What are the steps in configuring the PA

hi,
can u help in configuration of PA (Personnel Administration)
what r the steps.wht is the process.
Thanks n Regds,
Archana.

hi,
There are numerious steps involved for the configuration of the pa
You need to check basic settings
create company code,
company,>
personnel area>
personnel areas>
then you need to create employee structure
employee group..
employee sub group
then assign company to company code
assign employee group to employee sub group
what best you can do is go tp t-code spro
then floow each step under enterprise structure
and come to personnel management under which you need to configure personnel administration
if answered give points

Similar Messages

  • What are the steps involved in configuring Oracle EBSR12 after installation

    What are the steps involved in configuring Oracle EBS R12 after installation is complete?
    We have an empty oracle EBS R12 installed and up and running. We do not have anything configured.
    Please direct me to the documents that can be followed to do initial steps for the application functionality to work.
    Thanks,
    SR

    What are the steps involved in configuring Oracle EBS R12 after installation is complete?
    We have an empty oracle EBS R12 installed and up and running. We do not have anything configured.
    Please direct me to the documents that can be followed to do initial steps for the application functionality to work.All Oracle EBS Docs 11i/R12 can be found at:
    Oracle Applications Documentation
    http://www.oracle.com/technetwork/documentation/applications-167706.html
    Thanks,
    Hussein

  • What are the steps in Apple Configurator iPad restore? It appears to me that Configurator repeats steps, but it probably is that I don't know what happens and when.

    what are the steps in Apple Configurator iPad restore? It appears to me that Configurator repeats steps, but it probably is that I don't know what happens and when.

    If you have a rescue email address (which is not the same thing as an alternate email address) set up on your account then you can get a clue to what it is, and potentially use it, by going to https://appleid.apple.com/ and clicking 'Manage your Apple ID' on the right-hand side of that page and log into your account. Then click on 'Password and Security' on the left-hand side of that page and on the right-hand side you should see an option to send security question reset info to your rescue email address.
    If you don't have, or don't want to use, your rescue email address (you won't be able to add/change it until you can answer 2 of your questions) then you will need to contact iTunes Support or Apple to get them reset (which will be by phone as they need to verify your id - we are fellow users here on these forums).
    e.g. you can try contacting iTunes Support : http://www.apple.com/support/itunes/contact/ - click on Contact iTunes Store Support on the right-hand side of the page, then Account Management , and then 'Forgotten Apple ID security questions'
    or try ringing Apple in your country and ask to talk to the Accounts Security Team : http://support.apple.com/kb/HE57
    When they've been reset you can then use the steps half-way down this page to add/change rescue email address for potential future use : http://support.apple.com/kb/HT5312 . Or you could change to 2-step verification : http://support.apple.com/kb/HT5570

  • What are the configuration steps required ?

    Hi
    Gurus,
    Client requires:
    "We have construction going on at our warehouses and the projects are going
    to take about a year.  We need to track retainers on the payments we make to the contractor. 
    Payments are due in a couple of weeks and it is a priority to monitor progress on the construction."
    Example:
                                                                    GL Account#         
    Debit  Construction In Progress                      122000          100%
    Credit  Vendor                                                601095            90%
    Credit  Accounts Payable / Retainage            202000            10%
    At this time we have a request for a solution to process what is necessary
    to compile with the following scenarios.
    what are the configuration steps required.
    Thanks
    Anil

    Hi,
    Whether the contractors are treated as one time vendors or regular vendors. If you have to create new account group for subcontractors
    Does only one account group related vendors need the retainage analysis or for all the vendors. Will be mainly the general contractors at each location  One group is sufficient even they are at different location you can maintain the same in REGION
    Does only single partial payment exists and the remaining due amount to be treated as due on a particular date or multiple payments exists against the same invoice. The 10% must accumulate in a liability account over the life of the contract and is paid at the end. There may be multiple of payments which you need to knock off against the service entry sheet(study above reply)
    The construction cost which is treated as outstanding to Vendor to be exclusive of the cash expenditure made for such construction. Yes, but the entire 100% needs to debited to CIP Until and unless the work is not completed so how you can treat as outstanding payment to vendor. If you want you can maintain a provision for this
    Check with above and above replies.
    Regards,
    Sankar
    Edited by: Durgasankar.Innamuri on Jul 29, 2010 10:17 AM

