What is the promper format of files using the Document step in UCCX 8

Hello all,
I am working a script that is using the document steps in the script editor.
The script will allow the user to call in and turn a greeting on and off
I have a few sample scripts from version 5 and 7 and do this but I am on verions 8.0 and can't seem to figure out the document step
in the old verison of the script editor you put in the full windows path where the document is stored.
How is this done in the linux version?
I have tried the following
"filename.xml"
"filename"
"/filename.xml"
"filename"
/filename
/en_US/filename.xml
none seem to work.  when i do a debug on the script it says the file does not exist.
how do i need to list the filename in the create and write document steps.
if anyone has a script i could use that is version 8 that would be great as well!
thanks!
Ken

I assume you're referring to the Write Document step?
That step writes directly to the filesystem, in the appliance version (8.x+) you can only write to a specific directory on the file system, which you can get from:
System.getProperty(“uccx.customer.dir”)  
However, I believe these are deleted after some time and are not really suitable for long term storage. If you have a HA cluster this is certainly not going to work.
Assuming so, your next option is to use the Documents subsystem which works something like this:
User authUser
authUser = Get User (User ID: myUsersName)
- Success:
     Authenticate User Password (User: authUser, Password: myUsersPassword)
     - Success:
          Upload Document (Language: en_US, Name: fileName, Document: dataToWrite, User: authUser)
          - Success:
               /* document uploaded without issue */
You can then read from that file via
Document doc = DOC["en_US\" + fileName]
Something like that should work.

Similar Messages

  • What is the next step after editing or triming a video ? What type of file format to save and what to do after that ?

    what is the next step after editing or triming a video?
    what type of file format should be save and what to do after that?

    In the early days of digital video editing, an export render could take hours!  Not many applications are as hard on system resources as video editing, and rendering the final edit is probably the most system intense action of all.  
    Head on over to the Premiere Pro Hardware forum to see what sort of computer hardware the pros use for NLE (non linear editing), or to the PPBM5 site for a better look.
    PPBM5 Benchmark
    Also check out the specs on the Video Guys website

  • What kind of video formats can i use to import into imovie?

    what kind of video formats can i use to import into imovie?

    Hello,
    Adobe stopped supporting flash for android since ICS. You may still be able to download the latest (old) flash player "at your own risk" from Adobe archived flash player versions:
    http://helpx.adobe.com/flash-player/kb/archived-flash-player-versions.html
    Please read the disclaimer at the end as it is not advised to install unsupported flash versions.
    As for video streaming, there are lot of apps for that and it's just a matter of your preference.
    Hope that helps

  • What are the key steps & order to follow: changes in my flat file structure

    HI,
    I have a Cube which sits on ODS.
    In the ODS,  the are 6 characterisics: Char1, Char2,...., char6; and 3 key figures: kf1, kf2, and kf3.
    The ODS is loaded through a flat file.
    Through an update rule and startup routine, the ODS updates the cube.
    Now, I have a new requirement to add 2 new characteristics (Cha10, char20) and one 2 key figures (KF55, KF66)).i.e. the flat file will now be coming in with these new fields.
    I have an idea but this this is the first time I really have to implement, I need to be sure.
    What are the key steps that I need to go through and in what order?
    Thanks

    What version are you running ?
    Will you need to load history data as for these new fields or is it just going forward ?
    Is it all one to one mapping for the new fields ?
    1. Make sure you know to what dimensions you need to add the new chars ? New dimension for these two ?
    2. New chars to be made keyfields ?
    3. Update Type for keyfigures Overwrite or Additive ?
    Enhance the Cube, DSO, change  TRFN/TR/UR..

  • Once I receive my Network Access Code(N.A.C.) for iphone 5 what are the next steps I follow to unlock my phone from vodafone to use on another network???

    Once I recieve my Network Access Code(NAC) for my iPhone 5, what are the next steps I follow to unlock it from vodafone to use on another network???
    I have my other nano sim ready and waiting to port my number to it, but im just waiting on vodafone to email me the NAC code, which i checked up that I was eligible for!!!

