0 kg of stock available......

Dear friends,,
I am doing delivery w/o reference to sell scrap material. when I am saving sys. postes an error 0 kg material xxxx available.
but if in material master MRP views, in availability check field, presently the value is 02 (individual requirement), but if i change it to KP (no check), everything goes fine. material is available in MMBE..
Regards....

When you change checking group to KP, no availability check is carried out which is why you aoid the error when you make that change; No check is maintained for the checking group in OVZ2.
MMBE is not a suitable transaction to check availability. You need to use CO09. For example, you may have 5 in stock, but this 5 may be confirmed to a sales order (i.e it is promised to this order), therefore leaving 0 available. However, you still have 5 in stock which is what MMBE will show.
For deliveries, checking rule B is usually used so enter CO09 with Material / Plant / B.
SAP Note 89362 explains why you should use CO09, and not MMBE in more detail.
Edited by: Noel Connolly on Feb 10, 2012 11:29 AM

Similar Messages

  • MCHB,MARD - Stock available at plant level and storage location level

    Hi ,
    How to determine how much stock available at Storage location level and Plant level. (Lot is not maintained).
    In MCHB-Stock at lot level is shown.
    In MARD-Stock at Storage Location level is shown lncluding
    the stock maintaned at the lot level.
    If i want to know the stock which is not maintained in Lot, i.e, Stocks directly maintained at Storage location / Plant.
    Do I need to subtract the MCHB Value from MARD Value ?
    Is there any other way available to find the stocks which is not maintained at lot level.
    Regards
    Prasath

    Hi prashant,
    What do u mean by stock maintained at SL level without batch level.  Do u mean that some materials are subjected to batch management and some or not?
    If that is the case, for all batch managed materials, u can see the stock at batch level and also same is summed up at SL level.  But still what ever u are getting from MARD table isstock at SL level only.
    If u have activated batch management for any material, it will always be shown at lot level also.
    hope this clarfifies query
    award points if found useful

  • Report on daily sale,stock availability,pending order,Ageing report

    Report on
    daily sale for time period
    stock availability
    pending order
    Ageing report

    Dear Goutam
    Through VF05, you can see sales daily.
    For stock MMBE
    For Pending Order, VA05
    Thanks
    G. Lakshmipathi

  • Automatic BOM Selection as per Stock availability

    Hi...
    I have a query.....How can i set an Automatic BOM selection as per stock availability
    Problem is that the client is having more than 1 type of raw material which can be used, so the user needs to consume the ROH as per the stock availability, in that case he has to manualy check and amend the Production Order accordingly.
    Hence, i want to set a system wherein the system would do the checking of the ROH material and then select that material and execute the production order accordinly.
    Requesting your valuable inputs.
    Thanks in advance,
    Harris

    Harris,
    Please explore the possibility of defining "Alternative Item Group", in the BOM Item level details(Basic data tab).
    From Application help for your referance,
    Alternative item: group
    Consolidation of alternative items within a BOM. Every material in the assembly can be included in the alternative item group.
    Use
    As soon as you enter an alternative item group, you see an additional dialog box with the following data: ranking order, strategy, usage probability.
    You can maintain alternative items in the following situations:
    Alternative positions with specific usage probability
    These alternative items are incorporated with a specific usage probability. Enter the usage probability for each alternative item in the group, so that:
    dependent requirements are determined in requirements planning
    dependent requirements are changed to a reservation in the production order
    Alternative positions as information
    You can enter an alternative item for information purposes. This item would then, for example, only be taken into account in situations involving missing parts.
    As there should be neither dependent requirements nor a reservation for this item, enter no usage probability.
    Procedure
    Enter the same character string to denote the alternative items of an alternative item group.
    Enter the same strategy for all alternative items in the alternative item group.
    Dependencies
    Alternative items are valuated in the following way:
    Dependent requirements determination
    Requirements planning determines the dependent requirements according to the usage probabilities that have been entered.
    If the usage probability is 0%, then no procurement is planned for the item. For information purposes, however, dependent requirements with 0 as quantity are created.
    Withdrawal posting
    You can control the withdrawal posting for the resevation in the production order in the following way:
    Withdrawal according to usage probability (manual change is possible)
    Withdrawal if there is 100% availability
    (Check ranking order and strategy)
    Example: See Strategy for alternative position
    Regards,
    Prasobh

  • Customer Order Assigned to Tranport Order. Stock Available ?.