  • What are the steps to configure Fund Management in Plant Maintenance

    Hi Friends,
    while creating Plant Maintenance order through T code iw31.
    In the main menu     Go to-Assisments----Fund management.
    now this Fund management is in grey mode.
    What are the steps i need to carry to make it active mode.
    Please suggest
    Thanks in advance

    Dear
    Ask with your Co person either they activated fund mgt. This is thier Job u can activate your order types for commitmente check at KOAB.
    Ask them to look at SPRO--PUBLIC SECTOR MGT
    Also at SPRO-CONTROLLING-INTERNAL ORDERS-BUDGET AND AVAILABLITY CONTROL
    You also check at your OIOA.
    thenna

  • What are the configuration steps for cheque process

    hi,
    sap gurus,
    what are the steps for cheque process if our customer wanted to pay by the mode of cheque.
    regards,
    balaji.t
    09990019711.

    Hi,
    Kindly go to OVFD where in you will have to create a new payment procedure if it's not there in standard SAP. Then, you will have to assign this new payment guarantee procedure in customer in sales area data>billing document screen. As far as standard SAP is concerned you will be able to assign the payement by cards in customer master, but for DD process I think you will have to create it.
    Hrishikesh

  • What are the steps  needs to be perform to define a data model

    What are the steps  needs to be perform to define a data model
    a.     Information Gathering 
    b.     Hardware & Software
    c.     Structure the Information – MDM
    d.     Transfer into a Physical Model – BW data model
    e.     Explore use of existing model – Business Content

    Hi Siva,
         Very first activity is Proof of concept (POC), here we have to show How BW works for clients Reporting requirement during POC we as BW consultants need to creat some sample BW back end objects and also some reports based on business requirement. This is very crucial stage as Client Judge wethere BW would meet his demands. If every thing is fine then next step is Bidding.
    After Bidding the contract then actual Project intiates. from here we follow ASAP methodology.
    <u><b>
    Project Preparation</b></u>
    Here Senior Consultant would go to Client place for Business Process Transistion and to know in what way the Architectue should be set up so here Basis People will come into picture.
    <u><b>Blue Print</b></u>
    Transistion could be understood by BRD (Business Requirement Documents) BRD states what is exact requirement and it is given by End users.
               By seeeing thr BRD's we as BW consultants must prepare APPlication Design Documents . The Application Design Documents states all the Technical aspects that needs to be performed as BW backend and also as well as Frontend.
    <u><b>Realization Phase</b></u>
      Here as BW consultants we must start confuguring as mentioned in ADD's by taking care of all performance aspects, once all the configuration are done we do Unit testing. unit testing is an activity where we check all the design process wether it running correct or not. After unit testing we move the design objects to Qulaity for Integration Testing.
    <u><b>Testing</b></u>
        Here end user will check all the objects, reports on end to end basis. after integration testing is done then UAT ( User acceptance Testing) would come into picture where user check each process and sign off.
    <u><b>Go live</b></u>
    Here all the object will be moved to Production where end users and power users can start working on the system. intially for some days Development team would be taking care of all support activites there after  it will be transitoned to support team.
    Hope It helps you.
    Assign Points if it usefull
    Regards
    Sujan

  • What are the basic steps for creating a content repository?

    I am trying to create a document store on a file system (fsdb) that will hold files that are ftp's to that location. Is this possible using KM? If so, what are the basic steps for creating a file system repository and using it through KM? I have found stuff on help.sap.com but that only tells you what each component does not what actual steps need to be taken to setup KM, such as user rights , creating an entry point, so that all of KM is not visible, etc...
    If anyone knows of any guides that show a step by step process that would be great too.
    Thanks
    Paul

