URGENT: Prob with Production Order Confirmation

Hi Gurus,
I have a problem with Production Order Confirmation.
When I am confirming a Prod Order and if the components present are more than '999', then error is being thrown and Material Document Number is not being created.
I want to split the records into 500 slots and pass them at a time for the creation of the Production Order so that it doesnt throw me an error while creating a Material Document No.
While saving the Production Order confirmation order, it should split the records into 500 slots each and then create Material Document No for each slot.
Can anyone please help me out in this regard, how to solve this.
Thanks & Regards,
Harish Kalla

Hi Harish,
This problem is addressed in OSS Note : 36353
The Symptom reads like this
==========================================================================
When you post documents using the AC interface (from SD, MM or other applications), items appear in the FI document which are identical in all or in almost all fields.
This can also cause error message F5 727 ("Maximum number of items in FI reached"). The system issues this error if more than 999 items occur in an FI document.
===========================================================================
This Note is an elaborate one..
Hence, go through this and ask your FI Consultant to help you in this regard.
All the best..
Regards,
Siva

Similar Messages

  • Service GR link with Production Order confirmation

    Dear PP Experts,
    My scenario is like this ,
    With respect to service one annual contract will be there & one release Purchase Order for one month will be there.
    I want to take this service with Service GR from Service Entry sheet in a particular operation of a production order.
    Is it possible to get the service entry sheet during confirmation of production order of that particular operation.
    Please any one can give some idea.
    Thanks & Regards
    Aniruddha Biswas

    Hi ,
    It is not possible in Standard SAP . But I can give you some insight for custom development
    1) Create Contract
    2) PR can be created from the Prodn order with reference to contract.
    3) Instead std confirmation , use the custom program for confirmation , which will carry out a)creation of the purchase order b) service entry  and finally confirmation.
    There is functionality in Plant Maintenance that creation of PR is possible wrt to Frame work purchase order and service entry is done for a PR directly without Purchase order. But this functionality is not avl for the prodn order.
    I don't know how far this is useful for you.....
    Regards
    Mani

  • Total Production Order Confirmation..Urgent

    Hi
    Can anyone tell me where to find the total production order confirmation by Second ( or minutes or hours ) for any month i.e. say for example March 2007  
    Please suggest......Its urgent
    Rgds

    Hi Vichy,
    Try this,  COOIS,
    List =confirmation
    Profile =std profile
    selection -> sys status =CNF
    Resrict ther report with Dates with Order header level.
    To get activity values use change layout option inside the report.
    Select the field  like unit/activity. from change lay out menu.
    Pradeep
    Edited by: Pradeep Kumar on Apr 18, 2008 9:19 AM

  • User Exit for Production Order confirmation with CO15

    Hi All,
    what User Exit I should use when validating batch when we do Production Order confirmation with CO15.
    Not when we create or release a Production Order.
    Will reward,
    mindaugas
    Edited by: Mindaugas Kazlauskas on Jan 30, 2008 5:03 PM

    Hi
    The Follwing Userexits available:
        Transaction Code - CO15                     Enter Production order Confirmation
    Enhancement/ Business Add-in            Description
    Enhancement
    CONFPP01                             
      PP order conf.: Determine customer specific default values
    CONFPP02                               
      PP order conf.: Customer specific input checks 1
    CONFPP03                              
       PP order conf.: Cust. specific check after op. selection
    CONFPP04                             
        PP order conf.: Customer specific input checks 2
    CONFPP05                               
       PP order conf.: Customer specific enhancements when saving
    CONFPP06                               
       PP Order Confirmations: Actual Data Transfer
    CONFPP07                               
       Single Screen Entry: Inclusion of User-Defined Subscreens
    CONFPS01                              
       PS confirmation: Determine customer specific default values
    CONFPS02                               
      PS confirmation: Customer specific input checks 1
    CONFPS03                             
        PS confirmation: Customer specific check after op. selection
    CONFPS04                              
       PS confirmation: Customer specific input checks 2
    CONFPS05                              
       PS confirmation: Customer specific enhancements when saving
    CONF0001                               
      Enhancements in order confirmation
    CONFPI01                              
       Process order conf.: Calculate cust.specific default values
    CONFPI02                               
       Process order confirmation: Customer spec. input checks 1
    CONFPI03                              
       Process order conf.: Cust. spec. check after op. selection
    CONFPI04                               
       Process order conf.: Customer specific input checks 2
    CONFPI05                              
       Process order conf.: Cust. spec. enhancements when saving
    CONFPI06                              
      Process order confirmation: Actual data transfer
    CONFPM01                             
        PM/SM order conf.: Determine cust. specific default values
    CONFPM02                             
        PM/SM order confirmation: Customer specific input checks 1
    CONFPM03                               
    PM/SM order conf.: Cust. spec. check after op. selection
    CONFPM04                              
       PM/SM order conf.: Customer specific input check 2
    CONFPM05                              
       PM/SM order conf.: Cust. specific enhancements when saving
    If it is helpful rewards points.
    Regards
    Pratp.M