    Hello everybody,
    Our system release is 47.200.
    We are looking for run  a transport order assigned to a customer order.
    What happens:
    We have prepared the customizing and also a user exit to have the option to work with the assigned orders.
    Currently we can create the suppliers assigned orders
    and also we can create assigned transport orders.
    The problem appears when we want to make the expedition of the assigned transport order VL10G, then the system says that we don’t have stock available and that is not true because we have stock available Unrestricted Use.
    4999200004 000010 Only 0 ST of material 0401010 available
    4999200004 000010 An item with no delivery quantity is not permitted.
    The system looks the stock available for customers not the stock
    Unrestricted Use.
    Is possible to make a customer order assigned to Transport Order and this looks the stock available in the status Unrestricted Use.
    If we have to make a movement every time that we have stock available for the transport assigned order.
    It will not be a good process, will be very manual or if we will have to create a not standard Program sure that it will make mistakes...
    We are looking for this solution and sure that in a future we will need for
    the same with intersociety orders.
    Thanks for advance,
    Regards,
    Xavier Carbó

    Hi,
    I will explain our problem step by step:
    1.- In our system we have made the configuration to be able the assigned orders:
    When we make a customer order we can create an automatic purchasing order
    if we change the item category of the customer order.
    Also we can create a Transport Order.
    2.- We use the Transport Orders to send material from the central warehouse to
    the little warehouse.
    3.- The Transport Order is similar as Purchasing Order, the different is that this
    kind of order make a Picking / Delivery note in the central warehouse.
    With this delivery note we make the reception in other warehouse.
    4.- The problem that we have appears when we want to create
    the Picking / Delivery note. with VL10G
    At this moment the system says that we don't have stock available.
    Our Assigned Transport Order is looking the Customer Stock Available
    not the  Unrestricted use stock that is our normal stock ATP and is where
    we have always all our stock ATP .
    5.- For prepare the delivery note I have to make a material movement
    of stock to translate the Unrestricted Stock in Customers stock ATP.
    If I have to make this movement every time it will be very manual and
    we will do mistakes sure.
    I want that the Assigned Transport Order checks the Availability with the
    ATP Unrestricted Stock.
    I don't know if we can do something to find an automatic solution for the ATP,
    for us it will be very interesting because we can prepare this Transport orders
    connected to the Customer Order and this will be great.
    Thanks for advance,
    Xavier

  • Block Stock consider during MRP Run and Stock availibility check

    Dear All,
    I am facing the stock availibility check , Sytem consider the Defective material which is Block in same storage location ,and system not generate the Planned order .
    -Blocked Material stock 100, and requirement 100 then system not generate the planned. Client need the system generate planned order 100 , Because 100 material is defective.
    I have configured the system scope of availibility , Block stock check remove , but problem is not solve.
    Thanks
    Rajesh Tiwari

    Dear ,
    Can you please re-check your MRP plant parametrs in OPPQ wether   you have selected blocked stock( Available Stock tab )  option by chance ?
    Please de-select the same  and re-run MRP.Generally MRP does not consider block stock  in net requirement calcualtion .One more thing  , MRP does material avilablity check as per OMJJ set up ( define availbality chek ) but does not consider the same while doing net requirement calcualtion to generate PR rather it goes down to MRP plant parametrs ( oppq or oppr )
    Hope this is clear
    Regards
    JH
    Edited by: Jiaul Haque on Sep 16, 2010 9:29 AM

  • Stock/Availability updation terminated(MD04)

    Hi all,
    After posting of GR with MB31, i was refresh the Stock/Availability list. While refreshing it was terminated. And an error message displaye as " Express document update was terminated received from author SAP". But GR documet was posted.
    What s the problem with my steps? Kindly explain.

