Work Order Cost Rolling Up to WBS Element!

Hi everyone,
I created a Project A with WBS structure in PS (not statistical WBS structure). And then I assigned a work order to one of the WBS element A.0001. I did not post any cost to the WBS element directly. I only charged $1000 to the work order. Now when I use CN41N to generate the cost report and I found the $1000 in work order rolled up to WBS element  A.0001 ($1000 showed at work order level and also WBS element level). Then I settled $1000 in the work order to a WBS element C.0001 in Project C. When I run CN41N again to see the cost in Project A, the $1000 still showed up at work order level, but it did not show up at WBS element level A.0001. I need the cost to roll up at WBS element level also, so this is a big problem for me.
I did several test. Assigned another work order to this WBS element A.0001 and charged another $1000 to the work order. Then I settled them to cost center directly instead of to WBS element. The $1000 showed up at the work order level and also at WBS element level (the cost rolled up from work order to the WBS element in that report). Then I tried to settle to GL account, the cost will roll up to WBS element too.
So I found only when I settle the cost to WBS element, the cost won't roll up. I think it might be a configuration problem. Does anyone know where I need to configure in order to let the cost roll up to the WBS element after I settle the Work order to a WBS elements?
Really appreciate your help!
Ting

Hi Martina,
This is awesome, very helpful! Now I know how to deal with it.
Thanks a lot!
Ting

Similar Messages

  • Cost Before settlement in WBS element

    Hi Experts ,
    In my scenario following costs are coming to WBS element,
    1. Cost from Network ... i.e. Networks are getting settled to WBS element
    2. Internal Order .....i.e. Internal orders are getting settled to WBS element
    3. Plant Manitance order...i.e. PM orders are getting settled to WBS element
    4. Cost from other WBS element..... i.e. cost from one WBS element get settled to other WBS element
    All the cost from WBS element get settled to AUC then from AUC to final asset.
    Before settlement of WBS element  I can see the cost in WBSE in trasnaction CJI3.
    After settlement if I see the cost of same WBSE in CJI3 , it shows 0 cost ,as all the cost has been settled to Asset.
    I wanted to know what was cost before my settlement in CJI3 transaction.
    Could you please let me know in CJ3 transaction on which fields I need to put the filter in above scenario ??
    Regards,
    Pradip Shelke

    Hi,
    YOu can also filter on the basis of document type.
    Please check the relevant document types like WE ( Goods reciept ) etc. Not only KOAO but other business transactions like KOAE also are settlement docs exclude them.
    BR

  • Work Order Costs

    Hi Experts!!
    We need a report on the work order costs, however, we have some non-valuated materials in the components list.  We are trying to pull the costs of the non-valuated materials from the Purchase Info Records and show that costs as part of the Warehouse Issues Actual cost.  I thought this would be a custom report - Please let me know if any standard report is available or any way of tweaking the standard report.
    Also I am able to see the Actual/Planned costs of the order on iw33 costs tab.  I am trying to find out if there is any standard FM that i could use to get the work order costs.  Also is there any infosets that i could use to pull the data for the jobs costs in my custom report.
    Regards,
    Yuvi.

    Hi,
      Have a look at transaction IW3M(Goods  movement for order),It might be easier to modify this to pick up the Last PO price (Or Info rec price) for the non valuated materials.
      Have a look at FM PM_WORKORDER_COSTS_LIST this will list out the costs at the value category level and also show the total costs, very similar to what IW33 shows.
      The costing information can be picked up from table PMCO.
    Regards
    Narasimhan

  • No costs visible for statistical WBS element

    Hi,
    The followin steps are the setup:
    - Project with a statistical WBS element and a network below
    - Create a PO with Account category "Fixed Asset"
    - Fill in a fixed asset, but also a (statistical) WBS element (put field 'project' optional in customizing)
    - execute a MIGO to book costs
    Now when I run the cost report for this project using transaction CJI3 then I do NOT get the costs visible on this statistical WBS element.
    HOWEVER when I do the same steps, but instead of putting a statistical WBS element I put the network (next to the fixed asset) then I do get the costs visible.
    Is this normal or do I have to change something in order to get the costs visible for my statistical WBS element?
    kindest regards
    bert

    Is this necessary?
    Because in the end I want to book these costs as actual costs on my fixed asset...