    Hi Paul
    First of all you need to create a new repository
    Suppose you want to add all the documents under folder Paul under C: Drive
    (Even you can put whole documents of C: drive into Paul)
    Navigate to System Admin -> System Configuration -> Knowledge management -> Content Management -> Repository Manager -> File System Repository
    There you can create a new directory by clicking on button New
    Give the parameters as follows :-
    Name               :           Anything you like
    Description       :           Anything you want
    Prefix (must start with /)  :  Probably same as your repository name like \Paul
    Lookup mode : caseless
    Root Directory   :  C:\Paul
    NOTE:  This is the trick. You need to give the proper path means folder path which you want use as repository)
    Repository Services  :  Any services you want
    Property Search : Managercom.sapportals.wcm.repository.manager.generic.search.SimplePropertySearchManager
    Security Manager         :           AclSecurityManager
    ACL Manager Cache   :           ca_cm_rep_acl
    The save it
    Now see whether the same repository is coming under KM Content or not, if not may be after restart it will come.
    I think the above information will help you. If still you have problem, please feel free to contect me.
    Regards,
    Chamkaur

  • What are the different steps to follow in order to develop an application and deploy it into a PAC

    Hi,
    I developped a program on my computer but in order to deploy it in a PAC , I don't know what are the different steps to follow?
    What are the difference between a stand alone application and communication with server mode.
    Can the file which will be downloaded into the PAC be in a form othre than (.exe). 
    what does the deployment licence consist of??? is it a software? 
    if the file is .exe then how to maintain it?
    Thank you for all,
    Regards

    Hi!
       Since I'm familiar with FieldPoint PACs, I'll refer to that (but maybe it is similar for cRIO...).
       An embedded application (standalone), runs entirely and independently on the PAC, while if you're not doing this, you'll have your computer, with LabView, which is controlling the PAC.  In this mode, application is dowloaded in PAC's RAM, so when you reboot controller, application will be lost.  If you build an embedded application, you can provide for application to boot authomatically at boot, each time the PAC reboots.  These are some basic stuffs on embedded applications with LV.
        To deploy an application to a PAC, you need LabVIEW + Real-Time module. Without it, you can't build an embedded application on PACs.
        usually, the file dowloaded is an .exe, and some libraries.  What would you like to have, exactly? For example, I think you can buy a simple .exe, which is universal, which loads VIs dinamically, so you can download directly VIs, but I've never tried this way....
       Deployment license, I think, refer to PCs, id est, when you use a PC or PXI as embedded target, in PACs, you have it bundled (it seems to me) whit the PAC you buy, so you don't have to buy an extra license for every PAC you ship with your application.  Otherwise, if you develop a Real-Time application for a PC, you will ship PC + OS licensed + Real-Time extension licensed, but this is not your case, since you'll use PACs.
       The maintain problem... I've already faced with! Simply, for my needs it was enough to make an application which loads configuration files, depending on different task the controller has to do. If you have to dowload a completely new version of VI.... it's better to deploy new application from LV.  But maybe you can bypass this problem with dinamic VIs loading...
        Let me know if this help.... Have a nice day!
    graziano

  • Freight Material why it is required and what are the configuration?

    Hi experts,
    My clientsu2019 requirement is they want freight material to be configured in DIEN material type? I want to know why they want this and what are the steps to configure it apart from material master
    Plz need your help
    Thanks
    Krushna

    Hi experts Please need your help

  • What are the steps to migrate j2ee project from version 1.4 to 1.6

    Hi All,
    What are the steps to migrate java project from version1.4 to 1.6 and weblogic 9 to 12c.
    Currently my application(java version1.4) is running on weblogic 9, i want to migrate it to weblogic 12c, what are the major steps i have to follow.
    Please anyone of you help me as soon as possible.
    Thanks,
    Yugandhar.G

