please explain me following procurements with detail steps.
1. "withdrawal from alternative plant"
2. Stock Transfer (proc. from alternative plant)

Hi
The explanation for
"withdrawal from alternative plant"
Implementation Options
You can specify for an assembly that the components required to build the assembly are to be withdrawn from a different plant from the planning plant (that is, the issuing plant). Dependent requirements for these components are directly created in the issuing plant. You can use withdrawal from alternative plant for both components produced in-house and procured externally. A special procurement key is defined for both procedures.
This procedure provides an alternative to using stock transport orders and is especially useful when plants are close together.
Prerequisites
In Customizing for MRP, in the IMG activity Define special procurement type, you have maintained a special procurement key for Withdrawal from alternative plant and you have entered the issuing plant there.
You have assigned the component, which is to be withdrawn from an alternative plant, to this special procurement key in the material master of the planning plant (MRP 2 view).
In the withdrawal plant, you have created a material master for the component to be withdrawn.
Process Flow
An assembly in plant 0001 contains two components. Component 2 in plant 0001 has the special procurement key Withdrawal from alternative plant with the issuing plant 0002. This defines that this component is to be withdrawn from plant 0002. Therefore, when producing the assembly in plant 0001, component 2 is withdrawn from the plant 0002 but the other components are withdrawn from plant 0001.
1.You carry out the planning run in the planning plant, that is, in plant 0001. During the planning run, the system creates a planned order for the assembly in plant 0001, if this is necessary.
2.The system creates a dependent requirement for component 2 in plant 0001. A dependent requirement is created in the issuing plant, that is, in plant 0002, for the component 2 with the special procurement Withdrawal from alternative plant.
3.When the planned order for the assembly is converted into a production order, the dependent requirements of the components are automatically converted into dependent reservations. The withdrawal for the production order is carried out in plant 0001 for the component 1 and in plant 0002 for component 2.
You can follow as  above for
withdrawal from alternative plant"
For the other thing Pl. let me know whether you require procurement from the other plant or simple stock transfer.
Regards
YMREDDY

Similar Messages

  • Set withdrawal from alternative plant without maintaining the issuing plant

    Dear Expert,
    Please help me..
    When I want to maintain special procurement type 70 (withdrawal from alternative plant) for plant 1500, 2500 (new plant), I set the withdr. altern plant  for BOM component produced in house but when I want to save , then system ask me to input the issuing plant. I know it because of dependencies.  but why in the past, when I maintained special procurement type 70 for plant 1000, 2000, and 3000 I can saved it without maintaining the issuing plant?
    Can you tell me which customizing/ configuration link to this dependencies (if we choose withdrawal from alternative plant we need to maintain the issuing plant too)?
    Can we save the special procurement type 70 without maintaining the issuing plant like we had done before for plant 1000, 2000, and 3000?
    Thanks,
    P.

    you cannot customize one by one, what you can do is copy plant (EC02)

  • Withdrawal from another plant

    Dear Experts,
    there is an SAP standard process in ECC defiend as withdrawal from another plant, when for example creating a planned order in ECC, the dependant demand of the component product is placed on the plant assigned e.g the alternative plant.   We are using SCM7.0 and SNP as part of our supply chain solution.  Can someone advise how and if it is possible to replicate the standard process of withdrawal from another plant in APO SNP?, what settings are essential etc?
    Basics of withdrawal from another plant are as follows:-
    - create a special procuremnt key and populate the  flag withdrawal from another plant, assign to the material master in ECC.
    Cheers
    Paul Martens

    Nandha,
    thank you for the OSS note reference.  Very useful.  One more question, from this note it suggests that the functionality of withdrawing from another plant is only designed to work with PPDS, is this correct?
    Cheers
    Paul

  • Withdrawal from alternative plant & SPK as the Sp. procurement type

    Hi there,
                 Can any one please enlighten me what is the diffrence between Withdrawal from alternative plant & SPK as the Sp. procurement type..... from perspective of all the modules in SAP........
    Regards
    Kaushik