  • Production order confirmation with BAPI

    Dear PP friends,
    I want to create a program to confirm production orders in mass at header level like CO15. To do it I am trying to use BAPI_PRODORDCONF_CREATE_HDR and it works fine for planned backflush.
    However, I am not able to change data of goods movement (quantity, warehouse and batch). Is it possible?
    What is the function of GOODSMOVEMENTS table?
    I studied the following thread but I could not solve it.
    Production Order Confirmation BAPI
    Does anyone have suggestions?
    Thanks in advance.
    Marcos

    Hi Caetano,
    Thanks for your reply.
    I tested BAPI_PRODORDCONF_GET_HDR_PROP and it proposes goods movements according with open quantity of the production order. In this case, would I have to adjust all movements with actual quantity?
    Is possible to propose goods movements according with confirmed quantity?
    Regards,
    Marcos

  • Discontinuation functionality with production orders

    Dear Guru's,
    Can anyone please confirm: is the functionality for discontinuation of a material (including follow-up material) not available with production orders?
    Example: in our system we have component A that is followed up by component B. This is set in material master - MRP 4.
    We also have production orders for the upcoming 4 months in our system. If the stock of component A is depleted within these 4 months, we would expect to see requirements (orderreservations?)  on component B, but this is not the case.
    Thanks for any comments,
    Rgds, AJ

    Hi
    Discontinuation works for Production orders.Couple of Checks needed for both Follow up and Discontinued Materials to arrive to actual problem
    1) Base unit of measure must be same
    2) Should have same MRP type
    3) Not defined as Co-Products
    For detailed info pl refer the link
    [Discontinuation|http://help.sap.com/saphelp_47x200/helpdata/en/b1/c044d1439a11d189410000e829fbbd/content.htm]
    Regards
    Brahmaji

  • Serial Number. Production Order Confirmation. GR. UD. Sales Delivery

    Hi Gurus,
    Please help on this issue to get any user exits .....
    As part of Serial number management, we have a certain issues on serial number confirmation, goods receipt from production order and quality inspection with UD.
    Master data:
    Finished product material master, Workscheduling view, Serial number profile maintained " ASRN"
    Process flow:
    1) Avalon Specific Serial numbers generation for finished goods through production order release status.
                  (A11206000001)
                                        A  - Avalon
                                        1   - PCB Unit 1
                                        12 - Year 2012
                                        06 - Week
                                        000001 - Running serial number for the week.
    2) Production order confirmation through CO11n transaction.
    3) Production order Goods receipt through MIGO transaction against order.
    4) Quality Inspection with Usage Decision through QA32 transaction.
    5) Goods Issue for Delivery.
    SAP Product Error:
    1) System does not track and control the operation wise confirmed serial numbers during order confirmation.
    2) System does not track and control the finally confirmed serial numbers during order goods receipt.
    3) System does not track and control the last goods receipt qty in Usage Decision.
    4)  For semi finished product, if we maintain serial number profile in workscheduling view, system is not showing goods issue material list in Co11n transaction for the finished goods.
    5) Interfacing the serial number reading scanner with SAP,  is not working without entering material number and serial number manually.
    6) System does not tracking and controlling the last Usage Decision done serial number during Goods issue to Sale order Delivery.
    Regards,
    Santha

    Hi Santha,
    This is a bit vast, but I'll try to address at least some of the issues:
    1- serial number in operation confirmation is not possible, for the reason that serailization is part of stock management, and as WIP in an order, this is not stock yet. Actually you cannot confirm the manufactured material either, and those 2 go together.
    For tracking specificly WIP, there's something called WIP batches; you may look into it to see if you can use it.
    2- during GR system will propose those SNs that you have defined for the order at release or creation.
    3- ?
    4- GI in CO11N is provided only for BACKFLUSHED material components. Serialized materials CANNOT be backflushed.
    5- You can use a barcode reader to read the serial number (instead of keyboard entry) when cursor is on the right field in the respective screen.
    6- ?

