1 line item in the sales order ship to different shipping address

Hi,
Our customer A have 3 different branches (meaning 3 different shipping address).
During the creation of the sales order for 1 material A, I want to ship 50pc to this customer A:
10pc to address A1
20pc to address A2
20pc to address A3
In my sales order, is there a way I just create 1 line item with the order qty 50pc for this material A, but split into 3 schedule line with 3 different ship to address?
I know there is alternate way where I create 3 different line item (with order qty 10, 20 and 20) and change the ship to address in the Item -> Partner tab. But using this method, I have to create 3 times of the same material in 1 sales order, just with the different shipping address.
I want to know is there a way I just need to create 1 line item?
Kindly please advise. Thank you.

Hi there,
When you have 3 different ship-to address, system will anyway create 3 different deliveries. This is coz if the header data in shipping (ship-to) is different, system will split the deliveries. Routes are different to 3 ship-to addresses & they cannot be combined in the same delivery.
So as mentioned in above thread, create 3 different line items or create different sales orders all together for different ship-to parties.
Regards,
Sivanand

Similar Messages

  • How to delete a line item from the sales order

    Hi all,
    how to delete a line item from the sales order for which the production is already happened and it has been delivered. the production order status is DLV.
    Regards
    Kumar

    Hi
    U can do this in two ways one u can short close the order by entering Reason for rejection in VA02 at header level and if yr order is multiple line item order u can enter the reason for rejection in any of the line item which u don't want to deliver.
    This is called short close ( as the qty is not delivered fully).
    Thx.

  • Sample Material in the 3rd Line item of the Sales Order

    Hi,
    We have configured the system in the sales order as follows.
    1. Commercial Material
    2. Bonus Material.(ie Free Material)
    Now, i want to add the 3rd line item in the sales order as Sample with different Material number. How go about this. kindly let me.
    Regards
    Ravi

    Hi there,
    Enter the material in the sales order & change the item catg manually in VA02.
    But free goods & sample materials are dealt differently..
    Freegoods is entered as TANN item catg along with nornam TAN item in standard order OR.
    But sample materials or free of charge items are processed through different order type FD for eg.
    Even thought the item catg proposed in FD is TANN,, the whole process will not have pricing as TANN items arenot relevant for pricing.
    Regards,
    Sivanand

  • Delivery doc creation for a selected line item of the Sales order

    Hi folks,
        Can any one help me in how to create a delivery order for a selected line item of the Sales order.My requirement is the request comes from the web browser where a sales document and details of the items are shown the user select one line item and request for delivery create of that particular SO doc.I have used couple of FM to create delivery but the delivery create is depend on the schedule line dates so iam unable to figure out where exactly i can distinguish between the line items.
    Example:
    SO:- 11193645
    Line item -1 has 2 schedule line 06/11
                                     06/13
    Line iteam-2 has 1 schedule line 06/12
    so if i try to create Delivery doc for date 06/12
    it creates partially for line 1 and line 2.
    but my requirement is i wanted to create SO for only line item 1 as i wanted to process Del Doc for only line item 1.
    If you have any idea please help me.

    hi ,
    You can develop a customised FM to process the Idoc data .
    1. Read the Idoc data into internal table for the line items which need to be delivered .
    2. Run BDC for transaction 'VL01N' ( delivery creation ) through which  eliminate the line items which are not in internal table and save the delivery document
    Note : Because in VL01N , you specify the sales document with respect to which you want to perform delivery hence automatically all items are copied to the delivery document .
    During BDC recording , select items by " MOVING TO TOP"
    and then deleting the selected item
    If you face problem in BDC recording , i can help u that too .

