Urgent :-PIR Saving w.r.t multiple Production version/Month wise

Hi,
1) Please let me know whether It is possible to enter  Planned independent requirement saving in MD61 Txn code month wise &  with respect to three Production version..
i.e. in detail,
I am having 3 alternative BOM’s of the same finish material. I want save the  Independent Requirement in a particular month with respect to 3 BOM’s /3 Production Version wise in the same month.
After that I want to run MRP multilevel planning which will create planned orders of Finish Products & Dependent materials exploding corresponding BOM with respect to the particular Production Versions.
2) Please let me know the best suitable strategy which will not consider present stock & Production/Planned orders in hand , will only create planned orders from the PIR saved in the Demand Management.
Please sugggest the best way to do. I am in pressure from the client.
Regards

Hi
    PIRs cannot be created for 3 production versions.
In MRP documentation, check for quota arrangement. Planned orders can be assigned to three different production versions in equal quantities by the quota arrangement.
MRp run reads the quota file MEQ1 when it has to distribute planned orders across three production versions.
Regards
Pragnesh

Similar Messages

  • Receiver Determination when multiple Product Versions / identical namespace

    Hi,
    How would the receiver determination be done when we have multiple product versions with identical namespaces and interface names ?
    During development, when we do a release transfer to another product version, the namespaces and interface names remain same as the current objects.
    How would XI resolve the correct interface in this case ?
    thanks,
    Manish

    The XI does not care about the application systems. When a message is received by the application, it knows, what to do with the messages.
    The receiver could be an RFC call, an IDOC, an Abap Proxy, here the correlation between interface and Abap code is unique.
    The receiver could be a File, or JMS adapter, here the correlation  between interface and communication channel is unique as well.
    You might reuse IDOCs or RFCs or in rare situations other interfaces in different software components and install them for the same application system. But you can only generate proxies from one interface.
    Regards
    Stefan

  • Can we get Multiple production versions in APO

    Hi,
    Is there  a way to get multiple production versions into APO, as the info record( we are using) is what drive the creation of the PDS in APO from ECC
    Is there a way to find out how we can have multiple production versions in APO.
    Thanks
    Maddy

    Maddy,
    Standard functionality in APO is to support multiple production versions.
    Production Versions are a standard object in ECC.  They consist of a combination of a Bill of Materials, a Routing, and a few other bits of data.  For a given material/plant combination in ECC, there can be many Production Versions.
    Production Version - Repetitive Manufacturing (PP-REM) - SAP Library
    These Production Versions are integrated in standard CIF via either Production Process Model or Production Data Structure.
    Integration of Production Process Models - Integration of Master Data - SAP Library
    Integration of Production Data Structures Generated from R/3 Mas - Integration of Master Data - SAP Library
    Best Regards,
    DB49

  • Multiple Production Versions in Subcontracting Inforecord

    Hi Gurus - I have a question on how to assign multiple production versions in Sub-contracting Inforecord?
    I heard this functionality is available in ECC 6.0 is that true? If so how can I assign multiple production versions? What happens after we CIF across to APO? Any help is highly appreciated.
    Thanks and regards,
    Murali.

    Murali - Its possible to use multiple PV in sub contracting.
    Settings in ERP :
    1. In CFC9 activate the - Transfer multiple selection of PDS indicator. When you select this indicator, the system allows you to select several productions versions in the integration model; it also creates a Production Process Model (PPM) or Production Data Structure (PDS) for each production version in SAP SCM
    2. Assign the PV's to the subcontracting info record through -  Logistics  - Central Functions  - Supply Chain Planning Interface - Core Interface - Advanced Planner and Optimizer - Environment  - Data Transfer  -Assign Multiple Production Versions
    3. When you select the integration model parameters for PDS, you have selected PP/DS Subcontracting as the PDS Type value. Similarly, for PPM, you have selected Subcontracting PPM as the Type of PPM value.
    Subcontracting with multiple production versions is supported. However, the integration with an SAP ERP system requires at least SAP ERP 2005 with Enhancement Pack 03.
    Rgds
    Valavan

  • Costing - Multiple Production Versions and Recursive BoMs

    Hi All,
    We have a production and product costing scenario as follows:
    Production versions 10, 20 and 30. It takes all three versions to manufacture the finished material and there are no intermediate products in this scenario. 10 and 30 are to be costed and 30 is a recursive BoM with the input from version 10 also being the output. 10 is the main production step with components but 30 is a recursive BoM sometimes only with the output material as the input and sometimes with a more complete BoM but which includes the output material as an input component.
    The quantity input appears to be the same as quantity output for the recursive element.
    If anyone has come across this scenario and you can let me know what design principles you followed I would appreciate it.
    We are getting iteration error messages when costing production version 30 and even reducing the input quantity below 95% of the input as per the SAP documentation does not fix the error message.
    Any help you can give will be greatefully received.
    Thanks.
    Regards,
    Tim

