Usage Decision Results to any stock update?

Dear SAP Experts,
I want to know , when usage Decision is taken in QM, stock will be updated or not?
After usage decision say few quantity is scrapped and given usage decision code for the same. I want to know this decision will update to stock or not? if it doesnot update the satock automatically, then what standard movement types are used to post this scrapped quantity.
Please help, and its urgent.
Thanks & Regards,
Mohd Ismail.

Hi,
I want to know , when usage Decision is taken in QM, stock will be updated or not?
May or may not be! 
Stock posting through QM and UD are 2 separate events although executed through same TCode.
If you want that stock should be posted automatically in to unrestricted or into block with UD at the same time, you can do that setting in QS51 against appropriate UD code.
If the system status of inspection lot contains UD ICCO SPCO, that means stock posting and UD both have been done
After usage decision say few quantity is scrapped and given usage decision code for the same. I want to know this decision will update to stock or not? if it doesnot update the satock automatically, then what standard movement types are used to post this scrapped quantity
I could not interpret this correctly.
Seems that you are narrating a case where UD and stock posting are done and later you want to scrap the material
You can simply do it through MIGO using 551 movement. (Scrapping against cost center from unrestricted use)
But changing once given UD, will not perform any movement again.

Similar Messages

  • Usage decision cancellation

    Dear All,
    For the manual inspection lot created i did RR. Then in the usage decision screen i enter decision as rejected and saved. status shows as UD   ICCO STUP. Then i go to the functions and cancel lot. The status now shows as LTCA ICCO STUP. Then again i wanted to give the decision as accepted. that time a message occurs as LTCA Lot cancelled and STIC short term inspection cancelled.
    1. can i change the usage decision results again after giving usage decision once?
    2. what are the steps to do it?
    Regards,
    DTD

    Goto QA12 T-Code revert the Cancellation Status and SAVE
    Again goto QA12 T-Code you can change the UD Code from R to A without any problem.
    Normally if we want to change the UD Code no need to cancel the Insp. Lot diretcly through QA12 we can do it.
    Best Regards,
    K. Raghavendra Nayak

  • Restriction on usage decision Save

    Hi Experts,
    We are able to save usage decision even after inspection stock posting pending.
    Is it possible that system allows usage decision save only after inspection stock posting in such a way that all inspection lot qty. becomes zero.
    Even some/partial stock posting pending system not allows to save ud.
    Pl. help me to sort out problem
    Gkude

    U can use user status for this.
    Quality Management   Quality Inspection  Status Management  Define Status Profile  create user status QM_UDSTK
    create 2 status NOUD and STCO
    in NOUD
    Make usage decision        forbidden and no action
    in STCO
    Complete inventory posting    Permitted   and Set
    Make usage decision              Permitted   and No action
    attach this user status in inspection type.
    this will be attached to new inspection lots only.
    ud will not be allowed, if stock is pending for clearance.
    when complete stock posting is over u have to save and then take ud
    or
    change the user status manuly from NOUD to STCO and then UD will be allowed

  • BAPI to post stock movement in QM's Usage Decision

    I'm looking for a bapi or standard program to register stock movements in QM as a result of a usage decision.
    We've tried using BAPI_GOODSMVT_CREATE with no success as it returns error QA 495 "Change the inspection stock of material in QM only"
    Thanks
    André

    Hello!
    You do not need to create TO manually. Set up RLAUTA11 report as a job.
    To run RLAUTA11 you have to maitain:
    creation indicator:
    Logistic Execution->Warehouse Managment->Activities->Transfers->Set Up Autom. TO Creation for TRs / Posting Change Notices->Automatic TO creation/control data: for warehouse level: any character
    Logistic Execution->Warehouse Managment->Activities->Transfers->Set Up Autom. TO Creation for TRs / Posting Change Notices->Movements assign: set up your indicator in field "Automatic TO" Background processing (MvT type and warehouse, probably your e.g. MvT is 321 - realese from Quality Inspection stock)
    Next You must create variant for job with your warehouse and creation indicator.
    Best Regards,
    Marcin