  • Settling the costs of a parent WBS elements

    Dear experts,
    i have a cost project consist of 3 levels work break down structure:
    level 1: a root WBS element
    level 2: splited into 2 WBS elements (Production - Maintenance)
    level 3: spliting each WBS element of the above level into 3 WBS elements (Service - Materials - Labour)
    actual postings ONLY is against level 3 WBS elements and the costs is acomulated to level 2 and then to level 1
    but my customer wants to settle ONLY level 2 WBS elements (Production - Maintenance).
    so...
    i maintained settlement rules only for level 2 WBS elements (Production - Maintenance)
    level 3 WBS elements  (Service - Materials - Labour) are assigned settlement profile
    90, which has the setting "Not for settlement".
    when i tried to run settlement for level 2 WBS elements (Production - Maintenance) i failed coz i got 3 "Nor relevant" and 1 "No change"
    so, my question is: is it possible to settle aparent WBS element in which there's no actual costs has incurred "has no actual costs of its own", however, it only has childs WBS elements that have actual costs

    If you read your post carefully you will understand what mistake you are doing. Read SAP Help and search forum regarding settlement you will find the answer for this
    so, my question is: is it possible to settle aparent WBS element in which there's no actual costs has incurred "has no actual costs of its own", however, it only has childs WBS elements that have actual costs
    Edited by: Mohamed Rafi on Jul 4, 2011 7:06 PM

  • Return Order Credit Memo updation in WBS element

    Hi,
    I have an issue on the automatic updation of return order for WBS element, once the sales order is been assigned to the wbs and billing is done payment also made by the customer and wen the customer sends the return order stating that in those goods he wont require some goods than in sales cycle credit memo is done for the payment return to customer but is there any place where the wbs gets updated for the revenues deduction of the payment given back to customer where its has to be deducted................how to do this
    Kindly help me doing this.
    Thanks and Regards
    Praveen B M

    Hello,
    Thanks for you reply and i just want to know that.
    If we assign the return order to the WBS element, the credit memo automatically has the WBS element assigned to it or do we have to manually assign the credit memo to a WBS element? if yes how?
    Thanks and Regards
    Praveen B M

  • Work Order & Cost Center Commitment Management

    We have a business requirement to be able to view our work order commitments (Reqs and POs) from the work order as well as from the cost center assigned to the work order via a settlement rule. Our business users do not like the work order collecting all of the costs instead of the cost center where they perform their cost controlling.
    The actuals will settle to the cost center eventually but without the commitments they have no way of planning for future costs. Commitments management is activated for both the cost centers and work orders involved. I am open to any suggestions on how to achive this requirement. Thanks!

    Any thoughts?

  • Work Order - Cost Settlement (Urgent)

    Hi All,
    I would like to know where i can check the costs, after doing MB31 or CO11. I suspect the way the work order flow has been setup in incorrect, as the work order is supposed to generate a purchase requisition, which is to be converted to a PO. But at the moment i just see a number in the requisition column of operations page of the work order. But no p-req's are seen in MD04 output.
    I checked in MB51, i find a 101 movement for the sub-assembly work order, but the cost column is 0. Await inputs.
    Vivek

    Dear Vivek
    1. Tick the sub-contracting box in Routing (to ensure the system generates sub-con purch reqn during MRP run & then i convert it to sub-con PO) ---> <b>This will not create Subcontracting PR during MRP run. This will create PR during Production order release or that particular operation is released.</b>
    2. In the above case, after the let us first operation if you are sending it to contractor then there will be any entry in Inventory management as it is not material subcontracting it is only SERVICE subcontracting i.e. this particular operation is subcontracted. This procedure is followed when contactor is working with in your company premises.
    3. The procedure you are talking about in you serial no 1 to 4 is the <b>material subcontract...</b>the procedure is as below
    Let us say you have a final product C.
    C needs B
    B need s A
    A needs raw material X and Y
    In the above case
    C and B is having routing
    In A material master MRP2 view....enter special procurement key as subcontacting(in STD sap the key is 30), procurement key = F
    A has a BOM having items X and Y.No routing for A
    When youn run MRP
    System will create Pl order for C and B, SUBCONTACTING PR to A and PR to x and Y
    After you procure X and Y, You can convert PR of A to PO.
    Then you will send the material i.e. issue the material to subcontractor through 541 and special stock O.
    This stock you case see in MMBE with special stock O.
    Once you receive the material A, when you do GR, the materials are issued to A and A will be inventarised with mov type 101.
    The cost of serve and the cost of raw material is booked to cost center entered in subcontracting PO.
    The cost of this will be settled to production order later.
    I hope it is clear.