  • Re: Printing Cancelled line items in the sales order on the packing slip

    Hi gurus,
    Currently we have a unique requirement in our company. Our wholesale customers send the Purchase order to us via EDI. Now saw they have requested an order containing 10 materials out of which we can fulfill only 8. the other 2 due to some reasons cannot be fulfilled.
    So the business wants to keep the other 2 line items to be entered in the sales order with a cancelled status.
    Now correct me if I am wrong, only the confirmed line items will be copied from a sales order to a delivery document. So thats the reason why these cancelled line items cannot be printed on the packing slip.
    However somehow the business wants the packing slip tp have the 2 line items printed on it with the reason of not being delivered. this is to facilitate the customer to know why those items couln't be fulfilled by our company. Now we cannot use a manual work-around of letting the customer know about the impossibility of not fulfilling the other 2 items as there are a lot of orders that come thru EDI per day.
    Can anyone suggest a solution to this requirement asap.
    Thanks in advance
    Vinit

    Hi Vinit,
    This requirement makes a lot of sense, that is to be able to inform your customer that some item(s) of the sales order could not be delivered, not even partially.
    A possible solution would be to allow for zero quantity in the delivery item (check customizing and mark "zero quantity allowed" in the item category).
    Then in the packing split, it would be easy to print the delivered quantity (0) and the sales order quantity (whatever it was), because you have the "null" item available in the delivery.
    Personally I am not found of having have delivery items with zero quantity, but they are useful in that case, and they can also be useful to automatically "close" the sales order item (instead of having to do it manually if the goods can't be served).
    Note: Usually in Consumer Goods, if you can't serve part of a sales order to a customer, you have to close it, because the Retailer's next Sales Order will include the remaining quantity.
    Hope it helps.
    Best Regards,
    Franck Lumpe
    Freelance SAP ERP Consultant

  • Splitting the Line Items in the Sales Order

    Hello,
             I have a requirement where when I enter a Particular Material and enter Quantity, then there should be a Line Item Split with Some Quantity with the First Line Item (000010) and there should be another Line Item which should be automatically created (000011).  I've tried MV45AFZZ - USER_EXIT_MOVE_FIELD_TO_VBAP but that is not of much help.
             Can someone give me the Place where I can create an Enhancement Implementation / or any Exit which would serve this purpose?
    Thanks and Regards,
    Venkat Phani Prasad Konduri

    Managed to find an Enhancement Point in the Standard SAP Code and hence the Issue is resolved.
    Thanks and Regards,
    Venkat Phani Prasad Konduri

  • How to delete the line item from a sales order

    Hi all,
    how to delete a line item from the sales order for which the production is already happened and it has been delivered. the production order status is DLV.
    Regards
    Kumar

    Hi Kumar,
    I think you can just delete it in the sales order directly, if you are using make-to-order scenario, then there will be special stock left for the sales order as the production has been goods receipt, you need to use MM transaction move the stock to unrestricted use stock. If you are using make-to-stock scenario, there should be no further problem. If you are using assembly order, please try to reject the sales order item to see if it could fullfill your requirement.
    Regards,
    Rachel

  • Send all line items of a sales order to IPC along with condition lines data

    We wrote some pricing routines in R/3, where while doing he calculations for condition line item, we needed to pull in the material information for previous line items. So we exported vbap and imported it inside the routine to be able to have access to all the line items in the sales order. Now, we need to put in the same kind of logic in CRM/IPC. My question is what would be the equivalent of SAP's(import/export) commands for internal tables in case of IPC. I looked at the BADI CRM_COND_COM_BADI but still do not see how I can send all the line items  data to IPC. So I guess, the question comes down to, how do I send all the line items of the sales order (whole VBAP in R/3 terms) to IPC along with the condition line data? Can someone please help?
    Thanks

    Hi Vaibhav,
    If you can get the list of Sales orders which has deleted line items and force completion status. You can manage them in BI via lookup  or navigation attribute.
    Just my views I am sharing .
    Thanks,
    KDJ

  • Line item creation in sales order

    Hi
    I am working on User Exit USER_EXIT_SAVE_DOCUMENT_PREPARE. On saving a sales order i need to do some validations and based on the validations i need to add a line item to the sales order in the user exit.
    What are the ways that i can create the line items through the user exit

