Use of ECC 6.0 with PI 7.0 server?
use of ECC 6.0 with PI 7.0 server?
what are the requirements for uploading wsdl and Tpz files from service Market Place to PI 7.0 server?
Hi
RZ70 automatically creates and uses an RFC to the SLD - assuming this RFC can communicate over your network
setup it should work
BTW You can always add a system manually to SLD or from other SLDs content as well - just in case this doesn't work
Best regards
Stuart
Similar Messages
-
Get option back - "I want to use a work email account with a BlackBerry Enterprise Server"
Hello,
I have a Virgin Mobile USA blackberry. When I go into the Setup Wizard - Email setup the only option I get is "I want to create or add and email address".
How do I get the other option that says "I want to use a work email account with a BlackBerry Enterprise Server" back? This option was there before I activated the phone but is gone now. No email accounts have been setup yet.
I am trying to use this phone with a work account. I have my Enterpise Activation Password but I have no place to enter it.
Thanks
Scott
Solved!
Go to Solution.Hi and Welcome to the Forums!
Have you tried here:
Homescreen > Options > Advanced Options > Enterprise Activation
scott852 wrote:
This option was there before I activated the phone but is gone now. No email accounts have been setup yet.
Given this, I suspect actually that your account, from your carrier, does not include BES. If the above mentioned item is not in your menus, then that would likely confirm this. I suggest you contact your carrier to ensure you have a BES-level account from them.
Good luck!
Occam's Razor nearly always applies when troubleshooting technology issues!
If anyone has been helpful to you, please show your appreciation by clicking the button inside of their post. Please click here and read, along with the threads to which it links, for helpful information to guide you as you proceed. I always recommend that you treat your BlackBerry like any other computing device, including using a regular backup schedule...click here for an article with instructions.
Join our BBM Channels
BSCF General Channel
PIN: C0001B7B4 Display/Scan Bar Code
Knowledge Base Updates
PIN: C0005A9AA Display/Scan Bar Code -
Using an 8.0 client with a 6.5 server
We currently have an application running on AIX and Tuxedo Client 6.5, that connects
to a 6.5 server.
We are thinking on migrating the application to Linux, and found that Linux is
only supported for Tuxedo 7.1 and higher.
Would there be any problem if we used the 8.0 client instead of the 6.5 client
to connect to the same 6.5 server?
If that was possible, then we would be able to migrate the application to Linux.
Thanks for your help,
DeboraI think you might face problem if the client is native
because client will be built with shared library
libtux.sl which will give you an unresolved symbol
error.
but if you have clients which come in as workstation client
then you should be able to connecct properly.
use WSL with -t option in that case or export an environment
variable WSOFPRE71(confirm the spelling) to yes.
thanks
Roopesh
"Debora" <[email protected]> wrote:
>
We currently have an application running on AIX and Tuxedo Client 6.5,
that connects
to a 6.5 server.
We are thinking on migrating the application to Linux, and found that
Linux is
only supported for Tuxedo 7.1 and higher.
Would there be any problem if we used the 8.0 client instead of the 6.5
client
to connect to the same 6.5 server?
If that was possible, then we would be able to migrate the application
to Linux.
Thanks for your help,
Debora -
SAP ERP 2005 ECC 6.0 with Windows 2000 Application Server
Hi,
We are currently running SAP 4.6C in iSeries model 570 OS V5R3.
I would like to know after upgrade from 4.6C to ERP 2005 ECC 6.0 if we will gain any performance improvement by adding Windows 2000 Application Servers in our environment. Second Question - how much load will be taking away from the iSeries if adding one application server (Memory and CPU).
RamonHi Ramon,
what hardware do you use at the moment ?
820, 870, 5xx ?
How any CPUs ?
How much memory ?
You are on 4.6C ASCII right now ?
In your case, I don't see, that Win 2003 servers help in performance, I would guess, that the CPU after the upgrade is about 60% which is still ok - then using 3-tier - especially in R3 environments is mostly not good for the performance because of the DB time increasement.
The memory you will need is pretty the same for the iSeries.
Regards
Volker Gueldenpfennig, consolut.gmbh
http://www.consolut.de - http://www.4soi.de - http://www.easymarketplace.de -
Has anyone found a way to use the Epson Print Utility with an Airport?
I have an Epson Photo 2200 connected to the USB port of my Time Capsule. Everything has been working great until recently. Now I cannot use Epson Printer Utility unless I connect the printer directly to my Mac via the USB port. It does not find the printer. Connected directly, Epson Print Utility2 works properly. Epson Print Utility3 does not find the printer, even when connected directly. Reading the various discussion threads, I am not alone and the problem is with many, if not all of the Epson printers. The Utility worked fine at one time but appears to have quit working over the network probably around OS upgrade 10.5.2. In addition, you must use the Gutenprint driver when installing the printer. Epson's gives an error.