  • Usage Decision Stock Posting

    Dear All,
    I have following queries which needs to be clarified.
    1. In the results recording level after recording we give valuation as Accepted or Rejected. But what ever the valuation (Accepted/ Rejected) we give in results recording, in the usage decision level we can give valuation as whatever we like. whats the relationship between results recording level valuation and usage decision level valuation?
    2. How do i make in the usage decision if i give valuation as rejected quantity to be posted to Scrap or stay in Quality Inspection until re inspection is done? If i have to maintain a status profile for that can some one detail the steps?
    Thanks and Regards,
    DTD

    1. In the results recording level after recording we give valuation as Accepted or Rejected. But what ever the valuation (Accepted/ Rejected) we give in results recording, in the usage decision level we can give valuation as whatever we like. whats the relationship between results recording level valuation and usage decision level valuation?
    Hi
    There is no relation between RR ,DR & UD which you take.
    as you rightly said even if RR valuation is Reject you can Accept lot in UD.
    This is std sap
    if you want that after any char  is rejected then UD should be rejected then use
    user exit:
    QEVA0010 UD: Usage decision check
    2. How do i make in the usage decision if i give valuation as rejected quantity to be posted to Scrap or stay in Quality Inspection until re inspection is done? If i have to maintain a status profile for that can some one detail the steps?
    The simplest way you can do create a selected set with code AH: Hold QI lot.
    This means UD is taken but stock posting is still pending with QI
    Status profile will help you but this will make thinks more complecated.
    Regards
    Sujit

  • Usage decision vs result recording.

    Hi All Guru,
    I am new in QM , was MM & PP support. I am confused here about the usage decision vs result recording.
    I do understand in QM there's inspection lot , in order to release the inspection lot , i should released the UD.
    So what's the different between this both ?
    Can i have inspection lot without result recording ?
    Or can i have inspection lot without UD ?
    Please help to clarify my confuse.
    Thank you

    Hi Crag ,
    Thanks for understand because i am totally new in QM.
    I won't use QM for Notification here. I will use QM for stock transfer & QM in Delivery before PGI.
    As i know the basic requirement of QM 
    Setup the Master Data (QM View & all QM relavant data) ---> Type of inspection (which will determine which type of inspection to carry out ) -----> Inspection Lot Configuration --->Configuration for UD ----> Configuration for COA.
    Master data that which required
    Material master QM view,
    Master inspection characteristics,
    Task lists or inspection plans
    Code, Code groups and Selected sets.
    Quality info-record
    My Question :
    By having the above setup and configuration , without result recording can i have the COA to print out for either Post Process Inspection (Final FG) or Inspection at Delivery ?
    With the Master Data which i mention as above , is it sufficient for me to activate
    Post Process Inspection (Final FG - QM PP)
    QM Inspection at Delivery (QM /SD)
    QM stock transfer with inspection type 08.
    Hope to hear from you.
    Thank you

  • USAGE Decision required before stock posting

    Hi QM Gurus!
    How do i configure the system so that it will require the user to ENTER A USAGE DECISION for a inspection lot  first before he can make a posting in the INSPECTION LOT STOCK TAB in the same screen.
    the requirement is that the user cannot make any postings from QM without making a usage decision.
    I would appreciate any help.
    Thank you,
    Heinrick Palad

    Hi,
    The same can be acheived by creating a status profile with suitable object type (Insp. lot with or w/o plan or char.)using "BS02" & assign it to the Inspection type.
    In the user status create an initial status say "INIT' & click on "Forbidden" against "Start inv. pstg bef. UsageDec". Create a second status say "UDAL' & click on "Set" against "Make usage decision".
    This will surely solve your problem. Just test & revert.
    Reward points if useful.
    Rgds,
    Srini
    Edited by: Srini k on Dec 17, 2007 1:24 PM

  • (Usage Decision )Stock Post To Unrestricted Use.

