Wrong commitments value for a wbs element

H Experts
I have a WBS element and entered a PO commitment with subsequent partial GR and IRs.
But my cooitment report does not get reduced with subsequent IRs and it got updated with first IR only.
Please suggest what would be the reason for wrong commitment report.
Thanks
ramSiva

run the programs RAKNBU01and  there is a note  for incorrect committments........... 1491430     Incorrect Commitments for Service Items and
1492317     Incorrect commitments after posting service entry sheet
Edited by: reena ghadge on Nov 25, 2011 12:54 PM

Similar Messages

  • Vendor wise/Invoice wise consumption for each WBS element

    Any standard report from SAP, which provide details of Vendor Purchase order / Contract, details of SES with WBS no. and details of Vendor invoice in columnar form.
    SAP system can not generate standard reports giving vendor wise/Invoice wise consumption for each WBS element of particular asset.
    Please help me to get this report.
    Thanks in Advance.

    Hi
    Your starting point should be CJI3 report or any PS report... Here you get the FI Doc no
    If this FI Doc No is generated from MM, check the Header segment of the document.. It would have MM Doc NO + Fisc Yr populated in the ref key... This gives you the link between FI & MM
    From here on, you can take it forward... You can look up this doc no in MSEG Table and find the PO no... Then go to EKBE table for other PO details....
    br, Ajay M

  • Reversing TECO status for Multiple WBS elements

    Hi,
    Question on setting and then reversing TECO status for a WBS element.
    When a project is closed technically in project builder, all underlaying items (wbs, network/activity) are technically closed as well.
    When you try to undo this, only the status of the top element is changed, not the underlaying items.
    Is there any way in which we get the underlaying items changed as well (mass change is not an option)
    Regards,
    Jatinder Bansal

    You can try two methods :-
    1.  Open project in project builder, Select project definition and then go to WBS Overview under project definition, now select all WBS Element and then undo TECO status. Now all the WBS status will be updated. But, this will not have any effect on network and its activities.
    2. Open the project in planning board, now select all the objects, now undo the TECO status. This will change the status of all selected objects like WBS,Network and activites....

  • Tables for Budget allocated and spent for a WBS element

    Dear experts,
    I am new to PS domain, kindly tell me the table names where I can find the Budget allocated to a WBS element and Open budget for a WBS element.
    Thanks & Regards,
    Murthy.

    Hi,
    I think by conversion cost you mean Production cost of the turbine.
    Since you do both the actvities Material procurement and production under the same WBS. The budget cannot be tracked separelty.
    Have 2 different WBS strucute one for procurement and one for production. However you can add the existing Nwk activities to these WBS.
    Regards,
    Ramesh-

  • FM for standard WBS element change - CJ92

    Hi all,
    Is there any function module to make changes in standars WBS element/proj.def tocde- CJ92.
    If any knows, please provide me the same.
    Thanks much!
    Chandra.
    Edited by: Sekhar on Apr 7, 2010 1:10 PM

    Thanks... Is this work for standard WBS elements ?

  • How to carry forward budget next year for single wbs element

    Hi,
    i want to carry forward budget next year for single wbs element.
    pl suggest me.
    Thanks & Regards
    Purna.M

    Hi,
    Go to CJCO click on Dynamic Selection and in master data of WBS element select No of person responsible and give the person responsible and execute.before that maintain no of person responsible in that specific WBS element.
    hope it will solve ur problem.
    Regards
    Avinash

  • Header WBS for two WBS elements

    Dear All,
    Is it is possible to create a Header WBS for two WBS elements which were
    triggered by Two different line items in a sales document.Please detail the process
    if a possibilty for the same exists.
    Award points are assured for valuable replies.
    thanking you
    Best regards,
    R.Srinivasan

    Dear Sunil,
    I am using the Standard project with same structures only.I am not able to get the header WBS for Two WBS elements triggered from the same sales order.what are other possibilities for this problem.
    Can you please elobrate your reply
    Thankingyou,
    Best regards,
    R.Srinivasan

  • How do we get complete hierarchy for a WBS element??