    Hi Jeet,
    The following are the logs for exception.
    <Dec 13, 2012 12:04:52 PM CST> <Warning> <Socket> <BEA-000449> <Closing the socket, as no data read from it on 0:0:0:0:0:0:0:1:52,370 during the configured idle timeout of 5 seconds.>
    <Dec 13, 2012 12:07:14 PM CST> <Warning> <Deployer> <BEA-149251> <Operation Remove failed for application "tcs". Error: java.lang.NullPointerException
    java.lang.NullPointerException
         at weblogic.servlet.internal.WebAppModule.remove(WebAppModule.java:851)
         at weblogic.application.internal.flow.ModuleStateDriver$4.previous(ModuleStateDriver.java:236)
         at weblogic.application.internal.flow.ModuleStateDriver$4.previous(ModuleStateDriver.java:223)
         at weblogic.application.utils.StateMachineDriver.previousState(StateMachineDriver.java:148)
         at weblogic.application.utils.StateMachineDriver.previousState(StateMachineDriver.java:138)
         Truncated. see log file for complete stacktrace
    Caused By: java.lang.NullPointerException
         at weblogic.servlet.internal.WebAppModule.remove(WebAppModule.java:851)
         at weblogic.application.internal.flow.ModuleStateDriver$4.previous(ModuleStateDriver.java:236)
         at weblogic.application.internal.flow.ModuleStateDriver$4.previous(ModuleStateDriver.java:223)
         at weblogic.application.utils.StateMachineDriver.previousState(StateMachineDriver.java:148)
         at weblogic.application.utils.StateMachineDriver.previousState(StateMachineDriver.java:138)
         Truncated. see log file for complete stacktrace
    >
    <Dec 13, 2012 12:07:14 PM CST> <Error> <Deployer> <BEA-149265> <Failure occurred in the execution of deployment request with ID "1355371555961" for task "1". Error is: "java.lang.ArrayIndexOutOfBoundsException: 8"
    java.lang.ArrayIndexOutOfBoundsException: 8
         at com.bea.objectweb.asm.ClassReader.readUnsignedShort(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at weblogic.application.utils.annotation.ClassInfoImpl.<init>(ClassInfoImpl.java:44)
         at weblogic.application.utils.annotation.ClassfinderClassInfos.polulateOneClassInfo(ClassfinderClassInfos.java:145)
         Truncated. see log file for complete stacktrace
    Caused By: java.lang.ArrayIndexOutOfBoundsException: 8
         at com.bea.objectweb.asm.ClassReader.readUnsignedShort(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at weblogic.application.utils.annotation.ClassInfoImpl.<init>(ClassInfoImpl.java:44)
         at weblogic.application.utils.annotation.ClassfinderClassInfos.polulateOneClassInfo(ClassfinderClassInfos.java:145)
         Truncated. see log file for complete stacktrace
    >
    <Dec 13, 2012 12:07:14 PM CST> <Warning> <Deployer> <BEA-149004> <Failures were detected while initiating deploy task for application "tcs".>
    <Dec 13, 2012 12:07:14 PM CST> <Warning> <Deployer> <BEA-149078> <Stack trace for message 149004
    java.lang.ArrayIndexOutOfBoundsException: 8
         at com.bea.objectweb.asm.ClassReader.readUnsignedShort(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at weblogic.application.utils.annotation.ClassInfoImpl.<init>(ClassInfoImpl.java:44)
         at weblogic.application.utils.annotation.ClassfinderClassInfos.polulateOneClassInfo(ClassfinderClassInfos.java:145)
         Truncated. see log file for complete stacktrace
    Caused By: java.lang.ArrayIndexOutOfBoundsException: 8
         at com.bea.objectweb.asm.ClassReader.readUnsignedShort(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at weblogic.application.utils.annotation.ClassInfoImpl.<init>(ClassInfoImpl.java:44)
         at weblogic.application.utils.annotation.ClassfinderClassInfos.polulateOneClassInfo(ClassfinderClassInfos.java:145)
         Truncated. see log file for complete stacktrace
    >
    <Dec 13, 2012 12:07:17 PM CST> <Error> <Console> <BEA-240003> <Administration Console encountered the following error: weblogic.application.WrappedDeploymentException: 8
