Hi
I am trying to use CTM with PPDS PDS. When I create the master data structure it is not able to pickup the succesive source of supply.
i.e. Suppose Product A (in-house production) has a component B (externally procured), the T-lane for B is existing from plant to the vendor. The PDS for A is now added to the MDS, when we now try to generate the MDS, it does not pick up the downstream source of supplies and gives the error "Could not find source of supply for B".
The BADi for using PPDS PDS with CTM has been implemented already but the problem still exists.
If I use PPDS PPM i do not get this problem.
Kindly help.
Regards
Manoj

Hi Keiji
I saw this message sometime back on this thread then I dont know what happened to it
Subject: Re: Using PPDS PDS with CTM
Message: Hi Manoj
Following comment means, you already implement BADI /SAPAPO/CURTO_CREATE Method CREATE_CTM_PDS ?
>The BADi for using PPDS PDS with CTM has been implemented already but the problem still exists.
From your comment, you try to use normal PPDS PDS. But since CTM require CTM PDS for PPDS, if you do not have CTM PDS, please create CTM PDS by using above BADI during CIF transfer of your PDS.
If above comment does not apply,  do you see any error message in CTM master data check ?
best regards
Keiji
The CTM PDS have been created, thats what i meant by that BADi implementation. The problem is still existing. The CTM master data check says that the source of supply cannot be found. I replicated the same model with PPM and it worked.
Thanks
Manoj
Edited by: Manoj Narain on Jan 5, 2009 3:33 PM

Similar Messages

  • CTM PDS with Overlapping operations

    Hello APO Guru's,
    Has anybody come across on creation of CTM PDS with overlapping operations?
    We have a requirement where we have 5 operations/phases in our Master Recipe and have defined a Start-Start relationship between operations, with an offset.
    We have activated an BADi /SAPAPO/CURTO_CREATE, to create a CTM PDS while CIFing PPDS PDS. CTM PDS gets created but without any activities.
    Could anyone provide any insights on how to handle this situation?
    With Regards,
    Mangesh

    Hi Mangesh,
    Where you able to find solution to your problem. Following is the issue that I am facing
    We are having two operations 010 and 020 in a routing and we want to schedule both the operations at the same time and not in sequence. I believe that we can use the "required overlap functionality" in the routings for the parallel scheduling of the two operations.
    After setting the overlap functionality when I trying to run SAP_PP_002 the operations in the PPDS order are being scheduled in sequence. In addition, the PPDS PDS also shows an End- start in the activity relationship (I don't know if this makes any difference)
    Could one of the experts please let me know what are the settings in PPDS that you used to run the two sequential operations in parallel in APO?
    Thanks in advance

  • Pl Order Creation with help of PPDS PDS

    Dear All,
    We are trying to create plan order with help of PPDS PDS. But i am not able to create Pl Orders with PDS which have multiple setups.
    it gives error for locked activity network, but if i use ppm insted it creats the order.
    Any input would be helpfull
    also i am integrating SAP R/3 4.7 to SAP SCM 2007
    Regards
    Negi

    Dear Mangesh,
    I have already maintained all the above settings, also PDS was created from R/3.
    Error I get is: different setup keys for activity with lock activity chain
    This happens only for PDS which have multiple setup phase  with same setup group
    I am able to create planned order with PPM but not with PDS.
    Thank you
    Regards
    Negi

  • Is PPDS PDS possible without ECC ie using LSMW BAPI or similar?

    We are trying to get an APO SNP/PPDS model working for planning in divisions before hooking up fully to ECC, and have got SNP PDS uploads working fine for SNP using BAPI (BUS10014     Production Data Structure) which we trigger within an LSMW.
    But trying to create PPDS PDS instead (so we can use some block planning functionality) and I have not got to work yet. Almost works, ie data goes into most of the background table, but PPDS PDS cannot be seen in display transaction, and cant use it.
    Wondering if anyone else has got to work? And if it is even POSSIBLE? ie maybe PPDS is only designed to work with ECC wheras SNP can work stanalone or with non-SAP system?