    Hi,
    It is not a straight forward thing. Adding data to table XVBAP won't work. It will create inconsistency. There are so many other tables involve here too, like, VBPA, VBUP, VBKD, KONV. There can be other tables too based on how your sales order is configured.
    Also, modifying these tables (XTAB, YTAB ) in this user-exit may cause database inconsistency.
    Regards,
    RS

  • How to combine the line items of 2 Sales orders into 1 delivry

    how to combine the line items of 2 Sales orders into 1 delivry
    and their process, pre-requisites and tcode

    The prerequisites are:
    1) In the customer master sales area data, shipping tab, there is a field called Order combination. u must tick that.
    2) for the two orders, the sold to party & ship to party must be same
    3) both orders must have created from same plant & shipping points
    4) the line items must have same loading grp.
    5) the both orders sheduline line date must be same.
    transaction code for the same is VL04.
    enter the required data and select the order nos to be processed.
    Do reward points if it is useful

  • Can we limit the no of line items in a Sales Order

    Can we limit the no of line items in a Sales Order.

    Hi Atul,
    You can use user exit USEREXIT_MOVE_FIELD_TO_VBAP in MV45AFZZ
    Reward points pls.
    Regards,
    Govind.

  • Route schedule not updated in some line item of a sales order

    Hi Gurus,
    All order are processed through the EDI interface automatically. Order
    XXXXXXXXX for USA customer 40000XXXX is maintained in route reschedule
    setup T-code VL52 on specific departure day thursday.
    above are line item of same sales order, with same shipping point and route .
    Why only some salesorder lines missing the route schedule ?? 
    Please Help
    Regards
    Abhilash

    When you post a query here, you need to have patience until some members go through your post.  Please dont expect somebody should respond to you immediately as everybody has their own priorities.
    Coming to your query, it could be due to many reasons as per the following note:-
    Note 1750978 - Route Schedule does not populate on sales order
    Go through the Resolutions given in the above note and check with your system
    G. Lakshmipathi

  • Production Order and Internal Order for each item of the sales order

    Hi
       I am developing Make To Order Report where I have to display the MTO Line Items and non MTO Line Items. For non MTO Line Items I have to display Internal order with Planned and Actual Costs and also Production Order with Planned and Actual Costs. Could anybody tell how to get the Internal order no and production order with Planned and Actual costs for each line item for a sales order.
    Thanks
    Naga

