:
    Mono/Multi: User can select Single value or Multiple.
    BW Variable: Same we have (Single/Multiple)
    Free/Constrained: User can Enter his/her value directly or No change option.
    BW Variable: By defalut you will get this, once you made it to Optional input.
    Persistent/Not_Persistent: Refreshed report has to show last selected value means use Persistent otherwise Not_P.
    By seeing the Prompt syntax , I can say your Variable is after Customer Exit, Correct??
    Workaround for your Problem is:
    <FILTER KEY="ZV_DATE"><CONDITION OPERATORCONDITION="Equal"><CONSTANT TECH_NAME="@Prompt('Date (Previous Day)','A','Date\LovDate (Previous Day)Base',mono,primary_key)"/></CONDITION></FILTER>
    You have to remove that Date class and objects from prompt syntax. Because of that it showing up LOV's not calendar.
    Like:
    <FILTER KEY="ZV_DATE"><CONDITION OPERATORCONDITION="Equal"><CONSTANT TECH_NAME="@Prompt('Date (Previous Day)','A',',mono,primary_key)"/></CONDITION></FILTER>
    Why, It should be blank??
    Because Date needs no class\object to show up, by default you will get Calendar on the fly.
    Hope you got my point.
    Thank You!!

  • Error In SNP PPM Creation . . .

    Hi All,
    I am getting following error message while converting PPDS PPM to SNP PPM. . .
    " SNP-relevant and non-snp relevant modes exist in operation "
    Please can someone let me know the solution on this. .
    Thanks in advance.
    Regards,
    PP.

    Hi,
    Please  check if any  single or multi-mixed resource has "Not SNP Rel. indicator" has  been set on the Planning Parameters tab page is in the PPDS ppm.
    Regards
    Datta

  • Multiple Resource in SNP PPM

    Hi Experts,
    I have scenario where bottleneck resources changes with time. Lets say that I have two workcenters WC1 & WC2. Operation 10 will be performed through WC1 and operation 20 will be performed through WC2. SFG1 is input material for operation10 and FG1 is output material through WC2. So SFG1 will be processed through WC1 & WC2 and output material is FG1. Operation 10 & 20 are sequential operations. WC1 & WC2 have the same scheduling time for both the operations 10 & 20
    Now, WC1 runs in three shifts in May'10 and WC2 runs 2 shifts in May'10. So WC2 is bottleneck resource in May'10. In June'10 WC1 runs in two shifts and WC2 runs in three shifts so WC1 is the bottleneck resource in June'10. Simply, bottleneck resource can be either WC1 & WC2 depends on time.
    So in my routing I have two operations and operation 10 contains WC1 & operation20 have WC2. Further, we created Production Version (PV) and CIFed as PPM. When converting PP/DS PPM to SNP PPM I can chose only one mode so only one work center (resource) in one PPM and another work center in another PPM. We need both workcenters in one SNP PPM.
    Could any one guide to meet this scenario.
    Thanks,
    Naveen
    Edited by: Wilian Segatto on May 14, 2010 11:54 AM

    Hi Bandana,
    I am trying the same but I am not able to create single Resource,
    Would u plz briefly explain me what parameters u are providing,
    Thanks,
    Radhey

  • Cost center planning data-Plan Variable Costs in Object Currency

    Dear All:
    I have copied a standard planning layout and for the field, 'Planned Fixed Cost' and 'Planned Variable Cost', I have selected 'Plan Variable Costs in Object Currency' and 'Plan Fixed Costs in Object Currency' as the Key Figure.
    I am doing this because our Controlling Area currency is TWD and the other company will upload the planning data in RMB .
    However when I do the above settings and try to save, I am getting the following errors.
    The column 'Plan Fixed Costs in Object Currency' can input correctly but the column 'Plan Variable Costs in Object Currency' canu2019t be update in KP06 .
    ex.
    Planner profile: SAPALL
    layout :1-101
    I can't update the column "Plan Variable Costs "
    I copy the layout 1-101 and change the column to  'Plan Fixed Costs in Object Currency' and it  still can't input variable cost
    BR,
    Carol