    Hello all,
    It is possible that you have syntax error for development objects that are assigned to a package (Dev class) that is 'switchable' and that its switch is off.
    In general, these development objects are meant to be used when specific 'business functions' are switched on.
    Switching on a business function has to be analyzed and tested carefully because most of them CANNOT be switched off. Even Reversible business functions cannot be switched off when they are activated in a productive system. This is forbidden.
    In this specific example, program SAPLBOS04 belongs to package AD_BOS_01. This package contains switchable objects related to switch ECO_BOS. This switch can be switched on via more than one 'industry-specific' business functions all belonging to DIMP.
    Switching on DIMP has to be analyzed thoroughly because some business functions are getting automatically switched on (Bfunc DIMP_SDUD) and cannot be reverted.
    Each business function activates different functionality. Documentation can be found in IMG -> Activate Business Functions (TA SFW5). There you have a Documentation column with a link to the Help Portal.
    Using TA SFW_BROWSER you can see the different objects related to business functions displayed in a tree.
    Before switching on business functions you have to take precautions. See http://help.sap.com/saphelp_nw70ehp1/helpdata/en/de/899442047b0831e10000000a1550b0/content.htm
    Regards,
    Pascale Boyer
    SAP Dev Support

  • Can we use SNP PDS in Multi level ATP ?

    Hi All,
    We do CTM planning with existing SNP PDS In APO and now we want to explore to use the Multi level ATP functionality for GATP.  I know, MATP can create the ATP trees if the stock is not available and these can be converted into PPDS order.
    My question is, can we use SNP PDS for this purpose?
    Thanks,
    Abhilasha

    Hi Abhilasha,
    There is no such specific mention anywhere in the literature that you cannot use SNP PDS for MATP. The only downside to using SNP PDS is that SNP PDS are meant for mid to long term planning and the activities/operations in SNP PDS are usually not in detail i.e only important activities or bottle neck components are usually used which will not always facilitate detailed scheduling.
    On the other hand MATP creates ATP tree structures by plan exlosion(which can be SNP/PDS) and saves the requirements groups(component requirements of header level) with dates/qts and source of supply. It uses PPDS component to convert these ATP tree structures into PPDS planned orders depending on the conversion horizon/requirements dates. It does that by reading the source of supply, requirements dates and quantities from ATP tree structure and by plan explosion.
    When MATP planned orders are created you should no longer plan them with automatic planning run as that will cause re-explosion of the plan and might cause incorrect down stream requirements if you had had substitutions at component leve during MATP check. In planned orders, you have an option of changing the allowed sources of supply (in source of supply section). But for orders created by MATP, you will not be allowed to change the source of supply field from SNP PDS to PPDS PDS in the planned order because it will re-explode the plan. So you can decide for yourself if you can use SNP PDS as source of supply for PPDS planned orders.
    Hope that answers your question.
    Regards,
    Mohan

  • Alternative resources and alternative modes with CTM

    Hi everybody,
    we are trying to figure out, whether CTM supports alternative resources and alternative modes.
    Does anyone know if it is possible or has even implmented the functionality?
    Thank you in advance for your help.
    Best regards
    Mitch

    Hi Mitch,
    It depends on what CTM profile you are using. 1) Bucket based or 2) Time continuous.
    1) Bucket based : You will have to use SNP PDS and SNP PDS do not support alternative modes.
    Alternative resources are not supported at all in SNP. 
    As an alternative, You can use the BAdi /SAPAPO/CURTO_SNP with CIF_IMPORT parameter to create multiple PDSes in case there is alternative resource in routing/recipe.
    2) TIme continuous: You will use CTM PDS.
    PPDS PDS supports alternative resources. I am entirely not sure about CTM PDS.
    I will check out, if I can find out.
    Which CTM profile you are using?