    Hi,
    You can get the Production orders, Planned orders, Internal orders generated for Sales order item from AFPO table (use fields KDAUF-Sales order number & KDPOS-Sales order item). Then to identify the order type use order category (AUTYP) from table AUFK.
    Once you have the Production/internal order, you can ge the cost from COSS and COSP table. Use the object number from AUFK to get the cost entries from COSS & COSP.
    You can use the following sample code as reference.
    Hope this is helps.. (Don't forget to mark it... )
    Form GET_COSTS                                                       *
    Get the material cost, labour hours and the labour cost for the      *
    sales order material.                                                *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_COSTS.
      DATA V_OBJNR LIKE AUFK-OBJNR.
    DATA v_menge LIKE vbap-kwmeng.
      SELECT SINGLE OBJNR
        INTO V_OBJNR
        FROM AUFK
       WHERE AUFNR EQ AFPO-AUFNR.
      SELECT * FROM COSS
       WHERE OBJNR EQ V_OBJNR
         AND WRTTP IN ('01', '04'). " p_wrttp. "Labour Cost ( Plan, Actual)
        PERFORM GET_VALUES_FROM_COSS.
      ENDSELECT.
      SELECT * FROM COSP
       WHERE OBJNR EQ V_OBJNR
         AND WRTTP IN ('01', '04')         " p_wrttp
         AND KSTAR NE '0000510033'. " EQ p_kstar2.      "Material Cost
        PERFORM GET_VALUE_FROM_COSP.
      ENDSELECT.
    Get the unit cost of the production order by dividing the production
    cost by the order quantity. The result will be multiplied by the
    GL posting qunatity (Delivery quantity) to get the production cost
    for the quantity being deluivered.
      IF NOT AFPO-PSMNG IS INITIAL.
        OUT_REC-LABOUR_HOURS_ACT = OUT_REC-LABOUR_HOURS_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_HOURS_ACT =
                          OUT_REC-ADDNL_LABOUR_HOURS_ACT / AFPO-PSMNG.
        OUT_REC-LABOUR_HOURS_PLN = OUT_REC-LABOUR_HOURS_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_HOURS_PLN =
                         OUT_REC-ADDNL_LABOUR_HOURS_PLN / AFPO-PSMNG.
        OUT_REC-LABOUR_COST_ACT = OUT_REC-LABOUR_COST_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_COST_ACT =
                         OUT_REC-ADDNL_LABOUR_COST_ACT / AFPO-PSMNG.
        OUT_REC-LABOUR_COST_PLN = OUT_REC-LABOUR_COST_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_LABOUR_COST_PLN =
                         OUT_REC-ADDNL_LABOUR_COST_PLN / AFPO-PSMNG.
        OUT_REC-MATERIAL_COST_ACT = OUT_REC-MATERIAL_COST_ACT / AFPO-PSMNG.
        OUT_REC-ADDNL_MATERIAL_COST_ACT =
                         OUT_REC-ADDNL_MATERIAL_COST_ACT / AFPO-PSMNG.
        OUT_REC-MATERIAL_COST_PLN = OUT_REC-MATERIAL_COST_PLN / AFPO-PSMNG.
        OUT_REC-ADDNL_MATERIAL_COST_PLN =
                         OUT_REC-ADDNL_MATERIAL_COST_PLN / AFPO-PSMNG.
      ENDIF.
    Multiply the calculated Unit Production costs with the GL quantity to
    get the actual production cost of the quantity delivered.
    Calculation for Labour Hours
      OUT_REC-LABOUR_HOURS_ACT = OUT_REC-LABOUR_HOURS_ACT *
                                 OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_HOURS_ACT = OUT_REC-ADDNL_LABOUR_HOURS_ACT *
                                 OUT_REC-QUANTITY.
      OUT_REC-LABOUR_HOURS_PLN = OUT_REC-LABOUR_HOURS_PLN *
                                 OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_HOURS_PLN = OUT_REC-ADDNL_LABOUR_HOURS_PLN *
                                 OUT_REC-QUANTITY.
    Calculation for Material Cost
      OUT_REC-MATERIAL_COST_ACT = OUT_REC-MATERIAL_COST_ACT *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_MATERIAL_COST_ACT =
          OUT_REC-ADDNL_MATERIAL_COST_ACT * OUT_REC-QUANTITY.
      OUT_REC-MATERIAL_COST_PLN = OUT_REC-MATERIAL_COST_PLN *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_MATERIAL_COST_PLN =
          OUT_REC-ADDNL_MATERIAL_COST_PLN * OUT_REC-QUANTITY.
    Calculation for Labour cost
      OUT_REC-LABOUR_COST_ACT   = OUT_REC-LABOUR_COST_ACT *
                                   OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_COST_ACT = OUT_REC-ADDNL_LABOUR_COST_ACT *
                                  OUT_REC-QUANTITY.
      OUT_REC-LABOUR_COST_PLN   = OUT_REC-LABOUR_COST_PLN *
                                  OUT_REC-QUANTITY.
      OUT_REC-ADDNL_LABOUR_COST_PLN = OUT_REC-ADDNL_LABOUR_COST_PLN *
                                  OUT_REC-QUANTITY.
    Get the planned material cost from the total of the planned cost of
    the component materials in the production order confirmations.
      SELECT BWART MENGE MATNR SHKZG FROM AUFM
        INTO (AUFM-BWART, AUFM-MENGE, AUFM-MATNR, AUFM-SHKZG)