    Hi All,
    Is there any FM to get complete hierarchy for a WBS element??
    Or any other method that would achieve this requirement ??
    Eg:
    C.00103.1
    C.00103.1.1
    C.00103.1.2.3
    C.00103.2
    C.00103.2.1 etc
    If i give C.00103.1, all the WBS elements in the hierarchy should be displayed.
    Any pointers are of  great help.
    Regards
    Prathima

    Hi,
    Available Methods
    Getinfo : Read detailed information about WBS [ BAPI_PROJECT_GETINFO ]
    Maintain : BAPI: Project maintenance [ BAPI_PROJECT_MAINTAIN ]
    SaveReplica : Replicate work breakdown structure (ALE) [ BAPI_PROJECT_SAVEREPLICA ]
    The WBS hierarchy object type defines the hierarchy of the WBSelements. A project definition always has exactly one hierarchy. If theposition of a WBS element changes, the whole hierarchy has to berebuilt. Therefore, the WBS hierarchy object type has only one command:
    Create. Every WBS element receives exactly one entry in the table parameter IWbsHierarchieTable with which it defines its position.
    Command: Create
    Use this command to create or change a WBS element hierarchy for aproject definition. Enter the WBS hierarchy object type and the Create
    command in the table of the IMethodProject parameter. The commandrefers to all entries in the table of the IWbsHierarchieTable parameterthat contains the data for the data for the hierarchy. Each entry inthe IWbsHierarchieTable refers to a WBS element that describes its position relative to the other WBS elements.
    Example
    - Positioning WBS elements TRAINING , TRAINING.1 and TRAINING.2 . (WBS elements TRAINING.1 and TRAINING.2 are subordinate toWBS element TRAINING. WBS element TRAINING1 is positioned on the left of TRAINING.2.)
    IMethodProject
    OBJECTTYPE = WBS-Hierarchy
    METHOD = Create
    OBJECTKEY =
    REFNUMBER =
    OBJECTTYPE =
    METHOD = Save
    OBJECTKEY =
    REFNUMBER = I
    ProjectDefinition
    PROJECT_DEFINITION = PD-TRAINING
    IWbsHierarchieTable
    WBS_ELEMENT = TRAINING
    PROJECT_DEFINITION = PD-TRAINING
    UP =
    DOWN = TRAINING.1
    LEFT =
    RIGHT =
    WBS_ELEMENT = TRAINING.1
    PROJECT_DEFINITION = PD-TRAINING
    UP = TRAINING
    DOWN =
    LEFT =
    RIGHT = TRAINING.2
    WBS_ELEMENT = TRAINING.2
    PROJECT_DEFINITION = PD-TRAINING
    UP = TRAINING
    DOWN =
    LEFT = TRAINING.1
    RIGHT =
    Notes
    Further Information
    For more information, see the R/3 Library under PS Project System -> Structures -> EPS Interface
    Regards,
    Vijetha.

  • How to find Annual Budget for a WBS element ?

    Hi All ,
    Is there any way by which i can find the annual budget for a WBS element ?
    I have been working on this for a long time , but couldnt get the answer .
    So getting back to this place .
    Thanks in advance .
    Regards,
    Ambar .

    Hi,
    This link may help you.
    how to get the budget amt and commited amt and available amt?
    Regards,
    Shamma

  • 2 boms for same wbs element

    hi all
    is it possile to create 2 separate bom of same material for one wbs element ?
    e.g.
    i have material " M " and wbs element is " W "
    so now i want to create 2 boms for this wbs .

    Hi,
    You can't create more than one WBSE BOM for a Unique conmination of WBS Element/Material/Plant/Usage.
    Hope this clears you.
    Regards,
    Hari.

