Warranty Processing

Hai Guys
I just one clarification with u.I have trying to fully implement the warranty process.
Basically i did master warranty added at Tech objects.
Bit i need to go 4 warranty clain WTY T code.
In configuration (owty) Wrty Processing----General settings
iam nothing getting for doing the configuration . the system provides no entries exist. Am i missing any Functional module implementation to getting the display at screen 4 configuration. Authorisation is  missing is 05 (Display)  . after getting this is it helpful? anyone working fully integrate with FI also.
THENNA

Hai
Just i need some refer from ur end. My equip has the master warranty like Hrs, Days.
While carrying the mtc work within warranty period iam getting pop up message.
Tell me where i need to enter the counter value since in entering the value at BGM1  T code wont create the meas docs.
Incase if i have created the meas point against the same cahrector after updating the counter value it is not appearing at BGM2 or master data of equip of warranty.
After that if fails with in warranty iam trying to send the equip to warehouse thro 501 mov. But here iam facing some errors.
Another way if directly affter creation of defective notification iam trying for claim thro wtt  t code.
But the same i have just created but not familiar with this.
Any 1 working this scheme please pass the documents at [email protected] mail id.
Thanks
thenna

Similar Messages

  • Mapping Warranty process in SD

    Dear Experts,
    I am bit confused in mapping warranty process with help of Billing plan in SD. As i thought of we can do with the help of billing plan.
         " The dealer may raise claim ( based on valid warranty) for the spare parts which are non-returnable and damaged , for which Company will raise the credit memo request (based on the billing reference) and credit memo (with 50% of the claim released on the same day as claim punching and rest 50% ONLY after 90 days )"
    Can any one do help me int this please
    With Thanks &Regards
    Aswin Nair

    Dear Aswin,
    As per my understanding of your requirement,  the credit memo request is created with reference to the orginal billing document.
    Hence there has to be a copy control between your invoice type and credit memo request type.
    (if the credit memo request need to be created only with a reference, then check reference mandatory in VOV8 of your credit memo request'
    Since the materials are non-returnable and damaged, it can be assumed that there will not be any return delivery in your case.
    So the credit memo request should have a copy control setting with the credit memo in VTFA.
    The 50 % -50 % can be achieved by using a milestone billing plan in which the second billing date in the reference billing plan will be 90 days after the first billing date/ credit memo creation date (claim punching date).
    Please try this out and let us know.
    Thanks & Regards,
    Hegal K Charles

  • CRM 2007 - Warranty Processing

    Hi Gurus
    We're running CRM 2007 in a standalone system and I'm trying to put Warranty Processing together.
    I'm new to Warranty Processing so require some guideance on this subject.
    I've followed Best Practice Guide C13 and have created a warranty.
    We do not use Installed Base.
    I need to know how the end process works:
    Eg. Customer Calls to make a claim on a warranty.
    How is this captured and how must I configure for this scenario.
    Many Thanks in Advance.
    Regards
    Panduranga

    hi,
    We use install base to capture the details of what is installed in customer premise. Generally install base is used in scenarios of corporate customer. That does not means we cannot use install base for individual customer. Use of install base depends upon product as well. Eg for the company like hp who sell servers and computers can use install base to capture what has been given to the customer. eg hard disk, motherboard, processor, ip adderss etc.
    use tx ib51 to create install base. Install base has various componets such as
    Text.
    Product
    I Object
    Structure gap
    Ibase
    I Object is used to store unique details of customer such as IP address of computer etc.
    You can also attach warranty, counter to your install base.
    Now coming on to your scenario.
    You can attach warranty to install base/comp. When customer will come and ask for service or register complaint, he will specify his install base number or component number. Depending upon the warranty attached to the ibase, pricing of service order can be done. Eg there is warranty on processor but not on hardisk. So if you are offering service to customer on processor then as per configuration you can give service free of cost or can charge customer.
    This is how install base is used. There are many other benifits such as when  you see install base fact sheet you will be able to see all the complaint and service order on install  base without doing any coding effort.
    Hope it information will help you. For further details you can refer to help.sap.com
    Best regards
    Pankaj kumar

  • Warranty process implementaion

    Dear all,
    We are looking to implement Warranty process in our company. Ours is a manufacturing company and we are in ECC 6. I understand we have to activate DIMP to have the standard warranty process implemented in our system. But I am not able to get the complete picture of how Suppliers and Dealers are integrated.
    What is DMS for?
    How are suppliers integrated?
    Kindly help me understand how Dealers and Suppliers are integrated.
    Thanks and Regards
    Madhu

    Hi ,
    Can anybody guide me about the document flow in claim processing.....
    I created the master data for warranty management and i am able to create claim record in the system and now i am stucked at one point my claim is in process and now in action tab i am clicking to create credit note but i am unable to perform...
    can anybody guide me .....what is the next step to proceed...
    thanks and regards in advance
    Harmeet.

