Can anyone advise as to APPROXIMATELY how long it should take to move from 10.7 SC (16.1) to Release 11i?

Is there a documentation/manual available for upgrading from 10.7SC to Release 11?
<BLOCKQUOTE><font size="1" face="Verdana, Arial">quote:</font><HR>Originally posted by Mark Smith ([email protected]):
When you upgrade, the things that take the real time are the other things around the Apps. For instance, R11/11i means that you need to use either Internet Explorer 4/5 or Netscape Navigator, or use the Applet Viewer that comes with R11. This means that your users need to be on Windows 95/98/2000/NT, and not on 3.11. Hence, you will need to upgrade your desktops and then check that the other applications that you use are all upgraded to 32 bit. When you have done this, look at the server sizing and processing power to check that it can handle R11. You will no doubt be aware that most of the processing is now moved on to the concurrent server and database server and away from the desktop. This may mean that you need extra processing power. You may want to add disk too whilst doing the server upgrade. Next, check the operating system for the server - it may need to be upgraded. Finally, look at upgrading the Apps ! This is really not that complicated. You can complete the upgrade of the system in as little as 2 days, depending on what you are running, although you will obviously need to upgrade your test environment first and then go through User Acceptance Testing to check that all features are still working. With your modules, you should get users to write a Test Plan and Test Script for each module and to then action this plan against the various functionality, recording results as they go. If you want to consider a rough ballpark figure for the whole thing, you should look towards a 2 month duration. Hope this helps !<HR></BLOCKQUOTE>
null

Similar Messages

  • Upgrading from 10.7SC to 11i

    Has anyone considered upgrading on a plant-by-plant basis or a module-by-module basis? We have 15+ plants implemented on the same instances. Our senior executives are looking for ways to mitigate the risks of upgrading in a "big bang" appraoch.

    I do not have an answer for you, but wanted to let you know we are in a similar situation. We are looking at consolidating our database instances (domestic and international) and would like to minimize our risk on the 11i deployment. Feel free to contact me and we could compare projects.

  • Upgrade 10.7SC to 11i

    We are looking to upgrade from 10.7 SC to 11i. Our current configuration is single node. We wish to go to a two node configuration as part of the upgrade. Is there a way to do that as part of the upgrade or do we perform the upgrade and then split the nodes out?
    Thank You,
    John

    You carry it out as part of the upgrade.
    When you get to run the RapidWiz for the first time, page 2-2 in document A92167-01.

  • MS Project plan for the upgrade of 10.7 SC to 11i

    Can some kind person supply me with a MS Project plan for the
    upgrade of 10.7SC to 11i. Our applications are GL/AP/FA/Project
    Acc. Any other doco would be most helpful.
    Thank you
    [email protected]

    We have completed our first upgrade of FA from 10.7 SC to 11i. Most issues arose from the introduction of WorkFlow for Account Generator. In addition we have had difficulty activating the "security by book" new feature. This is still under investigation. We upgraded PO, AP, FA and GL. I can say that more than half of our time has been spent resolving FA issues.
    The length of time the task will take will depend on which functionality you use. Have you seen the upgrade kit on metalink? it has all the upgrade steps. From that you could determine how many steps you need to perform.
    Hope this helps.
    null

  • 11i Upgrade - Projects Pre-Upgrade steps

    We are upgrading from 10.7SC to 11i (11.5.2) and in running several of the Category 2 pre-upgrade steps, we have found that only really old projects show up as exceptions that should be "fixed" prior to the upgrade.
    These projects are now closed and the revenue/invoices etc. are for prior fiscal years. We will probably get accounting errors (from flexfield/acct combinations that have been disabled) if we try to process the old transactions. We are also not sure that we want to write revenue events or create changes for fiscal years already closed.
    Has anyone else seen this? How did you handle it -- did you reopen projects, re-enable accounts and process the exceptions noted by the scripts? Will upgrade FAIL because of the presence of these exceptions?
    Any input you can provide would be helpful.
    Thanks in advance,
    Maria
    null

