Value driver tree in sem-cpm

Dear all,
Iam facing a problem in copying actual or plan value fields to the simulation value field in my value driver tree with simulation presentation in web version.
when i click copy button by giving plan value field in source field and simulation value field in target field values are not copying to simulation field.
while assigning simulation value field to value driver tree, i defined like this..
simulation value field : SIM1  value type : 30 this 30 is defined in the master data of value type. iam using value type instead of version. Is this causing problem?
Please help me. Any suggestions will be appreciated..
Thanks and Regards
Rajesh

Hello Rajesh,
it seems like the assignement to planning elements is incorrect (or incomplete). Please check documentation at link http://help.sap.com/saphelp_erp2005vp/helpdata/en/48/90ad3998693f51e10000000a114084/content.htm (especially the tables describing the prerequisities and the mapping).
Best regards,
Ludek

Similar Messages

  • Short Dump While creating a Value Driver Tree

    Hi all,
    I am trying to create a value driver tree in CPM. i am on SEM verion 3.1b. I am able to create the value driver tree but when i goto the graphical view it generates a ABAP short dump. does anybody have any idea on this

    hi srini,
           Elaborate it clearly .
    Regards ,
    Muneeh Gitta.

  • Integrating VDT with Managment Cockpit in SEM - CPM

    Hi ,
    I am working with Managment cockpit in SEM-CPM. I want to integrate my Value Driver Tree ( VDT ) to my Managment cockpit.  Can anybody tell me the procedure of the same.
    Thanks & Regards,
    MANDAR

    hi mander,
    follow this link.
    https://help.sap.com/saphelp_sem320bw/helpdata/en/1b/3131375fc9342ae10000009b38f839/frameset.htm
    look out at the cpm-vdt node of this link.hope it will provide you the information you need.

  • Objectives in SEM-CPM

    Hi all,
    I'm trying to find some documentation about objectives in the CPM.
    Will be grateful for any help.
    Comment: Our projects uses measures and Value Driver Trees combined by BPS formulas and the all the data is saved on an InfoCube. (not using BSC)
    thanks & BR.
    Or.

    Hi
    Check the link Below
    http://help.sap.com/saphelp_nw04/helpdata/en/7a/72663ca0a9272ae10000000a11405a/frameset.htm
    Assign points if its useful
    Cheers
    SM

  • SEM-CPM Activating Strategy Template

    Hello All
    After activating a Strategy Template in SEM-CPM version 6 transaction UMB_ST_VIEW when viewing the result in the Measure Catalog I have greyed out Business Content Measures showing they are active but the activated measures do not beolong to a measure catalog. The system wont allow me  to assign them to my own personal catalog and I cannot deactivate them to allow drag and drop. Can anyone please help me with this problem.
    Thanks
    Phillip

    hi
    Balanced Score Card has to be configured as follows:
    First You have to Define Strategy
    For Example Strategy : Revenue Growth
    For this particular strategy u can have 4 perspectives
    1. Financial Perspective
    2. Customers Perspective
    3. Internal Process
    4. Learning & Growth
    For Financial Perspective: You can have different Objectivees
    eg for objectives:1. New Revenue Sources
    2. Increase Profitablilty thru Premium Brands
    Next For each objective u can have measures and initiatives
    For eg: for increase Profitablity thru Premium Brands
    Measures: Profit, Revenues
    Initiatives: Allocate Budget For Advertisement , Promotinal Activity etc.
    So Overall the sequence will be First : Strategy
    and For Each Strategy u will have different Perspectives and for each perspective different objectives and for each objectives u will assign different measures and initiatives.
    Objective will pertain to repective perspective only.
    For each initiative u hv to assign respective incharge and budget to be alloted.
    Next u hv to create value fields and assign Actual, Plan and Target values
    For score calculation u need to define Formula: and select the formula id for eg: a/b
    and give a=actual and b=plan  then u hv to assign table
    next u hv to select graphics also
    then u sav ur BSC.
    if u hv still hav any queries u can contact
    tx
    srin
    tx
    srin

  • SEM-CPM-MC: Creating CPM variables

    Hi,
    I know this is probably not the right place to post it, but I couldnt find a better place.
    I trying to create a variable in SEM-CPM-MC, but no matter what I do, I'm only able to create a runtime variable with selection type P - Variable for single value. I can select the other values, but when I save the variable SAP automatically corrects it to Singe value again. I can also create a design variable with the other types, but not a runtime variable. How do I create a variable for which you can enter an interval?
    In the documentation it also says, that you should be able to create variables on a frame level. I don't see any button where I can create a variable on a frame level. I've done exactly as it says on help.sap.com, but I don't have a button to create a new variable on a frame level. How do I do that?
    Any help is appreciated and will be rewarded generously :o)
    Thanks,
    -J

    hi Yaj,
    yes, there are business content, sap measure catalog, measures, strategy tempates, bw infocubes, etc.
    you can activate single or mass, go to sap measure catalog, e.g you can activate node 'financial measures' for mass activation or specific measure only under that catalog.
    to activate infocubes etc, you can use rsa1(administrator workbench)->business content, detail steps see sap help
    http://help.sap.com/saphelp_bw33/helpdata/en/80/1a66d5e07211d2acb80000e829fbfe/frameset.htm
    CPM business content, see
    http://help.sap.com/saphelp_erp2005/helpdata/en/7a/72663ca0a9272ae10000000a11405a/frameset.htm
    hope this helps.

