Hi Gattu,
Could you please check the Function Module "KKBW_PCP_ITEMS_GET_ITEMIZATION" inside this function module there is one include program "LKKBW_PCP_ITEMSF03" which allows only one period to run in the infopackage. i am facing the proble that i can load only one period at a time whereas i need to load 12 periods.
Look into this function module. hope it helps.
worst thing is that this extractor doesn't support Delta.I think there is bug in this extractor. Do let me know if you come across any OSS Note or some workaround.experts please contribute your inputs.
Thanks.
San.

Similar Messages

  • WINDOWS MANAGEMENT FRAMEWORK 4.0 - A required certificate is not within its validity period

    Hello, 
    I can't figure out if this is because the Root Certificates were updated in April 2014 then apparently expired by Microsoft or if the PowerShell installer signed this file with a bad software release signature??
    We were deploying PowerShell 4.0 (Windows6.1-KB2819745-x64-MultiPkg.msu) with ConfigMgr 2012 with a dependency of .NET Framework 4.5.1.  Everything was working fine until sometime around April 24 (exact date unknown).  Now any 
    Win 7 SP1 machines I try to update will not install WMF 4.0.  They installed .NET 4.5.1 without any trouble.. 
    The digital signature on it it states it was signed Sept 27 2013 and the certificate expires 4/24/2014. 
    Even if we change the system clock to April 1 2014 it still will not install.. but this shouldn't matter anyway.  They just can't sign new software with that certificate.. surely I can install it..
    As for a log... If I run as C:\Windows\ccmcache\3>wusa.exe Windows6.1-KB2819745-x64-MultiPkg.msu /log:c:\windows\ccmcache\3\broken.txt 
    In the broken.txt I see: 
    Install Worker.01194: Operation Result Code of the installation: 0X4        HRESULT of the installation: 0X80240022                Operation
    Result Code of the update:0X4 HRESULT of the update: 0X800b0101 
    Install Worker.01243: Failed install update Update for Windows (KB2819745) 
    Install Worker.01287: Exit with error code 0X800b0101 (A required certificate is not within its validity period when verifying against the current system clock or the timestamp in the signed file.) 
    WINDOWS MANAGEMENT FRAMEWORK 4.0 FOR MICROSOFT OPERATING SYSTEM PRODUCTS 
    Windows6.1-KB2819745-x64-MultiPkg.msu 
    I also see this same event information in Setup event log..
    I don’t know what to do here.  Anyone else having this problem? 

    Hi,
    Have you ever seen this article?
    Event ID 4107 or Event ID 11 is logged in the Application log in Windows and in Windows Server
    http://support.microsoft.com/kb/2328240/en-us
    If you have any feedback on our support, please click
    here
    Alex Zhao
    TechNet Community Support

  • Customer Exit Variable Period 000 is not valid in financial year variant Z2

    Hi all,
    I am trying to get the week number from a particular posting period. But I get this error when I execute the Query:
    Error Group
    RFC_ERROR_SYSTEM_FAILURE
    Message
    SYST: Period 000 is not valid in financial year variant Z2
    I checked in "FIRST_DAY_IN_PERIOD_GET" FM and it is not accpting period 000 for PERIV Z2. It works fine for all other periods.
    Does anyone have an idea on this?
    Thanks.

    Simon,
    So do you think that there is a problem in my Query restrictions? You ask me to restrict from 0 - 12, but this period is calculated based on the SY_DATUM in a cust. exit variable. And this period is being used to pull week number. So, do I need to change the code?
    But I already have another query which is similar to this, only ready for input options are missing in the new one. The older one is working fine but the I have problem with this.
    Any more ideas?
    Thanks!!

  • Create asset-error"E003 SYST: Period 000 is not valid in financial year var

    Error during Asset Creation: E003
    AS01: Create asset was executed. During saving the asset got an error
    E003 SYST: Period 000 is not valid in financial year variant
    Following are the Depr keys assigned;
    LINA is being used for Book Depreciation
    MSTL Depreciation key is being used for ACRES, ALT MIN, ACE, E&P.
    Asset Class is Buildings

    Hello!
    I had the same problem a few month ago. There is a SAP note about this. Run the Asset Year end technical proces in ARJW. Try again your asset creation.
    Greetings,
    Stéphane

  • FGV003 - SYST: Period 000 is not valid in financial year variant K4

    Hello,
    I am getting the error below when trying to bring Period 000/2008 from our BCS cube into a basic cube.  I've run the "Transfer Global Settings" for our R/3 system but am still getting this error.  The BCS does have Period 000 Yr 2008 with FYV K4 and is showing in the master data for fiscal period.  Any ideas??
    SYST: Period 000 is not valid in financial year variant K4
    Thanks,
    Senthil