    Hi Nanda Kumar ,
                               I got your point..........my query is that ........
    <u>case 1</u> : Suppose  we are maintaing in SPRO  for plant 1001
    SP type  7D & then Special procurement as Stock transfer & plant 1000.
    In this we can move the stock from the plant 1000 to destination plant 1001.... after defining the SPK - 7D in the material master .
    <u>Case 2 :</u>  We maintain the Special Procurement as 70 in the material master....... then in SPRO for the plant 1001 with SP type as 70....... & we maintain the withr.alterbative plant as 1000.
    So here also as per my understanding we can move the stock from the plant 1000 to 1001.......
    so what is the diffrrence.......please elucidate me.......
    Is it this way that if there are more than one plant from where we move the stock ..... then with SP type 70 we can have only one Issuing plant.... so in the situation where there is some another material for which  issuing plant is differrent then we have to take the help of SPK......
    Thanks & Regards
    Kaushik
    Message was edited by:
            Kaushik Choudhury
    Message was edited by:
            Kaushik Choudhury

  • Withdrawal from other plant- sales

    Hi dudes,
    suppose if i am using 70  special proc. key for semifinished materials and are planned in other plant gets consumed for FERT materials order in the main plant.
    suppose if i maintain the sales views for these semifinshed materilas in the main plant and can i do the PGI for sales order from other plant to main plant where the sales procesing is happening.
    thanks in advance
    Robert

    Special procurment key 70 is reservation from FERT plant to the supplyiong plant.
    Against this reservation you need to issue the material? Is it your scenario?
    As I know the material will be withdrawn duting backflush from the supplying plant directly
    If you want to sell the raw material from supplying plant to production plant, then you need to set up STO, in OMGN.
    Since usually we use it for inter company tranfer and billing, I am not sure whether you can do it for the plants with in the same company code.

  • Withdrawal from Alternative Plant

    Hi,
    I am trying to use special procurement type to withdraw components of finished goods produced in Plant A from Plant B. i.e. Plant B owns the components, Plant A acts as subcontrator but has full PP running.
    The problem is that Plant A and Plant B are in different company codes and different controlling areas and I am getting an error due to different controlling areas when I try to do this.
    Does anyone know how to get around this? Or of an alternative way to run this process?
    Many thanks.

    Hi
    As the both the plants are under different company code, you will have to use stock transfer order to transfer the components from plant B to plant A.They have to be recived (GRN) and accepted after which they will come into plant A stocks.
    Please take help of SD collegue to get this done
    regards
    Prakash

  • Transfer of sales orders from one plant to another

    Dear all,
    My requirement is as follows:
    I have created some 500 sales orders (open) in one sales org+plant.
    Now due to plant shifting to other area, I want to transfer all the above open sales orders to another sales org+plant.
    One option is to create them manually. But that is time consuming and prone to errors.
    Second option is to upload thru LSMW. That too is very tedious.
    Third option is to extend/assign new plant to the old sales area and change the plant in the orders. But I want in the new sales org + new plant.
    Is there any other option by which I can transfer the above sales orders from one plant to another?
    Regards
    SAPshed

    Hi SAPshed,
    The problem is not the change of plant, which is standard functionality, but the change of sales organization.
    An awful lot of information depends on the Sales Organization: Company code (!!), customers, materials, prices, profit center, etc.
    SAP does not even admit creating a sales order in a Sales Organization A with reference to a sales order with a sales organization B.
    IMHO your best option is to try to maintain the current Sales Orders with the current Sales Organization and change the Sales Order in VA02 (your third option).
    If you are absolutely sure that all materials and customers are created for the new Sales Area in the same way and that prices (discounts) are the same, you might want to do a direct update to VBAK table to change the Sales Organization (nasty!), but be prepared for the consequences (no SAP support in case of problems, you are on your own).
    Therefore if you insist on a different Sales Organization, then option 2) will be your best best.
    Best Regards,
    Franck
    P.S. IMHO it is Best Practice to have a unique Sales Organization / Company Code.