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Measuring point update by production order confirmation

    Hi friends,
    I created a prt as equipment and assigned it to the routing. I created a production order and when i confirm the same i am getting following error as:
    Document MeasUnit has a different dimension to the characteristic unit
    Message no. IR071
    Diagnosis
    The measurement unit on creation of the measurement document must have the same dimension as the measurement unit of the characteristic of the measuring point.
    In this case, the measurement unit % does not suit the character unit EA of the measuring point 103.
    System Response
    Processing will not be continued.
    Procedure
    Use the possible entries help.
    Please suggest the solution.

    Hello Sir(s)
    i have gone through entire post for the subject related to measuring point auto update from production order confirmation.  I have tried the same but i dont know what i am missing.
    if i put some value like 1 or 2 and appropriate UOM then only my measuring document is being updated with the same value not with the actual confirmed quantity..  i have already maintained standard formulla in prt view.
    my basic requirement is to get actual value of produced quanity as counter update. means if 20 pieces have been produced and confirmed in co11n, then counter must bhe updated with the value of confirmed quantity.
    please advice what value should i put as usage in routing master to get actuall counter update.
    Will Highly appreciate your quick reply.
    Snapshots
    Regards.
    Mohammad.

  • Goods Receipt with production order in WM

    Hi all,
              My client requirement is whenever i am issuing  goods to the production order the stock reserved to production order, once i confirmed the  TO stock level  reduced.Once production  completed when i put the goods receipt with production order the stock increased for finished goods only at storage location level not  upto warehouse level.
    when i put goods receipt with others the stock increased in  warehouselevel upto my destination bin(as i configured).My requirement is how to move goods to my  destination bin when goods receipt for production order. any configuration required? solve my issue
    i am maintaining configuration as
    i)in omlj iam using movt type-103, source as 901(scr checked),dest as 003,reqirement type-orders.
    ii)in omlr i am assigning 103wm mov type to 101 im type.
    whether  my configuration is correct or i have to do any other configuration ?..i am not maintain any production staging process is it necessary?
    appreciate your help always
    ramesh

    To consolidate your requirements once again
    You want imediate TO creation for components. (It is configured & working fine now)
    You dont want imediate TO creation for finished goods, only in the case of GR for Productio order. Right?
    If Yes, you need to have a small configuration setting (if it is missing)
    In OMLR Create TO immediately Indicator should be space "Do not initiate TO creation" (not X) for 101 F - 103

  • Production order confirmation problems

    My production facility has been having problems for years centered around the production order confirmation process.  My colleagues and I are considering submitting an OSS note to SAP, but figured that we should present our problems in these forums before making that next step.
    Here are some individual issues which I believe may be related.  All of these issues occur off and on at random.  They will typically occur when more users are working in the SAP system or when SAP is running slow.
    - When an order is confirmed and a label is printed, sometimes the quantity on the label will be incorrect.  Sometimes no label will print out at all.  When the order is unconfirmed and then reconfirmed again, a label prints out with the correct quantity.
    - When a confirmation is unconfirmed, the unconfirmation will not backflush the associated materials correctly.  Sometimes this error will appear in CO1P for us to re-confirm, but not always.
    - Sometimes confirmations will only backflush certain materials and not ALL the components within the production order.  When the confirmation is unconfirmed and then reconfirmed again, the confirmation will backflush all materials correctly.
    These problems occur at random intervals and never present the user with an error.  Close to 100% of the time all the confirmation issues will be corrected by simply u201Cre-doingu201D the confirmation as we did the first time (no changes in the process).  Only the second time around there will not be any issues.  This leads me to believe there is some internal issue with SAP, perhaps involving which tables CO11N pulls from when a confirmation is made.
    Any and all help is appreciated.  We currently run the AFS version of SAP.  This is my last stop before submitting an OSS note.