  • Settlement to cost center posted for statistical WBS element

    We have the following scenario
    Statistical WBS elements with assigned Cost center posted for actual postings
    Network assigned to statistical WBSE and settlement rule on the same WBSE
    On settlement run CJ88  the network costs are transferred from network to Cost Center posted in the WBSE.
    Issue:
    While analysing the active availability control the assigned value is doubled. This happens only of the networks are settled. System considers the Actual values from network + Statistical value from WBSE to caculate the assigned values.
    Simulation details as under.
    SP-SET-02-3  (wbs element)
        COSS 2011 11 0007101000     0001240704 KOAO D INR                 100.00  INR
        NWA 500000002408 0010
            COSS 2011 04 0007101000     0001240704 KOAO O INR                 100.00- INR   S  -- does not contribute to assigned value
            COSP 2011 04 0007101000     0001240704 COIN D INR                 100.00  INR
            COSP 2011 01 0007101000     0001240704 KPPP D INR                 100.00  INR   M   -- does not contribute to assigned value
    Hence the assigned value gets doubled and eating up the budget.
    Anyone encountered similar issues pls share the possible solutions.

    Hi Mohit
    It is against SCN's rules to post the same discussion thread twice. You have already posted a similar question in the below thread. Please refrain from doing this and close one of the threads.
    Initial balance upload of revenue GL accounts with wbs
    Regards
    Sowmya

  • Type defined array of clusters for holding configuration data - setting default values for each array element

    Hi,
    I was wondering if I could get some information and opinions about using a type defined array of clusters to hold configuration data.  I am creating a program to test multiple DUTs and wanted to have a type defined control for each DUT containing the information needed to create the DAQmx tasks for all of the signals for that DUT.  I am wanting to do this so that the data is hard-coded and not in a file that the user could mess up.
    The type def controls are then put in a subVI that chooses the appropriate one based on the DUT Type enumeration wired to a case structure.  
    I am having problems with the type defined control.  I am seeing issues when attempting to save a unique configuration to each array element in the array of clusters.  Somehow it worked to begin with, but now clicking "Data Operations --> Make Current value default" on individual elements of the cluster or the entire cluster (array element) is not saving the data when I re-open the type def control.  What am I doing wrong?  Am I trying to do something with arrays of clusters that I should not be doing?
    I have attached one of the type defined controls for reference.  I tried changing it to Strict to see if that helped, but no luck.
    To reproduce, change the resource string for array element 0 and make the new value the default value.  Then close the type def, and re-open it.  The old value is still present in that element.  The VI is saved in LabVIEW 2012.
    Solved!
    Go to Solution.
    Attachments:
    CM_AnalogInputs.ctl ‏11 KB

    Values of a typedef are not proprigated to instances of the control. THey will pick it up if created AFTER the data values have been changed. THey will not get updated with future changes. You should either create a VI specifically for hardcoding your values or implement a file based initialization. The file based would be much better and more flexible. If you don't want users to modify the data simply encrypt it. There is a noce blowfish library you can download.
    Mark Yedinak
    "Does anyone know where the love of God goes when the waves turn the minutes to hours?"
    Wreck of the Edmund Fitzgerald - Gordon Lightfoot

  • Is it possible to add more input values for a payroll element?

    Hi All
    I have created an element with 1 default input value 'pay value' and another input value '1xx1'. I have linked this to payroll and attached to many employees. Now due to business requirment, I need to add one more input value '2yy2' and also I need to change the formula. Eventhough its a minor change in formula, without a new input value it will not work. I tried to add a new one by datetracking to the element creation date without sucess.
    Is it possible to add input values after saving an element?
    Regards
    Rahman

    You can Change the Required Input Value to Not-required
    Alter the Sequence of the Input Value to be displayed in the Element Entry Screen
    You can Change the Input Value Validation Rule minimum, Maximum, Lookup and Formula
    Change your specification of which input values create Database Items. Note, however, you cannot remove Database Items if they are used in any formulas or QuickPaint reports.
    You cannot remove existing input values or add new one if you have created any entries for the element
    For more details you can refer http://ramesh-oraclehrms.blogspot.com/2007/08/maintaining-element.html