    Hi Carol
    I have done this many times and never faced this issue
    Just delete the copied layout and Copy it again from 1-101....
    May be delete the existing columns of the layout and choose the desired key figure of object currency
    Then assign the layout to Planner Profile
    Regards
    Ajay M

  • Reposting fixed costs to variable costs

    Hi Gurus,
    one of our subsidiary company uses target=actual method in the cost center accounting. Sometimes they forget to plan some cost elements during the planning process. If some costs incurred on these unplanned cost elements, SAP put all of these costs to the fixed costs during the period-end closing (activity allocation).
    So far so good, but is there any possibility to repost these costs to variable costs on cost center level???
    Thx

    Thanks a lot for the quick reply.
    We know the splitting method but this company don't use it. For this reason I asked about a possibility if it is possible to repost the amounts from fixed to variable costs afterwards.
    I would be grateful for an other solution.

  • How to avoid SYSTEM_NO_TASK_STORAGE  with multiple single values variable

    Hi experts,
    I am trying to do a distribution with reference data standart SAP function.
    Fields to be changed:
    ZPDHIER2 (Economic Group II)
    ZPDHIER3 (Economic Group III)
    ZPDCLIENT (Client)
    Fields for condition:
    KEY FIGURE NAME
    Fields for reference:
    KEY FIGURE NAME
    ZPDSTATUS (Status)
    FISCPER3 (Fiscal Period)
    The parameters group is like:
    Fields for condition:
    Key figure: ZM_070 (one of the key figures)
    Fields for reference:
    Key figure: ZMONT_TN
    FISCPER3: 001
    Status: DE
    - "Only distribute not assigned" is checked
    I do not want the data to be distributed by any ZPDHIER2, ZPDHIER3 and ZPDCLIENT so I have restricted these characteristics in the planning level by some variables. These variables are user exit type and return multiple single values.
    The issue regarding this message is that when I execute this function, depending on the size of the data brought by ZPDCLIENT user exit variable, this dump might or might not occur. As for the testing I've done, i realize that if the number of clients exceed 500, dump will occur.
    This multiple single values variable (or any other solution) must be prepared for 3900 clients, and this number is expected to increase.
    Anyone have faced same problem?
    Hope you can provide me some help regarding this issue.
    Tanks in advance,
    André Oliveira

    Hi Wadih saad,
    I think the memory is not suffcient to hold the load. Check your swap space and memory during the client export and also check whether there is sufficient space in the hard disk to hold the export files.
    You must have calculated the client size by using the test run. This size must be available as free space in hard disk to do the export.
    Make the available space and do the export it will work.
    Regards,
    Maheswaran J

  • Base cost and Variable Cost

    Hi All
       Can anyone help me to understand what is base cost and what is variable cost. And also from where can I find these both.
    Thanks
    Vani

    Mayby you mean fixed and variable costs?
    Variable costs are expenses that change in proportion to the activity of a business.
    For example, a manufacturing firm pays for raw materials. When activity is decreased, less raw material is used, and so the spending for raw materials falls. When activity is increased, more raw material is used and spending therefore rises.
    Fixed costs are business expenses that are not dependent on the level of production or sales.
    For example, a retailer must pay rent and utility bills irrespective of sales.

  • Switch between SNP-PPM and SNP-PDS

    Hi,
    In APO I have both SNP-PPM and SNP-PDS, but right now I am having some trouble with the bucket time from the PDS so I am trying to temporarly change my PDS to PPM.
    My query is:
    - Is there a way in APO to make the SNP-PPM the default production model over theSNP- PDS?
    I was searching for some kind of documentation on this topic and I found that I should change the priority for the PDS throught the PDS_MAINT transaccion in ECC, is this the only way to do it?
    Thank you in advance,
    Fernando

    Hi ,
    SNP heuristics  planning source determination gives first preference to Quota arrangement.
    You may include PDS as a source of supply in the inbound quota arrangement of the product.
    There is a BADI  BAdI /SAPAPO/PWB_SOS to modify the content and the sequence of the sources of supply in the ranking list.
    The normal ranking list for SNP source determonation  is as below:
    Quota arrangements
    Procurement priority
    Procurement costs
    Procurement type
    There are two other BADIs releveant as below:
    u2022        /SAPAPO/CURTO_SNP ) Enhancements When Creating an SNP PDS (R/3) (Generation)
    u2022        /SAPAPO/CULLRTOSNP ) Change SNP/CTM Production Data Structure Data (Generation)
    Hope this gives some options.
    Regards
    Datta