    Ok many thanks for telling me this BUT 1 last thing, once vodafone get back to me then is it just a matter of plugging my iphone into itunes and letting it sync? Like will a message be displayed or anything on screen letting me know or confirming that the phone has been unlocked...???

  • Project online licenses is purchased via OLP, what is the next step to use project online?

    hi,
    Project online licenses is purchased via OLP (Open License program), what is the next step to use project online?
    tnx

    I recently had this with a client using Exchange Online.  You should have recieved a Microsoft Licence Confirmation.  
    From memory I had to login to the OLP tool, and associate these with an O365 account.  Your reseller who you bought the licences from should be able to help
    Ben Howard [MVP] | web |
    blog | book

  • I'm a newbie to Blackberry - What is the first step to correctly using the instrument ?

     I'm a newbie to Blackberry - What is the first step to correctly using the instrument ?
    I just acquired my first blackberry phone  model-9810. What are the different simple  steps or the procedure that I should follow  to correctly use this instrument, i.e., telephone features first, internet features later. Your assistance to a newbie is highly appreciated.     All the best!  
    Solved!
    Go to Solution.

    Yes.
    - If my response has helped you, please click "Options" beside my post and mark it as solved. Clicking the "thumbs up" icon near the bottom of my response would also be appreciated.

  • I have a mac pro book and i need further editing tools, i need to do more professional design , i use key note a lot , but i cant crop an image in key note and i find it limiting. what is the next step?

    I Have a macbook pro and i want to edit my pictures further. Such as writing on them with different fonts etc.. ,but also being able to crop them the size i want, which key notes wont let me do. What is the next step?
    thanks!!

    Try the excellent shareware application, Graphic Converter. In addition there are many very good photo editing programs for the Mac. Look for them all at MacUpdate or CNET Downloads.

  • What are the basic steps for creating a content repository?

    I am trying to create a document store on a file system (fsdb) that will hold files that are ftp's to that location. Is this possible using KM? If so, what are the basic steps for creating a file system repository and using it through KM? I have found stuff on help.sap.com but that only tells you what each component does not what actual steps need to be taken to setup KM, such as user rights , creating an entry point, so that all of KM is not visible, etc...
    If anyone knows of any guides that show a step by step process that would be great too.
    Thanks
    Paul

    Hi Paul
    First of all you need to create a new repository
    Suppose you want to add all the documents under folder Paul under C: Drive
    (Even you can put whole documents of C: drive into Paul)
    Navigate to System Admin -> System Configuration -> Knowledge management -> Content Management -> Repository Manager -> File System Repository
    There you can create a new directory by clicking on button New
    Give the parameters as follows :-
    Name               :           Anything you like
    Description       :           Anything you want
    Prefix (must start with /)  :  Probably same as your repository name like \Paul
    Lookup mode : caseless
    Root Directory   :  C:\Paul
    NOTE:  This is the trick. You need to give the proper path means folder path which you want use as repository)
    Repository Services  :  Any services you want
    Property Search : Managercom.sapportals.wcm.repository.manager.generic.search.SimplePropertySearchManager
    Security Manager         :           AclSecurityManager
    ACL Manager Cache   :           ca_cm_rep_acl
    The save it
    Now see whether the same repository is coming under KM Content or not, if not may be after restart it will come.
    I think the above information will help you. If still you have problem, please feel free to contect me.
    Regards,
    Chamkaur

  • What are the different steps to follow in order to develop an application and deploy it into a PAC

    Hi,
    I developped a program on my computer but in order to deploy it in a PAC , I don't know what are the different steps to follow?
    What are the difference between a stand alone application and communication with server mode.
    Can the file which will be downloaded into the PAC be in a form othre than (.exe). 
    what does the deployment licence consist of??? is it a software? 
    if the file is .exe then how to maintain it?
    Thank you for all,
    Regards