         at com.bea.objectweb.asm.ClassReader.readUnsignedShort(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at com.bea.objectweb.asm.ClassReader.<init>(Unknown Source)
         at weblogic.application.utils.annotation.ClassInfoImpl.<init>(ClassInfoImpl.java:44)
         at weblogic.application.utils.annotation.ClassfinderClassInfos.polulateOneClassInfo(ClassfinderClassInfos.java:145)
         at weblogic.application.utils.annotation.ClassfinderClassInfos.populateClassInfos(ClassfinderClassInfos.java:137)
         at weblogic.application.utils.annotation.ClassfinderClassInfos.<init>(ClassfinderClassInfos.java:28)
         at weblogic.application.utils.annotation.AnnotationMappingsImpl.loadAnnotatedClasses(AnnotationMappingsImpl.java:69)
         at weblogic.application.internal.ApplicationContextImpl.processAnnotationMappings(ApplicationContextImpl.java:985)
         at weblogic.application.internal.ApplicationContextImpl.getAnnotatedClasses(ApplicationContextImpl.java:1010)
         at weblogic.j2ee.managedbean.ManagedBeanModuleExtensionFactory.create(ManagedBeanModuleExtensionFactory.java:43)
         at weblogic.servlet.internal.WebAppModule.initModuleExtensions(WebAppModule.java:562)
         at weblogic.servlet.internal.WebAppModule.init(WebAppModule.java:271)
         at weblogic.servlet.internal.WebAppModule.init(WebAppModule.java:636)
         at weblogic.application.internal.flow.ScopedModuleDriver.init(ScopedModuleDriver.java:162)
         at weblogic.application.internal.ExtensibleModuleWrapper.init(ExtensibleModuleWrapper.java:74)
         at weblogic.application.internal.flow.ModuleListenerInvoker.init(ModuleListenerInvoker.java:84)
         at weblogic.application.internal.flow.InitModulesFlow.initModule(InitModulesFlow.java:312)
         at weblogic.application.internal.flow.InitModulesFlow.initModules(InitModulesFlow.java:325)
         at weblogic.application.internal.flow.InitModulesFlow.prepare(InitModulesFlow.java:378)
         at weblogic.application.internal.BaseDeployment$1.next(BaseDeployment.java:706)
         at weblogic.application.utils.StateMachineDriver.nextState(StateMachineDriver.java:35)
         at weblogic.application.internal.BaseDeployment.prepare(BaseDeployment.java:237)
         at weblogic.application.internal.EarDeployment.prepare(EarDeployment.java:61)
         at weblogic.application.internal.DeploymentStateChecker.prepare(DeploymentStateChecker.java:158)
         at weblogic.deploy.internal.targetserver.AppContainerInvoker.prepare(AppContainerInvoker.java:60)
         at weblogic.deploy.internal.targetserver.operations.ActivateOperation.createAndPrepareContainer(ActivateOperation.java:207)
         at weblogic.deploy.internal.targetserver.operations.ActivateOperation.doPrepare(ActivateOperation.java:96)
         at weblogic.deploy.internal.targetserver.operations.AbstractOperation.prepare(AbstractOperation.java:229)
         at weblogic.deploy.internal.targetserver.DeploymentManager.handleDeploymentPrepare(DeploymentManager.java:747)
         at weblogic.deploy.internal.targetserver.DeploymentManager.prepareDeploymentList(DeploymentManager.java:1216)
         at weblogic.deploy.internal.targetserver.DeploymentManager.handlePrepare(DeploymentManager.java:250)
         at weblogic.deploy.internal.targetserver.DeploymentServiceDispatcher.prepare(DeploymentServiceDispatcher.java:159)
         at weblogic.deploy.service.internal.targetserver.DeploymentReceiverCallbackDeliverer.doPrepareCallback(DeploymentReceiverCallbackDeliverer.java:171)
         at weblogic.deploy.service.internal.targetserver.DeploymentReceiverCallbackDeliverer.access$000(DeploymentReceiverCallbackDeliverer.java:13)
         at weblogic.deploy.service.internal.targetserver.DeploymentReceiverCallbackDeliverer$1.run(DeploymentReceiverCallbackDeliverer.java:46)
         at weblogic.work.SelfTuningWorkManagerImpl$WorkAdapterImpl.run(SelfTuningWorkManagerImpl.java:545)
         at weblogic.work.ExecuteThread.execute(ExecuteThread.java:256)
         at weblogic.work.ExecuteThread.run(ExecuteThread.java:221)
    >