    Dear colleagues:
    The same problem is appearing to me. I am trying to run a job in background but the following error appears to me>
    SYST: Period 000 is not valid in financial year variant 36
    Do you know what I have to do to suprime the error?
    The job I am trying to run is for creating an evaluation in order to run the report S ALR 87012167
    Your Sincerely
    Leonardo López
    FI Consultant

  • SYST Period 012 is not valid in financial year variant R2 Msg no;FGV003

    Hi SAP Gurus,
    I have encountered with an error as following :
    SYST: Period 012 is not valid in financial year variant R2
    Message no. FGV003
    Our client following calendar year till December 2009.  They want to change to April to March , from April 2010 . So we need to define a shortened fiscal year for January to March 2010 for 3 months.
    One important thing is Depreciation should be calculated only for 3 months ie., from January 2010 to March 2010 for year 2010. For year 2011 u2013 April 2010 to March 2011 be calculated.
    I have done the following settings :
    Current fiscal year variant = K4, i.e. the standard variant with 12 periods (calendar year)
    -the current fiscal year must be closed on 31.12.2009
    -this change have to be done in the next month, i.e. on 01.01.2010
    -on 1.1..2010 starts the new fiscal year 2010
    -the fiscal year 2010 ends on 31.03.2010 and have 3 posting periods
    1) Create a new Fiscal Year Variant for the shortened fiscal year u2013 e.g. "R2" (OB29).
    2) R2 to be made Year Dependent. Current Period Configuration
    Month Days Period Year Shift
    1 31 1 0      
    2 28 2 0
    3 31 3 0
    4 30 4 0
    5 31 5 0
    6 30 6 0
    7 31 7 0
    8 31 8 0
    9 30 9 0
    10 31 1 +1
    11 30 2 +1
    12 31 3 +1
    3) Company Code assignment (OB37): K4 to be replaced with R2 .
    4) Controlling Area (OKKP): K4 to be replaced with R2.
    5) Fiscal Year to be shortened for Depreciation Areas in Asset Accounting customization (OAYP).
    6) Table T093C to be viewed to check whether the field XRUMPF (Shortened Fiscal Year) has been activated with u201CXu201D..(SE 11 Check Table) Done manually
    Other Problem : 1. The system calculates deprecation for period 3 ( Full year deprecation) as seen from AW01n for one asset.
    2. When I run AFAB for 2010 period 1 the error is displayed
    SYST: Period 012 is not valid in financial year variant R2
    Message no. FGV003
    Please anybody help me in this issue .
    Subbu

    Have you maintained the Year Shift Properly in OB29
    For e.g if Financial Year is from July to June, year shift will be as follows:
    Month      Days        Period       Year Shift
    1     31     7     0
    2     29     8     0
    3     31     9     0
    4     30     10     0
    5     31     11     0
    6     30     12     0
    7     31     1     +1
    8     31     2     +1
    9     30     3     +1
    10     31     4     +1
    11     30     5     +1
    12     31     6     +1
    Check also FI period and aseet periods are open through OB52 and AJAB

  • SYST: Period 012 is not valid in financial year variant V3 Message no. FGV0

    Hi!
    While I am going to create Asset it is giving me following error :
    SYST: Period 012 is not valid in financial year variant V3
    Message no. FGV003
    I checked in OB29, I have maintained 12 period,
    can you please tell me what will be the problem.
    Rakesh

    Have you maintained the Year Shift Properly in OB29
    For e.g if Financial Year is from July to June, year shift will be as follows:
    Month      Days        Period       Year Shift
    1     31     7     0
    2     29     8     0
    3     31     9     0
    4     30     10     0
    5     31     11     0
    6     30     12     0
    7     31     1     +1
    8     31     2     +1
    9     30     3     +1
    10     31     4     +1
    11     30     5     +1
    12     31     6     +1
    Check also FI period and aseet periods are open through OB52 and AJAB

  • "SYST: Period 012 is not valid in financial year variant Z4"

    Hi
    Iam getting this error  "SYST: Period 012 is not valid in financial year variant Z4"
    in Asset accounting  when using the shortend fiscal yr with 9 periods in 2010.
    Generated the period control OA84 for this variant Z4  but still getting the error.
    Please advise.
    Thanks in advance

    Srini,
    Our FY is Apr 2 march.
    For 2010 , i put below and in shortend fiscal yr tab i put 9. still having this error.
    1     31     10     -1
    2     28     11     -1
    3     31     12     -1
    4     30     1     0
    5     31     2     0
    6     30     3     0
    7     31     4     0
    8     31     5     0
    9     30     6     0
    10     31     7     0
    11     30     8     0
    12     31     9     0
    Please help
    Thanks,
    Heera

