Wrong Price in Shopping Cart after PR Changed in ECC

Hi All,
I'm using SRM extended classic scenario, and i have the following scenario:
1. Create PR in ECC using material assigned to contract (contract exist both in SRM and ECC) with quantity 8 PC. This PR document type didn't use release strategy.
2. Transfer PR ECC to SRM using BBP_EXTREQ_TRANSFER
3. SC created in SRM with quantity 8 PC and already assigned to the same contract
4. Run report BBP_SC_TRANSFER_GROUPED to create PO with contract (test mode)
5. No error message when simulate create PO
6. Change PR quantity to 4 PC in ECC
7. Run BBP_EXTREQ_TRANSFER in ECC
8. Shopping cart quantity updated to 4 PC in SRM, but ITEM PRICE BECAME ZERO
9. Run report BBP_SC_TRANSFER_GROUPED to create PO with contract (test mode)
10. Got error message 'Enter the price or deselect the 'Invoice Expected' indicator
When I change PR in ECC, I only change the quantity, not the valuation price. Why the price is changed to zero in shopping cart?
Does anyone here ever face the same problem?

problem solved. I've raised oss message and got note 1451988

Similar Messages

  • Price in Shopping Cart

    We are implementing classic scenario in SRM 7.0.  In our implementation we are not creating PRs from shopping but only POs will be created in ECC.
    Even though Info Recrods are available and is shown in source tab on shopping cart, the price in the info record is not defaulted in the shopping cart.   Any suggestions on how to bring Info records price into the shopping cart?

    >
    Sanjeev wrote:
    > Thanks Muthu.
    >
    > I can Material price in shopping cart.  The info record is assigned automotically to the source list.  Currently the system is behaving the way it is supposed to.  It creates PO in the backend as per the info record irrespective of shopping cart price - perfect.
    >
    > I am exploring the SAP notes 419528 and 411992, to get the info record price in the shopping cart price.
    >
    > Two issues:  If I get the info record price and change the price in the shopping cart, is it possible to create backend PO based on shopping cart price?  Example:  Shopping Cart price defaulted from info record - $100, changed to $110.  The PO should be created for $110. - when you refer a fixed vendor inforecord , contract this price takes precedence rather than your manual price in the shopping cart...
    >
    > Second issue:  An old shopping cart exists for material 'A'.  I am creating a new shopping cart by copying  the old shopping cart.  I change the material to 'B', but shopping cart price won't change even after check still shows price of material 'A'.  Any solution? - old template always has issues due to poor copy functionality
    >
    > Thanks
    > Sanjeev

  • Rejected Shopping Cart cannot be changed

    Hi Gurus,
    I am facing an issue with rejected shopping cart. Rejected shopping cart cannot be changed. Change button is visible but after clicking, it shows all the fields in display mode. Do you know if there is any OSS note for this issue for the support pack- SAPKIBKT14 ( SRM 5.0)?
    Thanks for help
    Regards
    Kapil

    Is the entire cart rejected or just one item?-> Entire cart rejected
    Is there a workitem in the inbox of the requester to accept the changes? -> There is no work item in the inbox of requestor to accept changes. There is no Accept changes button either in the check status transaction
    Are you trying to change the cart via inbox or check status?-> Via Check status
    Do you have the status 'in your inbox' for the cart?-> No status in the Approval inbox. But under Messages it shows- Mail: Shopping cart 1000001582 was Rejected
    If not, then please check the workflow log for any red lights. (SWI6)-> No red lights in SWI6. Everything is green
    This is what it shows-> (Sub)workflow created->No errors
    SWD_API_ADHOC_EXTENSION_STORE-> No errors
    Work Item Submitted for Execution->No errors
    Work Item Submitted for Execution->No errors
    Regards
    Kapil

  • Impact on shopping cart due to change in backend system

    Hi All,
    Our client is changing the backend ECC5 system to ECC6 on new server (new logical sys) with FI restructring in ECC6.
    We have SRM4.0 system ( with CCM on same client) with Extended classic scenario.
    What will be impact on Shopping carts which are awaiting for approval or in Held status( used by client as template) .There is only product category and vendor and no material number in Shopping cart  from catalog.
    As the product categories and vendors are same in ECC6 also , during cutover can the shopping cart with held/open status  be posted after changing backend system, Or we need to upload it.
    Any thoughts on this please.
    Best regards,
    Avinash