  • What are the correct steps for installing Oracle Entitlement Server SSM?

    Can somebody explain what are the correct steps to install OES SSM 10.1.4.3? I have installed OES admin 10.1.4.3 and applied the CP2 patch. it is allowing me to open Entitlement Administration, where I can define the policy.
    Is it sufficient to have this Entitlement Admin to call the policy from BPM? Do I need a SSM ?
    When I try to configure Java SSM using ConfigTool.bat -process myssm_config.properties I am getting the following error
    Is Admin in the same BEA-HOME as SSM: [default: Yes]:
    Give the location of the Admin: c:\bea\ales32-admin
    Enter the identity directory name which will be used: [default: CoESSM_dir]:
    Enter the root node which will be used to create resources: [default: //app/policy/CoESSM_app]:
    Checking if default ARME port is free: 8000
    Generating policy files based on templates ...
    Checking if SSM instance already present
    Checking to see if SSM ARME port is free.
    Checking JDBC parameters...
    Checking to see if asipassword was run...
    2010-03-15 18:06:59,295 [Main Thread] ERROR com.bea.security.SsmConfigTool.AlesConfig - You need to run asipassword first
    2010-03-15 18:06:59,295 [Main Thread] ERROR com.bea.security.SsmConfigTool.ConfigurationTool - Error making changes: You need to run asipassword first
    I have tried running the asipassword utility, but still it gives the same error. Please let me know what am I doing wrong?

    Yes I have explored this pdf...but it doesn't tell how to use the policy from the BPM. My question is if I want to use the policies from BPM, then do I need to install the SSM ?
    If yes, what are the correct steps of installation ?
    I am getting the errors while configuring the Java SSM.
    Is Admin in the same BEA-HOME as SSM: [default: Yes]:
    Give the location of the Admin: c:\bea\ales32-admin
    Enter the identity directory name which will be used: [default: CoESSM_dir]:
    Enter the root node which will be used to create resources: [default: //app/policy/CoESSM_app]:
    Checking if default ARME port is free: 8000
    Generating policy files based on templates ...
    Checking if SSM instance already present
    Checking to see if SSM ARME port is free.
    Checking JDBC parameters...
    Checking to see if asipassword was run...
    2010-03-15 18:06:59,295 [Main Thread] ERROR com.bea.security.SsmConfigTool.AlesConfig - You need to run asipassword first
    2010-03-15 18:06:59,295 [Main Thread] ERROR com.bea.security.SsmConfigTool.ConfigurationTool - Error making changes: You need to run asipassword first
    I have tried running the asipassword utility, but still it gives the same error. Please let me know what am I doing wrong?

  • What are the  configuration tht pi administration have to perform

    hi friends
      i am new to pi can any one help me what are the  configuration tht pi administration have to perform and post installation to be done after installing pi in stand alone box?
    plz help
    thnks
    ravi

    Hi,
    This might help you
    /people/sravya.talanki2/blog/2006/11/15/post-installation-steps-for-activating-adobe-document-services-in-sap-xi-nw-2004s
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/95d7d490-0301-0010-ce93-c58f9a3cde0b
    https://websmp101.sap-ag.de/~sapidb/011000358700009389172004E.PDF
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/95d7d490-0301-0010-ce93-c58f9a3cde0b
    http://help.sap.com/saphelp_nw04s/helpdata/en/78/f59442062bcd6ae10000000a155106/frameset.htm
    http://help.sap.com/saphelp_nw2004s/helpdata/en/49/9dd53f779c4e21e10000000a1550b0/frameset.htm
    Regards
    Agasthuri Doss

  • What are the imp. settings to configure in invoice verification in SPRO

    dear all gurus,
    i want to know the what are the important setting must be configure in the invoice verification setting in SPRO customization.
    pls. send the detailed steps, if the screen shots available it would be highly appreciated.
    i need the urgent help on that.
    thnx in advnce to all.
    rgrds,
    rajesh

    Hi,
    The details Conf. for Invoice Verification are following:
    1. Define Document Type for Invoice
    SPRO-> Financial Accounting (New) -> Account Receivable and account Payable -> Business Transactions-> Incoming Invoices and Credit Memos-> Make and Check Document Settings
    -> Define Document Types
    or
    T.Code:OBA7
    2. Define Number Ranges for Invoice
    SPRO-> Material Management -> Logistic Invoice Verification -> Invoice Verification-> Number Assignment for Accounting Documents-> Number Range for Document Type in FI
    or
    T. Code: OMR4
    3. Set Check for Duplicate Invoice
    Navigation Path: IMG-> Real Estate -> Tools -> Change Message Control
    or
    T. Code: OBA5
    4. Set Tolerance Limit for Invoice
    SPRO -> Material Management -> Logistic Invoice Verification -> Invoice Verification-> Invoice Block-> Set Tolerance Limit
    5. Activate Direct Posting to G/L Account and Material Account
    SPRO -> Material Management-> Logistic Invoice Verification ->  Incoming Invoice ->  Activate Direct Posting to G/L Account and Material Account
    6.Activate Company Code for Materials Management
    SPRO -> Logistic General ->Material Master-> Basic Setting ->  Maintain Company Code for Materials Management
    7.Default Value of Invoice Verification
    T. Code: SM30
    8.Assign tax Code for Non Taxable Transaction
    SPRO -> Financial Accounting (new) -> Financial Accounting Global Setting (New) -> Tax on Sales and Purchase ->  Posting-> Assign Tax Code for Non Taxable Transaction
    or
    T. Code:  OBCL
    Regards,
    Biju K