    Murali - Its possible to use multiple PV in sub contracting.
    Settings in ERP :
    1. In CFC9 activate the - Transfer multiple selection of PDS indicator. When you select this indicator, the system allows you to select several productions versions in the integration model; it also creates a Production Process Model (PPM) or Production Data Structure (PDS) for each production version in SAP SCM
    2. Assign the PV's to the subcontracting info record through -  Logistics  - Central Functions  - Supply Chain Planning Interface - Core Interface - Advanced Planner and Optimizer - Environment  - Data Transfer  -Assign Multiple Production Versions
    3. When you select the integration model parameters for PDS, you have selected PP/DS Subcontracting as the PDS Type value. Similarly, for PPM, you have selected Subcontracting PPM as the Type of PPM value.
    Subcontracting with multiple production versions is supported. However, the integration with an SAP ERP system requires at least SAP ERP 2005 with Enhancement Pack 03.
    Rgds
    Valavan

  • Report to view the batch details of the products sold month wise

    Report to view the batch details of the products sold month wise.
    Please send it .

    Dear Goutam
    Use <b>MB51</b> where you can select the field "Batch".
    Thanks
    G. Lakshmipathi

  • MRP Scheduling with a material with multiple production versions scrap rate

    Greetings all.
    I have a problem with MRP scheduling.  How do you account for different loss rates or scrap rates on a material because of multiple versions of a material that are in production.  For example, we have an item.  There are two differen ways to make that item and both have different loss rates or scrap rates.  How do we account for this.  And whatt happens when you have these with multiple routings.  Thanks.

    Dear,
    It can be handled in 3 ways.
    1st way - Create 2 versions to represent 2 ways of production. Create a 3rd version name it as total and make it as a first version so that MRP will take this version for scheduling. In total version give the most correct scrap qty and timming in routing. Hence when you run MRP system will consider the total version, then change the varsion in planned order as per your requirement.
    Second way - Create 2 version and if you are using Demand planning, in MD61 against the qty represent the version number so that when youn run MRP, the planned order will carry the version.
    3rd way - Create 2 Production version and create a quota arrangement and assihgn these two Production version as Quota items and give the % share. Hence when youn run MRP system will share the demand qty into two different version as per Quiota arrangement(setting in MRP2 is necessary fir planning).
    Please come back which one you are looking for so that we can give furthur information

  • Production Version in Material Master

    Hi,
    I am having problems with this.
    I need to either change date on a production version or
    delete the product version.
    I have tried using a batch input sequence from my program both for changing the date
    and for deleting the production version and this all works well.
    Now this isn't good enough since there can be multiple production versions on a material
    and I don't know which line to change or delete in the batch run.
    Is there a good FM or BAPI to handle this?
    I don't want to change the MKAL table directly since there is a history table
    connected to this also (MKAL_AEND).
    What is the best approach?
    Rgds,
    /Fredrik.

    How can I use this to achieve what I want to do, either
    change the production version date or delete the production version?
    I have tried C223, but this is not good enough, nor is batch run in MM02.
    I can have multiple production versions and can not pick the correct line
    in batch run to change or delete.

  • Is there option to assign Production Version in MD62

    Hi,
    Can any one please help.
    I have a HALB Material with 3 Production Versions (with the same Lot Size and Validity Dates)
    While creating Planned Indipenmdent requirement (PIR). how can i specify what Production version to be used here and as well for MRP run.
    Can any one please guide me.
    Thanks and Regards
    Khadeer

    Hi,
    Goto MD62
    Execute the report
    Goto Schedule line tab page
    Fallow the menu path
    Setting Production version
    Enter the Production version required
    Save
    Check the PV where it is in green colour it should be active with valide date.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Aug 2, 2008 4:34 PM

  • How to get production version in your contract?

    hi all,
    I have already maintain multiple production versions for one product, but how can I let it appear in the contract item?
    thanks

    Hi,
    I think I have already answered this one. You can get the curent version either from wwv_usr_menus$ or wwv_modules$
    select version from wwv_modules$
    where id = <module_id>
    and status = 'PRODUCTION'
    This gives the version of the current production version.
    Thanks
    Sharmila

  • MRP Run with production version.