Has anyone found a way to use the Epson Print Utility with an Airport print server with OS 10.5.2 or later?Before receiving this reply, I had other problems with the Gutenprint driver. I'm not sure what I did but after playing around for about a day, the Epson driver finally worked while connected through the USB port. The printer then worked with the Airport. The print utility still doesn't work without being directly connected. (It used to work while connected to the Airport. Until recently, I never connected the printer directly to a computer.)
-
Playback of flv using Flash Player 10.1 and Flash Media Interactive Server jerky.
Greetings:
Thanks for taking time to read this.
Here is our problem:
Playback of flv using Flash Player 10.1 and Flash Media Interactive Server jerky.
Playback ok if using Flash Player 10.0 with Flash Media Interactive Server.
1. Record live using Flash Media Interactive Server
2. Attempt to play back resulting flv using Flash Player 10.1 and Flash Media Interactive Server.
Video plays ok for a few seconds and then plays faster than as recorded -- very jerky.
Audio plays at normal rate.
OS: Windows 7 64bit (two different machines. All updates installed.)
Web browser: FireFox 3.6.10 and IE8 8.0.7600.16385
Flash version: 10.1.85.3
Tried with hardware acceleration on and off.
Note: Also had another person report the same thing on a Mac.
We had been using Flex 3, so we tried building with Flash Builder 4 – had the same problem.
This is a show stopper for us.
Tried using Wowza and everything worked.
We’re dropping FMIS and switching to Wowza.
If someone can suggest something else to try, we would appreciate it.Hi Greg,
So if I understand correctly, your findings are:
Flash Player 10.1.85.3 + Flash Media Interactive Server = Jerky Video
Flash Player 10.0.x.x + Flash Media Interactive Server = Smooth Video
Flash Player 10.1.85.3 + Wowza = Smooth Video
And what about Flash Player 10.0.x.x + Wowza?
Also, if you could check the network traffic to confirm if it's Flash Player causing the issue or it is receiving it like that from FMIS.
Cheers
--Vikas -
Use of ECC planningtime fence when planning with APO SNP
I am using SAP ECC for execution, and SAP APO SNP heuristics for planning.
So, for a product planned in APO, the MRP type in ECC is X0.
So, as there is no MRP planning in ECC for such a product, what is the use of the ECC planning time fence? I think it becomes redundant in ECC - yes? In fact, I do not see it in the stock reqs list (MD04).
So, in ECC, all that 'planners' can do is to manually reschedule planned/production orders - yes?
Any shortage alerts will only be visible in APO - yes?
Thanks for any advice on this...Hi
Please find below the answers from my side.
Two questions in my mind...
So, if MRP type = X0 in ECC, the planning time fence is not seen in MD04.
First of all, we should not have any planning time fence in ECC, as it is not adding any value for products with MRP type X0. Yes in MD04 we can not see it.
2. How can ECC users easily distinguish between planned orders which are in the 'short term' from those which are beyond the SNP production horizon?
I think they have to use APO alerts. I think that should be right approach as APO is leading planning tool.
Thanks
Amol -
SAP ECC 6.0 with DB2 on winds 2008r2 using VMware
Dear All,
Request you to guide me in giving some information related to
-compatibility
-best practice
-official guidelines for SAP installation.
We have purchased SAP ECC 6.0 with DB2 as RDBMS.
Thanks in advance.
by
Harika NI got information
Note 1130801 - DB2 LUW, DB2 z/OS release for VMware, XEN, and Hyper-V
The usage of DB2 Version 9.1 for LUW, DB2 Version 9.5 for LUW, and DB2 9.7 for LUW on Windows and Linux (SUSE and RedHat) with VMWare, KVM, and XEN is permitted and supported by SAP and IBM.
Kind regards,
Harika N -
Performance issue after Upgrade from 4.7 to ECC 6.0 with a select query
Hi All,
There is a Performance issue after Upgrade from 4.7 to ECC 6.0 with a select query in a report painter.
This query is working fine when executed in 4.7 system where as it is running for more time in ECC6.0.
Select query is on the table COSP.
SELECT (FIELD_LIST)
INTO CORRESPONDING FIELDS OF TABLE I_COSP PACKAGE SIZE 1000
FROM COSP CLIENT SPECIFIED
WHERE GJAHR IN SELR_GJAHR
AND KSTAR IN SELR_KSTAR
AND LEDNR EQ '00'
AND OBJNR IN SELR_OBJNR
AND PERBL IN SELR_PERBL
AND VERSN IN SELR_VERSN
AND WRTTP IN SELR_WRTTP
AND MANDT IN MANDTTAB
GROUP BY (GROUP_LIST).