  • Stock transfer from excisable plant to nonexcisable

    Dear All,
    My scenario is i am selling (proforma invoice) material "Carton" from my XYZ plant(Excisable) to ABC plant(Non excisable)
    Also i am not paying for this and it will be against proforma invoice.
    Material value is 100 per unit with excise value 1021= 13 (which i have paid when procured the material)Total value = 113
    After stock transfer i want excise accounts of xyz plant should reversed (as i cant take benefit of this excise value which is 13 rupees) I want material master value of 100 rupees of my "Carton" material should get credited from my XYZ plant and material master of my ABC plant should get debited with 113 value (13 rupees of excise should go in material master value as this plant is non excisable)
    Please let me know how to configure the same / suggest the route to do the same
    Thanks,
    Naren

    Dear,
    But it is not getting loaded on material as you cant assign stock account again for another transaction key.(It is giving error that Already it is assigned for BSX)
    Entries happening are
    Stock account  - Credited from excisable plant's business area  - 100-
    Stock account  - Debited to non- excisable plant's business area - 100+
    Other losses material (key is AUM) - 10+
    Material overheads - 10-
    Please tell me the whole process
    Naren

  • How to transfer the requirement from one plant  to many plants(STO)

    hai gurus,
    My scenario is as follows:
    1) Plant "A" is Receiving plant.
    2) Plant "B" ,Plant "C", Plant "D" is three production plant.
    3) All the above 4 plant under same company code 1000.
    4) Now plant "A" gets the requirements and pass on to all the three production plants, which
    is based on forecast.
    5) How the requirement to be passed on from plant "A" to all the three production plants namely B/C/D
    under sap
    6) After production of fert under 3 production plants the final products is transferred to the plant "A"
    ware houses which is situated near by plants of B/C/D.
    7) Only one fert material( Fert 1) is common for all three plants produced based on the capacity at all three plants.
    8) Remaining fert material is plant specific, that is for Example Fert 2,3,4 produced only in plant" B"
    Fert 5,6,7 produced in plant "C" and Fert 8,9,10 produced only in plant "D".
    How to map into sap
    waiting for the positive reply
    Regards,
    sekar chand

    Hi again,
    For more details on stock transfer from alternative plant in MRP, see also the attached link:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d2d5a44af11d182b40000e829fbfe/content.htm
    Regarding FERT1, you can place sales order, but it will not trigger requirements in the manufacturing plant. Also, because all plants are in the same CC it is not a good idea.
    If you are willing to do some manual/external work in determining how much of FERT1 will each manufacturing plant produce, then you can just manually create STOs accordingly. These STOs will generate MRP requirements in the manufacturing plants.
    Regards,
    Mario

  • ITunes keeps takeing unauthorized withdraws from my bank account for no reason i have made no purchases so they have no reason to be takeing money out of my checking account.  can someone tell me how to get my 100$ back.cant fig out how to email them

    ITunes keeps takeing unauthorized withdraws from my bank account.  I have tried to figure out how to get my money back from the 4 unauthorized withdraws to my account. I cant figure out how to get there email address or how to initiate a live chat with them and there website has been no help to me.  Can someone please tell me how I can get my money back
         Thank you

    you need to call apple support. All contact methods are listed here. http://support.apple.com/kb/HE57 good luck
    I Hope I Was Able To Help You Or Solve Your Question.
    Simmm
    3/12/2012
    <Edited by Host>

  • Transfer posting from one plant to another plant

    Friends i want to transfer goods from one plant to another plant of same company code and iam trying this one in transaction migo if post for this it gives an error
          "posting only possible in periods 2006/05 and 2006/04 in company code" what error it is

    Hi,
    Use the MMPV to open the new posting period date.
    here you have to use your company code & Current date , then execute to open the new posting period.
    while running this transaction you ensure that GR open screen should be closed.
    hope it helps....
    manoj Singh

  • How to find out company code from a plant ?