    Hi Experts;
    I am working as a member of a SAP implementation supporting team. The client wants to run MRP with alternative BOM, not with the 1st BOM. As a solution for the requirement i created production versions and assigned to MD61 schedule line tab. It is working properly.
    But the user maintain some quantity as a safety stock for finished materials also. To cover the safety stock requirement, system create planned orders with the 1st BOM, not the production version.Already i have maintained the selection method "3" in material master.
    Is it possible to cover safety stock with alternative BOM.
    Please help..
    Thanks,
    Malka

    Hello Malka,
    For your issue,,
    As per other expert suggested you can block the first production version but if in future you want use first production then,,
    In these case you maintain production version in many way
    Ex.
    1.  Lot size .(if production version using for specific lot)
        Maintain the Lot for both production version, so Production version 1 lot completed system take       second production version.
    2. Production version validity date (If production version using for specific period )
        In this case after completion of 1. Production version period system take second one
    3. Manually selection of production version (If multiple production version and all have same condition)
        Whenever you convert the planned order to production order, one pop up come and ask for                manually selection for Production version, for this you go to OPL8 and select the Manually                production version
    I hope this information cover your all requirement, No need to go with quota arrangement
    Still you want know about the Quota arrangement, Please create new thread so other expert also provide their view
    Regards
    Umesh Mali

  • Quality plan as per production version

    Hi SAP gurus,
    My client has multiple Production versions and they want to use different Quality plan as per version , how  I can map this process in SAP.
    I tired using in production version by putting Qualiity plan instaed of routing,  Inpection lot is created but when it come for the production order it was asking for the routing / or operation generation.
    As few specfication of Quality plan is different , that is the reason Plan has to be specific to PV.
    Thanks in advance.

    Hi
    Even if you create a Inspection plan you might have observed in the production version you have to specify the Routing.
    Reason is syem will check the routing for cost collector in production order.
    what you can do is may be you can carry out inprocess inspection with routing & specify the char in the task list
    or
    You may have to go for userexit while selection of the task list you will select the appropriate task list with appropraite prod version
    Also if you creat two inspection plan with two gr counters & do not tick on "Auto Assign" in the QM view,
    System will create a lot of 04 with CRTD status.
    In QA02 you can go & manually attach the relevent task list.
    What you can do is create a Group with name of "prod version" itself.This will ease the attaching of the tak list to the the lot.
    I hope this will add some value.
    Regards
    Sujit

  • Use of different production versions for MRP and costing

    Dear PP Gurus ,
    We have a scenario in which there are multiple production versions for a particular product .The MRP run as welll as costing run considers only the production version 0001.
    We would like the system to consider different production versions for MRP and costing ..that is 0001 for MRP and 0005 for costing .
    Is this possible ... if yes ...Kindly suggest the config and master settings for this to happen .
    Ram ~

    Dear Ramakrishna,
    For doing the costing for a specific production version use CK11N,under quantity structure tab key you
    can assign the prod.version which is to be used for costing purpose.
    While taking MRP if you want to consider the particular Prod.version,assign the demand to the
    correct prod.version under schedule line tab in MD61.
    Otherwise the system always picksup the first prod.version for MRP.
    One more alternative is you have to lock the other prod.versions if you want the system to consider a
    particular prod.version.
    Check and revert back.
    Regards
    Mangalraj.S

  • Our family has multiple products from IPods, IPads, IMac, and Apple TV. However, we made a mistake when registering them so that we seem to have at least two different ITunes accounts. How do I combine them or reset the accounts to make them one?

    Over the years we have purchased multiple products from IPods, IPads, to IMacs. Unfortunately, along the way, we accidentally created more than one ITunes accounts so that we can only access some songs etc on certain devices and not on others. How do we reset our devices to create one account or transfer our music to one account?

    You don't. You cannot combine iTunes accounts at this time. Pick the one that you want to use and stick to that one account for all the purchases.
    Before making any changes read this article - http://support.apple.com/kb/ht4627
    MJ

  • New to Apple products (finally) - can I use my Itunes account with multiple products e.g. Iphone and Ipad?

    New to Apple products (finally) - can I use my Itunes account with multiple products e.g. Iphone and Ipad?

    Oh yes! Apple will be happy for you to buy as many Apple products as you can afford.
    As and when needed, each can be given its own selections of content to sync with.
    tt2

Maybe you are looking for

  • Unable to create connection pooling

    hello everyone, i am trying to implement connection pooling with sybase as the database and tomcat 5 as the container. But this is the exception thats coming : javax.naming.NameNotFoundException: Name jdbc/TestDB2 is not bound in this Context My serv

  • Invoice Date, Create Date, and Due Date

    I have a customer who is entering invoices normally like any customer would.  They will have a few that will sit on someone's desk for a couple of days before it gets entered into the system.  As an example the invoice date is 2/6/2015.  The created

  • Node creation

    Hi All, What is the difference in creating a node in Webdynpro ABAP and mapping them onto ABODE form TO creating the tables and nodes in Aodbe form and mapping them to WDA. In which cases we follow which apporach.. When I need to work both with WDA a

  • Font types of illustrator cs2 document

    Hi,           I need to get font types (open type, true type and type1) of illustrator cs2 document.  Can't able to get using script and action.  Manually i can get by saving document info of a document.  But when i trying through action cant able to

  • Bex Query Technical Name - auto populate

    When a user creates a query and goes to save it.... is there a way to populate the technical name box with a suggested (user can amend if required) technical name? The reason that I want to do this is because there is a strict query naming convention