LOOP AT I_COSP .
COSP = I_COSP .
PERFORM PCOSP USING I_COSP-_COUNTER.
CLEAR: $RWTAB, COSP .
CLEAR CCR1S .
ENDLOOP.
ENDSELECT.
I have checked with the table indexes, they were same as in 4.7 system.
What can be the reson for the difference in execution time. How can this be reduced without adjusting the select query.
Thanks in advance for the responses.
Regards,
Dedeepya.Hi,
ohhhhh....... lots of problems in select query......this is not the way you should write it.
Some generic comments:
1. never use SELECT
endselect.
SELECT
into table
for all entries in table
where.
use perform statment after this selection.
2. Do not use into corresponding fields. use exact structure type.
3. use proper sequence of fields in the where condition so that it helps table go according to indexes.
e.g in your case
sequence should be
LEDNR
OBJNR
GJAHR
WRTTP
VERSN
KSTAR
HRKFT
VRGNG
VBUND
PARGB
BEKNZ
TWAER
PERBL
sequence should be same as defined in table.
Always keep select query as simple as possible and perform all other calculations etc. afterwords.
I hope it helps.
Regards,
Pranaya -
Crystal Report against ECC 6.0 with SSO configured
I created a simple report against the ECC 6.0 Article table and saved it to InfoView. I can run the report fine, but when others run it they get an error stating the logon parameters are incomplete. We are in the process of configuring single sign on and have created other Crystal Reports going against ECC 6.0 with Business Views where SSO turned on in the data connection. Everyone can refresh those reports with no problems. Is their some report setting that needs to be set for Crystal Reports using a data source directly against ECC 6.0 tables?
We have multiple reasons for implementing SNC.
The main reason we have enabled SNC is to simply the users experience while working in the SAP environment. We are going live this month with Plant Maintenance, SRM, Project System, General Ledge and Asset Management reporting cubes in our BW environment as well as in our ECC 6.0 environment. We have set up SAP Portal and have created iviews to BOBJ folders and reports. Users are authenticated once by logging on to the Lan. Once logged on we would like them to seemlessly run SAP transactions and Business Objects reports through the SAP Portal based on their job function. Each user has security setup in BOBJ and SAP to allow access to transactions and reports appropriate for their job function.
We have three types of SAP reports and data connectors.
- One set of Crystal reports go against ECC 6.0 through Business Views with a Data Connection set up for SSO.
- One set of WEBI reports goes against BW queries though Universe Connections set up for SSO.
- One set of Crystal reports go directly against ECC 6.0 tables.
We currently have two issues:
1) The Crystal reports going directly against ECC 6.0 tables are returning the error
Error - The database logon information for this report is either incomplete or incorrect.
2) When we send a link to any report using OpenDocument if the user is not logged on to InfoView they get a rather long error message:
Account Information not recognized: Active Directory Authentication failed to log you on. Please contact your system admin....
Our hardware and server setup is a load balancer connected to a cluster of two Tomcat servers connected to two BOBJ servers. -
Profit center accounting in ECC 6.0 with Document Splitting
HI
We are working on a project in ECC 6.0 with document splitting functionality. I would like to know how to transfer Payables/Receivables, Materials, Assets in Profit center accounting. I have done necessary configuration but some how results are not getting updated in PCA. Is there any specific report required to see result or standard reports gives the results.
I have assigned Accounts in 3KEH and their default assingment in 3KEI kindly tell me how to proceed about it.
I have done these configuration so far
Define Ledgers for General Ledger Accounting
Assign Scenarios and Customer Fields to Ledgers
Classify G/L Accounts for Document Splitting
Classify Document Types for Document Splitting
Define Zero-Balance Clearing Account for profit center
Define Document Splitting Characteristics for General Ledger Accounting
Activate Document Splitting
Apart from these is there any other configuration kindly let me know
Get points
Regards
GeetaHi,
I am using S_ALR_87012284 to generate my financial statements. But whenever I provide a profit center value in the dynamic selection screen, i will encounter the FAGL_DB007 error.
The error message reads -->
Invalid selection when reading balances in new General Ledger Accounting
Message no. FAGL_DB007
Diagnosis
Read access to balances of New General Ledger Accounting can only be granted to selection conditions for fields in table &V1.
System Response
No balances can be read.
Procedure
Check the selection criteria by calling up the transaction.
Anyway I can overcome this error?