  • SEM-CPM- Strategy Creation

    Hi Friends,
    I  work in SEM 6.0 environment and i am trying to create a strategy in SEM-CPM in transaction <b>UMB_ST_NAV</b>,once i enter the screen none of the icon or radio buttons work ..it doesnt allow me to create the strategy nor the exit icon takes me out of the screen. Has anyone encountered it earlier. Pls post your views.
    Thanks and Regards,
    Ram

    Hi,
    I don't know if the solution is as easy for you but :
    I did have the same problem with my frames... the problem was that (in the web version) <b>after having selected a value</b>, I had to click on the "<i>V</i>" on the bottom-right of the screen to update the graph according to my selection.
    I hope it helps.

  • SEM-CPM Demo

    Alright guys
    I am looking to see if anyone knows of any eLearning or demos for SEM-CPM, just to give me a an idea of how it works. New to SEM, but I am looking to learn CPM for a client of ours.
    Thanks in advance.
    Scott

    Hi Scott,
    Well man
    i am giving some info regarding the SEM
    SAP Strategic Enterprise Management (SAP SEM) delivers end-to-end capabilities to support performance management life cycle, including:
    •     Consolidated financial reporting -- With SAP SEM, you can generate consolidated financial and managerial reports for a globally distributed business or entity. The application can aggregate financial data from SAP and non-SAP systems into a single analytical reporting environment, enabling you to monitor the financial performance of individual subunits.
    •     Planning, budgeting, and forecasting -- SAP SEM helps enables you to model various planning options and use preconfigured planning software to get a quick start on operational planning tasks such as cost center planning and sales planning. The application supports traditional budgeting and rolling forecasts as well as collaborative planning.
    •     Corporate performance management and scorecards -- With SAP SEM, you can develop KPIs that support a number of popular scorecard methodologies, including balanced scorecard, economic value-added, and activity-based costing methods. You can link operational and strategic plans and develop scorecards and performance measures based on financial and non financial data.
    •     Risk management -- SAP SEM helps you identify, quantify, and analyze business risks within individual business units and manage risk-reducing activities.
    ALL the very best
    -Rakesh

  • SEM CPM  Drilldown does not work

    In sem CPM, when selecting a value of filter in drilldown of a frame of SEM CPM does not update the graph.
    Some idea?
    Thanks.
    Jorge

    Hi,
    I don't know if the solution is as easy for you but :
    I did have the same problem with my frames... the problem was that (in the web version) <b>after having selected a value</b>, I had to click on the "<i>V</i>" on the bottom-right of the screen to update the graph according to my selection.
    I hope it helps.

  • Best practice in implementation of SEM-CPM

    Is someone have  the experiance of implementing SEM-CPM using best practice. and if so, does it reduces implementation time?

    We should be able to adopt the best pratices when the software finally gets integrated into netweaver.
    Ravi Thothadri

  • Inconsistency between Condition Base Value in Rebate Monitor / Semi .....

    Hi All,
    there  is a big problem in Inconsistency between Condition Base Value in Rebate Monitor / Semi Automatic Bypass / MIS.
    We have discovered issues with inconsistent figures.
    Condition Base Value Rebate Monitor until Feb 29th is not equal with value from Semi Automatic Bypass with Settle to date Feb 29th
    - first analysis indicates, that Semi Automatic Bypass is taking 3 Billing documents into account which have Service Rendered Date March 3rd , but Billing Date Feb 29th:
    THE Rebates Monitor and Semi Automatic Bypass figures are always provided based on Requested Delivery Date/Service Rendered Date (and not based on Billing Date) and to ensure, that figures are always consistent.
    How to  fix it?
    Thanks in advance and regards
    William

    Hi,
    USE FMs SD_BONUS_READ and SD_BONUS_STAT_TARGET to fetch the values.
    Babul.

  • Connect more than 1 external BI in SEM-CPM-BSC or SEM-CPM-MC

    Hello,
    I have seen the help.sap.com that helps me how to put a defined BI (but only one BI).
    Design -> Default BW System
    Design -> Access to SAP BW
    Design -> RFC Destination for Project System
    But what we have is 3 BI systems. Each one with one module (HHRR, FI, SD). We want to join those BI modules into the SEM CPM. But I don't see how to put those 3 external BI in my CPM.
    Please help me...
    Best Regards...
    Pablo Mortera.