  • Warranty Process for  managing Vendor warranty

    Hi ,
    We are in the process of designing Warranty parts handling solution for a Passenger Rail company .
    Need inputs to design this Vendor Warranty process in SAP.
    Here are major steps in Current legacy system that we need to consider for designing this end to end process in SAP
    1.The Client receives Parts (with serial number) from External Vendor with Warranty.
    2.The Warranty Information is maintained with validity periods, serial numbers, vendor number, expiration etc for received parts.
    3.If the parts Fail during operations, Part return transaction is executed which checks in background for Valid warranty information related to serial numbers and creates Warranty Claim. Warranty Claim is communicated via fax or phone to Vendors.
    4.Warranty Purchase order referencing to warranty claim with zero price is created and parts are shipped to Vendor for replacement along with warranty PO.
    5.Vendor delivers parts covered under warranty & parts are received in system against warranty Purchase order no.
    What would be the best possible way to address this with SAP warranty management functionalities under SAP PM/ CS modules (Master warranty/ Warranty claim processing etc)?
    Any inputs or experiences on similar type Warranty process handling in SAP will be really helpful. Looking  forward to get your best inputs on this.
    Thanks in advance,
    Krish

    Dear Krish,
    You can follow the following steps :
    STEP 1:-
    SPRO >> Materials Management >>Purchasing >>>Purchase info record >>Maintain inspection Certificate categories >>>Create certificate category u201CWu201D description warranty
    select relevant check boxes as per your requirement & Save.
    STEP-2
    Maintain info record for material through Transaction Code ME11.
    ME11>>>General data>>>Select Certificate category u201CWu201D (As you defined earlier in configuration) Enter certificate number means warranty number in our terminology Enter Valid to
    If you want enter country of Ctry of origin, Ctry of origin and customer tariff number Save
    Hope that your problem will solve.
    Rajesh

  • Customer Service - handling Warranty process for Materials

    Our Business,
    1. Our Plant is 1000 - sold a Equipment to a Customer "C100"
    2. A Material is broken in the part of Equipment - where the Material[M100] is under Warranty.
    3. This Material[M100] is received in Plant 1000.
    4. Then this Material[M100] is transferred to Plant 2000[Service Plant]
    5. Material[M100] is serviced in Plant 2000 then transferred to Plant 1000.
    6. Then this Material[M100] is given to the Customer from Plant 1000 in free of cost as the Material is under Warranty.
    "Here in Step 5. We have to know the cost of expenses for Service, that can be posted to Cost Center. Cost must not post to Material after Service as this is given to the Customer as free of cost.
    We have to Map this Business in SAP.
    Please suggest best fit for above Business Scenario
    Thanks
    Raja

    Hi ,
    thanks for your response. If you can provide me more specific details of this scenario without having PM/CS orders for warranty claim that would be great.
    We want to track , maintain  & raise claim for warranty parts in the system for serialised materials; also need to send parts to vendor at zero cost and receive back in the system - we will not be using SAP PM . so any inputs on how to develop this process with warranty functionlities in such scenarios will be very helpful.
    looking forward for more relevent responses..
    Thanks
    Krish

  • HP Warranty Process

    I am having an issue with my laptop that is less than a year old and still under warranty.  I was wondering how the process works with HP.  I had a hell of a time even purchasing the laptop, but that is more BEstBuy's fault than anything to do with HP.  I have been having an issue with the fan for a while now.  It sounds absolutely horrible, and now when I start the laptop up, it tells me the fan is not working properly.
    Is this a situation where I am going to be without my laptop for a long period of time?  I would like to be able to get it fixed locally and be reimbursed or have HP work with the company themselves.  I don't feel I should be out of use of my laptop.  Never thought I would be having substantial issues months after purchasing it.
    Any help would be greatly appreciated.  I know this has nothing to do with HP, but I am in a long distance relationship, and having my laptop to be able to use Skype is pretty important right now.