    Dear QM Expert,
    I create a inspection lot of Finished Good and inspection type is 04 used when take a decision in QA11 then the Inspection lot is not open and the message has shown.
    <b>The function you selected
    cannot be
    carried out:
    Access usage decision</b>
    When i use QA12 then message show is this,
    <b>You cannot perform this task because the usage decision has not been made yet.</b>
    But the stock is not posted To unrestricted use.
    I want to stock post or cancel the document but i cant cancel or reverse the document.
    Please suggest me the urgent bases what i do for stock post to unrestricted use.
    Once problem has been mentioned here that the logistic period has been closed and FI/CO period will be close after six days.
    thanks
    ufarooq
    Message was edited by:
            Shahzad Sami

    Hi,
    Follow these steps for the qm inspn procurement.
    1.Create Material Master Record with QM View.
    2.Activate QM Proc/ Specify Control Key 0001.
    3. choose Inspn set up and inspn type to be entered as 01 and set the active indicator.
    4. Create Q-info record with material / vendor.(qi01)
    5. Enter the release by date as 31.12.9999
    7.Create inspn plan(qp01) with usage 5 and status 4and enter the control key as PPQM.
    8.Choose the operation and assign the inspn characteristic / sampling procedure
    9.MD61/MD02/MD04
    10 Convert the Purchase requisition as Purchase Order.
    11. Receive the Material against the PO.
    12. In MIGO against PO receive the material.
    13.QM lot will be created
    14.qa02 check inspn plan / sample.
    15.qe51n results recording
        lot origin 01 mat no and execute results
    16.qa11 ud code select accept and chooseinspn tab page and type the qty to be proposed and save.
    17.stock will move to unrestricted use .
    Regards,
    nandha

  • Mass Uploading of Result Recording + Usage Decision.

    Dear Gurus,
    Are there any BAPI or BADI to Mass upload RESULT RECORDING(t code QE23) + USAGE DECISION(QA11) through an excel in the fore ground mode and back ground mode
    Regards
    Shoib

    RESULT RECORDING : BAPI_INSPCHAR_SETRESULT
    UD: BAPI_INSPLOT_SETUSAGEDECISION

  • Regarding problem with updating usage decision in QA11

    Hi Experts,
    I am trying to use the Bapi "BAPI_INSPLOT_SETUSAGEDECISION" to update the usage decision in QA11 in a proxy. I am not being able to understand what parameters to be used and how.
    CALL FUNCTION 'BAPI_INSPLOT_SETUSAGEDECISION'
      EXPORTING
        NUMBER               = INPUT-SAP_USAGEDECISION-DETAILS-UD_INSPLOT  "inspection lot no from the proxy structure.
        UD_DATA              = lw_data
      LANGUAGE             =
    IMPORTING
      UD_RETURN_DATA       =
      STOCK_DATA           =
       RETURN               = li_return
    TABLES
      SYSTEM_STATUS        =
      USER_STATUS          =
    Please help.

    Hi,
    Just pass the inspection lot number to the field NUMBER and try, because there are no standard programs in which this FM is called apart from a Business Object BUS2045, it is called in the method InspectionLot.StatInterface.
    You can check that for any clarification, but it is not clear there as well.
    Thanks,
    Mahesh.

  • Record usages decision- inspection lot stock

    hi gurus,
    when i am using a record usages decision screen (QA11) after putting my inspection lot number it show me only two tabs Defects and charterstics it didn't show me an inspection lot stock tab.
    Please suggest
    Regards
    Maashish

    Hi Maashish,
    I believe that your PO is for cost center.
    when you will recieve the material using MIGO for This PO, then matieal stock/Value will be posted to Consumtion Account ( Stck will not posted to store) and GR/IR for Vendor.
    In this case if Inpection lot generated,  then using QA11/QA32 you can records quality information in  Result & UD.
    In this case Transfer posting 321/105 for material will not take place.you can input quality inforamation only. 
    Hope this piece of info. will help to resolve your query..
    Cheers
    Manoj Singh