  • No costs visible for statistical WBS element

    Hi,
    The followin steps are the setup:
    - Project with a statistical WBS element and a network below
    - Create a PO with Account category "Fixed Asset"
    - Fill in a fixed asset, but also a (statistical) WBS element (put field 'project' optional in customizing)
    - execute a MIGO to book costs
    Now when I run the cost report for this project using transaction CJI3 then I do NOT get the costs visible on this statistical WBS element.
    HOWEVER when I do the same steps, but instead of putting a statistical WBS element I put the network (next to the fixed asset) then I do get the costs visible.
    Is this normal or do I have to change something in order to get the costs visible for my statistical WBS element?
    kindest regards
    bert

    Is this necessary?
    Because in the end I want to book these costs as actual costs on my fixed asset...

  • Auto Run Program not updating Settlement Rules for few WBS elements

    Hi,
    Addition of settlement rules for OPEX WBS.
    In producion system, two jobs are running daily for generating settlement rules of WBS elements but, all WBS elements are not updating with Settlement rules.
    It is becoming a problem in the Period end while doing the settlement. Currently we are updating the settlement rule manually.
    We have investigated and found the following WBS element with Profile name  are not updating Settlement rule.
    H-U0DU0204DE-EX-J0  - HHDC01
    H-N0U00ULD01-P1-D1-W2 - 000090
    H-U0DU0204DE-EX-U0-T1-OB - HHDC01
    H-U0DU0204DE-EX-U1-W1-ON - HHDC01
    H-U0DU0204DE-EX-U2-W1-ON - HHDC01
    H-U0DU0204DE-EX-I0-E1 - HHDC01
    H-U0DU0204DE-EX-I0-B1 -HHDC01
    H-U1DU0204DE-EX-U0-W1-ON - HHDC01
    Job Names :
    ZFPD_UK_SETTLEMENT_RULE_GEN
    ZFPD_NO_SETTLEMENT_RULE_GEN
    Please suggest on this issue
    Regards

    Hi,
    I suppose these are background jobs. Usually there is an issue with background jobs that are run for a custom developed program. Not sure why that happens. Even i faced this issue with a couple of jobs in my system. I have still not found out the reason as to why this happens. There might be a possibility that these projects were being processed in the foreground by some user and hence they were omitted from the run.
    I would suggest you to consult your technical guys on this.
    Regards,
    Gokul

Maybe you are looking for

  • Web Service error after upgrade to ECC 6

    Hi, We've create web services which are running well on ECC 5. These services will be used as an interface to other system and will return an XML result to the caller But when we upgrade the server to ECC 6, we can't connect to the webservice The err

  • Getting Error while installing UCM

    Hi All, Am getting error while installing the UCM in my system. Error description:- NOTICE:     Install logging initialized at 2/5/10 3:34 PM. NOTICE:     Installing master server. NOTICE:     Installing with Java version 1.5.0_11. NOTICE:     Instal

  • RMAN date format

    Hi list backup of archivelog from time ="to_date('23042011 23:00','ddmmyyyy hh24:mi')" until time="to_date('23042011 24:00','ddmmyyyy hh24:mi')";rman reports using target database control file instead of recovery catalog RMAN-00571: =================

  • 10.3.9 - 10.4.6 upgrade - now no users!!!!!!!!!! can't login

    I've been running 10.3.9 for a long time with no problems. A recent app needed 10.4. So I puchased 10.4.6 from my local apple dealer. Inserted the disc. Clicked upgrade. Restart - can't login using my root login and password Select change password fr

  • Photoshop launching issues

    I just downloaded a rial of Photoshop (for Windows), when launching the program it appears to load up fine, then before I can use it I get a message "A problem caused the program to stop working correctly". I downloaded Illustrator to test if I would