    Hello friends,
    I have to modify a program that uses FM "BAPI_COMPANYCODE_GET_PERIOD".   For that, we have to export company code ID.  Currently it is hard coded with one company code.  Now we want to make this program usable by all company codes.  So instead of hard coding, I would like to dynamically find out company code based on the plant.   So I want to know - how to find out company code from a plant ?  Is there any table that has plant to company-code assignment data, or any other FM/BAPI to get this info ?
    Thanks,
    - Chetan

    hi
    u can find this from table T001K
    or just goto EC01
    here click on STRUCTURE>NAVIGATION
    double click on co code u will get the list
    u can slo try this in EC02
    regards
    kunal

  • STO from different plants to depot in a single excise invoice

    Hi all,
    We are in exports, and have EOU and NON EOU plants, Now the scenario is we transfer all the goods to depot from Mfg plants. from there we do the single shipment.
    we are implementing SAP. Transfering all the materials from Mfg plants to Depot through STO.
    Form there want to make single shipment, which we received from diffrent palnts, When we are trying to do J1IJ it is taking delivery ref, and with in the J1IJ taking the mother invoice reference. Is it possible to club the all materials from different palnts and make one depot excise inovice.
    2) When I created ARE-1 with ref depot excise invoice it is taking all the details of Mfg plant details but not the depot detail. is it correct,
    for more clarity the depot is issueing a CT2 to Mfg to transfer the material and against that Mfg plant is sending the goods by creating ARE-3, Depot will create ARE-1 while doing export to claim the rebate.
    Thanks in Advance.
    Regards,
    Raghava

    Hi Jeyakanthan,
    Thanks for the reply.
    I have gone thru the "Multiple Goods Receipts for a Single Excise Invoice " in Sap Help Documentation, what I have understood is that we can do multiple Goods Receipt against a Single Invoice. Here in this case we do the Goods Receipt against Purchase Order , do the Invoice Capture for first goods receipt againts Purchase Order and we enter the Invoice Number (say 745, sent by the Vendor) while capturing excise invoice. When the second shipment (against the same PO) comes, we do goods receipt and we refer the "Only Refer Excise Invoice" while doing the goods receipt. Finally after when we have entered all the shipments for the PO, we do the Excise Posting.
    Here in our case we have already posted the Goods Receipt (without entering the Invoice Number in first goods receipt) and now we want to capture & post excise invoice for a Single Excise Invoice (Invoice No. say 745,).
    Please correct me if my understanding is wrong.
    Here we have got two options:
    a. Reverse all the goods receipt & re-enter the goods receipt .
    b. post two separate excise invoice against each goods receipt mentioning dummy excise invoice number like 745-A & 745-B.
    Option a seems difficulty as we will have to reverse all the subsequent goods receipt & transfer posting documents.
    Option b seems legally wrong, as per understanding.
    Request you to please advise.
    Regards
    PK

  • Excise asset tranfer from one plant to another within the company code

    Hi All,
    Please provide me the procedure how to transfer an asset from one plant to another.
    The asset is an excisable pls provide the process for accounting in SAP for movement of FA on which we have taken excise duty and further we have to pay duty on removal of FA
    Edited by: siva prasd on Oct 19, 2011 7:11 AM

    Dear,
    Please check: Re: asset transfer within company code from one plant to another using STO
    Re: how to transfer  an asset from one plant to another plant within comp code
    http://sap.ittoolbox.com/groups/technical-functional/sap-acct/asset-transfer-237416
    Regards,
    Syed Hussain.

  • Purchase of Raw Mat by New Plant (CoCd New) from Old Plant (CoCd Old), STO?