    Hi,
    In your above output it will be
    The Most Recent Release Patchsets on Metalink(Not Included Above) are:
    =======================================================================================
    ad        R12.AD.A.6          7305220 08/11/05 11:14:22 Checkin Released     By_Metalink                               
    ad        R12.AD.B.2          8502056 09/12/16 06:44:40 Checkin Released     By_Metalink                               
    ad        R12.AD.B.3          9239089 10/07/07 14:22:15 Checkin Released     By_Metalink                               
    cdr       R12.CDR.A          10161040 11/05/11 08:39:23 Checkin Released     By_Metalink                               
    cla       R12.CLA.B           8506229 09/06/30 23:13:11 Checkin Released     By_Metalink                               
    Thanks

  • 11i Upgrade Plan

    We are upgrading our applications 10.7SC to 11i. Can anyone supply a upgrade project plan that we can use as a sample.

    Is there any such plan/template available which we can use to gain knowledge on R12 upgrade strategies and planning?I do not think such template exists in any of the links available for public access.
    You might google and see if any docs/links are available -- For example, this link http://www.claremont.co.uk/cmsfiles/claremont/docs/whitepapers/WP_PrototypeCRP.pdf
    Thanks,
    Hussein

  • Conversion project

    We have decided to abandon an upgrade from 10.7SC to 11i in favor of a re-install of 11i. This is t allow the reconfiguration of certain modules in support of new requirements and adjustments being made in the business.
    We have identified 37 discrete conversion types in the following modules: Purchasing/Receiving, Quality, Projects, Order Entry, General Ledger, Accounts Payable, Accounts Receivable, Fixed Assets and Cash Management.
    How realistic is it to expect one devloper to accomplish this task in 3 months.
    Thanks
    Ayokunle Giwa

    Hi Jai,
    There is nothing like conversion from BPS to BPC. Both are different tools but used for the same functionality. You have to rebuild the whole configuration in BPC.
    Thanks
    Anjali

  • Headstart for release 11i financials

    I believe there was a version of headstart for generating custom forms for release 10.7sc oracle financials.
    will there be a version that will generate for release11i/designer6i

    Yes, Headstart for release 11i is currently under development. We hope to have this release available later this year.
    Regards,
    Lauri

  • Payroll Performance Improvement from 10.7 to 11i

    My Customer is currently using Oracle Payroll 10.7SC. They are facing a big problem in tuning the performance due to their setup.
    Now they are planning to upgrade to Oracle 11i Payroll. They would like to know if there is any whitepaper/document that talk about any architecture, design or functions in the latest Payroll 11i that can improve the Payroll Run performance in order to justify the upgrade.
    I would appreciate your help. Please kindly feedback directly to [email protected]
    Many thanks.

    Migrating through 11.0 to get to 11i is not a requirement. We have gone from 10.7ICA to 11.5.1 (11i) with over 1200 custom objects, including interfaces, reports, etc.
    11i does have a number of "undocumented features" but there are fewer and fewer as companies like us do Oracle's beta testing no their behalf!! At the moment, the patch levels for 11.5.1 make it a 'resonably' stable product.

  • 11i migration

    Hello all,
    FOr those you are already on 11i can you please provide some help here.
    We are planning to migrate AR to 11i(11.5.7) from 10.7SC on Windows 2000 server.
    Database is sun solaries 8.1.7 version.
    If you have already started or completed can you please provide me with any doc or procedures/steps to follow to do this whole migration.
    I have been going thru metalink, OTN,Oracle web sites too and reading lots of doc but I was wodering for those who already did.
    Please let me know asap
    thanks
    saritha

    Hi Atul,
    I just ran it again. Same thing - got stuck. Here is the last few lines in the log file
    Attempting to connect to database using :
    jdbc:oracle:thin:@oldhost.olddomain.com:1521:PROD,APPS,passwd
    DbSid :PROD
    DbHost :oldhost
    DomainName:olddomain.com
    DbPort :1521
    ADX Database Utility
    getConnection() -->
    sDbHost : oldhost
    sDbDomain : olddomain.com
    sDbPort : 1521
    sDbSid : PROD
    sDbUser : APPS
    Trying to connect using SID...
    getConnectionUsingSID() -->
    JDBC URL: jdbc:oracle:thin:@oldhost.olddomain.com:1521:PROD
    When I saw the log file the first time, it seemed to me that it was trying to make a db connection to the old host to retrieve info to create the new context file.
    It will stay there for a long time before timed out.
    Thanks