  • Work Order Cost/Planned data by Activity Type

    Does anyone know the cube that would contain planned and actual cost for work orders using the work order activity type (AUFK-ILART)
    Will reward points as always.
    Richard

    Hi Ashish Jain,
    I have planned activity type/price with the transaction KP26, but the system doesn't return any value in planned costs of WBE.
    Why?
    Thanks
    Nicola

  • Goods Issue against Work Order assigned to WBS - Report

    We are doing Goods Issue against Work Order with movement 261, the data picked up from work order is not including
    the WBS element mentioned on the work order. Through this WBS element report is created through MB51, with total receipts, total issues, transfer postings etc made against WBS element, but without WBS element No. in material document,
    we cannot pull this report through MB51, as we see material document No.created against work order but not the WBS
    No. there, so this report cannot be pulled from MB51 through WBS element.
    Does anyone know of any other report that I can pull From WBS No. as all these material documents are hitting WBS with
    total receipts, total issues, transfer postings against the said WBS mentioned in the work order.
    Doing Good issue against WBS is no problem, as the material document saves the WBS No.

    >
    Justin zhang wrote:
    > 1. Try to see CN52N whether meet your business requirments
    >
    > 2. I use two steps approach investigating material documents for project WBS element:
    >
    >     a.  use IW39 list the work orders by selection criteria of WBS (this is PM order list).
    >     b.  use SAP std. ALV copy functions and past work order numbers into MB51selection criteria
    >
    >
    > I'm interested in std. t-codes if others can provide. Thanks.
    >
    > Edited by: Justin zhang on May 19, 2010 10:17 AM
    Thanks Justin, your IW39 solution worked, as it has posting date selection defined there
    which I cant find in CN52N. My solution was take details from MB51, then pull report IW39 within
    posting dates and then export the WBS elements against work order to excel and then copy
    the WBS elements in the MB51 report created.

  • Sales Order Costing (Project Scenerio)

    Dear All,
    I am doing (MTO) sales order costing (Account Assignment is WBS element).
    Material  Code XYZ contains raw material X,Y,Z.
    XYZ=XYZ and price in Material master price control (V) - 50,100,150 price for X,Y,Z.
    So when I does Sales order Costing XYZ=50100150
                                                         XYZ=300
    Requirement comes from Sales order and when GR will done system will have new price for mareial
    X=100,Y=200,Z=300. So when production order confirm the actual cost of the material =100200300
                                                                                    =  600
    But,system is giving      XYZ=50100150
                                       XYZ=300.
    Please guide me how to  get actual cost 600 instead of 300.
    Regards
    Sainath

    Hi
    GR for the order will be done at the old std price of XYZ.
    But when you do sale order costing, actual latest price of X, Y , & Z will be costed. That will be used to arrige the COGS entry.
    But for GR against the process order old ZYZ value will be used.  Difference 600-350 will go as Price difference.
    New sale order costing value 650, if you maing Ek01 or EK02 this will be considered for COGS entry.