    Dear Gopinath,
    Check for the lock entries in the T code SM12,select the relevant one and delete it.
    Check in MB51 for the latest document along with the time and for movement.IF its prsent and if found
    ok in MD04 also means leave it as such.
    Check and revert back.
    Regards
    Mangalraj.S

  • Rush order :-Even though stock available  Sytem is not ablet   to confirm

    Hi all,
    In case of Rush order- insipite of  stock available in the system  its not able to confirm the quantities .
    Immediate delivery is not happening because of this
    Please let me what might be the reason?
    Regards
    Anil

    Hi anil maripady
    As you are doing rush order , first of all go to VOV8 and check the following things in  rush order document type :
    1) Shipping Conditions - immediate
    2) Immediate Delivery - [X}
    3) Lead time in days - NIL
    Now go to  MD03 and check how much  stock is available of that material and how many open orders are also there with that material in that plant
    Another option go to MMBE and check how much stock is there for that material in that plant and storage location
    Regards
    Srinath

  • QI stock availability & releasing

    as it is configured in the system, QI stock is available stock, and won't trigger missing parts for the production order. however, is there a way in the system, that when i release an order, it would restrict me, because stock is still in QI and hasn't been UD-ed.?

    Hi raf timan 
    In transaction OPJJ - Define Scope of Check uncheck the incl.quality inspection stock for the respective availability check entered for the mateial in the material master(02).
    This setting will exclude the stocks available in quality during availability check in production order.
    To restrict the production order release when there is a stock deficit of the input materials, goto transaction OPJK - Define Checking Control select the entries for respective plant, order type and business function 2 - Check availability during order release.
    Go in to detail in the material availability tab in the Mat. release enter 3 -No release if parts are missing. This will restrict the release of order when stock deficit.
    Regards
    Soundar

  • Maintaining Stock Availibility : physical table or materialized view  ?

    Hi All,
    We have typical Order processing application where I should maintain
    stock availibility => Order is rejected if Stock is not available. The number of orders is 1000 perday, 22 branch, using VPD. 10 users each branch.
    We are really tempted to use JUST view /materialized view to maintain stock position. (where traditionally we use a phiysical table for this, updated after insert/update/delete of transactions)
    So the view will be like this :
    Create View Stock AS
    Select Prod.Code, Prod.beginning_balance,
    ( SELECT Sum (Qty) from Purchase Where ProdCode = prod.code ...) AS Purchase,
    ( SELECT Sum (Qty) from Order Where ProdCode = prod.code ...) AS Order,
    From Products Prod
    So to get the stock availability for a particular product :
    Select Beginning_balance + Purchase - Order from Stock Where Code = ...
    Please give comments, will this work with good performance ?
    Or has anybody done like this in their application ?
    Thank you for your help,
    xtanto

    If we're talking about a materialized view, I assume you'd do incremental fast refreshes. If we're talking about 1000 transactions a day, I wouldn't be at all concerned. Growth of the transaction table ought to have no impact on the speed with which the materialized view could be refreshed.
    I can't think of any blocking issues that would arise from using a materialized view that wouldn't occur if you were updating a separate physical table. The timing might be slightly different, but Oracle's multi-version read consistency ought to work the same either way, hence you ought not ever block.
    Justin

  • Check stock availability in non-PROD loc

    Hello,
    I have set my production st/location(PROD) in material master, When I creates the prod order it always check the stock availability in PROD location and pops up missing parts as stock is in raw materials loc.
    Can we set something, so that while prod order creation, it should check stock availability in all raw material locations (but not in PROD).
    added laterly----
    I think it can be done via OPJJ, no sto loc inspection, but what could be the pro/cons for setting this indicator.
    Please suggest.
    Regards,
    JPS
    Edited by: Bhatti JPS on Apr 7, 2010 5:35 PM

    JPS,
    If you make the OPJJ setting, it will check all storage locations in that plant, including PROD.  Depending on what this StLocn is used for, this is probably OK.
    Some companies 'stage' their materials, which means they move stock from RM stockroom to a production floor staging area location.  Then, they run their ATP.  'Missing parts' means they have to go to the RM Stockroom, get the missing stuff, and move it into the production staging area.  For these companies, they want PROD checked exclusively.
    Other companies (sounds like your company) don't stage their components.  They run their prod order ATP checks, and any missing parts list they hand to the expeditors, who may go to the department that makes the subassembly (manufactured component), or may go to Purchasing department to expedite the RM (Purchased component).  
    It really depends on the business requirements.
    Rgds,
    DB49

  • Ordre quantity is not confirming even stock available

    Hi Gurus,
    I have automatic batch determination configured. In sales order order quantity is not confirming even if there is stock available in batch. I have checked in mmbe stock is available for batch in unrestricted use. What will be the cause that order quantity is not confirming.
    Regards
    Yogesh