    These doscuments should help:
    http://h10025.www1.hp.com/ewfrf/wc/document?cc=us&lc=en&docname=c01007591
    and
    http://h10025.www1.hp.com/ewfrf/wc/document?cc=us&lc=en&docname=c01657439
    For warranty, please call HP and get the warranty updated.
    http://h20565.www2.hp.com/portal/site/hpsc/public/wc/home?ac.admitted=1407833440146.876444892.492883...
    or
    http://h10025.www1.hp.com/ewfrf/wc/weInput?cc=us&lc=en
    Wish you luck,
    Karthik
    --Say "Thanks" by clicking the Kudos (purple thumbs up icon in the lower right corner of a post)
    --Please mark the post that solves your problem as "Accepted Solution"

  • Warranty Processing status

    hello
    its regarding Warranty claim, I am not able to find change logged.  And when a claim reaches a certain status eg., DBM2, it does not allow you to view exiting docflow.
    How to get out of this problem so that I can see the Doc flow atleast for processing status eg DBM2??
    Regards
    Vishal

    Hi Vishal,
    Firstly check in transaction OWTY -> Define Warranty Claim Types
    the action control attached to the claim type .Then in
    OWTY -> Control Data -> Process Control -> Define Action Control  
    Kindly maintain the following entry as well for the current status:
    1. Action Control: XXXX       
    2. StartProcessing: DBM2
    3. Action: T*                 
    4 TargetProcess.: DBM2
    check this
    Regards
    Vijayesh V V

  • Warranty Process

    Hi,
    I want to configure warranty, that is if my material is defective within a specific warranty date, i will be able to swap the material with a new material free of cost. Is there any standard fuctionality in SAP to configure this. If it is there what are the configuration steps??
    Regards
    Gaurav

    Hi,
    Standard SAP functionaity is available but thats part of PM module, if PM module is under scope then yes..this is possible else..as far as my knowledge goes, in sales doc ..header level u have guarantee field under sales tab..just check out how much helpfull is this for u...secondly..if u want at item level..u may have to involve abaper..
    Regards
    Jagdish

  • How does the Out of Warranty process work?

    My iPad mini decided it wanted to take a bath the other day and now it's done for.  Left it in a bag of rice for a week and it will not turn on.  I was doing some research and saw that it can be replaced under the Out of Warranty fee for $219 but didn't see too many details on how to go about doing that.  Can I take it into a store or do I have to mail it somewhere, and if so, where? 

    The easiest is if you live near a store. Call and make an appointment. take in your device and talk to them. As I understand it, you pay the fee and walk out with a refurbished replacement.
    http://www.apple.com/retail/geniusbar/
    When you talk to the store you can verify the procedure with them.

  • Repair center warranty process

    Hey guys 
    I have a dv9700t laptop which is like 3 years old and still under warranty. 
    my screen burnt out  part # 
    "447990-001 
    17.0-inch WSXGA+ TFT WVA bright view (BV) dual lamp display panel - Features the glossy bright view (BV) technology - With microphone and webcam"
    HP tells me they dont have the part so I was upgraded to a case mamanger who asked me to sent it in because service senter might have the part...
    My question: If HP does not have the part how could the service center have it? where do they get their parts from? I am hoping they dont have it and I get a n upgarde computer probably a dv7t 
    is there a way to find out what the repair center has in stock and how they deal with it when they dont have it?
    has anyone gotten an upgrade computer from a case manager for parts not being availble for their old computer 
    thanks guys

    sorry to hear but in all honesty, it is your responcibilty to secure your data; not theirs.  making an image of your system and saving to an exernal drive for safe keeping would have been the prudent thing to do.  I've never heard of a repair being made that quickly.  Typically the user is w/o their computer for a few weeks or longer.
    L305-S5955, T9300 Intel Core 2 Duo, 4GB RAM, 60GB SSD, Win 7 Ultimate 64-bit

  • Handling Warranty for Vendor

    Hi,
    I need to do Warranty Process for Vendor(Transaction wise).
    1.When I am raising a Purchase Order to Vendor for the material which is in the Warranty Period, the system should allow to raise PO without Price(Free Item is disabled)
    2.In case of service, system should allow to make Purchase order with zero price.
    3.After creating Maintenance Order what is the procedure to be followed in Warranty Process.
    I have tried to get the relevant documents but not enough materials are available for Warranty Process. Please help.
    Your help would be highly appreciated.
    With Regards,
    S.Manivel