    Hi,
    I have not worked on AFS, so consider the below as a pointer which might help:
    When you post confirmations & notice that the components are not being backflushed, check in COGI it could be that there are some incorrect goods movement. You will be required to clear these entries from COGI.
    I suspect that you notice these because, the confirmations are being posted even before the stock for the same has been received & hence the issue with labels as well.
    Do a check on the above, if it resolves the issue, then i would suggest re-design the process to ensure you do not have COGI or COFC entries.
    Also do a search in OSS for AFS specific notes on confirmation.
    Hope it helps.
    Regards,
    Vivek

  • Error during Production Order Confirmation mfbf ( backflush)

    in my company in sap when i using mfbf for production Order confirmation of tractor then during backflush using mfbf tcode order confirm but in my store dept no metiral cunsume  so please regards this problem
    with warm regards
    pritpal singh

    Dear Pritpal,
    sorry dear,today i cant check  my inbox immediately. Anyway my mail id is [email protected]
    have checked as per my previous post.
    regards
    pradeep

  • Production Order Confirm/Label Printing problems

    I am currently having issues printing out labels for production orders.  Whenever I confirm an order, our printer will print out a different quantity or no label at all.  
    Here is a brief history of production order confirmations today....
    Entered                Printed
    80                           40 (2 labels of 20)
    20                           No Print
    20                           No Print
    40                           No Print
    ALL confirmations were accepted by SAP
    SAP WILL often drag during a normal confirmation when correct labels are printed
    SAP will NOT drag when a confirmation is entered and no labels are printed
    Yesterday I had a confirmation for 10 print out a label for 19.  All of the quantities in SAP are correct, it's only the printer that is creating labels for different quantities.  If all the lot sizes in SAP are correct, what do you think the issue might be?

    Hi,
    Based on what i understand of your query, would suggest to work with your technical person to have a look at the print program. The delay you notice or the incorrect data being printed might have to do with the program.
    Regards,
    Vivek

  • Without Production order confirmation How to settle the cost of prd order

    Dear all,
    How to settle the cost production order with out production order confirmation.Any setting is there Or program.
    Regards,
    Naresh Redddy.

    Dear Naresh,
    To settle the cost of production order, you need not to confirm it. But on the same time if you want to settle the order when its not confirmed then WIP amount will be posted. WIP value will be posted if your order does not have DLV or TECO status. In your case, if you not confirmed the order, only material cost if any issued for order will be calculated, no activity cost will be calculate. And if you want to post the variance then order status needs to be either DLV (Completely Delivered) or TECO (Technically Completed). Here also the cost of activity will not be considered as you didn't confirmed the order.
    So if you want to settled the order without confirmation, then Activity cost will not be added in your settled cost. So your product costing will not be accurate.
    Please revert if you have any other doubts.
    Regards,
    Hiren Ramani

  • Goods movement tab in production order confirmation

    Hi Gurus, please suggest me with the solution for my requirement.
    while performing production order confirmation, some user should be restricted to see goods movements and some can. how is can me done?
    Thanks in advance.

    Dear,
    Please refer my reply from this link,
    [CO15/CO11N  Goods Movement Screen Hide or Non-editable  |CO15/CO11N quantity column should be non editable in Goods Movement Screen]
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Conntrans -- Errors during "Receive" phase

    Hi, I'm trying to run the conntrans on one of the mobile clients for the first time. I see that there are entries in the in outbound queue of the mobile site(checked on CRM server). I get an error during the receive phase saying "Error during data re

  • Convert UTF-16 to UTF-8

    Hi My source file is UTF-16 and Target file is UTF-8. I am using XSLT mapping . If i m testing in Altova XML  its working fine. But when i am testing the same thing using my scenario its not wroking. I have tested this using Test option in ID. If i c

  • Laptop won't power on after making three beeps

    This thread has been moved to another message board. Click the link to jump to its new location.

  • Problem with XLIFF

    Hi All, I am new to ADF. I want to localize sample application using XLIFF. I wrote xlf file for each jsff file with the locale 'en_US'. It was working fine. Now i added another locale 'fr_CA'. It is always picking 'fr_CA' properties only. Below is t

  • How we make button in accept release button fbvo for workflow trigger

    Hi Experts I did workflow configuration, fin a/c- fin a/c global setting- doc - doc parking- Create Workflow Variant for Parking Documents Assign Company Code to a Workflow Variant for Parking Documents Define Release Approval Groups for Parking Docu