  • SNP PPM Selection Criteria

    Hi Experts,
    I would be really glad if you could help me regarding this issue.
    I have 2 Materials with 2 SNP PPMS. The SNP PPMS were generated by converting PPDS PPMS  which was cifed from R/3. The production versions in R/3 has the same validity date.
    Lets say for Material A:
    - It has 2 production versions and 2 SNP PPMs
    - PRD1 and PRD2
    - when I had run the SNP location heuristic it had selected PRD1.
    Material B
    - It has 2 production versions and 2 SNP PPMS
    - PRD1 and PRD2
    - when I had run the SNP location heuristic it had selected PRD2.
    May I kindly ask therefore how PPMs are selected by the APO system in the case of SNP PPMs running SNP location Heuristic? Unless I understand the process, I cannot still create alternative PPMs. I cannot always assign manually the Procurement Priority of all the PPMs generated.
    I am really hoping you'd help me regarding this issue.
    Thank you so much.
    Sincerely Yours,
    Ria
    Edited by: Ria Montealto on Jul 31, 2008 10:16 AM

    Hello ,
    As you must be aware the basis for selection of ppm are 'quota arrangment' ,'procurement priority' ,'costs(multilevel cost)' ,'procurement type' .
    Kindly refer to following link for more detailed information and how this ranking list can be changed. "http://help.sap.com/saphelp_scm2007/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htm ".
    Also if all the parameters are same , it will refer to nomenclature of the ppm as the ppm name contains the version number ciffed from r/3.
    For example, if there are versions "0001 " and  "0002 " in r/3 and these versions are ciffed to APO to create ppm .
    The snp hueristics will select the ppm of prod. version 0001 .
    Thanks & Regards
    Abhijit S Nakhwa

  • SNP PPM can't be activated

    Hi ,
    I am working in SCM 5.1 , I wanted to test the dependent demand flow in SNP heuristic run and for the same I have tried to create PPM. I have created resource bucket  & single mixed both. But when I am trying to activate the SNP PPM it gives me error "No linked PP/DS plan exists for SNP plan". IS it necessary to have PP/DS plan for SNP ppm ? Is anybody else faced the same problem in SCM 5.1 ?
    Thanks for your support.
    Best Regards,
    M

    Hi,
    are you getting some more error? like 'bucket consumption is not defined'. then you have to define the 'bucket consumption' in the resource. go to 'mode' of the 'ppm' and check resource consumption is properly defined or not.
    thanks,
    Satyajit

Maybe you are looking for

  • Problems setting up hotmail email account on Blackberry Pearl

    I have had difficulty setting up my hotmail account on my pearl. whenever i enter my username and password (which i have checked millions of times to ensure that it is correct) and hit log in i get the message "please check your information and try a

  • Driver Issue on Vista x32

    Since I have upgraded to Vista from XP I am having trouble accessing my phone. My phone model is a 7250i and I connected through CA-42 I downloaded the new Nokia PC Suite which is compatible with Windows Vista. I followed instructions to install PC S

  • HT204266 How do I get my money back for a bad app?

    I bought an app iTransfer and it never worked. I tried to get rid of it and get my money back with in 10 mins of using it but I couldn't. I spend $3 on it. Please return my money to me. I dont mind if its a credit. I just want it the money back! Some

  • Stuck Outbound Queues in CRM system

    Hi Guys, In CRM system the out bound queuse for the Sales Orders got stuck with the following error "Too many recursive subroutine calls" The Sales Orders are not getting replicated from the CRM system to R/3. The business partners associated with th

  • How to remove the deleted Request ID in BW

    Hi Experts, I had a full load repair REQUEST ID "REQU_xxxxxxxxx" that has been deleted from Infocube. It has also been deleted from  Reconstruction.I made sure that the status was RED. I checked in RSICPROT table, and the REQUEST ID "REQU_xxxxxxxxx"