  • Difference between SNP PDS and PPDS PDS

    HI Experts.
    Can you tell the major differences between SNP PDS and PPDS PDS.
    Thanks
    Raja kiran R

    Hi Raja,
    Unlike PPDS planning (time-continuous planning), the least time bucket in SNP planning (bucket oriented planning) is a day, not seconds. Which is why the duration of individual activities in SNP PDS are planned in days only. Scheduling in SNP is based on the fixed duration of an activity and not based on order quantity or capacity load. If a plan contains 3 activities each with fixed duration of 1 day, then the SNP planned order will have duration of 3 days.
    On the other hand in PPDS, the duration of an acitivity is calculated based on the resource load that generates the order quanitity, which means larger the qty to be produced, the longer the duration of the activity.
    Hope this helps!
    Regards,
    Umesh

  • How do I use your iPhone with multiple iTunes libraries

    Hi, I have my music spread out between 3 seperate Itunes libraries on 3 different profiles on my computer. I have the newest generation Ipod Nano, Ipod Shuffle, and Iphone 4s. My Ipod's are both full, so I've decided to start putting music onto my phone. With my Ipod's, I can plug them into one profile on the computer, download the music on the Itunes library that exists on that profile, then do the same with the other profiles with no issue. However when I try to do this with my phone, It asks me to erase the music I have gotten from one Itunes library and sync with the current library, as soon as I plug it in to a different Itunes on one of the other profiles. I have my Iphone configured with the Manually manage music option, and I still haven't found a way to use my Iphone with multiple music libraries. PLEASE HELP

    http://support.apple.com/kb/PH12113 - If you use manual syncing, you can sync items from more than one iTunes library to your iPod. (You can sync iPod touch, iPhone, and iPad with only one iTunes library.)
    http://support.apple.com/kb/HT1202 - When manually managing content, you can add content from multiple libraries to your iPod or iPad. Even when manually managing music, some content may be available from only one library at time. This includes all content on iPhone and video content on iPod and iPad.
    They seem inconsistent as far as the iPad is concerned but in both articles the iPhone appears to only be able to sync to one library at a time.
    Troubleshooting Home Sharing - http://support.apple.com/kb/TS2972

  • Using multiple desktops with a 4 finger swipe on a Mac Book Pro running Lion- is there a way that I can allow Safari open on several but not all??  Looks like I can set it for one but not others.  All, one, or nothing

    Using multiple desktops with a 4 finger swipe on a Mac Book Pro running Lion- is there a way that I can allow Safari open on several but not all??  Looks like I can set it for one but not others.  All, one, or nothing

    Hey Eric,
    Thanks for taking the time. Unfortunately no that does not solve it. Same as swipe it will get me there and it will show separate programs spaced out. The issue I am having is that all my open word files are bunched up in a pile on top of each other. I can see the edges of each one but I want them to be separated from each other enough that I can visually identify what file is what.
    Again, thanks for trying, it is appreciated.

  • Error while using between operator with sql stmts in obiee 11g analytics

    Hi All,
    when I try to use between operator with two select queries in OBIEE 11g analytics, I'm getting the below error:
    Error Codes: YQCO4T56:OPR4ONWY:U9IM8TAC:OI2DL65P
    Location: saw.views.evc.activate, saw.httpserver.processrequest, saw.rpc.server.responder, saw.rpc.server, saw.rpc.server.handleConnection, saw.rpc.server.dispatch, saw.threadpool.socketrpcserver, saw.threads
    Odbc driver returned an error (SQLExecDirectW).
    State: HY000. Code: 10058. [NQODBC] [SQL_STATE: HY000] [nQSError: 10058] A general error has occurred. [nQSError: 43113] Message returned from OBIS. [nQSError: 27002] Near <select>: Syntax error [nQSError: 26012] . (HY000)
    can anyone help me out in resolving this issue.

    Hi All,
    Thank u all for ur replies, but I dint the exact solution for what I'm searching for.
    If I use the condition as
    "WHERE "Workforce Budget"."Used Budget Amount" BETWEEN MAX("Workforce Budget"."Total Eligible Salaries") AND MAX("Workforce Budget"."Published Worksheet Budget Amount"",
    all the data will be grouped with the two columns which I'm considering in the condition.
    my actual requirement with this query is to get the required date from a table to generate the report either as daily or weekly or monthly report. If I use repository variables, variables are not getting refreshed until I regenerate the server(which I should not do in my project). Hence I have created a table to hold weekly start and end dates and monthly start and end dates to pass the value to the actual report using between operator.
    please could anyone help me on this, my release date is fast approaching.