    Hi Laurent,
    In ECC6 ,consolidation of many company codes  to single company code will happen, whereas in SRM as there is only one backend purchasing org we need to map this with new backend purchasing org of ECC6.0(which is unique for SRM)
    As per my understanding, as backend system change we need to replicate same product categories from ECC6 to SRM4.0 as SRM creates GUIDs for backend product categories and passes a sych GUID in ECC also.
    Will the existing shopping carts in Held/open condition get processed which had been already created with old Product categories and vendor details (which are replicated from ECC5) when backend system changed to ECC6
    Is this applicable for open purchase orders also as company code consolidates in ECC6. Do we need to close open PO or upload open with change data?
    Please suggest.
    Regards,
    Avinash

  • Wrong approver for shopping cart

    Hi Friends,
    I've found something very strange in my SRM system for Shopping cart approveal process.
    One of my SC is waiting for approaval by a approver who is assigned to different plant  and he has got nothing to do with this SC.
    The SC's basic data contains the responsibility  of some other LPR group for which approver is different and he is the actual approver of this SC.
    Can you guys provide some link where i can find documents related to approval process in detail and also the organisation structure material as i am new to SRM..? after providing the solution for above querry...
    Thanks in advance
    ss

    Hi Volkoale,
                    I am also facing the same issue. If you have resolved it kindly post your approach as it will be helpful to the community.
    In my case, there is one  cutomized table that contains list of approvers, but I am yet to debug and find the source of data for this table. Your reply will be rewarded.
    Cheers,
    Kris

  • Approver regrouping in Shopping cart after approval and refresh button is clicked

    Dear Experts
    I created a shopping cart (Say 5 levels of approval) it reaches the approver . The approver approves the shopping cart and the cart is in completion step. When after approval in 3 rd step. If i click on refersh button at the top, the list of approvers who approved the cart are getting grouped in to a folder like structure. How it can be avioded i.e we need the approvers to be shown in sequence even after n approvals and clicking on the refresh button.
    Thanks & Regards
    Arun.K.P

    Hi Laurent,
    Please check the screenshots.

  • Shopping Cart Approvers for changed shopping carts

    Hi
    We're currently working on a patching process and are having problems with shopping cart approvals
    We have a 2 stage approval for carts over £75K
    The scenario that is not working is
    The approver 1, approves the cart
    Then approver 2 rejects the cart
    The shopper then changes the cart by increasing the value
    The workflow should resend the cart back to approver 1 but it sends the cart to approver 2
    What changes need to be done to send the cart back to the original approver ?

    For  for n-Level Approval Shopping Cart sub workflow( 14000134 ) the workitem status  is set in the container element APPROVE_OR_REJECT when Sc is rejected it is set other than Zero and when is approved it is set to ZERO check in the workflow log whether this conatiner element is getting populated or not.

  • Dump while requesting shopping cart after activating "Extended classic"

    Hi ,
    I have been using the system in classic mode. It worked fine.
    Then i turned on the extended classic scenario on.
    i am using the shopping cart wizard.
    i am able to get to the first screen of ordering. when i fill the product cat , quantity and price and click on "Add to Shopping cart", a dump is generated.
    Please find below the dump description.
    What happened?                                                                               
    The exception 'CX_BBP_PD_ABORT' was raised, but it was not caught anywhere                     
           along                                                                               
    the call hierarchy.                                                                               
    Since exceptions represent error situations and this error was not                             
          adequately responded to, the running ABAP program 'SAPLBBP_PDH' has to be                      
          terminated.                                                                               
    Error analysis                                                                               
    An exception occurred which is explained in detail below.                                      
          The exception, which is assigned to class 'CX_BBP_PD_ABORT', was not caught and                
          therefore caused a runtime error.                                                              
          The reason for the exception is:                                                               
          Übernehmen       
    Please tel me how i can correct this.
    Thanks,
    Vignesh

    hi
    you need to do lot things
    Define Backend System for Product Category
    You perform this step only if you have already specified that you work with more than one backend system. Here you specify the backend system that the documents are posted in, depending on the product category.
    You can also enter the product category generically (for example, Office*).
    what is the settings here ..???
    you can order a cart but for PO . you need take care of number range etc..
    Muthu

  • What does the "+" symbol next to the price in shopping cart mean?