       WHERE AUFNR EQ AFPO-AUFNR.
        CHECK AUFM-BWART NE '101'.
        READ TABLE I_MBEW WITH KEY MATNR = AUFM-MATNR
                                   BWKEY = AFPO-DWERK.
        IF SY-SUBRC NE 0.
          SELECT MATNR BWKEY ZPLPR LPLPR PEINH
            FROM MBEW
            INTO I_MBEW
           WHERE MATNR EQ AUFM-MATNR
             AND BWKEY EQ AFPO-DWERK.
            APPEND I_MBEW.
          ENDSELECT.
        ENDIF.
        IF SY-SUBRC EQ 0.
          IF I_MBEW-ZPLPR NE 0.
            IF AUFM-SHKZG EQ 'H'.
              OUT_REC-PLANNED_MATERIAL_COST =
              OUT_REC-PLANNED_MATERIAL_COST +
                           ( I_MBEW-ZPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ELSE.
              OUT_REC-PLANNED_MATERIAL_COST =
              OUT_REC-PLANNED_MATERIAL_COST -
                           ( I_MBEW-ZPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ENDIF.
          ELSEIF I_MBEW-LPLPR NE 0.
            IF AUFM-SHKZG EQ 'H'.
              OUT_REC-CURRENT_MATERIAL_COST =
              OUT_REC-CURRENT_MATERIAL_COST +
                           ( I_MBEW-LPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ELSE.
              OUT_REC-CURRENT_MATERIAL_COST =
              OUT_REC-CURRENT_MATERIAL_COST -
                           ( I_MBEW-LPLPR * AUFM-MENGE / I_MBEW-PEINH ).
            ENDIF.
          ENDIF.
        ENDIF.
      ENDSELECT.
    Get the Future material cost per Unit by deviding the calculated
    Future material cost above with the goods reciept quantity to, then
    multiply the unit cost with the GL quantity to get the Future material
    Cost for the Quantity delivered. (Quantity in the entery from GLPCA
    Table).
      IF NOT AFPO-WEMNG IS INITIAL.
        OUT_REC-PLANNED_MATERIAL_COST =
           OUT_REC-PLANNED_MATERIAL_COST / AFPO-WEMNG * OUT_REC-QUANTITY.
        OUT_REC-CURRENT_MATERIAL_COST =
           OUT_REC-CURRENT_MATERIAL_COST / AFPO-WEMNG * OUT_REC-QUANTITY.
      ENDIF.
    ENDFORM.                               " GET_COSTS
    Form GET_VALUE_FROM_COSP                                             *
    Get the Material cost from COSP table.                               *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_VALUE_FROM_COSP.
      FIELD-SYMBOLS: <FS> TYPE ANY.
      DATA: V_COMPONENT TYPE I.
    Cummulate the posting values of all the 16 period buckets as to get
    total production order cost. This is to handle the aprtial posting of
    prodction order values in diffrent periods.
      V_COMPONENT = 15.
      DO 16 TIMES.
        ADD 1 TO V_COMPONENT.
        ASSIGN COMPONENT V_COMPONENT OF STRUCTURE COSP TO <FS>.
        IF COSP-WRTTP EQ '04' AND COSP-KSTAR EQ P_KSTAR2.
          ADD <FS> TO OUT_REC-MATERIAL_COST_ACT.
        ELSEIF COSP-WRTTP EQ '04'.
          ADD <FS> TO OUT_REC-ADDNL_MATERIAL_COST_ACT.
        ELSEIF COSP-WRTTP EQ '01' AND COSP-KSTAR EQ P_KSTAR2.
          ADD <FS> TO OUT_REC-MATERIAL_COST_PLN.
        ELSEIF COSP-WRTTP EQ '01'.
          ADD <FS> TO OUT_REC-ADDNL_MATERIAL_COST_PLN.
        ENDIF.
      ENDDO.
    ENDFORM.                               " GET_VALUE_FROM_COSP
    Form GET_VALUES_FROM_COSS                                            *
    Get the Labour cost and Labour hours from the COSS table.            *
    There are no interface parameters to be passed to this subroutine.   *
    FORM GET_VALUES_FROM_COSS.
      FIELD-SYMBOLS: <FS1> TYPE ANY,
                     <FS2> TYPE ANY.
      DATA: V_COMPONENT1 TYPE I,
            V_COMPONENT2 TYPE I.
    Cummulate the posting values of all the 16 period buckets as to get
    total production order cost. This is to handle the aprtial posting of
    prodction order values in diffrent periods.
      V_COMPONENT1 = 15.
      V_COMPONENT2 = 111.
      DO 16 TIMES.
        ADD 1 TO: V_COMPONENT1, V_COMPONENT2.
        ASSIGN COMPONENT V_COMPONENT1 OF STRUCTURE COSS TO <FS1>.
        ASSIGN COMPONENT V_COMPONENT2 OF STRUCTURE COSS TO <FS2>.
        IF COSS-WRTTP EQ '04' AND COSS-KSTAR EQ P_KSTAR1.
          ADD <FS1> TO OUT_REC-LABOUR_COST_ACT.
          ADD <FS2> TO OUT_REC-LABOUR_HOURS_ACT.
        ELSEIF COSS-WRTTP EQ '04'.
          ADD <FS1> TO OUT_REC-ADDNL_LABOUR_COST_ACT.
          ADD <FS2> TO OUT_REC-ADDNL_LABOUR_HOURS_ACT.
        ELSEIF COSS-WRTTP EQ '01' AND COSS-KSTAR EQ P_KSTAR1.
          ADD <FS1> TO OUT_REC-LABOUR_COST_PLN.
          ADD <FS2> TO OUT_REC-LABOUR_HOURS_PLN.
        ELSEIF COSS-WRTTP EQ '01'.
          ADD <FS1> TO OUT_REC-ADDNL_LABOUR_COST_PLN.
          ADD <FS2> TO OUT_REC-ADDNL_LABOUR_HOURS_PLN.
        ENDIF.
      ENDDO.
    ENDFORM.                               " GET_VALUES_FROM_COSS