  • Work Order to cost center settlement with line item detail

    Iu2019m having difficulty finding a method to settle from a work order to a cost center with line item detail.  When an order is settled with KO88 or KO8G the total value for that work order/cost element combination is combined and posted to the cost center as a lump sum with the description of CTR\######.  Users would like to see the individual values that posted to the work order in a cost center report such as  KSB1.
    I donu2019t see anything in the settlement rule, settlement profile or allocation structure that will allow line item settlement from work order to cost center.     Is line item settlement possible when settling to a cost center?   Is there an alternate way to see these expenses as line items in KSB1?
    Thanks,
    Jeff

    Thanks Christian,
    We've defined an allocation structure that we use for Project System and Work Order settlement and have Receiver Categories established as FXA, CTR and WBS with "by Cost Element"  checked.  Work order costs do settle to the cost center entered in the settlement rule, the problem is it combines all items values as a single amount when posting to the cost center.
    For example:  
    expenses post to the work order under cost element 500000 for $500, $200, $300 and cost element 600000 for $250 and $250.  The settlement rule says to settle to cost center 170000.  When the settlement takes place cost center 170000 is debited $1000 to cost element 500000 and $500 to cost element 600000.  We would prefer to see individual posting of $500, $200, $300 to 500000  and $250, $250 to 600000.
    Thanks,
    Jeff

  • Using FIDCCP01 to post costs to a WBS Element

    Hi,
    We're trying to post costs into SAP through idoc FIDCCP01, and it works fine when posting to cost centres or internal orders. When using a WBS Element (in the field PROJK) we get error status 51 with the message "Account (any gl code) requires an assignment to a CO object".
    We've checked that the WBS Elements being used are released and have settlement rules, and we've tried using both internal WBS codes (field PSPNR in table PRPS) and internal Project codes (PSPHI in PSPR) in the field PROJK in the idoc - external WBS codes are too long for the 8 characters.
    It may be possible that we're using the wrong reference from within SAP, or the wrong field in the idoc or that there's something else wrong with the set-up of our WBS Elements, but we can't work it out.
    Can anyone please help?
    Thanks.

    For info, answer from SAP below:
    SAP says Basic type FIDCC01 used for ALE IDOC data transfer (From one SAP system to other SAP system) and WBS element number (number associated with WBS code) could be different in two different system and hense in this interface logic it is clearing the value filled in the field PAOBJNR and PROJK. Hense in further processing accout assignement found missing.
    For more details check OSS notes 674027, 114814 and 197951.

  • Internal orders to WBS Element

    Hi,
    I,m working in a Project System implementation project, where all other modules are already in use.As per the existing process, Internal orders are created for asset accounting.Those are of statistical. All the purchase orders & costs are booked referring to the internal orders, the same cost is directly settled to Asset Under Construction or Asset.As the internal orders are created as statistical, there is no seperate settlement process & all the costs are directly settled either in AUC or in Asset as & when they are incurred(posted).
    Now as we are implementing Project Systems, Internal orders are going to be replaced by WBS Elements. Customer requirement is the same process of online settlement of costs to Assets from WBS Element & he doen't want to settle seperately.
    Now the issue is, 1) how the process can be mapped in SAP?
    I feel creating the WBS elements as statistical, the same process can be mapped. Is it possible/
    2) As one project is already in progress & some postings have been taken place against internal orders, customer wants to see all those postings on new WBS element, now how to migrate the same to respective WBS element in the new system?
    Thanks
    Kishore

    Hi Kishore Ji,
    For your question, simple answer is, you want to continue all AUC under Project Systems.  So far, you have considered statistical internal orders, anyway, which is not possible for you to settle directly.  So, please take that amount generate uploading document by using same account and using WBS element as debit and internal order as credit and status you release for internal orders.
    WBS elements you create as statistical without selecting account assignment category.
    Your problem will be solved.
    Assign points without fail.
    ALL THE BEST.

  • Sales order assignment to WBS element

    Can somebody tell me Where a Sales order is assigned to a WBS element?
    I am aware that it is assigned to WBS element Field in Item details>>Account assignment Tab. But in this tab page on Sales Order screen, I am not able to see WBS Element field. I am able to see the WBS element field for FERT items but not for DIEN.
    Can somebody tell me where exactly is this done so that I get the WBS element field populated in SO?
    Rgds