    Hello,
    I have Lumia 925.Recently I started facing problem with the headphone jack. The problem is,only left side of the headset works after plugging in.I reported this problem to Nokia Care but they refused to change the jack under warrranty. Since my handset is still under warranty. After pressurizing the Nokia Care executives,they rejected the handset by saying that it has some water traces inside the  handset.When I personally told them to take  a look,I found there were no traces of water. After keeping on discussing,they fooled me around and at last they recommended to pay for the damages. Even the Manager also tried to avoid me and ran out of the place.I'd been using Nokia handset since Nokia 3660 was launched,I never faced any technical issue cause of which I had to report to Nokia care. This was the first experience and I'm sorry to say,it was the worst. Please revert,and provide me customer cmplaint number.

  • How to handle the One-Time Customer Process (Customizations - Master Datas)

    How can we handle the processes of one time customers (for example sales from a store without a warranty process fort he products)? Iu2019m planning of creating a different sales document type and use a single customer number for all of the documents created. On the other hand SAP has a solution for the one-time customers but I donu2019t know its details. Can anybody explain me the standard one-time customer process of SAP (the needed customizations and the master datas to be created)?
    Thanks in advance for the answers....

    Hi..
    the one-time customer is an account group (CPDA) that is used for "walk-in" or "cash" buyers. although this account group can be used for regular sales orders, this is intended to be used with the Cash Sales type of sales documents, where no accounts receivable is created. you also need the one-time customer as a "dummy" and avoid creating many customer masters for buyers who may only do one transaction with your company.
    when you use the one-time customer account group in the Cash Sales order, you enter the one-time customer number in the sold-to party field. the system will then prompt you to enter the actual name (and address) of the buyer. you can have the option of generating SD reports with the real names of the customers.
    you create the one-time customer the same way you do with the regular Sold-to party. there are some differences, in the sense that this is a "dummy" account. you do XD01 or VD01 to create the account, choosing account group CPDA. you also make entries in the sales areas.
    Regds
    MM

  • Playbook broke, how to go about the warranty

    i live in canada, the blackberry broke in the philippines.  i'm still in the philippines, will be until september.   left the playbook plugged into the usb of a computer over night, won't start-up again.  the computer was running, the power supply was set at 220 volt going through a 220/110 transformer (for the monitor and other equipment).     the transformer has a fuse, maybe some kind of surge?  but the computer is fine.  
    anyway, my initial check is that the 90 day free customer service is over - do i have to pay to go through the warranty process?   its just over 3 months old.   will there be any issues replacing it in the philippines?    it was bought at a large electronic retail store in canada that has its own warranty, 2 years or whatever.  

    Contact support.
    Be a Shepard and not an iSheep.

  • PM Querry regarding Warranty

    hi
    any one plz explain the process flow for warranty claim processing ?
    regards
    pushpa

    Hi,
    Please check these threads to have some focus on process for warranty processing:
    Warranty check for previous date.
    Warranty and claims
    Also check this SAP file:
    http://help.sap.com/saphelp_nw04/helpdata/en/df/3efb377409bd5ae10000009b38f889/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/a4/5cf037f1d6b302e10000009b38f889/frameset.htm
    Regards,
    Subhasha

Maybe you are looking for

  • Error message into warning message KO450

    Hi, There are  unsettle RA  value in project PAD-9114. Because of  this unsettle RA  value in  the project  we are not able to  close the project and receiving error message like below: 1.There is still WIP for wbs 2.Balance of  wbs is not zero. Ther

  • Using a Mac Mini bought in the US in the UK

    I've been looking at buying my first Mac for about a year now so I thought it would probably be a good idea to go with a cheap one. Having a look at the apple site it turns out that I can get the Mac in the US for $599 which is about £316 or I can bu

  • INdesign CS3 suddenly crashes when trying to export pdfs

    I have exported PDF-x1as from Indesign for years with no issues. Suddenly today, indesign crashes when I select EXPORT. I have indesign CS3 on a macbook pro running 10.5.8. I work from home, and have to get some pretty huge projects out to the printe

  • How can i reduce the number of calls archived in recents

    How can i reduce the number of calls archived in recents

  • ORA-12054 when trying to create an MV

    10gR2 I'm trying to create an MV, but is failing with the mentioned error. I've tried to search for the reason(s), but cannot seem to find it. Can somebody help? Thanks. create materialized view MV_POC build immediate refresh on commit enable query r