    Dear all
    Our HQ which has an operating Plant A belonged to Company Code (CoCd) A,has acquired Plant B belonged to Company Code B.
    And due to the supply change management issue and strategic business location, HQ has decided to move both Plant A and Plant B into a new location (both Plant A and B are located quite far from each other) and these 2 plants are going to be consolidated into a new Plant C with new Company Code C. And CoCd A and B will then cease to operate.
    Now, due to the legal requirements, CoCd C will need to purchase all the raw materials from both CoCd A and CoCd B respectively at a different date due to the plant move.
    Previously, I have come out with the solutions
    1. Extend the material codes of Plant A & B to Plant C. Extend the SLOC as well.
    2. Plant C will create normal PO to buy from Plant A, with vendor = Plant A. Price will take from Supplying Plant A.
    3. Plant C will perform GR reference to this PO. Here the Stock Account of Plant C will be Debit.
    4. To reduce Stock Account of Plant A, perform GI to Scrap. Then FICO will do double entry to bring the value to Customer Account which is Plant C.
    5. Since we do not PGI or touch on SD, there is no billing doc and manual customer invoice has to be done.
    However, on 2nd thought, I think of to use Stock Transport Order. However, there are a few types of Stock Transport Order in SAP HELP:
    1. STO between Plants with 1 step
    2. STO between Plants with 2 steps
    3. STO with SD delivery
    4. STO without Delivery
    5. STO with SD delivery and billing.
    We are running against time and would prefer not to touch on anything in SD to do STO. And we do not need to monitor the Stock Transit as physical plant move will take place first, that make STO in PLant with 2 steps no applicable.
    Requirement:
    1. PO raised must take the standard price in Material Master of the supplying plant.
    2. It involves buying of stocks of 1 new plant C from the old plant A & B at the respective time. Accoutning document and relevant posting must be audited for legal purpose.
    3. If possible, we prefer not to touch on SD or the complicated solution to achieve this purpose.
    I have read a lot about the above 5 types of STO but I am unsure which one is best suit me. Please advise.
    Thanks.

    I just tested with Option 4: Create STO without SD Delivery.
    However, in the PO itself, it does not even have the INVOICE TAB at the item level. How am I going to perform Invoice Verfication to put the 17 % input tax which is very important?
    However, I have proceded with my testing for STO without Delivery
    1. Create PO with UB Doc Type and Item Category U, supply plant = Plant A. However, there is no Invoice Tab at the item.
    2. Perform GI reference PO, MVT 351. Here due to come missing config, I have done the following:
         a.Company Clearing Account
         b.Create customer master  CoCd CN10
         c.Create vendor master for CoCd CN50
         d.Account type D is not defined for document type WA. Go to OBA7 to tick Customer.
         e.Account type K is not defined for document type WA. Go to OBA7 to tick Vendor
        1 Material doc with 2 accounting doc generated, each for CoCd C and CoCd A
    4. Perform GR referenc ePO, MVT 101.
        1 Material doc generated with no accounting doc.
    5. MMBE Stock Overview, stock quantity of Plant A is now transferred to new plant C.
    There is no way I can do invoice as in MIRO, it said my PO contains no item.
    I desperately need my perform STO to have
    (a) Invoice Verification to capture input tax 17%
    (b) Delivery Cost maintained.
    I do not want to complicate the material master maintenance of the sales view of all my 16000 raw materials. That is why I prefer not to go for STO with SD DElivery.
    Can anyone please advise?
    Edited by: Daimos on Sep 4, 2009 12:49 PM

Maybe you are looking for

  • Execution time for the report.

    Dear All, How do i determine the execution time of the report? If i need to run some program then please do tell me how can i run the program too? Thanks..

  • RH AS3 Install of Oracle 9.2.0.4 is failing whilst linking ins_precomp.mk

    Install of Oracle 9.2.0.4 is failing whilst linking ins_precomp.mk - make.log is below. Please does anyone know how to solve this problem. Thanks in advance, Pentti Red Hat Enterprise Linux AS release 3 (Taroon Update 4) Kernel 2.4.21-27.0.2.ELsmp on

  • On gmail, I cannot open links

    When I try to open a link that is in my email (on gmail), it doesn't work and the message below appears : Grrr ! Il se peut qu'un bloqueur de fenêtres pop-up empêche l'application d'ouvrir la page. Si vous utilisez une telle fonction, essayez de la d

  • The detail algorithm of OLTP table compress and basic table compress?

    I'm doing a research on the detail algorithm of OLTP table compress and basic table compress, anyone who knows, please tell me. 3Q, and also the difference between them

  • PHP options in version provided by OS X Server 10.4.6/.7?

    My workplace is currently using Solaris 10/SPARC for webhosting, and our sysadmins were unable to get Apache 2.2.3/PHP5.1.4/MySQL5 to successfully compile and load. So they kept backing down to earlier versions of the above components until finally t