    I have several songs in my shopping cart with a "+" next to the 99cent price. What does it mean? Thanks.

    To state specifically, those are iTunes Plus files, Yes, they are DRM free, with better audio quality being AAC @256. If you will take a look at the right side of the main store window, there should be a link for iTunes Plus where you should be able to get more information.

  • Updating Custom Field on Shopping Cart after PO is Ordered in SRM

    After a PO is approved or rejected in SRM's UWL, the customer requires that a custom field on the related Shopping Cart gets updated with 'approved' or 'rejected'.
    I know that the save badi, BBP_DOC_SAVE_BADI, gets hit after approval/rejection of POs. We currently are using the function module BBP_PD_SC_UPDATE in the doc save badi to update this custom field.
    Is there anywhere else we could update the SHC? We don't think this solution is the best. Does SRM have any standard SHC update process after a follow on document is updated that we could put an enhancement in?
    Thanks!!

    The BADI BBP_CREATE_BE_PO_NEW gets executed after approval as well. It is part of the PO creation process and allows you to modify the PO document before it is finalized.
    Hope this helps.

  • "Your shopping cart items have changed"

    http://www.pixentral.com/show.php?picture=1PGAZ8UbC92ducxji2yjNV57vULt1
    Could somebody please tell what to do about this Pop Up
    It won't let me make a purchase.
    P.s. I have pressed refresh,but i just comes up with an error message.

    Try iTunes > Edit > Preferences > Store
    change to one-click
    Don't worry, it won't buy anything automatically.
    Save it, close iTunes, open iTUnes back up and change it back to shopping cart.

  • Attachment transfer issue from Shopping cart to Purchase req in ECC

    Hello,
    How are you all. Need your expert advise..
    We are trying to achieve functionality where documents which are attached on shopping cart get transfer into Purchase req in ECC (Classic Scenario with SRM 5.0 and ECC 6.0). For this we have done following config / enhancements:
    - Activated BADI "BBP_CREATE_BE_RQ_NEW" in SRM with following code for attachment;
    cs_ctrl_att-BE_DOC_TYPE = 'SRM'.
    cs_ctrl_att-BE_storage_cat = 'DMS_C1_ST'.
    cs_ctrl_att-TRANSFER_ACTIVE = 'X'.
    - Created new document type ECC with t.code DC30 for SRM and assigned the object links for EBAN table.
    After performing above task we are able to see Link of the attachment into Purchase req in ECC with document number (i.e. the one we assigned while defining document type in DC30) but not able to open the document in ECC.
    Could you please let us know if there is any settings which we have missed for actually opening documents in ECC?
    Thank you
    Ritesh

    Issue as reported Please let me know why the docs are not uploaded to SRm succesfully .
    I am facing the below weird issue .
    Easy shopping >Shop> eHiring catalog
    Click Transfer to SRM
    Now click on the button ‘Details’ and open the tab ‘Notes and attachments’
    All attchments are names after the 1st attachment and all have the same file type
    Basically you have lost all you attachments here, except 1 (when you click on the link, all links refer to the same document, so not just cosmetic). This is a problem.
    When you order this shopping cart and search for it and open it again, the attachment tab is even completely empty, so now all attachments are lost.
    Something like this, but less severe, happens in the process a bit further.
    - Approve the shopping cart with the applicable approver
    - Log in as Hiring desk:
    Still no original attachments (like job descriptions).
    Now click button ‘responses and awards’
    Click tab ‘Items’ and fill out price ‘40’ euro
    Click notes and attachment tab
    I added 5 attachments
    As can be seen here, the docx becomes an xlsx again, but it looks like it just takes over the 1st file type that was uploaded, it can also be the other way around (xlsx becomes docx) when the 1st uploaded attachment is a document.
    But in this case, when you click on the link, it will open the right file with the right program, so over here it looks like it is just cosmetic.