  • BEX Error: SYST: Period 053 is not valid in financial year variant M2

    Hi All,
    We have a merchandising report which bring the data for current year and previous year. While I execute the data for Fiscal Year/Period - 011.2011, I get the output. But when I execute the report for Fiscal Year/Period - 012.2011, I receive the below error.
    SYST: Period 053 is not valid in financial year variant M2
    We have variants M4 and M2.
    M4 is month wise where are M2 is weekly.
    In table T009B, we have a record for week 053 for year 2011 whereas we don't have a record for week 053 in year 2010. This is obvious as there are only 52 weeks in 2010 but 53 in 2011.
    I'm not able to track the exact reason for this error.

    Hi All,
    Thanks for the reply.
    I have tried maintaining entry for week 053 against year 2010 in T009B but this didn't work. I checked the 'Check Table' button for any dependencies and I saw T009 table.
    I maintained the entry as below in T009 table and it worked. Can someone explain how this work?
    Earlier entry for which I received the error:
    Fi.Year Variant    Year-dependent     Posting period    Special        Periods Description
    M2                            X                      052                     00              Retail Calendar Weekly
    Changed entry for which the error stopped appearing
    Fi.Year Variant    Year-dependent     Posting period    Special        Periods Description
    M2                            X                      053                     00              Retail Calendar Weekly
    Please help me understand so that if I transport the entry to Production, I don't face any serious issues.
    Regards,
    Murthy

  • Error in AS01 E003 SYST: Period 000 is not valid in financial year variant

    Hello SAP Gurus,
    I am encountering an error when creating an asset for a certain CC. Upon saving, error message 'E003 SYST: Period 000 is not valid in financial year variant' appears which prevents me creating the asset. My FY Variant K4 is already assigned in the correct company code. Not sure if this has something to do in period control, posting period or FY variant.
    Can someone help me explain the root cause of my error?
    Thanks in advance.
    Carlo

    Basically, period control will determine the depreciation start date. For 02, it is Pro rata upto mid-period at period start date.
    This is means that for asset value date after mid month, depreciation will be start from next month.
    As an example,
    asset value date from 01.01.2012 to 15.01.2012  -> Depreciation start date is 01.01.2012
    asset value date from 16.01.2012 to 31.01.2012  -> Depreciaiton start date is 01.02.2012
    etc

  • Period 012 is not valid in financial year variant V3

    Hi all
      i already posted this issue on ASSET ACCOUNTING two weaks ago ....but still waiting for your responce  .............
    Can any one pls help me out ..........its an urgent ...........
    when i check dep. thro' t.code AW01N/AS02 i am getting an error like "SYST: Period 012 is not valid in financial year variant V3".....
    i don't know why the system is throwing this type of error and where i have to do changes...........
    i am in 4.6c and the dep has not been run for long time . i suppose the last time the dep may be in year 2003......
    Can u guide how to rectify his error........ and bring all the assets upto date and run the dep in the SAP system.
    Presently my clients are posting the manual JV's for every Quater.
    Any help in this would be highly appreciated....
    Revert
    Regards
    Praveen

    Hi,
    Posting periods are controlled by two ways.
    one is technical point of view - OB52 (see here are you maintain account type wise or *)
    second is FI-MM point of view go for OMSY. You can see what are current period open for your company code. You can use T.code MMPV- for close the posting periods and MMRV to open or allow the period for posting.
    Hope this is fine, If yes assign points,
    Regards,
    Sankar

  • Survey was not found or it is not withing validity period

    Dear gurues,
    Hope you can help me with this issue in CRM 5.0
    I have created one survey, it includes dynamic questions by using function modules PBO and PAI, and fortunately it works fine when testing in trx. CRM_SURVEY_SUITE.
    Now i am trying to generate a URL by BSP. It works almost fine, but for some weird reason, once I type "Yes" or "No" for the first question of my survey (next questions depend on the answer of first one, if "Yes" - second question should be shown, if "No" - second question should be hidden), and then click enter, I get the following system message:
    survey was not found or it is not within validty period.
    I have already maintained the validity period under maintain survey attributes in trx. CRM_SURVEY_SUITE.
    the idea is to use this survey in e-mail campaign.
    i will really appreciate your input
    Thanks
    Karina

    Hi Karina,
    How you solved this issue...
    I am also getting the same error...
    Survey Was not Found or Is not Within the Validity Period.
    In GUI it is working perfectly.
    I tried the solution given by RAJA but it is also not working...
    I added a cutom button... Function code is SAVE.
    Didnt write any code for it..
    When Pressing that button i got the above error....