  • Are there advantages to using Adobe Bridge with Premiere Pro?

    I frequently use pictures with my videos.  Normally, I use Windows Explorer with the picture viewer to browse for what I'd like to use.  I've experimented with Bridge, finding it to be a memory hog and slow.  It got me wondering - Are there advantages vs. Windows Explorer?

    Bridge can be used to easily add hierarchical keywords to large amounts of clips (and afaik it's the only tool in the Adobe suit that can do hierarchical keywording with video files). Those keywords can then be used to find clips inside of Premiere. On large projects (1000+ clips) that can be a life saver.
    Apart from this and the features you mentioned (the cross software color stuff is useless for video as of CS6), I did not find any use to Bridge for video. Plus as you said, it is a memory hog, slow and in my own experience unstable with /  not adapted to video.

  • Using AJA IO with the FCP Voice Over Tool

    Has anyone used the io with the VO tool? I have gotten it to work in the past, however, there are a number of convoluted settings to go through to get it to work. It seems intermittent. Today it doesnt want to work at all.
    Does anyone have a list of the specific A/V settings, Capture presets, etc, that i need to have set in order for this to work?
    FYI--I have never had a problem capturing from tape--(using log and capture with beta, digibeta, dv, vhs)--only when capturing analog audio using the VO tool.
    gracias.
    dk

    You can do it here, in the Audio/Video settings under the Final Cut Pro menu. Click on the Capture Presets tab, then go to Generic Capture Template, duplicate it, then edit. Give it a name that you can recognize when you need to set up your project.

  • How do i run an external monitor with my macbook and change settings so that when i close the lid the signal to the monitor is not lost and i can continue using the mac with a mouse and a wireless keyboard?

    How do i run an external monitor with my macbook and change settings so that when i close the lid the signal to the monitor is not lost and i can continue using the mac with a mouse and a wireless keyboard?

    No, nothing will prevent the computer from going to sleep when you close its display except third-party hacks that are designed to do exactly that. I strongly advise against using any of those, as they may interfere with successful entry into clamshell mode (and they carry other downside risks as well). Just wait until the computer is asleep (with its sleep light pulsing), then press any key on the keyboard. It sounds as though your setup is working as it's designed to do.

  • How do I use a DAC with my Airport Express ?

    Hello,
    Can I use a DAC with Airport Express ? If yes, how ?
    TIA

    check out this CNET Crave article: Using Apple's AirPort Express with a DAC: A how-to guide

  • How do I use my ipad2 with apple tv

    How to connect and use my ipad2 with apple tv---the laptop works but can't get apple tv to recognize iPad

    The iPad only words with it by using it A's AirPlay output

Maybe you are looking for

  • Update 10.6.8 - dual screens - mouse problem

    I run a Mac Pro with 2 screens. I can just move my mouse (and windows) from one screen to another. I just did the update and now I can not move my mouse anymore from screen 1 to the other screen. So I can not get to the 2nd screen anymore with my mou

  • My iMessage on Macbook Air quit unexpectedly and I cannot open it now

    My imessage cannot work now!! When I try to open it, it just shows that "The last time you opened Messages, it unexpectedly quit while reopening windows. Do you want to try to reopen its windows again?" When I click reopen, it comes out the problem r

  • Photos in iPhoto don't print on 4x6 paper

    I have tried printing pictures from iPhoto to my Canon MP980 printer and the picutre is printing half of the picture (almost like it is set to print a 4x6 picture on an 8.5x11 piece of paper). I have changed the printer settings numerous times to 4x6

  • Deployment of Servlets with JDeveloper

    Dear Sir, I am facing problems for using initialised parameters in the servlets while deploying them(servlets) through JDeveloper. Kindly, let me know how I can remove hardcoded driver and ipaddresses from my file and still use them with JDeveloper(i