  • Sending shopping cart no from SRM to ECC while creating  PO in ECC from SRM

    Hi all,
    I have a requirement where in i need to enhance the custom screen of PO. In this custom screen there is a field called shopping cart number.
    So when a PO is created in SRM the shopping cart has to be copied into this custom field of ECC.
    i got to know that BBP_CREATE_BE_PO_NEW is to be used.
    So please enlighten me on how to implement this badi?
    Thanks and Regards
    Veda

    Hi Veda,
    Please go through the following Wiki link to know more about BBP_CREATE_BE_PO_NEW usage to send customer fields:
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/srm/bbp_create_be_po_new-CreatePOin+backend
    Thanks,
    Pradeep

  • Contract price in Shopping cart

    Hello Experts,
    When user creates SC and choose source of supply using contract, that time i want to read contract price from backend and populate that price into SC price field.
    Is it possible?
    I know that while creating PO it will take care. But i want that price in SC price field before order button pressed.
    Thanks in advance.

    Hi
    Internal Goods/Services make price changeable  - please see Dave note
    Price cannot be changed while ordering from Internal Goods/Services 
    Source of Supply for Internal Goods/Services from back end system
    regards
    Muthu

  • Wrong UOM in shopping cart with a contract as a supply source

    Hi experts,
    We are in SRM 7.0 classic scenario with ECC 6.0. SRM are creating SC with backend contract as source of supply.
    1. We select a material from a catalog (MDM)  with UOM in material master with value "G"
    2. In details /position in the SC, in  "supply of source" tag has a contract as a supply of source with UOM "ENV"
    3. so the contract has different UOM of the material
    4. The SC has taken the UOM from the material (material master ) instead of the contract.
    The user cant change the supply of source and he cant change the UOM that is taken the SC
    It´s behaviour not always is given. I mean that for some colleagues are determined correctly UOM in the SC and not others when we try to test the incident
    Any suggestion?
    Thanks in advance.
    Best Regards,
    Mar

    HI Maria
    can you check in the Badi BBP_SOS_BADI in the method BBP_SOS_PD_CHECK and BBP_SOS_CHECK by debugging as to why there is a difference..
    Ideally AFAIK .. it should pick up UOM from Contract instead of picking up from Material master ..
    For the users who are picking up from Material master compare the roles ..
    Also please advise what is the desired functionality .. you want it to be picked from contract or Material master ?
    Also try making the changes in SOS _badi and provide feedback ..
    Maybe it could alos relate to the default values of the requestor or for some pur org ..or item level Can you check the setting in SPRO-MM-External service management-Source Determination and Default Values
    regards
    Vinita

Maybe you are looking for

  • My AVG safesearch toolbar has disappeared and I cannot seem to make it reappear.

    I have two problems. 1.I finally downloaded the latest version of Firefox, which I had been trying to avoid since the last time I did so I had numerous problems. Now that I have done so, my AVG safe search toolbar has disappeared. 2. In addition, whe

  • Where is Search File Names option in Mavericks finder?

    Prior versions of the finder had an option to allow searching of file names only.  This seems to be gone in Mavericks.  Is there any way to get it back? 

  • Delivery date in  past

    Hi, While creating PO using ME21N  or changing PO using ME22N, system allows to put delivery in past with no warning message. Is this standard feature or do i need to activate some setting. Regards R.M.

  • Lost Album need to download again

    I lost an album on an older computer and need to download it again. I downloaded one of the songs again and was charged for it. Can I download a previously downloaded album and not get charged again?

  • SolidEdge on a MacBook Pro

    Hallo, I am considering buying a MacBook Pro. Does SolidEdge V18 work on this computer? From the specs it looks like it certainy does, but does it in real life as well? This is a maker or breaker for me and I can only convince my boss (and myself) to