    There're several ways:
    1.- Create remote Cubes where you get your queries. Then once the SEM system you will have a Cube that really is a "remote" cube in another system. This will also help by creating a MultiCube, related to the cubes created before...this way you have a big datamart (really a knowledge mart;-) ) that has all of the data/information related in one view.
    2.- In the local BW system, you may create local InfoProviders that are being fed by remote BW systems as InfoSources. (You'll have to create the InfoSources and copy the data loads in the local BW System)
    Hope this helps.
    Cheers.
    Jesus

  • Web Cockpit developent (SEM-CPM or VC or something else)

    This question is intended for SAP Development team or Product management team. We are looking to make a strategic decision about the tool set to build BI Cockpit on the Web.
    SAP has competing technologies, which can deliver the cockpit on the web and as a customer we need to make a choice that is right for at least next 3-5 years. We do not want to develop the cockpit using the technology that is not moving ahead with SAP development.
    Our current environment: BW 3.5, EP 5.0 system. Plan to upgrade EP 6.0 in next 3 month.
    As per my understanding, following are the tools that can be used for development of web cockpit.
    1)  Web Application Designer with or without any Java scripting.
    2) SEM-CPM (Corporate Performance Monitor).
    3) BSP (Business Server Pages) /HTMLB - 
    4) Visual Composer with EP.
    Customer’s business team has seen SEM-CPM and inclined to use that. As a IT team we want to choice the right tool set.
    Following are my questions:
    1) SEM-CPM: Does it have good foot print at SAP Customer base? Is it good tool to develop the Cockpits as primary tool set? Is SAP developing this technology in the future? I have not seen any updated white paper or documentations in service.sap.com after 2003.
    OR
    2) Visual composer is the right tool. Visual composer allows the BW and Non BW Data presentation. For our purpose, all data will be in BW and BW queries will be the only source for the cockpit.
    As IT team, we want to avoid using Java Script or other programming process because of the support & maintenance issues involve.
    Please help and provide comment or suggestions.

    Hi,
    SEM-CPM is not a very flexible tool. We have to live with its limitations. We cannot customise to suit client needs. There are limitations in chart types also. If customer uses excel based charts for metrics currently, check whether they are possible thro' CPM. Please also check the latest version of SEM-CPM.
    I would request to considering other alternatives as suggested ike Web cockpit based on Web Application Designer with or without any Java scripting.likes or BSP (Business Server Pages) /HTMLB or VC (not worked on this).
    reg,

  • SEM CPM

    Hi,
    I am new to SEM. I tried to search the forum for some documentation. Everyone referred to help.sap.com and service.sap.com/sem. In service.sap.com/sem I didn't find any documents for sem documentation. Help.sap.com doesn't have any examples.
    My first task on SEM CPM is to create dashboards.
    What is the best approach to learn CPM ?
    Thanks,
    GSM.

    Hi GSM,
    Refer the links below
    http://help.sap.com/saphelp_sem40bw/helpdata/en/1f/3131375fc9342ae10000009b38f839/frameset.htm
    https://websmp203.sap-ag.de/sem -->
    In Strategic Enterprise Management node --> Media Library -->  Presentations --> SEM CPM (and also Literature section)
    Hope it helps,
    Sree

  • SEM-CPM docs

    Hi,
    Can anyone provide me with any docs related to SEM-CPM module. I am actually looking for some documentation which explain WITH EXAMPLES.
    Thanks in advance,
    Points are assured.

    Hi,
    You can check this link
    http://help.sap.com/saphelp_nw04/helpdata/en/7a/72663ca0a9272ae10000000a11405a/frameset.htm
    Regards,
    Praveen

Maybe you are looking for

  • HR Renewal 1.0 FP4 and Standard Process

    Hi,   We had recently installed HR Renewal 1.0 FP4 in our sanbox client and when we checked the tcode HRASR_DT which is design tool for HCM Processes and Forms under Forms and Scenarios standard forms are listed but we don't see standard process. We

  • Business Partner Generation in Talent - New & Existing CPs

    Hello, We have upgraded to EP4 and are installing Talent Management, which requires the use of the Business Partners (BP).  I've activated the following integration switches: HRALX     HRAC     X     Activate HR Integration HRALX     OBPON     ON    

  • Web Analysis rename utility

    "The Rename Utility is a stand-alone application designed to update objects in a Web Analysis repository based on the data source metadata changes." Where I can find this utility? Thanks all!

  • Disable sound for specific users

    How do I disable sound for specific users?

  • Urgent!!: System Update 4.0 Can't Be Launched in SL500

    I am using SL500 under O/S Windows 7 32Bit. While I tried to launch Thinkvantage System Update (4.0 version), machine always shows this error message: " Unable to connect to the proxy server". Whenever I reinstall this update, and as soon as it was l