    Hi!
       Since I'm familiar with FieldPoint PACs, I'll refer to that (but maybe it is similar for cRIO...).
       An embedded application (standalone), runs entirely and independently on the PAC, while if you're not doing this, you'll have your computer, with LabView, which is controlling the PAC.  In this mode, application is dowloaded in PAC's RAM, so when you reboot controller, application will be lost.  If you build an embedded application, you can provide for application to boot authomatically at boot, each time the PAC reboots.  These are some basic stuffs on embedded applications with LV.
        To deploy an application to a PAC, you need LabVIEW + Real-Time module. Without it, you can't build an embedded application on PACs.
        usually, the file dowloaded is an .exe, and some libraries.  What would you like to have, exactly? For example, I think you can buy a simple .exe, which is universal, which loads VIs dinamically, so you can download directly VIs, but I've never tried this way....
       Deployment license, I think, refer to PCs, id est, when you use a PC or PXI as embedded target, in PACs, you have it bundled (it seems to me) whit the PAC you buy, so you don't have to buy an extra license for every PAC you ship with your application.  Otherwise, if you develop a Real-Time application for a PC, you will ship PC + OS licensed + Real-Time extension licensed, but this is not your case, since you'll use PACs.
       The maintain problem... I've already faced with! Simply, for my needs it was enough to make an application which loads configuration files, depending on different task the controller has to do. If you have to dowload a completely new version of VI.... it's better to deploy new application from LV.  But maybe you can bypass this problem with dinamic VIs loading...
        Let me know if this help.... Have a nice day!
    graziano

  • What is the next step after ABAP ? Need resources for SAP structure

    Hello,
    I have learned ABAP and now it is time to use it to write SAP programs. But what is the next step?
    From where can I get information about SAP tables to proceed?
    I have 2 ABAP books but they only provide the syntax for ABAP. After learning that, I am finding trouble in knowing on which objects/tables to apply it on.
    For example, I want to know that when I use the CV01n to create a file, what happens in terms of internal SAP tables?
    If I select multiple files in the search result "CV04N" which table should I access to get these selected files?
    Basically does anyone know where I can find such resources in order to understand how to proceed in developing SAP application ?
    Regards.

    Hi HASSAN,
        For Learning the Business part of  ABAP, (That is what is missing for you i.e the tables and their relations), i would suggest you to take one module at a time.
    Like MM(Material management) or SD(Sales and distribution) etc.
    Refer this link to know the business part of the SAP:
    MM:
    http://help.sap.com/saphelp_47x200/helpdata/en/96/df293581dc1f79e10000009b38f889/frameset.htm
    SD:
    http://help.sap.com/saphelp_47x200/helpdata/en/dd/55f33e545a11d1a7020000e829fd11/frameset.htm
    Regards,
    Ravi

  • What are the correct steps for installing Oracle Entitlement Server SSM?

    Can somebody explain what are the correct steps to install OES SSM 10.1.4.3? I have installed OES admin 10.1.4.3 and applied the CP2 patch. it is allowing me to open Entitlement Administration, where I can define the policy.
    Is it sufficient to have this Entitlement Admin to call the policy from BPM? Do I need a SSM ?
    When I try to configure Java SSM using ConfigTool.bat -process myssm_config.properties I am getting the following error
    Is Admin in the same BEA-HOME as SSM: [default: Yes]:
    Give the location of the Admin: c:\bea\ales32-admin
    Enter the identity directory name which will be used: [default: CoESSM_dir]:
    Enter the root node which will be used to create resources: [default: //app/policy/CoESSM_app]:
    Checking if default ARME port is free: 8000
    Generating policy files based on templates ...
    Checking if SSM instance already present
    Checking to see if SSM ARME port is free.
    Checking JDBC parameters...
    Checking to see if asipassword was run...
    2010-03-15 18:06:59,295 [Main Thread] ERROR com.bea.security.SsmConfigTool.AlesConfig - You need to run asipassword first
    2010-03-15 18:06:59,295 [Main Thread] ERROR com.bea.security.SsmConfigTool.ConfigurationTool - Error making changes: You need to run asipassword first
    I have tried running the asipassword utility, but still it gives the same error. Please let me know what am I doing wrong?