  • 11i to r12 Conversion - help needed

    Hi
    My client is doing re-implementation of r12 and migrating from 11i to r12. I need help particularly on conversions side. The client is a SaaS company. they are considering to bring open and history transactions and applied/unapplied receipts to r12 AR.
    - how to migrate revenue scheduled open/closed invoices from 11i to r12 since rev schedules for a SaaS company is expected to be long terms. and how to make sure that rev schedules are correct upon migration to r12??
    - for partially paid invoices how to make sure that the same partially paid amount reflects in r12 upon conversion? can a negative line amount equalling to paid amount be a possible solution??
    - upon migration do the closed invoices have to be converted as open and receipts re-applied after migration in r12 or they can be brought in as-is with status closed?
    - if customer paid for an invoice using a credit card in 11i and upon migration it came to notice that the credit card is no longer used by the customer so how to re-apply the same receipt in r12 which was applied in 11i using that credit card. do we have to enable it in r12 just for closing the invoice? what could be possibilities?
    please anyone if can answer would be very helpful
    Thanks
    -MS

    It depends on the dpi. Usually 72dpi = 72 pixels per inch.
    1000/72 = 13,88888 inch
    1 inch = 25,4 mm
    13,88888 * 25,4 = 352,7777 mm
    You do the arithmatic with a calculator.
    To do the same with pictures, you can do it in any image editor. Even Preview.app :
    !http://www.wyodor.net/_Discussions/PreviewResize.png!

  • Error while accessing Oracle E-Business Suite 11i from Linux/firefox

    error while accessing Oracle E-Business Suite 11i from Linux/firefox
    OS: SUSE Linux Desktop 11(SLED11)
    Web browser: firefox 3.x
    Java versions:
    # rpm -qa |grep java
    java-1_6_0-sun-plugin-1.6.0.u18-0.1.1
    java-1_6_0-sun-1.6.0.u18-0.1.1
    # java -version
    java version "1.6.0_18"
    Java(TM) SE Runtime Environment (build 1.6.0_18-b07)
    Java HotSpot(TM) Server VM (build 16.0-b13, mixed mode)
    when I access the url firefox says
    "Additional plugins are required to display all the media on this page"
    then I clicked on "Install Missing Plugin" button
    then I got the following message
    No Suitable Plugins were found
    Unknown Plugin (application/x-java-applet;jpi-version=1.4.1)
    please help/suggest
    Regards

    Hi user;
    Its not certified to login EBS from linux client
    Please check:
    Linux-cleint (ebs) certification
    pluggins
    Hope it helps
    Regard
    Helios

  • Install ORACLE 8.1.6 and 9i on HP UNIX 11.20 (11i)

    Hi,
    When I install ORACLE 8.1.6 and/or 9i on HP UNIX 11i (11.20, hardware: i2000 workstation), I got the following error message:
    Exception thrown from action: make
    Exception Name: MakefileException
    Exception String: Error in invoking target nnfgt.o of makefile
    /opt/oracle/product/8.1.6/network/lib/ins_net_client.mk
    Exception Severity: 1
    Would appreciate very much if someone can help to analyse the cause of the problem.
    Thanks.

    Hi,
    When I install ORACLE 8.1.6 and/or 9i on HP UNIX 11i (11.20, hardware: i2000 workstation), I got the following error message:
    Exception thrown from action: make
    Exception Name: MakefileException
    Exception String: Error in invoking target nnfgt.o of makefile
    /opt/oracle/product/8.1.6/network/lib/ins_net_client.mk
    Exception Severity: 1
    Would appreciate very much if someone can help to analyse the cause of the problem.
    Thanks.

  • What is the Diffrence between Oracle 11 and 11i

    What is the Diffrence between Oracle 11 and Oracle11i ?.
    With Rgds
    Arun J.Isaac

    Oracle 11i is internet based and run with java platform where we can see the applets downloading alongwith oracle forms and it refreshes all the jar files in oracle default directory.
    Oracle 11 is not intergrated with Java its an Oracle standalone platform.
    Regards,
    Arumugam S.