    Hi
    Hope the following will fulfill u r requirement
    1) What is WBS element?
    2) What is the Tcode to get to that screen?
    3) What is the need and pupose of WBS element?
    4) Do we happen to work on Functional module during our implementaion project? 5) In what scenario/situation we will be working on WBS?
    WBS is nothing but Work Breakdown Structure. It is mainly used in Project System (PS) module. Tcode : CJ20N
    For any project defined we must have atleast one WBS. Within this WBS we can have networks. Networks are nothing but the series of activities. Material are used to perform the activities.
    To explain in detail just consider one example:
    Govt of india wants to have Roads to be build through out the india. So Project can be defined in sap as “Connectivity”.
    WBS can be roads within different states like Roads for Gujarat, Karnataka etc.. i.e. WBS Gujarat, WBS Karnataka etc.
    We can define different networks for these WBS like Road Between Ahmedabad to Surat or Between Bangalore to Belgham.
    For this network we can have many activities like Land selection, Land Preparation, Road Building, Final finishing etc etc.
    Hemal’s example was a good example. Project Systems comes into play only when the industry’s business is based on projects like… Construction companies, Engineer to Order scenarios. You may not see anyone using PS module for retail business. As Hemal explained in that example, you have a main project which is broken down into WBS elements. You can use the TC CJ20N to create the project and the WBS elements. Each WBS may have mutiple Networks associated and each Network may have multiple Network Activities as explained in the example by Hemal.
    On the Sales Order, if your client is implementing PS module, you may have to attach the Sales Order to the WBS element it belongs to. WBS element is nothing but a bucket where all the activities belonging to that particular part of the project are captured. In the example, WBS Gujurat will tell you how many Sales Orders were created for the Gujurat sector, howmuch was spent on raw materials, what’s the currect stock ([roject stock) available. How many Production Orders have been confirmed and howmany of them are getting confrmed in the future. How many invoices have been generated or how much revenue has been generated for that particular sector. How many deliveries have been made, what deliverables are still not accomplished.
    So as you can see, PS is the center stage for all the modules that are being implemented like FI/CO, SD, MM, PP in this example. You can have cost centers and work centers defined. You can also have profit centers assigned at the plant level and get reports on varius selection criteria.
    In a complete cycle of PS, like in reality, you initiate a project, you confirm/release the WBS/activities as per requirement, you execute the project and you close it.
    One cannot initiate an activity unless it has been released by the project manager. Everything is accountable here and every dime is counted and at the end you know howmuch did you spend or make on each sector (WBS). Dont get confused with the term sector here… I am using it just for the explaination purposes.
    In one typical example, the company I was working with until not too long ago, had Deliveries from the Project (TC: CNS0). We never used VL01N. We used CNS0 to create a delivery and then used VL02N for confirming the picking quantity for the already created delivery document.
    I hope this should help you at least a bit. I’m not a PS consultant so I may not know a whole lot but trying going to CJ20N and you will see a lot yourself.
    PS concultants are one of the highest paid consultants. Their supply is less and so is the demand. They are expected to understand real world business processes very well and they are generally the center stage of a project.

Maybe you are looking for

  • Can I use 2 graphic card for optimisation in adobe?

    Hi, I am using Adobe CS6, Premiere pro, After effect, Photoshop, InDesign. Current set up is Dell XPS 8700, GTX 650 Ti, 128gb Plex SSD, 2TB 72krpm HDD, 16DDR3 non-ECC ram. I am looking to build a LGA 1366 dual xeon processor workstation. Plextor M5 P

  • HT2534 I cant find the none payment option

    I tried reading other articles but the none payment option doesnt show up. I have tried creating a new account and everything. This is super frustrating.

  • Dir listing with umlauts / special characters

    I've got a directory tree, where several files have umlauts or french accented characters in their names. When I do 'ls' in such a directory, I can see the umlauts fine in Terminal, e.g.: Die rote Wüste - Michelangelo Antonioni.avi Nazarin - Luis Buñ

  • FCX 1.5 MX and Flash 8

    Hello, I was searching about this, but until now I found no sufficient or clear answer..... Which communication component set ( and where can you download them ) can be used to develop for FCS 1.5 in Flash 8 Pro ? I'd like to use the AVPresence, Chat

  • Query Taking a long time

    Hi All,   Working in EBS Version 11.5.10.2 The below query takes a long time, Please i need some help in this issue select ood.organization_name                 ,to_char(cd.transaction_date,'RRRR/MM/DD HH24:MI:SS') trx_date                 ,gcc.segme