    Yes I have explored this pdf...but it doesn't tell how to use the policy from the BPM. My question is if I want to use the policies from BPM, then do I need to install the SSM ?
    If yes, what are the correct steps of installation ?
    I am getting the errors while configuring the Java SSM.
    Is Admin in the same BEA-HOME as SSM: [default: Yes]:
    Give the location of the Admin: c:\bea\ales32-admin
    Enter the identity directory name which will be used: [default: CoESSM_dir]:
    Enter the root node which will be used to create resources: [default: //app/policy/CoESSM_app]:
    Checking if default ARME port is free: 8000
    Generating policy files based on templates ...
    Checking if SSM instance already present
    Checking to see if SSM ARME port is free.
    Checking JDBC parameters...
    Checking to see if asipassword was run...
    2010-03-15 18:06:59,295 [Main Thread] ERROR com.bea.security.SsmConfigTool.AlesConfig - You need to run asipassword first
    2010-03-15 18:06:59,295 [Main Thread] ERROR com.bea.security.SsmConfigTool.ConfigurationTool - Error making changes: You need to run asipassword first
    I have tried running the asipassword utility, but still it gives the same error. Please let me know what am I doing wrong?

  • SXDB - record fields, --   what's the next step?

    Hi,
      I want to generate a input file template for batch input of BOM by t-code: SXDB by the following steps:
       T-code: SXDB --> input tansfer object: 30 ==> the follow the menu: goto: record fields --> input transaction code: CS01, then create a BOM... after that a BOM was created successfully, but I can't get a file format which met what I just recorded.
    So, my question is, what's the next step after performing "record fields" in SXDB, how to generate a default input file template by t-code: SXDB?
      Please kindly advise.
      Thanks and Best Regards.

    HI,
    Immediately after recording the BOM, you`ll be in the SHDB Screen. Now, you can save the recorded code to your report program, just download the same into a program.
    You can thus create a new program and the recorded code is reflected there, now customize as per your need and start uploading data from flat file.
    Reward if helpful, hoping that info. is helpful.
    Regards

  • What's the FPGA step size and how to calculate it?

    Hi there,
    I inherited an vi with problem in it. It's basically reading the binary file then display it. So the vi reads the binary file by using Read From Binary File, the output data from this function then sends to FPGA after multiply a number (32767/10). But unfortunately I got a wrong output. The final output value for some reasons looks got attenuated. People told me maybe it's related to the FPGA step size, so I want to know what is the FPGA step size and how to calculate it. Can someone answer my questions here?
    Thanks in advanced!!!

    Hi Weny,
    It sounds like you are trying to find out the output resolution of your FPGA module.  It would be helpful if you provided what FPGA module you are using in your tests so we know what information to provide.  For instance, the R Series Manual provides information on how to calculate the required DAC output code to generate the desired output voltage.  You should also try to keep the accuracy of your device in mind.  The analog output signal you are generating will be subject to gain, offset, and noise errors.  You can use the specifications sheet (such as the R Series Specifications) of your device to determine what accuracy your board will have.  The specs also provide information on the resolution of the board.  You can search ni.com for the manual and specifications for your particular device if you are not using R Series. 
    Regards,
    Browning G
    FlexRIO R&D

  • I need to upgrade from Mac OS x 10.6 8 what is the next step?

    I need to upgrade from Mac OS x 10.6 8 what is the next step?