  • Unconfirmed line items of a sales order into account in credit management

    Hi Gurus
    Updated the customer orders via prog. RVKRED09.
    There is only one open order for this customer = 720662. My question is: in the credit master the sales value/credit exposure is USD 77.100,00. The order is for USD 105,900.00 .
    Found out that line item 20 is not confirmed in the schedule lines. So the value in the sales value/credit exposure  equals item 10 and 30. So my 1question is: Where is the setting that  does not take unconfirmed line items of a sales order into account in credit management?
    Thanks in advance
    Regards
    Nalini Iyer

    Hi nalini
    Even though , you create a sales order for that line item , but if that item is not confirmed then the value  wont be considered.  into credit exposure. .
    But once it gets confirmed then the value will be taken into credit exposure..
    Regards
    Srinath

  • Keep Quote line item numbers in Sales order

    While creating a Sales order from Quote, SAP always creates line items with 100,200,300...and so on.
    If quote has 3 line items say 100,110, & 120 and we create a sales order with reference to this quote in VA01. The sales order line items become 100,200 & 300.
    The requirement is for Sales order to also have same line item numbers i.e. 100,110 & 120.
    To retain quote line item numbers in Sales order the ABAP change will be in VOFM or user exit?

    Hi,
    It is not a straight forward thing. Adding data to table XVBAP won't work. It will create inconsistency. There are so many other tables involve here too, like, VBPA, VBUP, VBKD, KONV. There can be other tables too based on how your sales order is configured.
    Also, modifying these tables (XTAB, YTAB ) in this user-exit may cause database inconsistency.
    Regards,
    RS