  • Relation between result recording and usage decision

    Dear Gurus
    While result recording for a lot, if any value comes less than or more than the limiting value the system is automatically valuating either rejected or accepted .. But this valuation is not getting reflected  in the usage decision there I can give accepted code even though it is rejected in RR. If any expert can tell me how to configure and relate RR with UD
    Regards
    Sandip Sarkar

    Hi
    Sandip
    As per SAP std there is no such a relation betweenRR & UD
    but you can keep acheck that Result are recorded & what is valuation.
    Use User Exit QEVA0010 UD: Usage decision check Logic will be check whether RR is done & all the char have status 5.
    that means all char are valutated.Then Build a logic that as per acceeptence or rejection of char UD code must be get selected.
    Suppose all char are rejected  & you  are taking UD as Accepted(A) then System should through Msg reading same.
    I hope this will add some value.
    Regards
    Sujit

  • No Stock posting before usage decision

    Hi,
    I am in process of implementating QM Module.
    I want to block stock posting from Inspection lot to unrestricted use (or any other use) before Usage Decision for the lot is taken.
    Can anyone give my solution for the same? Are there any SPRO settings for the same?
    Regards,
    Prashant Kolhatkar

    Hi Prashant,
    You must implement the User Status profile QM_L_003  No Stock Posting Before UD.
    Herewith I am pasting the ready made solution hoe to prevent UD before RR is done. What you need to do is change the Business transaction as per your requirement to this status profile.
    You can refer wither this [THREAD |DOCUMENTATION FOR THE BENIFIT OF ALL QM CONSULTANTS u2013USER PROFILE;or this [wiki |https://www.sdn.sap.com/irj/scn/wiki?path=/display/plm/setupofauserprofiletoavoidtheUDpriortoRR]to know the process step by step.
    If any query, pls revert with your detailed configuration of the status profile.
    Regards,
    Shyamal

  • What will effect the usage decision on vendor, Stock, purchasing,production

    Hello Expert,
    what will effect the usage decision on vendor, Stock, purchasing,production
    Thanks regards,
    Ram Rathode
    Moderator: Please, avoid asking basic questions

    Hi,
    Usage Decision completes the inspection and  life of Inspection lot will be over - when you take UD. Thus: by UD:
    ·        A quality score is determined for the inspection lot
    ·        The quality level (inspection stages for the next inspection lot) is updated
    ·        The quality management information system is updated with statistical data
    ·        Automatic follow-up actions are triggered
    Affect of Usage Decision on:
    Vendor: rating would come down.
    Stock: no affect (unless you make it mandatory for "Accept" UD to be used for stock posting).
    Purchasing: if the stock is returned to vendor, Purchase order would still be active. Also, Vendor rating would be affected
    Production: UD has no affect on production except when it is linked to stock posting.
    Outgoing certificates: In Certificate profile, if "accepted" lots are to be considered for Quality Certificate creation, then it may cause problem.
    Regards,
    KrishnaM
    Edited by: Krishna. Madduri on Jun 13, 2011 3:56 PM

  • Sample  still showing in quality inspection stock after usage decision completed

    After process order completed, we have received 100 units as a quality inspection stock.  After usage decision,( QA11), I have posted 98 units to unrestricted use and 2 units to the  to sample usage
    98 units successfully move to unrestricted stock.
    However 2 units for sample still showing quality inspection stock.
    I have checked MB51, mat document number for sample is 4900000160 and movement type is 331
    Do you have any idea why sample still showing in quality inspection stock. It  should consumed and zero out the quality inspection stock in MMBE

    Hi,
    Please check you MIC's control Indicators.
    Is it tick on Destructive insp. under Sample tab ?
    Please tick it and try again with whole process.
    Destructive Insp. : You specify whether the sample is to be destroyed after inspection. This means that is no longer available. This quantity is used in the usage decision as the proposed quantity for the posting to sample.

Maybe you are looking for