    Upgrading to Lion
    If your computer does not meet the requirements to install Mavericks, it may still meet the requirements to install Lion.
    You can purchase Lion at the Online Apple Store. The cost is $19.99 (as it was before) plus tax.  It's a download. You will get an email containing a redemption code that you then use at the Mac App Store to download Lion. Save a copy of that installer to your Downloads folder because the installer deletes itself at the end of the installation.
         Lion System Requirements
           1. Mac computer with an Intel Core 2 Duo, Core i3, Core i5, Core i7,
               or Xeon processor
           2. 2GB of memory
           3. OS X v10.6.6 or later (v10.6.8 recommended)
           4. 7GB of available space
           5. Some features require an Apple ID; terms apply.
    Upgrading to Mountain Lion
    To upgrade to Mountain Lion you must have Snow Leopard 10.6.8 or Lion installed. Purchase a redemption code at the Online Apple Store: OS X Mountain Lion. Mountain Lion is $19.99 plus tax. Use the code to redeem a download of Mountain Lion from the App Store. The file is quite large, over 4 GBs, so allow some time to download. It would be preferable to use Ethernet because it is nearly four times faster than wireless.
         OS X Mountain Lion - System Requirements
           Macs that can be upgraded to OS X Mountain Lion
             1. iMac (Mid 2007 or newer) - Model Identifier 7,1 or later.
             2. MacBook (Late 2008 Aluminum, or Early 2009 or newer) - Model
                 Identifier 5,1 or later.
             3. MacBook Pro (Mid/Late 2007 or newer) - Model Identifier 3,1 or later.
             4. MacBook Air (Late 2008 or newer) - Model Identifier 2,1 or later.
             5. Mac mini (Early 2009 or newer) - Model Identifier 3,1 or later.
             6. Mac Pro (Early 2008 or newer) - Model Identifier 3,1 or later.
             7. Xserve (Early 2009) - Model Identifier 3,1 or later.
    To find the model identifier open System Profiler in the Utilities folder. It's displayed in the panel on the right.
         Are my applications compatible?
             See App Compatibility Table - RoaringApps.
    Upgrading to Yosemite
    You can upgrade to Yosemite from Lion or directly from Snow Leopard. Yosemite can be downloaded from the Mac App Store for FREE.
    Upgrading to Yosemite
    To upgrade to Yosemite you must have Snow Leopard 10.6.8 or Lion installed. Download Yosemite from the App Store. Sign in using your Apple ID. Yosemite is free. The file is quite large, over 5 GBs, so allow some time to download. It would be preferable to use Ethernet because it is nearly four times faster than wireless.
        OS X Mavericks/Yosemite- System Requirements
          Macs that can be upgraded to OS X Yosemite
             1. iMac (Mid 2007 or newer) - Model Identifier 7,1 or later
             2. MacBook (Late 2008 Aluminum, or Early 2009 or newer) - Model Identifier 5,1 or later
             3. MacBook Pro (Mid/Late 2007 or newer) - Model Identifier 3,1 or later
             4. MacBook Air (Late 2008 or newer) - Model Identifier 2,1 or later
             5. Mac mini (Early 2009 or newer) - Model Identifier 3,1 or later
             6. Mac Pro (Early 2008 or newer) - Model Identifier 3,1 or later
             7. Xserve (Early 2009) - Model Identifier 3,1 or later
    To find the model identifier open System Profiler in the Utilities folder. It's displayed in the panel on the right.
         Are my applications compatible?
             See App Compatibility Table - RoaringApps.

Maybe you are looking for

  • Wifi works at home but not when away from home

    My Wifi works at home but not when away from home, what is wrong?  I thought with a phone plan I didn't need to have a wifi connection.

  • How can ew add filter in Dataset of MDX Query

    Hi, I am working on TFS 2010 Report with Report Builder 3.0 I need to fetch data on basis of Start Task Date(means when user start their task). So i have added a new field in a TFS Work Item Template with name StartTaskDate. Now i need to fetch the r

  • My MacBook Pro froze and when I rebooted it the drive will not mount

    I don't know what to do. The start up organ sounds and the gray wheel spins forever.  So, I found an installation disk but it was for an older OS, snow leopard (currently using OS 7.8 I think).  Anyway, I put it in and booted with it and brought up t

  • Copy value from 1 parameter to another parameter

    i have 2 parameters on a selection screen, p_file and p_file2 im doing a VALUE-REQUEST FOR p_file, now I want p_file2 to get the same value on the slection screen but this value is not appearing on the selection screen need help on that see code belo

  • STZBC table need to be updated correctly for DST Brazil Change.

    Hi All,                       STZBC table need to be updated correctly for DST Brazil Change. I see two options to change it: 1) Create a new line for 2009 in STZBC -> Variable time zone rule in DT1 and create the transport 2) Apply SAP Note 198411 (