  • Time stream from resource WC not valid for total display period (PP/DS)

    Hi Apo Experts,
    As I enter the product view in the PERIOD TAB, this error message pops up "Time stream from resource WC not valid for total display period".
    Diagnosis was "The time stream for resource WSMT200_9000_001 is not valid for the general display period. This can cause the display of the time buckets profile for this resource in the product planning table to be inaccurate."
    Please, can someone help me understood what was this error mean and the cause? And maybe an idea on how to correct this.
    Greatly appreciate your answer!
    Thanks in advance,
    Raymond

    Hi Raymond,
    the capacity of a resource in the live cache is generated in the past and in the future according to the settings Planning Parameters (/SAPAPO/RES01) on tab general data. Here the days- and days+ are important.
    e.g. the resource has got the following parameters: days- 30 and days+ 180.
    Today we have the 1th of January 2008.
    After starting the product plan table you can choose the planning horizon from/to.
    If the time fence is more than 180 days in the future you will get your message above because planning parameters do not "allow" more than 180 days in the future.
    Instead of this the message do not appear if you choose a smaller value.
    For more information please see SAP Note 449452.
    Hope this helps.
    Greetings
    Timo

  • Time stream from resource  not valid for total display period

    Dear Friends,
    In APO after PPDS Run, and executing  Product View, in period tab of product view I am getting an error with following meassge.
    Time stream from resource WP5_0110_001 not valid for total display period
    Message no. /SAPAPO/RRP_PT055
    Diagnosis
    The time stream for resource WP5_0110_001 is not valid for the general display period. This can cause the display of the time buckets profile for this resource in the product planning table to be inaccurate.
    Can anybody come across such type of error, if yes please let me know the possible solutions to overcome this problem.
    Thanks and Regards
    Nilesh

    Kinldy refer to  SAP Note No. 449452 for the exmplanation and solution to the issue.
    Rgs - Vikas

  • Hyper-v replication Error Hyper-V received a digital certificate that is not valid from the Replica server 'burstingreplica'. Error: A required certificate is not within its validity period when verifying against the current system clock or the timestamp"

    Hi,
    When trying to initiate hyper-v replication from the main server i'm getting this error in the event logs.
    Hyper-V failed to enable replication for virtual machine 'RECADemo': A required certificate is not within its validity period when verifying against the current system clock or the timestamp in the signed file. (0x800B0101). (Virtual Machine ID 561591B6-567C-...)--I'm using certificate based auth and cert is installed/recognized on both machines.Please help.Thanks,Jaffer
    Jaf

    Hi,
    This error occurs because the Microsoft Certificate Trust List Publisher certificate expired. A copy of the CTL with an expired signing certificate exists in the CryptnetUrlCache
    folder. Please try to renew the Trust List Publisher certificate.
    The related KB:
    Event ID 4107 or Event ID 11 is logged in the Application log in Windows and in Windows Server
    http://support.microsoft.com/kb/2328240
    How to Renew the Site Server Signing Certificate (Microsoft Certificate Services)
    http://blogs.technet.com/b/configmgrteam/archive/2009/02/11/how-to-renew-the-site-server-signing-certificate-microsoft-certificate-services.aspx
    Manage Trusted Publishers
    http://technet.microsoft.com/en-us/library/cc733026.aspx
    Hope this helps.
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

Maybe you are looking for

  • [IDCS3 - JS] editing text outside ID

    Hi all I have to modify the text content of paragraphs outside ID with a text editor and then I have to update the document with the new content. But if there is a table it do not appears in "textFrame.contents" and deleting the point in the text whe

  • Request Message Mapping Problem

    Hello friends, I am working in XI 2.0 and my senario is sap R/3->XI->File Adapter I take an idoc from the SAP R/3 system. and that comes properly to XI. I already created Data type, Message Type, Interface Type, Message Mapping and Interface Mapping

  • Cant Copy and DOnt Show

    It will ntolet me copy paste the embed code by any means not by mouse gestures or by Ctrl C and V If I put the code found on discussions and change the ID in the 2 places when I add to the page it does not show in the page It worked before and now it

  • Making a video from jpegs in IMovie 9

    Hi, An animator made me a video for a song I created. He gave individual Jpegs for every frame. I brought the JPegs into IMovie and but when I play the video it is jumping. Is there a way to select each still to be 1 frame and how do I smooth out the

  • HR payroll extractors : no extractor on CRT table in Business content ?

    Hi, your help would be appriciated for the following topics : HR payroll extractors I need a confirmation about the fact that there is no extractor on CRT results (cumulative table) for HR payroll results. By contrast, there is only datasource 0HR_PY