    Hi Madhukar,
    Please use availability check field in the material master in Sales view as " Batch managed" and also check the material for other Batch mgmt checks and this works properly.
    Please let me know your thoughts.
    Thanks and Regards,
    Satheesh Durgi

  • Delivery date not confirmed on the same day even though stock available

        Hi Experts - We are creating an STO in Brazil where stock is moving from 1 plant to another plant.
        Current ATP situation is as follows: which shows 22 EA still available.
    We are creating the STO from the plant 3004 to plant 3005.
    We are confused why the system is proposing the delivery date of March 17 instead of March 14, in spite of sufficient quantity being available.
    We do understand that it takes 03/17/2014 because of the upcoming weekend. But when stock is available on March 14, we would have expected this result.
    These are the key configurations that I have done:
    Material Master:
    MRP View: Planned Delivery Time is 0
    MRP Type: PD (MRP)
    Checking Group: 02
    Assign delivery type and checking rule config for Material Master is also done as follows:
    Request your help please!
    Regards
    Siddharth Sridhar

    Yes If Stock is available for material & still date is changing in STO creation than may be this could have happened due to time zone setting,
    2 option-I would request you   also go through Stock requirement List (MD04) & check where some pending order is lying & some purchase orders if yes then first block them,
    Sometime it heppens if earlier for same material you would have created Sales order (qty is 20) & stock available qty is 15 & still with 15 qty you would have done PGI.& after some time your would have done migo for the same shortage material & this time 5 qty material could be adjusted in shortage order that's why if you go through md04 then you would be able to block shortage qty which  is adjusted,n now date is showing deff,
    hope this would help,
    Thanks,
    Kamlesh

  • Due tu requirement class wrong stock availability

    Hi everyone,
    Our situation is this. We have a requirement type assigned to a Sales document item category. We create a Return PO for a material and choose that the stock type should be Blocked Stock (in Delivery tab in transaction ME21N). Why can it be that in one plant everything works perfectly fine but in another plant sistem says there is no stock available (and there is stock in that plant)? Please any help will be appreciated.
    Thanks!

    Hi Padmasri,
    Thanks for your reply. Yes, we also think that it has to be something different between the plants configuration, but I can't see any difference. If you have any idea, please let me know.
    Thanks,
    Nisha

  • Stock available in order to buy the Macbook in NYC

    I'm going to NYC in one week and I need to know where can I find stock available in order to buy the Macbook, because I read Apple stopped the production, Thanks!
    OSCAR

    Or you can save $150 by buying one from the Apple Refurbished Store. http://store.apple.com/us/browse/home/specialdeals/mac/macbook

  • Unrestricted stock available but outbound delivery not generated

    Dear All,
    We have continue facing this problem in last 15 days, unrestricted stock available
    In location but outbound delivery not generated.
    I request you, please help me & solve my problem ASAP.
    Regards,
    Alok Oberoi

    Hi Alok
      There are two situations  possible.
    1. Either the order may be blocked for delivery; which can be removed manually.
    2. In unrestricted use, material may be available & it may be displayed. But actuaaly it may be booked for some other orders in advance due to delivery priority. this can be checked using t- code md04

Maybe you are looking for

  • Unity Express voice mail timing issue.

    Hi, I have installed one uc520 at one of our customer. i configured voice mail but there is one issue with the voice mail timing. Suppose i retrive the voice mail the voice mail prompt is giving the wrong time. Suppose I send a voice mail to a subscr

  • Response message from CIDX Adapter to IDOC Adapter

    Hi Experts,               I have created scenario for "SAP IDOC - PI - CIDX" (OrderCreate_Request)               and also need to create respose message for "CIDX - PI - SAP IDOC(OrderCreate_Response)            Integration Repoistery               "

  • Can I plug a mini displayport cable into thunderbolt port?

    I have new iMac with thunderbolt.  I have a MDP to HDMI cable, can I use it?  Or must i purchase a new "thunderbolt to HDMI" cable?

  • Extended Syntax Error......

    Hi All, In my Program I have created the following Subroutine - FORM call_back TABLES record_tab  STRUCTURE seahlpres                                   CHANGING  shlp_top TYPE shlp_descr                                                      callcontro

  • Write number in words (using Oracle)