  • What are the steps applying incremental backups to standby database 11g

    Hi All,
    I have built 11g none ASM standby database from ASM RAC Database. Now I want to apply incremental backup to the standby database from primary but not sure how to do it. I tried following and I had an error “ORA-01103: database name 'ins-prim' in control file is not 'ins-sec'”
    1- I have configured standby database with RMAN backup.
    2- After finishing installation, I took a incremental backup from primary server(ins-prim) and moved incremental backup and control file to the standby (ins-sec) database
    3- I stared standby database nomount mode
    4- restore controlfile from “incremental backup location in standby database”
    5- alter database mount; and got this error
    “ORA-01103: database name 'ins-prim' in control file is not 'ins-sec'”
    What are the steps applying incremental backups to standby database with 11g?
    Thank you

    I build the database from backup and changed from ASM to none ASM and changed location of data files and logfiles. I think this changes makes the standby database as logical one.
    You can a have a physical standby with different locations for everything (redo/controlfiles/datafiles), ASM and no ASM etc. I have a such a configuration in production (10gR2)
    I build the database from backup
    Are you sure you have a standby ? Ins-sec receives the archivelog files from the primary ? How did you proceed to build this database ? I suspect you don't have a standby at all ! If you have duplicated the database ins-sec and ins-pri are independent databases and you won't be able to apply an incremental backup (your script was not correct but it is another story)

  • What are the steps to change existing sharepoint 2010 farm database server to a new server

    Hi
    i have a sharepoint 2010 farm and backend with sqlserver2012 standard edition on windows server 2008 r2 server
    now what are the steps to if  want to  connect this farm to a new sql server 2012 on windows server 2012 server and remove this existing server
    adil

    You have two options:
    Use a SQL Alias and you will then need to swing all databases over to the new SQL Server
    Don't use a SQL Alias and swing all but the Configuration and Administration databases to the new SQL Server, and individually re-configure Service Applications/Web Applications to use the new SQL Server. This will force you to keep the old SQL Server around.
    Trevor Seward
    Follow or contact me at...
    &nbsp&nbsp
    This post is my own opinion and does not necessarily reflect the opinion or view of Microsoft, its employees, or other MVPs.

Maybe you are looking for

  • Error while installing NW 7.4 SR2 in High availability

    Hello Guys, We are installing NW 7.4 SR2 Enterprise Portal with sybase database on windows 2012 R2 server under high availability i.e Microsoft Cluster. JEP is the system ID of the server, SAPJEP is the virtual host and X.X.X.36 is the virtual I.P fo

  • My iPod touch 4th gen is not dowloading iOS 5.

    When ever I plug it in the computer the mouse go's all whirly. This is stoping me from updating. My iPhone 3G works just fine when I plug it in. Is it the apple survers? My iPod basically crashes iTunes.

  • Authentication failure when adding new 'Segment in Use'

    Hi all! I've set up integration between Siebel 8.1.1.9 and OBIEE 11.1.1.5.0. I've applied My Oracle Support article ID 1400715.1, importing the modified SIF and Workflow definitions and re-deployed the SRF to the server. When attempting to drill into

  • Problem with installer

    Hello, I have a problem with my installer. Every time I try to install / upgrade a new application, it opens, but nothing happens. Thank you for your help, Pauline

  • Color Profile for SnapshotUtilsEx?

    Hello, I'm using SnapshotUtilsEx to get a pixel version of document spreads and pages. This works very well, but I can't figure out what color space the received image data is in. There seems to be no obvious way to find the attached ICC profile for