Rgds,
Bryan Goh -
Material warranty in ECC 6.0 with EHP 4
Till previously, warranty is limited to equipment and FLOC but with EHP 4 material warranty is also included. This I heard from SAP trainer. If any body worked in ECC 6.0 with EHP 4 has this feature, please let me know how it works and send any links to doc. Our requirement is like this. We are using Fleet management and some parts of the Fleet are under warranty. Parts are coded as Material. There are other ways to address the issue using enhancements. i would like to know if this issues is addressed in EHP 4.
Thanks In advance for your help.
SudhakarHi Denis,
You can install EHP7 for ECC6. You should 1st check Service Market place for PAM(product availability matrix) for combinations of DB and OS. You should understand your usage type and learn more about SWP/SUM/740 kernel/System Preparations and other knows prerequisites
1737650 - EHP7 for SAP ERP 6.0 SP Stacks - Release & Information Note
1865866 - SAP EHP 7 for SAP ERP 6.0 - Release Information
Divyanshu -
Integrating SAP ECC 6.0 with Microsoft Windows 2003 Active Directory
Hi Gurus,
We are planning to integrate our SAP ECC 6.0 with Microsoft Windows 2003 Active directory.
I have several questions on this:
1. Can i authenticate all the users from SAP
2. It is used only for user authentication or can it be also used for password authentication
ie user can login using his windows password?
3. While integration in SAP does a separate table or a field is created in database.
4.If a employee leaves a company than in SAP is it possible to lock & deactivate the user automatically.
Thanks in advance.
Regards,
NiharHi Mastek,
You should be able to accomodate your needs with respect to integration of your AD accounts with SAP ECC ABAP. This can be done via LDAP connector configuration. The below has info on how to perfrom the configuration at a high level. You will have to integrate, and map certain user data. You may also want to do some LDAP Connector research:
[http://help.sap.com/saphelp_nw70/helpdata/en/10/1a063a15c611d4b61f0000e835363f/content.htm]
On the Java stack - you can also confugure UME to integrate/authenticate with AD:
[http://help.sap.com/saphelp_nw70ehp2/helpdata/en/12/7678123c96814bada2c8632d825443/content.htm]
Hope this helps! -
UPGRADE ECC 6.0 with AFS 6.3 from R/3 4.7
We are now preparing the upgrade of our R/3 server to ECC 6.0 with
AFS . As per the plan and SAP guide for upgrade we started the prepare
phase with upgrade master for ERP 6.0 . But in the initial stage i saw
the page of prepare it showing all the induatry specific components
like ECC DIMP ,IS_OIL etc . But we want to use AFS 6.3 . So if i
continue the installation all the industry specific addon installed .
So why because of the conflict iam should not apply AFS into our
server .
So kindly tell me how can i remove ECC DIMP like industry components
from the prepare phase .good
-
Hi All,
I have IDES ECC 6.0 with Oracle database Installed. Now the disk space is full. I want to take the backup of the database files / Archive files and delete the same to get quite free space.
Please let me know what all the files I need to take the back up so as to delete it once done.Use BRBACKUP...
Read,
http://help.sap.com/saphelp_nw04/helpdata/en/79/5e0540a054e469e10000000a155106/frameset.htm
DO NOT DELETE DATAFILES... It will indeed give you space back but your DB will become unusable...!
If you're out of space you're better of getting some extra disk space.
Regards
Juan
Maybe you are looking for
-
Best Practices for setting up InDesign Effects for offset printing.
I'm new to the forum so I hope I'm posting my question in the correct place. I'm a prepress supervisor for a company that receives most of it's work as PDFs exported from InDesign. I notice on more and more work (proabably 75%) our customers are se
-
Is Shared storage provided by VirtualBox better or as good as Openfiler ?
Grid version : 11.2.0.3 Guest OS : Solaris 10 (64-bit ) Host OS : Windows 7 (64-bit ) Hypervisor : Virtual Box 4.1.18 In the past , I have created 2-node RAC in virtual environment (11.2.0.2) in which the shared storage was hosted
-
Ipad wont go back to a previous page
Hi There The problem i am experiancing is that i have to shut the Ipad down completly and then restart it in order to access a different app . The circular button on the bottonm of the ipad is non responsive , all hints and tips welcome as i am abou
-
I just did a clean install of Mountain Lion on my Late 2009 Mini. I use a 55" TV as the only monitor connected to the Mini and it is overscanning pretty badly. I do not have the option button to turn off the overscan feature. There has to be a way
-
I really like the Cover Flow feature in Finder, but I find that it does not display my Appleworks documents. I'm surprised that my old (forgive me) PC documents from Excel will display, but my Appleworks documents will not. Anyone else noticing this?