  • What is the difference between 11i for LInux (VS) 11i for Windows

    Hi,
    I have downloaded 11i E-Business suit for Windows and
    Installed it successfuly.
    I am having problem with windows plateform regarding listner, connection manager, service host, rpc all these stopping/terminating by itself and system rebooting.
    I would like to install 11i on Linux.
    Q1. Which files I need to download again?
    Q2. Is there any script I need to run for LInux?
    I have run adautostg.pl and it hasnot given me any error for start cd but when it came to appl_top it said as "This is for windows, continue any way" and I said yes. so it made stage.
    I can't run setup as user Oracle as it is not allowed to write on disk, can u also give me suggestion about that?
    I am installing 11i on single node.
    Q3. I can use the same files of windows for linux as
    I saw some .sh shell commands and
    startcd/rapidwiz/adautostg.pl is also used in
    unix/linux.
    Warm Regards,
    Rashid.

    I have run installation of 11i for windows on Linux plateform and now I would like to share it with u all.
    1. I run adautostg.pl by using command $perl adautostg.pl and it has staged all the startcd disks without any error.
    2. when it came to other cdies it has prompted me as "this file if for windows; continue any way" and I pressed ok and it has staged all the files without any furthur error.
    3. After it, I have made the necessary adjustments to run rapidwiz command and it run successfully. Now it has copied all the 113 files successfuly.It has run adrun9i.sh and is giving me error on process 5. (at 20% of installation) that it cannot run files
    adcctclean.sql INSTE8
    adclobconv.sql INSTE8
    adclobtmp.sql INSTE8
    adcmclean.sql INSTE8
    adcrdb.sh INSTE8
    adcrdbrdlg.sh INSTE8
    adcrobj.sh INSTE8_APPLY
    adcrobj.sql INSTE8
    addbccnv.sql INSTE8
    addbprf.sh INSTE8
    addbprf.sql INSTE8
    addbupdgsm.sql INSTE8
    adlicnse.sql INSTE8
    adsvdb.sh INSTE8
    adsvdcnv.sh INSTE8
    adsvdlsn.sh INSTE8
    adupdlib.sql INSTE8
    afdbprf.sh INSTE8_PRF
    afdbprf.sql INSTE8
    afmkinit.sh INSTE8_SETUP
    Directory: /mnt/hda7/proddb/9.2.0/appsutil/install
    adlnkoh.sh INSTE8
    Directory: /mnt/hda7/proddb/9.2.0/appsutil/scripts/PROD_localhost
    adautocfg.sh INSTE8
    adchknls.pl INSTE8_SETUP
    addbctl.sh INSTE8
    addlnctl.sh INSTE8
    adpreclone.pl INSTE8
    adstopdb.sql INSTE8
    adstrtdb.sql INSTE8
    config.c INSTE8
    successfuly. I think these files are required for linux installation and are found in linux cdies "RDBMS".
    If someone can send me these 11i files for linux at [email protected] I will proceed furthur and will let u know what will happend next in experiment :)

Maybe you are looking for

  • How to make direct selection handles visible against pasteboard?

    When I go to transform/resize images inside frames using the direct selection tool, I can't see the handles of the actual image because they are white against a white pasteboard.  I am using InDesign CS5 (ver 7.0.4) on a Mac. I have been using InDesi

  • Does Photo Stream support GIFs?

    I'm trying to add a GIF image to my photo stream by putting it in the Uploads folder on my PC, but it won't come up on my iPod Touch. Does photo stream even support GIFs, and if so, any guesses to why it might not be working? It has worked with JPGs

  • When will Adobe Flash Builder 4.6 support iOS 5.1 and the retina display?

    I have installed Adobe Flash Builder 4.6 along with the Adobe AIR 3.3 SDK and am understanding that there isn't support for iOS 5.1 nor the Retina display devices, is this correct?  If so, when will this be available?  If not, what is a good workarou

  • How do I unlock Sim card/phone?

    Just set phone with sim card pin. First time to use and it won't recognize. HELP!

  • Prevent Item Deletion From an Approved SC